Wind Energy Project

AE & the Team The Site


The Wind Assessment

Financial and Fiscal Incentives Project Cost Revenues Use of Funds

The Project: 50MW to Start


1,000 MW wind farm in one of the worlds fastest growing economies - Pakistan Build, Own, and Operate (BOO) wind farm in Gharo, Pakistan. 1,000 MW, to be developed in phases of 10 - 50 MW. Land has been specifically assigned. 4 years wind data collected and analyzed: optimal wind speed for commercial wind power development in the area. Full Pass-through tariff approved. Approved tariffs through 2012 over US 14.2 cents /kwh levelized. 10 year tax holiday on all revenue and no excise duty on imports relating to the project. 20 years PPA backed by the sovereign guarantee of the Government of Pakistan and available full OPIC guarantee. The PPA will impose an effective take-or-pay obligation on the purchaser. All revenue projections are based upon minimum production guaranteed by wind turbine manufacturer. Pakistan is a signatory country of the Kyoto Agreement; therefore the project would qualify for Carbon Credits under the Clean Development Mechanism.

Pakistan -- a New Frontier Country


Population: approx. 167 million.

Rapidly growing -- GDP of more than $500 billion.


Rapidly growing economy while power availability remains of strategic importance. Approx. 50% of world population resides within 2000 mile radius Main corridor for supplies to Central Asian Republics and Western China
(Source: CIA World Factbook) (Source: Pakistan Private Investment Board) (Source: Karachi Stock Exchange)

World Bank Ranks Pakistan Higher than China and India


- CEO, US/Pakistani dual national with strong political and personal relationships. Over 30 Years experience in Business - Project Manager, US/Pakistani dual national with 30 years international and Pakistani experience in Power Generation Projects - Country Manager, experience in procurement and strong connection with government officers - Technical Advisor, exWAPDA Executive

Pakistan Ranked higher than China or India!

Keys Components for a Successful Wind Farm Project


Key Components Development Cost Permitting and Licensing Regulations Land Use Regulation Construction Regulations Environmental and Other Regulations Equipment Construction PPA Tariff 1 Window Operation AEDB 1 Window Operation AEDB 1 Window Operation AEDB 1 Window Operation AEDB 1 Window Operation AEDB Not Applicable $ 100/month per technician 20 Years PPA Pass-through Latest approved between 12-14 c/kwh Political Risk Insurance and strong contractual guarantees backup by international agency Off Taker assumes all wind risk Several Local, State and Federal/Union Several Local, State and Federal/Union Several Local and federal/Union Zoning and permitting Several Local and Federal/Union Building Permits, storm-water Several Local Mini-NEPs,and Federal/Union FAA Not Applicable $ 6000/month per technician Market Pricing or very Short term PPAs Average of 6-8 c/kwh Pakistan North America and Europe

Contractual Guarantees

No Government or multilateral guarantees on the contracts

Wind Resources

Not Applicable

AEs Competitive Advantages in Wind Power in PK


Very Rapid Growth of the Wind Industry
Big players are concentrated on the main geographic markets. Pakistan is an Untapped Niche.

Wind Energy = New Industry in Pakistan

Few players in the industry. Market leaders are engaged in their traditional markets. Pakistan is an Untapped Niche.

Pakistan = Large Expansion Potential

17,000 MW of planned capacity by the year 2020. Flexible regulatory framework.

An opportunity to HELP a community, BUILD the Industry, and DOMINATE the Market!

Pakistan is an Untapped Niche.

Strong StrongTechnical/Management Management Team Team Effective Project Manager Experienced Legal Advisory Team Diversified and Qualified Board of Directors

The Team

Reputable EPC and Turbines Suppliers and Contractors

Strong Key Consultants


Top-level Scientific Advisory Board
CEO: Over 25 years of experience in New Business Development, Renewable Energy, Manufacturing, Debt & International Financing, International Negotiations, Executive Management, and Consulting in both Public and Private sectors. Country Manager: Served in the Pakistan Army for over 30 years, holding high honors and retiring from the Director General position for Information Systems. He then served as an advisor and consultant on Pakistan power and communication projects and as Vice President for Shahzad Internationals Information Technology, Telecom and Power Division. Over 30 years of experience in Electrical Engineering, Chief Technical Officer: Over 30 years of experience in Planning and Design, including procurement, contract and construction management of hydro & thermal power plants, distribution and transmission systems; steel and cement projects in WAPDA, General Electricity Company of Libya, Pakistan Steel Mills, Javedan Cement, NESPAK, etc. in collaboration with engineers from the United States, United Kingdom, Soviet Union, and India. CPA: U.S. and International accounting expertise.

Strong Technical Management Team Effective Project Manager Experienced Legal Advisory Team Diversified and Qualified Board of Directors

The Team

Reputable EPC and Turbines Suppliers and Contractors

Strong Key Consultants


Top-level Scientific Advisory Board
Over 25 years of experience in Engineering, Operations Management, and Project Development on the Energy and Power Generation sector. He has been Vice President of Energy, Engineering, and Technical Development for an industrial development group in the US Virgin Islands, Vice President of Project Development for Energy Answers International, LLC., CEO of Liberty Power Ltd., Pakistan, and Chief Engineer at Ogden Services, Inc. He has been responsible for the implementation of a $300 million Independent Power Plant while utilizing international financing and employing a multi-national team. He was also responsible for a 2,200 TPD Waste-to-Energy, 72-Megawatt Stream Cogeneration facility, and also a 3,000 TPD Waste-to-Energy, 80-Megawatt electricity facility.

He has authored a significant number of technical articles and has several professional associations: American Society of Mechanical Engineers (ASME), Board Certified Environmental Engineer in the American Academy of Environmental Engineers (BCEE), Diplomat American Academy of Environmental Engineers (DEE), Registered Professional Engineer (PE), and Registered Environmental Manager (REM).

