No
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 29 30 31 32 33 34 35 1 2 3 4 5 6 7 8 9 10 11 12 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45

18th Floor, De-Snag list

Date : 31/01/2014

Snag list
AHU,FCU,FIRE DAMPER,AIR PRESSURERIZATION SYSTEM,LIFT PRESSURE RIZATION SYSTEM, PA SYSTEM,CCTV, ELEVATOR operation testing Balance. During the snag visit water not available so all the Toilet w/c ,Hand Fauset,Urinal sensor Test balance Power redundancy not provided on floor. Main SMDB energy Meter not given. All FCU supply given from single source MCB. Separate PDB not provided in electrical room for Power Sockets LDB not provided for toilets Power sockets not provided in toilet for hand dryer. 6A Power socket provided in Common area & utility area. 6/16A Power Sockets not provided in Passenger Lift lobby. Signage and wall stand not provided for Fire Extinguishers in Electrical room. AHU supply duct and return duct installation balance, hence AHU room not offered for snag Lift lobby, Stair case and Lift Well - Air pressurization fan testing balance. Air Grill not provided on wash room - wooden door. (HRW function will not work properly) Fiber clothing not provided on insulation of chilled water line and drain line for FCU. All 3 no's Hydrant station in common area - Hose real drum movement not free from door. In Office area - hose reel water line support and Pressure gauge not Provided. Hand dryer, Paper holder and Soap dispenser are not installed in toilets. Air Ventilation not provided in Janitor rooms. Air Balancing for Toilet exhaust - pending. Toilet waste water Drain Trap below W/C therefore Cleaning and Maintenance not Possible. Flooring slop checking balance in washroom as water not available. Cleaning required for all floorings. All Fire shaft Key glass broken and Key not Provided. All shaft Tag and SLD not Provided Honey well system Trial Balance FCU operation Trial Balance. Fire sillet fill up pending in Electrical room and telephone room. During the snag LCP panel not working Toilet light switch Emergency and Normal power tag markin balance. Neaten clean required the arround the fixture and fixture. Insulated Steep Guard not Fitted in SMDB. 185 sqmm cable insulation damaged. Fire extinguser renewal date expire. ELECTRICAL ROOM Door closer not provided. Door dropdown seal and Floor Stopper not installed. Tap up box earthing not done. Electrical wiring pipe found PVC conduit in place of GI pipe. Bus-duct and Panel boards cleaning not done - Paint marks not cleaned. Ceiling Junction Box cover not fixed. LV Cables hanging on LV cable tray. Wall bracket not given for fire Extinguishers. Cable laying not properly and armored damage. DDC Panel found rusted. cable hanging in DDC panel and MCB missing. Access panel hanging For Office area 2/3/4 CT install in Main SMDB but Ampere meter or Energy Meter not installed "ELECTRICAL ROOM" - Signage not given on door. SERVICE LIFT LOBBY At wall Paint Cleaning required. handicap Toilet door Frame gap filling required. Polishing pending for wooden door frame inside Polishing balance LIFT LOBBY Fire shaft -1- Pressure gauge not fitted properly. Key Missing in fire shaft and glass broken. some places Ceiling cracked found. lift outside first mirror broken in Group B. TOILET-OFFICE AREA -1 Door Frame finishing required Both toilet. Door gap filling required. w/c-1 - Back side fill up required in ladied toilet. Chilled water shaft room duct insulation Missing at some places at FCU chw line. Janitor room Bib coke not installed. Door inside frame finishing required at Janitor room door. Shaft room install Electronics fitting in Place of T5 fittings. Fresh air shaft Insulation found Damage PHE shaft Bracket not painted. color finishing required at store room TOILET-OFFICE AREA -2 Door Frame finishing required Both toilet. wall allignment not properly in ladies toilet. Wash basin mixer foundly bypass Door gap filling required. w/c-1 - Back side fill up required in ladied toilet. Chilled water shaft room duct insulation Missing at some places at FCU chw line. Shaft room install Electronics fitting in Place of T5 fittings. Fresh air shaft Insulation found Damage PHE shaft Bracket not painted. color finishing required at store room Janitor room - tiles cracked near Tubelight. Janitor room- Door frame found cracked. Passage area Paint touch up required

Status

Remark

1 of 1

You might also like