ID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58

Task Name Construction 0f New Kindergarten - Lesak, Leposavic Non - Construction Activities Contractors accommodation, equipment, facilities, etc. Offices, equipment and facilities for the Engineer as specified Electricity, Water and other services for the Site during construction Survey, design (includin revisions) and obtaining all permits Preparation of the Programme, EMP, QM, Health and Safety, etc Site sign boards and signage Publicity measures in accordance with EC requirements Site Records and Progress Documentation

Duration 365 days 365 days 365 days 365 days 365 days 365 days 365 days 2 days 365 days 326 days

Start 31-05-2014 31-05-2014 31-05-2014 31-05-2014 31-05-2014 31-05-2014 31-05-2014 31-05-2014 31-05-2014 31-05-2014

Finish T 31-05-2015 31-05-2015 31-05-2015 31-05-2015 31-05-2015 31-05-2015 31-05-2015 02-06-2014 31-05-2015 22-04-2015 22-04-2015 31-05-2015 08-01-2015 15-06-2014 23-11-2014 08-01-2015 20-04-2015 05-06-2014 05-04-2015 23-12-2014 30-12-2014 13-12-2014 03-02-2015 07-12-2014 24-12-2014 11-12-2014 11-12-2014 23-01-2015 23-01-2015 30-12-2014 30-12-2014 10-01-2015 20-04-2015 14-04-2015 28-01-2015 31-03-2015 11-03-2015 11-03-2015 16-03-2015

12 May '14 M

23 Jun '14 T S

04 Aug '14 S

15 Sep '14 M

27 Oct '14 T S

08 Dec '14 S

19 Jan '15 M

02 Mar '15 T S

13 Apr '15 S

25 May ' M

Inspection and testing during construction (including tests at independent, certified 326 authorized days laboratories) 31-05-2014 As-built documentation Construction Activities - Structural Works Excavation and Compacting of gravel up to respective layer Reinforcement, Formworks and Concrete Works Fire Escape Stairs Construction Activities - Architectural Works Demolition Site clearance Waterproofing & Insulation External masonry works and Faade, insulation, plastering ,painting Internal Masonry works, drywall, and partitions Carpentry structural woodwork Roof covering and insulation works Rainwater goods and flashing External and inner doors External window Floor screeding and finishes to dry rooms and stairs Floor screeding and finishes to wet rooms Plastering and Internal finishes to dry walls and ceiling Plastering and Internal finishes to wet walls and ceiling Suspended ceiling Grassing of total area within perimeter fence and play ground Car park, fence, and paving Painting Construction Activities - Mechanical Works Central heating boilers and chimneys 39 days 217 days 10 days 161 days 6 days 322 days 3 days 5 days 183 days 19 days 148 days 6 days 14 days 27 days 86 days 86 days 45 days 45 days 96 days 96 days 59 days 6 days 9 days 23 days 234 days 13 days 22-04-2015 05-06-2014 05-06-2014 15-06-2014 02-01-2015 02-06-2014 02-06-2014 31-03-2015 23-06-2014 11-12-2014 18-07-2014 28-01-2015 23-11-2014 27-11-2014 16-09-2014 16-09-2014 09-12-2014 09-12-2014 25-09-2014 25-09-2014 12-11-2014 14-04-2015 05-04-2015 05-01-2015 09-08-2014 26-02-2015 26-02-2015 26-02-2015

Circulation pump and connecting insulated pipe work for Central Heating network 13 days Heating network of panel radiators and Al plast pipes. 18 days

Electric water heaters for boiler house, laboratory, and teachers room, toilets etc., combined 9 days domestic 16-03-2015 hot water production 25-03-2015with solar panels Extract ventilation systems for toilets Extract ventilation system with heat recuperation and fresh air supply 119 days 119 days 09-08-2014 09-08-2014 06-12-2014 06-12-2014 31-03-2015 31-03-2015 25-03-2015 26-02-2015 26-02-2015 19-12-2014 24-02-2015 24-02-2015 10-12-2014 24-02-2015 24-02-2015 12-02-2015 12-02-2015 17-12-2014 10-02-2015 18-12-2014

Water storage tank and booster pump for fire protection water, with connection to fire 6 days hydrant system. 25-03-2015 Fire protection, internal and external hydrants system and Fire handheld extinguishers 6 days Pump and roof storage tanks for toilets Construction Activities - Eletrical Works LV supply including connection fee Distribution boxes and cables Lighting, lighting fixtures and switches, emergency lighting LV small power - sockets and water heaters electric supply Lightning protection Fire detection system and fire alarms. LAN, audio and telephone cabling network and BMS where appropriate Construction Activities - Water and Sewerage Works Connection to all services including fees. Internal water distribution network for sanitary water. Sanitary equipment and fittings 9 days 256 days 2 days 146 days 14 days 14 days 178 days 14 days 14 days 194 days 2 days 137 days 9 days 25-03-2015 16-03-2015 15-06-2014 24-02-2015 26-07-2014 10-02-2015 10-02-2015 15-06-2014 10-02-2015 10-02-2015 02-08-2014 10-02-2015 02-08-2014 01-02-2015

Toilet water sewerage and storm water system including septic tanks or connection 137 to days mains as03-08-2014 appropriate.