Analisis de carga unitaria de losa de azotea, losa de entrepiso , Muros de block de 15x20x40 cm
CROQUIS Y REFERENCIAS
LOSA PLANA DE AZOTEA
ELEMENTO
Impermeabilizante
Entortado
Instalaciones
Losa Maciza
Aplanado de Yeso
Carga reglamentaria NTC- RC-DF
ESPESOR
(m)
DEL
MATERIAL
(kg/m3)
CARGA
MUERTA
(kg/m2)
0.005
0.020
----0.150
0.020
-----
1500.000
2100.000
----2400.000
1500.000
-----
7.500
42.000
15.000
360.000
30.000
40.000
494.500
100.000
594.500
494.500
Kg/m2
Kg/m2
Kg/m2
ELEMENTO
Losa Maciza
Firme de Mortero
Aplanado de Yeso
Instalaciones
Loseta De Barro
Carga reglamentaria NTC- RC-DF
ESPESOR
(m)
DEL
MATERIAL
(kg/m3)
CARGA
MUERTA
(kg/m2)
0.150
0.020
0.020
-------------
2400.000
2100.000
1500.000
-------------
360.000
42.000
30.000
15.000
80.000
40.000
567.000
170.000
737.000
Kg/m2
Kg/m2
567.000
Kg/m2
ELEMENTO
PESO DEL BLOCK DE 15X20X40cm
JUNTA DE MORTERO CEMENTO-ARENA
APLANADO DE MORTERO CEMENTO-ARENA
APLANADO DE YESO
ESPESOR
(m)
DEL
MATERIAL
(kg/m3)
0.150
0.020
0.020
0.020
2200.000
2100.000
2100.000
1500.000
PESO DE MURO=
h=
TOTAL (kg/m2)
330.000
42.000
42.000
30.000
444.00
3.500
1554.00
3.500
1554.00
m
Kg/m
m
Kg/m
ESPESOR
(m)
DEL
MATERIAL
(kg/m3)
TOTAL (kg/m2)
0.150
0.020
0.040
2200.000
2100.000
1500.000
PESO DE MURO =
h=
PESO DE MURO =
Kg/m
ELEMENTO
PESO DEL BLOCK DE 15X20X40cm
JUNTA DE MORTERO CEMENTO-ARENA
APLANADO DE YESO
PESO DE MURO=
h=
PESO DE MURO =
h=
PESO DE MURO =
3.500
1512.00
3.500
1512.00
330.000
42.000
60.000
432.00
m
Kg/m
m
Kg/m
Kg/m2
UBICACIN:
FECHA:
UNIDAD:
4/30/2013
indicada
Construrtec
HOJAS:
2
Sobrecargas de muros de block en losa de entrepiso devido a no coincidir lineal mente
provocando la sobrecarga sobre la losa de entrepiso
CROQUIS
REFERENCIAS
0.8
1.5
1
1.6
(a1/a2)
FC1
0.83
1.52
0.8
1.7
TABLERO 1
LONGIUTDES DE TABLERO
DATOS DE MURO
LADO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
6.82
5.92
6.00
6.00
5.00
5.00
0.83
0.83
1
1.6
peso del muro
1 PLC
10598.28
0.00
(a1/a2)
FC2
0.83
1.68
TOTAL Kg/m2
0.00
9192.22
TOTAL=
535.80
515.79
1051.59
0.8
1.5
1
1.6
(a1/a2)
FC1
0.83
1.52
0.8
1.7
TABLERO 2
LONGIUTDES DE TABLERO
DATOS DE MURO
LADO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
9.32
7.02
6.00
6.00
5.00
5.00
0.83
0.83
1
1.6
peso del muro
1 PLC
14490.58
0.00
(a1/a2)
FC2
0.83
1.68
TOTAL Kg/m2
0.00
10909.08
TOTAL=
732.58
612.12
1344.70
0.8
1.5
1
1.6
(a1/a2)
FC1 PLC
0.83
1.52
0.8
1.7
TABLERO 3
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
5.97
4.57
6.00
6.00
5.00
5.00
0.83
0.83
1
1.6
peso del muro
1 PLC
9277.54
0.00
(a1/a2)
FC2 PLL
0.83
1.68
TOTAL Kg/m2
0.00
7101.78
TOTAL=
469.03
398.49
867.52
0.8
1.5
1
1.6
(a1/a2)
FC1 PLC
0.83
1.52
0.8
1.7
TABLERO 4
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
8.79
3.69
6.00
6.00
5.00
5.00
0.83
0.83
1
1.6
peso del muro
1 PLC
13659.66
0.00
(a1/a2)
FC2 PLL
0.83
1.68
TOTAL Kg/m2
0.00
5734.26
TOTAL=
690.57
321.76
1012.33
0.8
1.5
1
1.6
(a1/a2)
FC1 PLC
0.83
1.52
0.8
1.7
TABLERO 5
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
6.40
6.55
6.00
6.00
5.00
5.00
0.83
0.83
1
1.6
peso del muro
1 PLC
9945.60
0.00
(a1/a2)
FC2 PLL
0.83
1.68
TOTAL Kg/m2
0.00
10178.70
TOTAL=
502.81
571.14
1073.94
0.8
1.5
1
1.6
(a1/a2)
FC1 PLC
0.83
1.52
0.8
1.7
TABLERO 6
