You are on page 1of 12

SPGC PROJECTS WARRANT Upd

Items Sub items Project title (Insert brief summary of scope as attachment Tray collection & dish washing machine Installing LCD at Highland coffee wall Samsung LCD Power cables at Data Center Power sockets & plug Power meter Manufacturing simulation lab LCD at Achievement wall GPB LCD at Corridor wall ATM 6 7 8 6.1 7.1 8.1 EOC relocation Waste shelter Futsal field Name of System owner

Nguyen, Thi Phuong Thao

2.1

Nguyen, Thi Kim Ly

2.2 3 3.1 3.2 3.3 4 5 4.1 5.1

Nguyen, Thi Kim Ly Le, Nguyen Hai Le, Nguyen Hai Le, Nguyen Hai Nueva, Ma Lourdes Truong, Jade Truong, Jade Nguyen, Thanh Liem Nguyen, Thi Hieu Tran, Quoc Hieu

8.2 9 10 9.1 10.1 10.2 10.3 10.4 11 12 13 14 15 16 17 18 19 20 21 22 23

Spectator Interlink Piping Multipurpose hall area Chairs & poster AV system Sound system upgrading Extra fire extinguisher in guard house VA sensor for 17 AHU Water fixture auto faucets Supporter for photo screen Video teleconference room retrofit Lobby safety improvement Pathway to phase 2 Food tray catchment Steel cage for IT storage Curtain in IW Exit Search Desksurface modification phase 1 4 power cables, sockets, plugs at Data Center Anti-foam

Tran, Quoc Hieu Ho, Minh Quan Nguyen, Hong Thuy Tien Nguyen, Hong Thuy Tien Nguyen, Hong Thuy Tien Tran, Thi To Hang Nguyen, Thanh Liem Nguyen, Hong Quan Ho, Minh Quan Batara, Walter Jay Marasigan, Gilbert Nguyen, Tran Lam Hai Ngo, Anh Tuan Nguyen, Thi Phuong Thao Ky, Dinh Lap Tran, Quoc Vu Le, Minh Thuan Nguyen, Van Son Nguyen Thi Kha

24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Fall protection project DI water in ATM Open roof at HC08 Lighting at smoking area Electric Bulletin Board Desksurface modification phase 2 & phase 3 VFD for CWP VFD for Cooling Tower VFD for MAH Live Cooking & Pho 24 Installing 02 Air cons at Guard houses Installing alarm system at kitchen area DCC chilled water efficiency Cafeteria HVAC optimize 18 power socket faceplates for IT cubs Nurse station at ATM Secondary domestic water supply Connecting Oxygen to LSS system Perimeter street lighting

Nguyen, Tran Lam Hai Huynh, Thi My Linh Nguyen, Thi Khanh Thuyen Pham, Dinh Khang QnR group Le, Minh Thuan Nguyen, Hong Quan Nguyen, Hong Quan Nguyen, Hong Quan Nguyen, Thi Phuong Thao To, Vu Hung Nguyen, Thi Phuong Thao Nguyen, Hong Quan Pham, Dinh Khang Pham, Dinh Khang Thieu, Minh Triet Nguyen, Hong Quan Pham, Quoc Trung To, Vu Hung

43 44 45

Polytent frame room Fence for Detrash # 1 Fence + rack for detrash #2

Tran, Ngoc Hoang Son Tran, Ngoc Hoang Son Tran, Ngoc Hoang Son

PGC PROJECTS WARRANTY MANAGEMENT TRACKING SHEET Updated ww44'13


Project location (Bldg & column number or description) Byte Kitchen Cafeteria Highland coffee wall Cafeteria Highland coffee wall Data Center Data Center Data Center Simulation lab 107 SS3-Achievement wall SS1-Corridor wall Primary EOC 108 Contractor Name Name of warranty administration Project turnover date

M+W VN

Hien: 0907998922 Hoang: 0918 408 955

ww24.1'11

M+W VN

Hien: 0907998922

ww35.4'11

TTT Corp. M+W VN M+W VN M+W VN M+W VN M+W VN M+W VN M+W VN M+W VN

0918 075 687 Hien: 0907998922 Hien: 0907998922 Hien: 0907998922 Hien: 0907998922 Hien: 0907998922 Hien: 0907998922 Hien: 0907998922 Hien: 0907998922 Hien: 0907998922

ww35.4'11 ww42.3'11 ww42.3'11 ww43.4'11 ww42.5'11 ww48.5'11 ww48.5'11 ww5.2'12 ww18.5'12 ww10.5

Grass field at right of GPB

M+W VN

Futsal field CUB-GPB-ATMIW Level 3 Level 3 Level 3 Level 3 Guard house ATM south mezzanine GPB, ATM GPB, 305 GPB, CR219 GPB, Lobby VNAT phase 1 -2 GPB, Byte kitchen GPB, CDC room IW, Exit Search GPB Data Center CUB

M+W VN M+W VN M+W VN M+W VN M+W VN M+W VN JLL M+W VN M+W VN M+W VN M+W VN M+W VN M+W VN M+W VN M+W VN M+W VN M+W VN M+W VN JLL

