You are on page 1of 6

HYDRAULIC CALCULATION

Name of Project: Basana Water Supply Project (Ram Pump)

Note: Name of source : Bui Mokal

District: Covalima

Suco:

Tacilin

Type of source : Spring

Sub District: Zumalai

Aldeia:

Basana

Fiscal Year: 2009

Reach
Flow (lps)
From

To

Chainage
(m)

Length (m)
Actual

Design

DL
=1.05*L

Reduced
Reduced
level
level
(Upper), m (Lower), m
RL1

Elevation
Difference
(m)
ED
=RL1-RL2

RL2

Available
Head (m)

Pipe Used
dia/class

Type
(GI/Poly)

HA
=ED+RH

SCT

Ram Pump Box

5.00

141.50

141.50

148.58

54.000

52.100

1.90

1.90

Ram Pamp box

Storage tank

0.30

150.00

150.00

157.50

52.100

73.468

21.37

Storage tank

P4

0.3

400.00

400.00

420.00

73.468

68.015

P4

P7

0.15

731.50

181.50

190.58

68.015

P7

P12

0.1

1003.50

272.00

285.60

64.015

Prepared by:

Static Head
(m)

Frictional
Factor

Head Loss
(m)

(per 100m)
FF

Residual
Head (m)

HGL
= RL1-HL

RH
= HA-HL

HL=

HGL (m)

54.000 3"

GI

0.90

1.00

53.10

21.37

51.100 32/10

PE

0.87

20.50

52.23

5.45

5.45

73.468 40/10

PE

0.65

4.80

51.58

64.168

3.85

8.65

68.015 32/10

PE

0.35

8.30

51.23

54.326

9.69

17.99

64.015 25/10

PE

0.69

17.30

50.54

Checked by:

Name:

Muhammad Amin

Name:

______________________

Designation:

Technical Engineering

Designation:

______________________

Date:

24/01/09

Date:

______________________

Page 02 of 02

Remark

Delivery
head

Storage tank

Page 02 of 02

HYDRAULIC CALCULATION
Name of Project: Basana Water Supply Project (Gravity)

Note: Name of source : Bui Mokal

District: Covalima

Suco:

Tacilin

Type of source : Spring

Sub District: Zumalai

Aldeia:

Basana

Fiscal Year: 2009

Reach
Flow (lps)
From

To

Chainage
(m)

Length (m)
Actual

Design

DL
=1.05*L

Reduced
Reduced
level
level (Lower),
(Upper), m
m
RL1

RL2

Elevation
Difference
(m)

Available
Head (m)

ED
=RL1-RL2

HA
=ED+RH

Static Head
(m)

Frictional
Factor

Pipe Used
dia/class

Type
(GI/Poly)

Head Loss
(m)

(per 100m)
FF

HL=
DL*FF/100

Residual
Head (m)

HGL (m)

RH
= HA-HL

HGL
= RL1-HL

SCT

P12

0.30

403.40

403.40

423.57

54.000

53.911

0.09

0.09

54.000

90/10

PE

0.02

0.07

53.99

P12

P20

0.30

721.80

318.40

334.32

53.911

52.027

1.88

1.96

53.911

90/10

PE

0.02

1.94

53.97

P20

P31

1016.20

294.40

309.12

52.027

53.167

-1.14

0.80

532.027

63/10

PE

0.10

0.70

53.87

0.25

Prepared by:

Checked by:

Name:

Muhammad Amin

Name:

______________________

Designation:

Tehnical Engineering

Designation:

______________________

Date:

24/01/09

Date:

______________________

Page 01 of 02

Remark

Page 01 of 02

HYDRAULIC CALCULATION
Name of Project: Bora Ikun Water Supply Project
District: Covalima

Suco:

Sub District: Zumalai

Aldeia:

Reach
Flow (lps)
From

To

Length (m)

Chainage
(m)

Q
SCT

Reduced
Reduced
level
level
(Upper), m (Lower), m

Actual

Design

DL
=1.05*L

RL1

Elevation
Difference
(m)
ED
=RL1-RL2

RL2

P4

1.00

79.30

79.30

83.27

520.000

513.272

6.73

P4

P22

1.00

540.90

461.60

484.68

513.272

510.560

2.71

P22

P04

0.3

108.50

108.50

113.93

510.560

493.095

17.47

B48

B54 (RT)