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
6.75
4.57
6.00
6.00
5.00
5.00
0.83
0.83
1
1.6
peso del muro
1 PLC
10489.50
0.00
(a1/a2)
FC2 PLL
0.83
1.68
TOTAL Kg/m2
0.00
7101.78
TOTAL=
530.30
398.49
928.79
0.8
1.5
1
1.6
(a1/a2)
FC1 PLC
0.83
1.52
0.8
1.7
TABLERO 7
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
4.60
3.03
6.00
6.00
5.00
5.00
0.83
0.83
1
1.6
peso del muro
1 PLC
7148.40
0.00
(a1/a2)
FC2 PLL
0.83
1.68
TOTAL Kg/m2
0.00
4708.62
TOTAL=
361.39
264.21
625.60
0.8
1.5
1
1.6
(a1/a2)
FC1 PLC
0.83
1.52
0.8
1.7
TABLERO 8
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
3.35
1.28
6.00
6.00
5.00
5.00
0.83
0.83
1
1.6
peso del muro
1 PLC
5205.90
0.00
(a1/a2)
FC2 PLL
0.83
1.68
TOTAL Kg/m2
0.00
1989.12
TOTAL=
263.19
111.61
374.80
0.8
1.5
1
1.6
(a1/a2)
FC1 PLC
0.83
1.52
0.8
1.7
TABLERO 12
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
3.62
6.51
6.00
6.00
5.00
5.00
0.83
0.83
1
1.6
peso del muro
1 PLC
5625.48
0.00
(a1/a2)
FC2 PLL
0.83
1.68
TOTAL Kg/m2
0.00
10113.43
TOTAL=
284.40
567.48
851.88
0.8
1.5
1
1.6
(a1/a2)
FC1 PLC
0.88
1.54
0.8
1.7
TABLERO 22
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
0.98
0.25
5.00
5.00
4.41
4.41
0.88
0.88
1
1.6
peso del muro
1 PLC
1515.15
0.00
(a1/a2)
FC2 PLL
0.88
1.66
TOTAL Kg/m2
0.00
380.73
TOTAL=
104.22
29.07
133.28
0.8
1.5
1
1.6
(a1/a2)
FC1 PLC
0.88
1.54
0.8
1.7
TABLERO 23
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
3.46
5.53
5.00
5.00
4.41
4.41
0.88
0.88
1
1.6
peso del muro
1 PLC
5375.13
0.00
(a1/a2)
FC2 PLL
0.88
1.66
TOTAL Kg/m2
0.00
8601.23
TOTAL=
369.72
656.63
1026.35
0.8
1.5
1
1.6
(a1/a2)
FC1 PLC
0.88
1.54
0.8
1.7
TABLERO 24
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
2.55
2.44
5.00
5.00
4.41
4.41
0.88
0.88
1
1.6
peso del muro
1 PLC
3962.70
0.00
(a1/a2)
FC2 PLL
0.88
1.66
TOTAL Kg/m2
0.00
3791.76
TOTAL=
272.57
289.47
562.04
0.5
1.3
0.8
1.5
(a1/a2)
FC1 PLC
0.68
1.42
0.5
1.8
TABLERO 26
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
4.24
2.20
5.00
5.00
3.40
3.40
0.68
0.68
0.8
1.7
peso del muro
1 PLC
6581.19
0.00
(a1/a2)
FC2 PLL
0.68
1.74
TOTAL Kg/m2
0.00
3418.80
TOTAL=
587.15
338.53
925.67
0.5
1.3
0.8
1.5
(a1/a2)
FC1 PLC
0.68
1.42
0.5
1.8
TABLERO 27
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
2.50
3.46
5.00
5.00
3.40
3.40
0.68
0.68
0.8
1.7
peso del muro
1 PLC
3885.00
0.00
(a1/a2)
FC2 PLL
0.68
1.74
TOTAL Kg/m2
0.00
5376.84
TOTAL=
346.60
532.41
879.02
0.5
1.3
0.8
1.5
(a1/a2)
FC1 PLC
0.68
1.42
0.5
1.8
TABLERO 29
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
4.22
2.20
5.00
5.00
3.40
3.40
0.68
0.68
0.8
1.7
peso del muro
1 PLC
6557.88
0.00
(a1/a2)
FC2 PLL
0.68
1.74
TOTAL Kg/m2
0.00
3418.80
TOTAL=
585.07
338.53
923.59
0.5
1.3
0.8
1.5
(a1/a2)
FC1 PLC
0.68
1.42
0.5
1.8
TABLERO 31
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
4.22
2.20
5.00
5.00
3.40
3.40
0.68
0.68
0.8
1.7
peso del muro
1 PLC
6557.88
0.00
(a1/a2)
FC2 PLL
0.68
1.74
TOTAL Kg/m2
0.00
3418.80
TOTAL=
585.07
338.53
923.59
0.5
1.3
0.8
1.5
(a1/a2)
FC1 PLC
0.68
1.42
0.5
1.8
TABLERO 33
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
3.00
0.70
5.00
5.00
3.40
3.40
0.68
0.68
0.8
1.7
peso del muro
1 PLC
4662.00
0.00
(a1/a2)
FC2 PLL
0.68
1.74
TOTAL Kg/m2
0.00
1087.80
TOTAL=
415.92
107.71