Strong Technical/Management Team Effective Project Manager Experienced Experienced Legal Legal Advisory Advisory Team Team Diversified and Qualified Board of Directors

The Team

Reputable EPC and Turbines Suppliers and Contractors

Strong Key Consultants


Top-level Scientific Advisory Board

Pillsbury Winthrop Shaw Pittman LLP. - Vast experience in International Infrastructure and Energy Projects. - PPA Negotiations. - International Contracts and Law Specialization. Kundi & Kundi (PK): - Local and International Contracts. - Strong relationship with the Government. - Successful experience in PPA and IPP Negotiations.

Strong Technical/Management Team Effective Project Manager Experienced Legal Advisory Team Diversified Diversifiedand andQualified QualifiedBoard Boardof ofDirectors Directors

The Team

Reputable EPC and Turbines Suppliers and Contractors

Strong Key Consultants


Top-level Scientific Advisory Board Air Marshal Shahid Hamid Ex-Vice President of the World Wind Energy Association, Chairman of Pakistan Wind Energy Association, Ex Chairman of 'Kamra Aeronautical Complex and Alternative Energy Development Board, and one of the pioneers and early supporters of the Wind Industry in Pakistan. Adriano Marconetto Strong track record in dealing with company IPOs. 15 years of experience as an Entrepreneur, and in advancing company IPOs. Co-founder of two successful renewable energy start-ups -- Pianeta and Electro Power Systems. Founded Vitaminic SpA, the leading European online music company, and listed the company on Nuovo Mercato in 2000. Shahid Naeem Over 35 years of experience in New Business Development, Renewable Energy, Finance, Executive Management, and Consulting in the Public and Private sectors.

Strong Technical/Management Team Effective Project Manager Experienced Legal Advisory Team Diversified and Qualified Board of Directors

The Team

Reputable ReputableEPC, EPC Turbines and Turbines Suppliers and Contractors Suppliers and Contractors

Strong Key Consultants


Top-level Scientific Advisory Board

GE Nordic Siemens FEW International SpeedWays BBB

Strong Technical/Management Team Effective Project Manager Experienced Legal Advisory Team Diversified and Qualified Board of Directors

The Team

Reputable EPC and Turbines Suppliers and Contractors

Strong Key Consultants


Top-level Scientific Advisory Board

Garrard Hassan BBB API Ecosecurity Alliant Energy Marsh USA First Wall Street Strategic Wealth

Strong Technical/Management Team Effective Project Manager Experienced Legal Advisory Team Diversified and Qualified Board of Directors

The Team

Reputable EPC and Turbines Suppliers and Contractors

Strong Key Consultants


Top-level Top-levelScientific ScientificAdvisory AdvisoryBoard Board to

Prof. Mark Z. Jacobsen: Stanford University - Civil Engineering, Economics, Environmental Engineering, Atmospheric Sciences.
Dr. Christina Lozej Archer: Stanford University - Civil & Environmental Engineering, Meteorology, Environmental Fluid Mechanics and Hydrology.

The Wind Assessment


Data collected throughout the years of 2003 - 2006 at the project site, the Meteorological Department, and Karachi International Airport.

Wind Corridor with 40,00050,000 MW Potential

Average Wind Speeds


Average wind speed at 50 m: 7.09 m/s, but can reach up to 11.28 m/s. Winds unobstructed from the predominant wind direction. No chance of future construction that would obstruct the winds path to the Wind Farm.

Average Wind Speed in Gharo at 50m


12

Average Speed (m/s)

Peak wind period coincides with summers 10 high-electricity demand


8 6 4 2 0
Average M onthly Speed Yearly Average Speed

Jan 4.85 7.09

Feb 5.41 7.09

M arc 5.37 7.09

April 7.82 7.09

M ay 10.53 7.09

June 8.89 7.09

July 11.28 7.09

Aug 7.87 7.09

Sept 8.73 7.09

Oct 5.19 7.09

Nov 4.33 7.09

Dec 4.82 7.09

Months

Financial Incentives
Non-residents are allowed to purchase securities issued by Pakistani companies All future cost increases are pass through Sovereign Guarantee for payment

OPIC guarantee for Political and or security risk

Fiscal Incentives

0% duty on imports of Renewable Energy plant supplies and equipment.


No levy of sales tax on RE plant, machinery, and equipment. Exemption from income tax including turnover rate tax and withholding tax.

Full Repatriation of equity and dividends is allowed.


10 year tax holiday.

Performa Income Statement

Revenues First 50 MW
(first 10 years)

FIGURES FOR 50 MW

Income Statement (000s)

10

Total Revenue Gross Profit

32,308 31,629

32,308 31,629

32,308 31,629

32,308 31,629

32,308 31,629

32,308 31,629

32,308 31,629

32,308 31,629

32,308 31,629

32,308 31,629

EBITDA

29,118

29,118

29,118

29,118

29,118

29,118

30,731

30,731

30,731

30,731

Proposed Investment
AE is seeking US $ 3 million short term investment from accredited investors for a maximum period of two years at 15% preferred return convertible to equity in the project at a preferred rate.

Use of Funds
EPC Payment $ Land Lease Administrative Generation License OPIC Legal Fees For PPA and IA Travel Total 650,000 475,000 350,000 175,000 150,000 1,050,000 150,000 $ 3,000,000

Ideal Wind and Site Conditions Minimum Regulatory Control Strong Political Will Experienced Technical Partners and Team Full Insurance Coverage for Political and or Security Risk 20 Years Power Purchase Agreement Makes it One of the Best Wind Projects in the World!