0.4

1698.00

188.00

197.40

434.570

443.040

-8.47

B54 (RT)

R1

0.4

1728.00

30

31.50

443.040

440.430

2.61

R1

R10

0.40

1980.00

252.00

264.60

440.430

441.600

-1.17

R10

R24

0.40

2415.00

435.00

456.75

441.600

439.560

2.04

R24

R26(T7)

0.40

2475.00

60.00

63.00

439.560

432.080

7.48

R26(T7)

R35(T8)

0.3

2738.00

263.00

276.15

432.080

417.910

14.17

R35(T8)

R42(T9)

0.2

2948.00

210.00

220.50

417.910

374.450

43.46

R42(T9)

R52(T10)

0.1

3233.00

285.00

299.25

374.450

343.070

31.38

RT

L1

0.1

10

10.50

443.040

440.430

2.61

L1

L4 (T1)

0.10

111.00

101.00

106.05

440.430

441.600

-1.17

RT

L11(T2)

0.50

285.00

285.00

299.25

441.600

439.560

2.04

L11(T2)

L12

0.40

485.00

200.00

210.00

439.560

432.080

7.48

L17

L22 (T3)

0.4

620.00

135.00

141.75

432.080

417.910

14.17

L22 (T3)

L25 (T4)

0.3

710.00

90.00

94.50

417.910

374.450

43.46

L25 (T4)

L30

0.2

864.00

154.00

161.70

374.450

343.070

31.38

L30

L34 (T5)

0.2

984.00

120.00

126.00

374.450

343.070

31.38

L34 (T5)

L40(T6)

0.1

1164.00

180.00

189.00

374.450

343.070

31.38

Prepared by:

Checked by:

Name:

______________________

Name:

______________________

Designation:

______________________

Designation:

______________________

Date:

______________________

Date:

______________________

HYDRAULIC CALCULATION
Note: Name of source : Bui Mokal
Tacilin

Type of source : Spring

Bora Ikun

Fiscal Year: 2009

Available
Head (m)

Static Head
(m)

Pipe Used
dia/class

Type
(GI/Poly)

HA
=ED+RH

Frictional
Factor

Head Loss
(m)

(per 100m)
HL=
DL*FF/100

FF

Residual
Head (m)

HGL (m)

Remark

HGL
= RL1-HL

RH
= HA-HL

6.73

520.000 50/II

GI

0.391

0.33

6.40

519.67

9.11

513.272 50/II

GI

0.391

1.90

7.22

517.78

17.47

510.560 40/II

GI

0.391

0.45

17.02

-0.45

8.55

500.000 40/10

PE

0.839

1.66

6.89

-2.10

2.61

443.040 40-II

GI

0.318

0.10

2.51

442.94

1.34

443.040 50/10

0.58

442.18

443.040 40-II

0.29
0.318

0.76

2.62

PE
GI

1.45

1.16

440.72

8.64

443.040 40/10

PE

0.84

0.53

8.11

440.19

22.28

PE

1.45

4.00

18.28

436.19

61.74

443.040 32/10
443.040 20/12

PE

7.79

17.18

44.56

419.01

75.94

443.040 20/12

PE

2.32

6.94

69.00

412.07

2.61

443.040 25-II

GI

0.326

0.03

2.58

443.01

1.41

32/10

PE

0.22

0.23

1.18

440.20

3.22

50/10

PE

0.426

1.27

1.94

440.33

9.42

50/10

PE

0.289

0.61

8.81

438.95

22.98

32/10

PE

2.4

3.40

19.58

428.68

63.04

32/10

PE

1.45

1.37

61.67

416.54

93.05

20-II

GI

3.25

5.26

87.80

369.19

119.18

15-II

GI

13.3

16.76

102.42

357.69

133.80

15-II

GI

3.81

7.20

126.60

367.25

______________________
______________________
______________________

Page _____ of _____

You might also like