523.64
0.5
1.3
0.8
1.5
(a1/a2)
FC1 PLC
0.68
1.42
0.5
1.8
TABLERO 34
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
2.83
2.49
5.00
5.00
3.40
3.40
0.68
0.68
0.8
1.7
peso del muro
1 PLC
4390.05
0.00
(a1/a2)
FC2 PLL
0.68
1.74
TOTAL Kg/m2
0.00
3869.46
TOTAL=
391.66
383.15
774.81
0.5
1.3
0.8
1.5
(a1/a2)
FC1 PLC
0.68
1.42
0.5
1.8
TABLERO 35
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
3.53
0.55
5.00
5.00
3.40
3.40
0.68
0.68
0.8
1.7
peso del muro
1 PLC
5477.85
0.00
(a1/a2)
FC2 PLL
0.68
1.74
TOTAL Kg/m2
0.00
857.81
TOTAL=
488.71
84.94
573.65
0.5
1.3
0.8
1.5
(a1/a2)
FC1 PLC
0.68
1.42
0.5
1.8
TABLERO 36
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
1.59
3.61
5.00
5.00
3.40
3.40
0.68
0.68
0.8
1.7
peso del muro
1 PLC
2466.04
0.00
(a1/a2)
FC2 PLL
0.68
1.74
TOTAL Kg/m2
0.00
5608.85
TOTAL=
220.01
555.39
775.40
0.5
1.3
0.8
1.5
(a1/a2)
FC1 PLC
0.68
1.42
0.5
1.8
TABLERO 37
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
3.69
3.00
5.00
5.00
3.40
3.40
0.68
0.68
0.8
1.7
peso del muro
1 PLC
5729.44
0.00
(a1/a2)
FC2 PLL
0.68
1.74
TOTAL Kg/m2
0.00
4662.00
TOTAL=
511.16
461.63
972.79
0.8
1.5
1
1.6
(a1/a2)
FC1 PLC
0.96
1.58
0.8
1.7
TABLERO 38
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
4.04
3.46
5.19
5.19
5.00
5.00
0.96
0.96
1
1.6
peso del muro
1 PLC
6278.16
0.00
(a1/a2)
FC2 PLL
0.96
1.62
TOTAL Kg/m2
0.00
5376.84
TOTAL=
366.93
348.79
715.72
0.8
1.5
1
1.6
(a1/a2)
FC1 PLC
0.96
1.58
0.8
1.7
TABLERO 39
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
3.13
3.34
5.19
5.19
5.00
5.00
0.96
0.96
1
1.6
peso del muro
1 PLC
4856.25
0.00
(a1/a2)
FC2 PLL
0.96
1.62
TOTAL Kg/m2
0.00
5191.91
TOTAL=
283.83
336.79
620.62
0.8
1.5
1
1.6
(a1/a2)
FC1 PLC
0.96
1.58
0.8
1.7
TABLERO 51
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
5.51
2.03
5.19
5.19
5.00
5.00
0.96
0.96
1
1.6
peso del muro
1 PLC
8562.54
0.00
(a1/a2)
FC2 PLL
0.96
1.62
TOTAL Kg/m2
0.00
3147.98
TOTAL=
500.44
204.20
704.65
0.8
1.5
1
1.6
(a1/a2)
FC1 PLC
0.96
1.58
0.8
1.7
TABLERO 52
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
6.51
0.00
5.19
5.19
5.00
5.00
0.96
0.96
1
1.6
peso del muro
1 PLC
10119.65
0.00
(a1/a2)
FC2 PLL
0.96
1.62
TOTAL Kg/m2
0.00
0.00
TOTAL=
591.45
0.00
591.45
0.8
1.5
1
1.6
(a1/a2)
FC1 PLC
0.96
1.58
0.8
1.7
TABLERO 53
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
6.60
2.01
5.19
5.19
5.00
5.00
0.96
0.96
1
1.6
peso del muro
1 PLC
10255.16
0.00
(a1/a2)
FC2 PLL
0.96
1.62
TOTAL Kg/m2
0.00
3123.54
TOTAL=
599.37
202.62
801.99
0.8
1.5
1
1.6
(a1/a2)
FC1 PLC
0.96
1.58
0.8
1.7
TABLERO 54
LONGIUTDES DE TABLERO
DATOS DE MURO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
7.70
1.80
5.19
5.19
5.00
5.00
0.96
0.96
1
1.6
peso del muro
1 PLC
11963.47
0.00
(a1/a2)
FC2 PLL
0.96
1.62
TOTAL Kg/m2
0.00
2797.20
TOTAL=
699.21
181.45
880.66
0.3
1.1
0.5
1.3
(a1/a2)
FC1 PLC
0.32
1.12
0.3
2
TABLERO 55
DATOS DE MURO
LONGIUTDES DE TABLERO
MURO
L. MURO
Lado Largo a1
Lado Corto a2
(a1/a2)
LC
LL
13.34
26.74
20.00
20.00
6.40
6.40
0.32
0.32
0.5
1.8
peso del muro
1 PLC
20730.36
0.00
(a1/a2)
FC2 PLL
0.32
1.98
TOTAL Kg/m2
0.00
41546.19
TOTAL=
245.63
546.38
792.01
TRANSMISION DE CARGAS
TRANSMISION DE CARGAS A PERIMETRO DE TABLEROS
Ing. Eduardo Omar salgado
CALCULISTA:
