Professional Documents
Culture Documents
Content:
Softwareapplicationforenvironmentalassessmentof
bioprocesses
Introduction DesignoptimizationTraditionalApproach Proposedstrategy Casestudy Conclusions Furtherperspectives
Shortdescriptionofthemethod
ImpactCategories RawMaterialAvailability LandUse Complexityofsynthesis ThermalRisks AcuteToxicity ChronicToxicity Ecotoxicity GlobalWarmingPotential OzoneDepletionPotential AcidificationPotential
=EIBioprocess
Descriptionoftheapplication:
Substancedatabase: properties ABCClassification Graphicalinterfaces: visualization environmentalassessmentofaplant additionofnewsubstancestothedatabase
Introduction:
optimization: Theactofobtainingthebestresultsundergiven circumstances.
design variables
function
result
Introduction:
o Multiobjectiveoptimization:
operating cost
ParetoFront
capital investment
Introduction
o Interactiveoptimization:
operating cost
1 capital investment
o Designoptimization:
o Proposedstrategy
data transfer
Matlab
SuperProDesigner - toolboxes : - optimization - statistics - advanced visualization tools - advanced computational tools
data transfer
Proposedstrategy
Casestudy:interactivemultiobjectiveoptimizationofa bioprocess
CaseStudy
f1(x) unitproductioncost($/kgmainproduct), f2(x) totalcapitalinvestment($) f3(x) EIBioprocess, f4(x) LlysineconcentrationinstreamS117(finalstream)(g/L) f5(x) biomassconcentrationinstreamS117(finalstream)(g/L) x1 glucoseinitialconcentrationinfermenterP20(g/L) x2 threonineinitialconcentrationinfermenterP20(g/L) x3 glucosefeedflowrate (m3/h) x4 Llysinefeedflowrate instreamS127(kg/batch) x5 biomasssplittingfractioninP14(%) x6 glucoseconcentrationinfeedstream(g/L)
Results
Initialsolution x x1 x2 I<={1,2,3,4,5} x3 x4 x5 x6 Values 60 1.4243 800 100 0.9823 1350 f(x) f1(x) f2(x) f3(x) f4(x) f5(x) Values 12.4414 1.1438*108 0.3095 0.4028 0.1056 I<={1,4} I=={3,5} I0={2} Preferences x x1 x2 x3 x4 x5 x6
Iteration1 Values 60 0.8 800 100 0.8 1350 f(x) f1(x) f2(x) f3(x) f4(x) f5(x) Values 4.4725 1.1546*108 0.1508 0.6221 0.0838
Iteration2 Preferences x x1 I<={1} I=={4,5} I0={2,3} x2 x3 x4 x5 x6 Values 78.5556 1.0273 962.315 190.5411 0.8222 1548.7 f(x) f1(x) f2(x) f3(x) f4(x) f5(x) Values 4.1153 1.1763*108 0.1613 0.6196 0.0956 I<={1,4} I=={5} I={2} I0={3} Preferences x x1 x2 x3 x4 x5 x6
Iteration3 Values 82.334 1.0024 975.57 306.81 0.8751 1560.2 f(x) f1(x) f2(x) f3(x) f4(x) f5(x) Values 4.4727 1.1546*108 0.1508 0.622 0.0840
Conclusions:
Theproposedmethodisaviablealternativetothetraditionally approach,beingeasytouseandsystematic.Canprovidean accuratesolution. Themainadvantagesare:
donotrequireadvancedprogrammingknowledge. canbeusedinbothdesignandoperationphaseofaplant.Inthe
FurtherPerspectives:
analysisoftheproposedstrategy
Optimizationalgorithm Improvings :