6.1.

1 Phase - I

S.No. Description Litres / Day


01 Water requirement @ 115 Lit / day & 5 persons / unit for 676200
1176 units (21 towers)
02 Water requirement @ 115 Lit / day & 5 persons / plot for 40250
70 plots
03 Club house (@15Lit/day for population 300) 4500
Total 720950

6.1.2 Phase – II (Future)

S.No. Description Litres / Day


01 Water requirement @ 115 Lit / day & 5 persons / unit for 1642200
2856 units (51 towers)
02 Water requirement @ 115 Lit / day & 5 persons / plot for 29900
52 plots
03 Club house (@15Lit/day for population 300) 4500
Total 1676600

6.1.3 Summary of water requirement


S. Description Domestic Flushing Total %age Collection
N. water water Water Flow at STP
Req. Req. Req. to (LPD)
(70LPD) (45LPD) (LPD) Sewer
01 Phase - I 439100 281850 720950 80 576760

02 Phase -II 1020800 655800 1676600 80 1341280


Sub total 1459900 2397550
03 UFW@15% 218985
Total 1678885
OHT (1/3rd 559630
of sub total)
Net water 1119255
Req. (at
UGT)
Say 1150 KL
6.1.4 The waste generated in phase-I and phase-II is directed to STP-1 and STP-2 respectively.
It is anticipated that water generation after recycling shall be to the tune of 80% of total
sewage generation.

Net Recycled water generation


Phase – I : 6,00,000 LPD
Phase – II : 13,50,000 LPD
SLUICE GATES

1. Design requirement

a) Sluice gates shall conform to IS:13349


b) Sluice gates shall be designed for specified seating and unseating pressure. Spindle shall be rising spindle.

2. Features of construction:-

a) The frame of gate shall be of flange back type, to be mounted on puddle pipe flange, provided dimensions
and hole drilling on the flange of gates are specifically provided to match pipe flange.

b) The gates shall be provided with electric actulator synchorpack type with starter, suitable for PLC based
automation application. Actuator should be of Rotork/Auma/Emotork male. Actuator should be weather
proof and suitable for outdoor installation.

3. Material of construction:

Wall thimble : CI to IS:210, Gr.Fg.200


Frame guide and side : CI to IS:210, Gr. Fg.200
Seating faces : LTB2 as per IS:318
Wedge blocks : LTB2 as per IS:318
Stem : SS AISI:410/431
Thrust Nut : LTB2 as per IS:318
Fasteners : C.S. Electrogalvanised

SHOP TESTING WITNESSED:

All the sluice gates shall be tested as follows:-

Seat clearance check:

Before final assembly, seating and wedging surfaces shall be cleaned through of all foreign materials and final
adjustment made. With the gate fully closed the clearance between seating faces shall be checked with 0.1
mm. thickness gauge. If the thickness gauge can be inserted between seating faces, then wedging devices must
be readjusted for the gate slide or gate frame or both re-machined until insertion is no longer position. In the
event of remaching, clearance shall be checked again as stated above.

Movement Test

After completion of assembly each sluice gate shall be shop operated three times from the fully open to the
fully closed position and return to the fully open under no flow condition to demonstrate that the assembly is
workable. The torque required on each sluice gate shall also be ascertained.

Hydrostatic and leakage test

1) With the sluice gate in the closed position the unseating pressure stated shall be applied from the unseating
side for a period of 5 minutes and leakage shall not exceed the maximum leakage permissible as per
IS:13349.

2) Finally a differential of one and half times the seating pressure stated shall be applied to unseating side of
the sluice gate. Under this test there shall be no leakage through the metal nor shall any part be
permanently deformed.

Size of gates - 1200x1200 mm


Qty - 1 No.
Seating head - 4.5 m
Unseating head - 1.5 m
Storm water pump

Vertical pump with mix flow or axial flow impeller capable to handle flood water complete in all respect with
suction bell mouth, column and shaft assembly, discharge head, motor floor plate, thrust bearing to take thrust
bearing to take thrust load of the pup. Pump to be driven by vertical solid shaft motor, operating on 415 volt, 3
phase, 50C/s column and shaft assembly will be self water lubricated. Discharge head of the pump will be
above the floor level.

Material of construction

Casting - 1.5% to 2% NICI


Impeller - SS CF8
Shaft - SS AISI:316
Column pipe - MS: 2026, minimum thickness 10 mm
Pump capacity - 1500M3/H
Head - 10 mtr.
……. - 80% without – xe tolerance
Motor rating - 15% over duty pointed out 10% over entire range.

Characteristic curve of pump and motor to be submitted by supplier.

Motor

Vertical solid shaft…………., electric motor in TEFC enclosure “F” class insulation with temperature rise
limited to Class “B” insulation suitable for operation on 415+ 10% volt, 3 phase, 50 cycle, AC supply and
conform to IS 325:/1978.

Electric Panel:

Panel should have independent incoming feeder suitable for 3 no. main pumps,……………. Other
……………load and having independent outgoing feeder for 3 main pumps………………. Etc. Incoming
feeder should be draw out electrically operated ACBS and 3 nos. pump of electrically……………of suitable
rating. …………………. And other load have MCCB/MCB.

Electrical panel should be designed in such a way that initially one pump will start automatically when water
level reaches at predetermined level, 2nd pump and 3rd pumps also starts automatically one by one as pre-
determined level and stop reversely at the same day. Further panel should have all protection devices for
automatic operation of …………….. for sluice gates, pumps etc., complete with starter, power capacitor,
single protection devices, overload / earth fault protection etc.

Minimum acceptable efficiency of the pump should not be less than 80% at duty point without negative
tolerance.

Motor should have atleast 15% power margin on duty point and 10% margin on the entire working range.

1 L of 2 Nos. 1000 m dia 1.5


HFL 4.0
Aug level of Nalla 1.4
Top of platform 4.5
1.3M3/sec

Head Pump

1.0 L of …………… 0.5 M


Size of pump 450
………….. 450 dia
Delivery 400 dia
Head 10M
HP 45x3600x10
.93x1x367.2x.8 = 55
KW 57.1
HP 57.1
.746 = 76

• Add 15% to cover voltage


fluctuation and reducing of
efficiency.
• Adopt 100 HP in the
manufacturing range.