Ricardo cortez Rodriguez
UBICACIN: Instituto tecnologico de la paz
PROPETARIO:
FECHA:
UNIDAD:
indicada
Construrtec
DETALLE DEL
CONCEPTO:
HOJAS:
Analisis de transmision de cargas sobre cada perimetro del tablero, calculo elaborado por
tableros regulares
CROQUIS Y REFERENCIAS
TABLEROS REGULARES EN LOSA DE CIMENTACION
TABLERO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
a1 (m) LC
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
6.00
6.00
6.00
5.00
5.00
5.00
a2 (m) LL
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
10.00
10.00
10.00
6.00
6.00
6.00
m
0.83
0.83
0.83
0.83
0.83
0.83
0.83
0.83
0.83
0.83
0.83
0.83
0.83
0.83
0.83
0.60
0.60
0.60
0.83
0.83
0.83
W Kg/m2
567.00
567.00
567.00
567.00
567.00
567.00
567.00
567.00
567.00
567.00
567.00
567.00
567.00
567.00
567.00
567.00
567.00
567.00
567.00
567.00
567.00
w1 (Kg/m)
708.75
708.75
708.75
708.75
708.75
708.75
708.75
708.75
708.75
708.75
708.75
708.75
708.75
708.75
708.75
850.50
850.50
850.50
708.75
708.75
708.75
w2 (Kg/m)
826.88
826.88
826.88
826.88
826.88
826.88
826.88
826.88
826.88
826.88
826.88
826.88
826.88
826.88
826.88
1190.70
1190.70
1190.70
826.88
826.88
826.88
a1 (m) LC
a2 (m) LL
4.41
4.41
4.41
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
5.00
5.00
5.00
2.60
3.40
2.60
2.60
2.60
2.60
3.40
3.40
3.40
3.40
5.00
5.00
5.00
5.00
6.80
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.19
5.19
5.19
3.91
3.91
4.00
4.00
4.00
4.09
4.00
4.00
4.00
4.09
5.19
5.19
5.19
5.19
20.00
m
0.88
0.88
0.88
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.96
0.96
0.96
0.66
0.87
0.65
0.65
0.65
0.64
0.85
0.85
0.85
0.83
0.96
0.96
0.96
0.96
0.34
W Kg/m
700.28
1593.35
1129.04
567.00
1492.67
1616.02
567.00
1490.59
567.00
1490.59
567.00
1090.64
1341.81
1140.65
1342.40
1539.79
1282.72
1187.62
567.00
567.00
567.00
567.00
567.00
567.00
567.00
567.00
567.00
567.00
567.00
1271.65
1158.45
1368.99
1447.66
1359.01
LC
LL
w1 (Kg/m)
w2 (Kg/m)
772.06
1756.67
1244.76
481.95
1268.77
1373.61
481.95
1267.00
481.95
1267.00
481.95
927.04
1140.54
969.55
1141.04
1308.82
1603.40
1484.52
708.75
368.55
481.95
368.55
368.55
368.55
368.55
481.95
481.95
481.95
481.95
1589.56
1448.06
1711.24
1809.58
2310.32
863.16
1963.96
1391.64
636.17
1674.78
1813.17
636.17
1672.45
636.17
1672.45
636.17
1223.69
1505.52
1279.81
1506.17
1727.64
1662.10
1538.87
734.70
492.03
544.81
497.54
497.54
497.54
502.81
554.24
554.24
554.24
563.26
1647.75
1501.07
1773.88
1875.83
3835.12
a1 (m) LC
a2 (m) LL
4.41
4.41
4.41
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
5.00
5.00
5.00
2.60
3.40
2.60
2.60
2.60
2.60
3.40
3.40
3.40
3.40
5.00
5.00
5.00
5.00
6.80
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.19
5.19
5.19
3.91
3.91
4.00
4.00
4.00
4.09
4.00
4.00
4.00
4.09
5.19
5.19
5.19
5.19
20.00
m
0.88
0.88
0.88
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.96
0.96
0.96
0.66
0.87
0.65
0.65
0.65
0.64
0.85
0.85
0.85
0.83
0.96
0.96
0.96
0.96
0.34
W Kg/m
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
494.50
LC
LL
w1 (Kg/m)
w2 (Kg/m)
545.19
545.19
545.19
420.33
420.33
420.33
420.33
420.33
420.33
420.33
420.33
420.33
420.33
420.33
420.33
420.33
618.13
618.13
618.13
321.43
420.33
321.43
321.43
321.43
321.43
420.33
420.33
