Lesson Outcomes
Having worked through this chapter the Student will be able to:
www.utp.edu.my
2/19/2014
Completion Equipments
1. 2. 3. 4. 5. 6. 7. Production Tubing Wellhead Systems X-mas Tree Packers Nipple and Mandrel Systems Sub-Surface Safety Systems Tubing-Annulus Communication Equipment
1. Production Tubing
Design of production tubing should satisfy the following criteria: Minimising pressure drop High strength for suspension of tubing joints High internal pressures for fluids flow High external pressures (between annulus & tubing) Resistant to chemical corrosion
www.utp.edu.my Well design and completion
2/19/2014
Production Tubing
Tubing Diameter OD + lbs/ft (4 OD, 9.5 lbs/ft) Tensile Strength H-40, C-75, L-80, et al Number is an indication of minimum yield strength multiply 1000 in psi. Letter grades indicate the manufacturing process Internal Pressure Internal vs differential pressure Burst pressure is calculated for gas filled tubing Maximum generally occurs at surface
www.utp.edu.my Well design and completion
Production Tubing
External Pressure Collapse is most likely at the bottom of the well Corrosion Acid corrosion; i.e. CO2 Sulphide stress cracking/hydrogen embitterment; i.e. H2S Some treatment use of inhibitor Coupling Types Connections that require internal pressure Metal to metal
www.utp.edu.my
2/19/2014
2. Wellhead Systems
www.utp.edu.my
Wellhead Systems
It has the following functions: Suspension of casings and tubings Flanging up fluid flow devices X-mas tree and/or BOPs Hydraulix communication with annulus Application in an offshore platforms or land based, wellhead can be devided into: Conventional Spool System Compact Spool Systems Mud Line Suspension System
www.utp.edu.my Well design and completion
2/19/2014
www.utp.edu.my
2/19/2014
www.utp.edu.my
www.utp.edu.my
2/19/2014
Wellhead is built up on the seabed, but production well be completed back to the platform. A wellhead built up on the seabed will be used to suspend casing strings Each casing will have an extension string from subsea wellhead to a subsidiary wellhead at the platform where the BOP and X-mas tree will be attached.
www.utp.edu.my
3. X-mas Tree
It is a system of valves which controls physical or hydraulic access into the tubing string or the annulus. The access capabilities required are: Capability to inject fluids Capability to produce fluids Capability to lower wireline service tool Capability to completely close the well Manually controlled valve and remotely controlled valve (hydraulically)
www.utp.edu.my
2/19/2014
X-mas Tree
One major disadvantage of cross piece Xmas Tree is the large number of flanges significantly increased possibility of leakage.
www.utp.edu.my
X-mas Tree
A solid block construction uses of a yoke piece configuration Normally the Xmas Three is connected by a flange or clamp to the top of the wellhead.
www.utp.edu.my Well design and completion
2/19/2014
4. Packers
It provides physical isolation of the casing/tubing annulus above the production zone. Provide well protection Corrosion protection Abrasion protection Casing/wellhead burst protection Production stability Production annulus heading
www.utp.edu.my
Packers
Zonal Isolation Selective or segregate production Annulus to Tubing Injection Gas lift or chemical Injection Operations Economic injection rate or fracturing Temporary Isolation Bridge plug
www.utp.edu.my
2/19/2014
Packers
Packers have four key features:
1. 2. 3. 4. Slip Cone Packing-element system Body or mandrel.
The slip device penetrate and grip the casing wall when the packer is set. The cone drives the slip outward and into the casing wall when setting force is applied to the packer. Once the slips have anchored into the casing wall, additional applied setting force energizes the packing-element system and creates a seal between the packer body and the inside diameter of the casing.
www.utp.edu.my Well design and completion
Packer Classifications
Permanent Packer
Permanent packers difficult to remove and it can be removed from the wellbore only by milling. Retrieval is usually accomplished by some form of tubing manipulation The permanent packer is fairly simple and generally offers higher performance in both temperature and pressure.
Retrievable Packer
The retrievable packer may or may not be resettable, but removal from the wellbore normally does not require milling. The retrievable packer can be very basic for low pressure/low temperature (LP/LT) applications or very complex in high pressure/high temperature (HP/HT) applications. This packer will invariably cost more with the same quality of permanent packer
www.utp.edu.my Well design and completion
10
2/19/2014
Packers Selection
Casing and tubing size Depth of the well and bottom-hole pressure Annular fluid type and differential pressure Extent of thermal stress and potential forces Need for tubing retrieval without the packer Bore size offered by the packer Completion string equipment compatibility The deviation angle, effect on setting mechanism
www.utp.edu.my
www.utp.edu.my
11
2/19/2014
www.utp.edu.my
www.utp.edu.my
12
2/19/2014
Disadvantages
Not 100% reliable Performance could be affected due to solid deposition Testing of valve operation is not easy
www.utp.edu.my
www.utp.edu.my
13
2/19/2014
www.utp.edu.my
Is it this?
A completion device that can be operated to provide a flow path between the production conduit and the annulus. Sliding sleeves incorporate a system of ports that can be opened or closed by a sliding component.
www.utp.edu.my
14
2/19/2014
www.utp.edu.my
Running Procedures