BRIDGETONE TVS INDIA PVT LTD

ANNUAL TRAINING PLAN Vs ACHIEVEMENT


Duration Faculty No. Of Facilities Departmens Persons
CAT

YEAR

Prepared by

Verified by

Approved by

04

05

06

07

08

Month 09 10

11

12

01

02

03

Planed S.No. Topic

Operator Leval

Middle Management

Higher Management

Achieved

Reschedule

Date

Reason for Delay

Next Date

Signature

Signature

Check sheet for confirmation procedure after the training


New Joining Supporter Workshop Change Return to same workshop after long time on rotion Check Item Observe Confinusly after the training New Joining Supporter Workshop Change Return to same workshop/station after a long tim on rotation (more than 1 monthP 1 Operator follows the standard procedure Operator undarstands the critical point 2 and adhere to the rule 3 The quality of the product is good 4 Operator has no problem doing 5 Need for re training 6 Signature of supervisor (confirmation) (Remark) Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Operation Name : Supervisor Name:

Created by

Checked by Approved By

Confirmation period
30 min 60 min 4hours end of day 1 day 2 day 3 week 1 week 2 month

Yes/No

Yes/No

Yes/No

DAILY WORK MANAGEMENT CHECK SHEET ( For Managers & Supervisors) Name of The Person S.No. A 1 2 3 4 5 6 7 8 9 10 B 1 Name of Activity Routine activities Morning Meeting Attendance Checking dress (Cap Helment, Shoe etc.) Material Storage Checking Safety Devices Audit of operator Review meeting with management Mr. Frequency Daily Daily Daily Daily Weekly Weekly Monthly Designation

Month May-09 Line Supervisor

Prepared by Santosh Kumar Department Assesment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Activities to be done in I/C period Instruction to operators about special check item/method handling/storage/Identificatio

2 3 4 5 6 C 1 Avialability of Material/Equip/instrument etc. Close Monitoring of WIP

Training / any other assignment given by management Training Programme

Signature of Supervisor / Manager Signature of In-charge Remarks (Problem point & their deposition)

Daily Weely

DAILY WORK MANAGEMENT CHECK SHEET ( For Managers & Executives) Name of The Person S.No. A 1 2 3 4 5 6 7 8 9 10 B Activities to be done in I/C period Instruction to operators about special check item/method handling/storage/Identificatio Santosh Kumar Designation

Month November Executive

Prepared by Santosh Kumar Department HR

Name of Activity Routine activities 5S & New Manpower Recruitment Attendance Updation Checking Dress (Cap Helment, Shoe etc.)

Frequency

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Daily Daily Daily Daily Weekly Weekly Monthly

2 Avialability of Material/Equip/instrument etc. 3 Close Monitoring of WIP 4

C Training / any other assignment given by management 1 Training Programme

Signature of Supervisor / Manager Signature of In-charge Remarks (Problem point & their deposition)