420.33
420.33
618.13
618.13
618.13
618.13
840.65
609.52
609.52
609.52
554.83
554.83
554.83
554.83
554.83
554.83
554.83
554.83
554.83
554.83
554.83
554.83
554.83
640.75
640.75
640.75
429.11
475.15
433.92
433.92
433.92
438.52
483.37
483.37
483.37
491.24
640.75
640.75
640.75
640.75
1395.48
DISEO DE LOSA DE CIMENTACION PARA LA PLATAN MOSTRADA CON LA CARGA MOSTRDA Y DATOS SIGUIENTES
DATOS:
Fc=
qa=
fy=
CROQUIS
250.00 kg/cm2
30.00 ton/m2
4,200.00 kg/cm2
CARGAS
329.60
93.81
448.93
98.39
387.91
94.95
401.27
104.07
586.89
117.63
663.95
119.38
COLUMNA
13
14
15
16
17
18
19
20
21
22
23
24
CARGAS
628.33
103.33
372.81
556.49
652.75
450.62
244.36
53.76
53.76
732.60
624.52
766.22
COLUMNA
25
26
27
28
29
30
31
32
33
34
35
36
CARGAS
615.66
840.27
53.76
53.76
1,020.00
521.12
651.71
587.14
248.81
749.25
824.83
473.00
COLUMNA
37
38
39
40
41
42
43
44
45
46
47
QT=
CARGAS
477.67
575.90
617.45
544.31
321.92
95.00
480.20
104.61
512.13
97.39
360.62
19,512.84 ton
PASO 2. DETERMINAR LA PRESION q SOBRE EL SUELO DEBAJO DE LOS PUNTOS DE LA LOSA, USANDO LA ECUACION:
DONDE:
A= area de la losa
MOMENTO DE INERCIA
IX=
IY=
A=
CENTROIDES:
XC=
YC=
87,167.37 m4
117,765.63 m4
1,102.64 m
17.50
15.00
m
m
X=
COLUMNA
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17
18
19
20
21
22
24
CARGAS
93.81
448.93
98.39
387.91
94.95
401.27
104.07
586.89
117.63
663.95
119.38
628.33
103.33
372.81
652.75
450.62
244.36
53.76
53.76
732.60
766.22
DISTANCIA
2.50
5.00
7.50
10.00
12.50
15.00
17.50
20.00
22.50
25.00
27.50
30.00
32.50
35.00
5.00
10.00
15.00
20.00
30.00
35.00
5.00
Q*X
234.53
2,244.65
737.93
3,879.10
1,186.88
6,019.05
1,821.23
11,737.80
2,646.68
16,598.75
3,282.95
18,849.90
3,358.23
13,048.35
3,263.75
4,506.20
3,665.40
1,075.20
1,612.80
25,641.00
3,831.10
14.76
m
COLUMNA
25.00
26.00
27.00
28.00
29.00
31.00
32.00
33.00
34.00
35.00
36.00
38.00
39.00
40.00
42.00
43.00
44.00
45.00
46.00
47.00
CARGAS
615.66
840.27
53.76
53.76
1,020.00
651.71
587.14
248.81
749.25
824.83
473.00
575.90
617.45
544.31
95.00
480.20
104.61
512.13
97.39
360.62
DISTANCIA
10.00
15.00
20.00
30.00
35.00
5.00
10.00
15.00
20.00
30.00
35.00
5.00
10.00
15.00
2.50
5.00
7.50
10.00
12.50
15.00
TOTAL
Q*X
6,156.60
12,604.05
1,075.20
1,612.80
35,700.00
3,258.55
5,871.40
3,732.15
14,985.00
24,744.90
16,555.00
2,879.50
6,174.50
8,164.65
237.50
2,401.00
784.58
5,121.30
1,217.38
5,409.30
287,926.80
y'
12.79
y=
COLUMNA
16
17
18
19
20
21
22
23
24
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
CARGAS
556.49
652.75
450.62
244.36
53.76
53.76
732.60
624.52
766.22
615.66
840.27
53.76
53.76
1,020.00
521.12
651.71
587.14
DISTANCIA
6
6
6
6
6
6
6
12.00
12.00
12.00
12.00
12.00
12.00
12.00
18.00
18.00
18.00
Q*Y
3338.94
3,916.50
2,703.72
1,466.16
322.56
322.56
4,395.60
7,494.24
9,194.64
7,387.92
10,083.24
645.12
645.12
12,240.00
9,380.16
11,730.78
10,568.52
m
COLUMNA
33.00
34.00
35.00
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
CARGAS
248.81
749.25
824.83
473.00
477.67
575.90
617.45
544.31
321.92
95.00
480.20
104.61
512.13
97.39
360.62
-2.74
-2.21
XC - X
YC - Y
m
m
-60,489.49
-74,967.06
ton-m
ton-m
PUNTO
Qt/A
X (m)
24.78
-17.90
24.78
-17.90
24.78
-17.90
24.78
-17.90
24.78
-17.90
24.78
-17.90
24.78
-17.90
24.78
-17.90
24.78
-17.90