Hien: 0907998922 Hien: 0907998922 Hien: 0907998922 Hien: 0907998922 Hien: 0907998922 Hien: 0907998922 Jimmy Hien: 0907998922 Hien: 0907998922 Hien: 0907998922 Hien: 0907998922 Hien: 0907998922 Hien: 0907998922 Hien: 0907998922 Hien: 0907998922 Hien: 0907998922 Hien: 0907998922 Hien: 0907998922 Jimmy

ww10.5

ww51.1'11 ww7.5'12 ww18.5'12 ww51.1'11

ww3.5'12 ww29.1'12 ww25.6'12 ww16.2'12 ww19.4'12 ww33.2'12 ww24.3'12 ww38.3'12 5th Nov'12 ww37.5'12 ww26.1'12

GPB, CUB, HC04 ATM HC08 Smoking area ATM GPB CUB CUB CUB GPB Guard house Kitchen ATM south mezzanine GPB GPB, level 2 Nurse station in ATM ATM back yard FA Lab Back yard fence

ATEA ATEA ATEA ATEA ATEA ATEA JLL JLL JLL ATEA JLL ATEA ATEA Schneider JLL ATEA ATEA ATEA ATEA

Bao: 0938163003 Bao: 0938163003 Bao: 0938163003 Bao: 0938163003 Bao: 0938163003 Bao: 0938163003 Khoa: 0905436365 Khoa: 0905436365 Khoa: 0905436365 Bao: 0938163003 Khoa: 0905436365 Bao: 0938163003 Bao: 0938163003 Long: 0917291122 Hiep: Bao: 0938163003 Bao: 0938163003 Bao: 0938163003 Bao: 0938163003

ww50.6'12 30th Jan 2013 16th Jan 2013

13th July'13 9th July'13 9th July'13 9th July'13

16th May 2013 27th May 2013 10th June 2013 11th July 2013 8th July 2013 21st August 2013 3rd Oct 2013 30th Oct 2013 5th Oct 2013

ATM Phase 2 Detrash room #1 Detrash room #2

ATEA ATEA ATEA

Bao: 0938163003 Bao: 0938163003 Bao: 0938163003

25th Sep 2013 6th Sep 2013 20th Sep 2013

EET

Warranty start date

Warranty expiration date

Remarks / Project status

1st June 2011

1st June 2012

End of warranty

25th August'11

25th August'12

End of warranty

18th August'11 12th Oct'11 12th Oct'11 20th Oct'11 24th Oct'11 12th Oct'12 12th Oct'12 20th Oct'12 24th Oct'12

End of warranty End of warranty End of warranty End of warranty End of warranty End of warranty End of warranty End of warranty End of warranty End of warranty

Sub-cons will do the warranty Sub-cons will do the warranty ww5.2'12 ww19.1'12 14th May 2012 ww5.2'13 ww19.1'13 14th May 2013

14th May 2012 March 6th 2012

14th May 2012 March 6th 2013

End of warranty End of warranty End of warranty

ww51.1'11 ww7.5'12 ww19.1'12 13th Dec 2011 15th Mar 2012 8th Feb'12 ww29.1'12 ww26.5'12 ww16.2'12 ww20.2'12 ww34.1'12 ww24.3'12 ww38.3'12 5th Nov'12 ww37.5'12 ww26.1'12

ww51.1'12 ww7.5'13 ww19.1'13 13th Dec 2012 15th Mar 2013 8th Feb'13 ww29.1'13 ww26.5'13 ww16.2'13 ww20.2'13 ww34.1'13 ww24.3'13 ww38.3'13 5th Nov'13 ww37.5'13 ww26.1'13

End of warranty End of warranty End of warranty End of warranty End of warranty End of warranty End of warranty End of warranty End of warranty End of warranty End of warranty End of warranty End of warranty Project Completed End of warranty End of warranty

ww51.1'12 30th Jan 2013 16th Jan 2013 4th April 2013 3rd March 2013 13th July'13 9th July'13 9th July'13 9th July'13 19th July 2013 16th May 2013 27th May 2013 10th June 2013 11th July 2013 8th July 2013 22nd August 2013 3rd Oct 2013 30th Oct 2013 5th Oct 2013

ww51.1'13 30th Jan 2014 16th Jan 2014 4th April 2014 3rd March 2014 13th July 2014 9th July 2014 9th July 2014 9th July 2014 19th July 2014 16th May 2014 27th May 2014 10th June 2014 11th July 2014 8th July 2014

Project Completed Project Completed Project Completed Project Completed Project Completed Project Completed Project Completed Project Completed Project Completed Project Completed Project Completed Project Completed Project Completed Project Completed Project Completed

22nd August 2014 Project Completed 3rd Oct 2014 30th Oct 2014 5th Oct 2014 Project Completed Project Completed Project Completed

25th Sep 2013 6th Sep 2013 20th Sep 2013

25th Sep 2014 6th Sep 2014 20th Sep 2014

Project Completed Project Completed Project Completed