24.78
-17.90
24.78
-17.90
24.78
-17.90
24.78
-17.90
24.78
-17.90
24.78
-17.90
M yx
Mxy
QT
A
Iy
Ix
My*X/Iy
11.39
-11.39
11.39
-11.39
11.39
-11.39
11.39
-11.39
11.39
-11.39
11.39
-11.39
11.39
-11.39
11.39
-11.39
11.39
-11.39
11.39
-11.39
11.39
-11.39
11.39
-11.39
11.39
-11.39
11.39
-11.39
11.39
-11.39
Y (m)
15.40
12.00
6.00
0.00
-6.00
-12.00
-15.40
-12.73
-15.20
-10.00
-3.75
0.00
7.50
15.20
-15.20
Mx*Y/Ix
-10.69
10.69
-8.33
8.33
-4.16
4.16
0.00
0.00
4.16
-4.16
8.33
-8.33
10.69
-10.69
8.83
-8.83
10.55
-10.55
6.94
-6.94
2.60
-2.60
0.00
0.00
-5.20
5.20
-10.55
10.55
10.55
-10.55
q
25.48
24.07
27.84
21.71
32.01
17.54
36.17
13.38
40.33
9.22
44.50
5.05
46.86
2.69
45.00
4.55
46.72
2.83
43.11
6.44
38.77
10.78
36.17
13.38
30.97
18.58
25.62
23.93
46.72
2.83
DISTANCIA
18.00
18.00
18.00
18.00
24.00
24.00
24.00
24.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
TOTAL
Q*Y
4,478.58
13,486.50
14,846.94
8,514.00
11,464.08
13,821.60
14,818.80
13,063.44
9,657.60
2,850.00
14,406.00
3,138.30
15,363.90
2,921.70
10,818.60
249,485.82
24.78
-17.90
24.78
-17.90
24.78
-17.90
24.78
-17.90
24.78
15.4
24.78
15.4
24.78
15.4
24.78
15.4
24.78
0.13
24.78
0.13
24.78
0.13
24.78
15.4
24.78
15.4
24.78
15.4
24.78
15.4
24.78
-15.4
24.78
-15.4
24.78
-15.4
24.78
-15.4
24.78
-15.4
10
24.78
-15.4
12
24.78
-15.4
13
24.78
-15.4
33
24.78
-2.5
34
24.78
2.5
35
24.78
12.5
36
24.78
17.5
43
24.78
-12.5
45
24.78
-7.5
46
24.78
-5
47
24.78
-2.5
11.39
-11.39
11.39
-11.39
11.39
-11.39
11.39
-11.39
-9.80
9.80
-9.80
9.80
-9.80
9.80
-9.80
9.80
-0.08
0.08
-0.08
0.08
-0.08
0.08
-9.80
9.80
-9.80
9.80
-9.80
9.80
-9.80
9.80
9.80
-9.80
9.80
-9.80
9.80
-9.80
9.80
-9.80
9.80
-9.80
9.80
-9.80
9.80
-9.80
9.80
-9.80
1.59
-1.59
-1.59
1.59
-7.96
7.96
-11.14
11.14
7.96
-7.96
4.77
-4.77
3.18
-3.18
1.59
-1.59
-15.4
-12.00
-6
0.00
17.9
15.2
7.5
0
6
12
15.4
-3.75
-10
-15.2
-17.9
-12.5
-7.5
-5
-2.5
-2.5
-5
-10
-12.5
2.6
2.6
2.6
2.6
15.4
15.4
15.4
16.4
10.69
-10.69
8.33
-8.33
4.16
-4.16
0.00
0.00
-12.42
12.42
-10.55
10.55
-5.20
5.20
0.00
0.00
-4.16
4.16
-8.33
8.33
-10.69
10.69
2.60
-2.60
6.94
-6.94
10.55
-10.55
12.42
-12.42
8.67
-8.67
5.20
-5.20
3.47
-3.47
1.73
-1.73
1.73
-1.73
3.47
-3.47
6.94
-6.94
8.67
-8.67
-1.80
1.80
-1.80
1.80
-1.80
1.80
-1.80
1.80
-10.69
10.69
-10.69
10.69
-10.69
10.69
-11.38
11.38
46.86
2.69
44.50
5.05
40.33
9.22
36.17
13.38
2.55
47.00
4.42
45.13
9.77
39.78
14.97
34.58
20.53
29.02
16.36
33.19
14.01
35.54
17.57
31.98
21.91
27.64
25.52
24.03
27.39
22.16
43.25
6.30
39.78
9.77
38.05
11.50
36.31
13.24
36.31
13.24
38.05
11.50
41.52
8.03
43.25
6.30
24.56
24.99
21.38
28.17
15.01
34.54
11.83
37.72
22.05
27.50
18.86
30.69
17.27
32.28
14.99
34.56
qa=
50.00
ton/m2
>
se aceptan las dimenciones de la losa
47.00
q=
ton/m2
d/2
40
40+d
b 2 40 40 d 120 2d
2
d/2
40
d/2
VCR FR
40+d/2
f c* b d
120 2d d 12621.85
d 2 60d 6310.92 0
60.00
70.00
cm
cm
45.86
26.46
ton/m2
ton/m2
q prom( modificada)
q
B L PCols
ANCHO B1=
2.70
m
Carga Promedio prom 1
2
30.00
L=
m
2,928.85 ton
reaccion de suelo=
3,446.35 ton
carga promedio para cada franja=
q1=
53.96
reaccion de suelo modificada=
ton/m2
Carga p romedio
q2=
31.13
ton/m2
prom
q promB1 L
44.36
24.98
41.71
20.89
37.09
29.48
35.37
37.18
0.87
Carga promedio
Pu
ANCHO B1=
5.20
m
30.00
L=
m
5,408.40 ton
ton/m2
reaccion de suelo=
5,481.46
ton/m2
carga promedio para cada franja=
q1=
44.96
reaccion de suelo modificada=
q2=
25.32
0.99
factor de modificaion de la carga de columnas=
ANCHO B1=
6.25
m
30.00
L=
m
5,868.68 ton
ton/m2
reaccion de suelo=
5,136.28
ton/m2
carga promedio para cada franja=
q1=
36.51
reaccion de suelo modificada=
q2=
18.28
1.17
factor de modificaion de la carga de columnas=
ANCHO B1=
3.75
m
30.00
L=
m
3,744.50 ton
ton/m2
reaccion de suelo=
3,792.85
ton/m2
carga promedio para cada franja=
q1=
37.56
reaccion de suelo modificada=
q2=
29.86
0.99
factor de modificaion de la carga de columnas=
ANCHO B1=
7.50
m
30.00
L=
m
8,162.41 ton
ton/m2
reaccion de suelo=
5,638.87
ton/m2
carga promedio para cada franja=
q1=
24.44
reaccion de suelo modificada=
q2=
25.69
1.81
factor de modificaion de la carga de columnas=
ton
ton/m2
ton/m2
ton
ton/m2
ton/m2
ton
ton/m2
ton/m2
ton
ton/m2
ton/m2
34.92
42.45
PARA LA FRANJA NN
q1=
q2=
35.32
46.06
ANCHO B1=
7.70
m
30.00
L=
m
8,936.31 ton
ton/m2
reaccion de suelo=
5,716.53
ton/m2
carga promedio para cada franja=
q1=
22.34
reaccion de suelo modificada=
q2=
27.16
2.29
factor de modificaion de la carga de columnas=
ANCHO B1=
2.70
m
30.00
L=
m
3,296.14 ton
ton/m2
reaccion de suelo=
3,466.96
ton/m2
carga promedio para cada franja=
q1=
37.15
reaccion de suelo modificada=
q2=
48.45
0.95
factor de modificaion de la carga de columnas=
ton
ton/m2
ton/m2
ton
ton/m2
ton/m2
DIAGRAMAS DE CARAGA
PARA LA FRANJA HIHI
ASIGNACION DE CARGAS
DIAGRAMA DE MOMENTO
DIAGRAMA DE CORTANTE
REACCIONES
COLUMNAS
1
16
23
30
37
41
REACION
CARGA
392.60
398.06
556.49
908.4
624.52
700.45
521.12
643.45
477.67
643.68
321.92
242.55
3,523.04
3536.59
DIFERENCIA
13.55
PARA LA FRANJA IJIJ
ASIGNACION DE CARGAS
DIAGRAMA DE MOMENTO
DIAGRAMA DE CORTANTE
REACCIONES
508.09
387.11
ton-m
ton-m
COLUMNAS
3
17
24
31
38
43
REACION
CARGA
448.93
638.3
652.75
1453.6
766.22
1115.99
651.71
1021.93
575.90
1017.16
480.20
380.63
4,940.15
5627.61
DIFERENCIA
687.46
PARA LA FRANJA JKJK
625.3
813.29
ton-m
ton-m
ASIGNACION DE CARGAS
DIAGRAMA DE MOMENTO
DIAGRAMA DE CORTANTE
REACCIONES
COLUMNAS
5
18
25
32
39
45
REACION
CARGA
387.91
621.04
450.62
1400.92
615.66
1054.1
587.14
949.21
617.45
914.27
512.13
333.73
5,177.56
5273.27
DIFERENCIA
95.71
PARA LA FRANJA KLKL
ASIGNACION DE CARGAS
DIAGRAMA DE MOMENTO
DIAGRAMA DE CORTANTE
607.85
784.88
ton-m
ton-m
REACCIONES
COLUMNAS
7
19
26
33
40
47
REACION
CARGA
401.27
388.93
244.36
916.47
840.27
752.93
248.81
726.35
544.31
793.11
360.62
316.1
3,648.98
3893.89
DIFERENCIA
244.91
PARA LA FRANJA LMLM
382.36
510.3
ton-m
ton-m
ASIGNACION DE CARGAS
DIAGRAMA DE MOMENTO
DIAGRAMA DE CORTANTE
REACCIONES
COLUMNAS
9
20
27
34
REACION
CARGA
586.89
518.72
53.76
1223.95
53.76
1250.46
749.25
540.51
3,658.31
3533.64
DIFERENCIA
-124.67
540.83
680.42
DIAGRAMA DE MOMENTO
ton-m
ton-m
DIAGRAMA DE CORTANTE
REACCIONES
COLUMNAS
13
21
28
35
REACION
CARGA
628.33
493.68
53.76
1201.65
53.76
1306.86
824.83
580.15
5,002.65
3582.34
DIFERENCIA
-1,420.31
PARA LA FRANJA NN
542.6
670.89
ton-m
ton-m
ASIGNACION DE CARGAS
DIAGRAMA DE MOMENTO
DIAGRAMA DE CORTANTE
REACCIONES
COLUMNAS
15
22
29
36
REACION
CARGA
628.33
290.11
53.76
717.47
53.76
803.89
824.83
361.15
2,082.36
2172.62
DIFERENCIA
90.26
358.63
441.39
ton-m
ton-m
DIAGRAMA DE CORTANTE
DIAGRAMA DE MOMENTO
M '
FRANJA
PARA LA FRANJA HIHI
ANCHO
2.70
MU
B
LOCALIZACION
0-5.2 suprior
5.2-8.0 inferior
8.0-11.0 superior
11.0-13.6 inferior
13.6-17.5 supeior
17.5-20.4 inferior
20.4-22.8 superior
22.8-25.5 infeior
25.5-30.5 supeior
Mu ton-m Mu ton-m/m
3,311.97
1,226.66
4,360.50
1,615.00
1,298.70
481.00
3,383.30
1,253.07
2,084.10
771.89
2,473.39
916.07
366.43
135.71
1,685.84
624.39
1,363.67
505.06
#3 @20cms
#3 @20cms
p
0.0026
0.0026
0.0026
0.0026
0.0026
0.0026
0.0026
0.0026
0.0026
#3 @20cms
#3 @20cms
As
15.6
15.6
15.6
15.6
15.6
15.6
15.6
15.6
15.6
varillas
#3
#3
#3
#3
#3
#3
#3
#3
#3
as
1.21
1.21
1.21
1.21
1.21
1.21
1.21
1.21
1.21
propuesta
# 3 @ 20cms
# 3 @ 20cms
# 3 @ 20cms
# 3 @ 20cms
# 3 @ 20cms
# 3 @ 20cms
# 3 @ 20cms
# 3 @ 20cms
# 3 @ 20cms
#3 @20cms
#3 @20cms
#3 @20cms
refuerzo
20.94
20.94
20.94
20.94
20.94
20.94
20.94
20.94
20.94
#3 @20cms
#3 @20cms
propuesta
# 3 @ 20cms
# 3 @ 20cms
# 3 @ 20cms
# 3 @ 20cms
# 3 @ 20cms
# 3 @ 20cms
# 3 @ 20cms
# 3 @ 20cms
# 3 @ 20cms
30.00m
5m
espesdor de la losa=
fc=
0.7 m
250 kg/cm2
RIGIDEZ DE LA CIMENTACION
m
0.35
momento de inercia= 14,291,666.67 cm4
centriode de la seccion A=
E=
221,359.44
kg/cm2
por lo tanto EI
EI=
3.1636E+12 kg/cm2
2B
donde:
SECCION A
0.70m
Ks=
79.42
lb/pulg
Ks1=
282.16
lb/pulg
expresado en (lb/pulg)
B=
16.37
ft
expresado en (ft)
1/ 4
bk s
4 EI
Ks=
2.20
Kg/cm
1.59
>
/2=
1.57
30.00m
6
espesdor de la losa=
fc=
0.7 m
250 kg/cm2
SECCION A
0.70m
RIGIDEZ DE LA CIMENTACION
m
0.35
momento de inercia= 17,150,000.00 cm4
centriode de la seccion A=
E=
221,359.44
kg/cm2
EI=
3.79631E+12 kg/cm2
por lo tanto EI
2B
donde:
Ks=
77.90
lb/pulg
Ks1=
282.16
lb/pulg
expresado en (lb/pulg)
B=
19.65
ft
expresado en (ft)
1/ 4
bk s
4 EI
Ks=
=
2.15
Kg/cm
1.51
<
/2=
1.57
2.90
5.20
5.20
5.20
6.25
6.25
3.75
3.75
7.50
7.50
7.50
7.70
7.70
7.70
2.70
2.90
5.20
6.25
3.75
7.50
7.70
2.70
2.90
5.20
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
Ks
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
SPRING
18,735.99
33,595.57
33,595.57
33,595.57
40,379.29
40,379.29
24,227.57
24,227.57
48,455.15
48,455.15
48,455.15
49,747.28
49,747.28
49,747.28
17,443.85
37,471.98
67,191.14
80,758.58
48,455.15
96,910.29
99,494.57
34,887.71
37,471.98
67,191.14
COLUMNA
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
6.25
3.75
7.50
7.70
2.70
2.90
5.20
6.25
3.75
7.50
7.70
2.70
2.90
5.20
6.25
3.75
2.90
5.20
5.20
5.20
6.25
6.25
3.75
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
Ks
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
2,153.56
SPRING
80,758.58
48,455.15
96,910.29
99,494.57
34,887.71
37,471.98
67,191.14
80,758.58
48,455.15
96,910.29
99,494.57
34,887.71
37,471.98
67,191.14
80,758.58
48,455.15
37,471.98
67,191.14
67,191.14
67,191.14
80,758.58
80,758.58
48,455.15
PASO 1._ crear el material del cual se elabora y definir la seccion con el tipo del material por el cual procederemos a dibujar la losa
PASO 2._ asignar los resorte en cada una de columnas asi como tambien asignar la carga correspondiente de cada columna
PASO3._ Correr la estructura para obtener los valore con el cual se pdra disear