CBWSP PHASE-II : Detailed Engineering Report

Package-1 (CDS-1)-ASIND

DESIGN OF ECONOMIC PIPE SIZE FOR TRANSMISSION MAIN: PS Kotri toCWR Dantra
From :

PS Kotri

To:

CWR Dantra

Water Flow

Pipe Data
Dia

material

Class

Rate (Rs)

Cost/m

Initial

2015

2404 KLD

100

DI

K-7

973

973

Intermediate

2030

3149 KLD

150

DI

K-7

1317

1317

Ultimate

2045

4124 KLD

200

DI

K-7

1656

1656

250

Length of rising main

21560 m

DI

K-7

2131

2131

DI

K-7

2614

2614

6.96

336.96

7264.86

0.00

7991.34

7974.65

100

350

DI

K-7

3318

3318

3.09

47.93

1033.30

0.00

1136.63

1119.94

150

CWR Dantra

K-7

3944

3944

1.74

12.01

258.98

0.00

284.88

268.19

200

K-7

4752

4752

1.11

4.11

88.54

0.00

97.39

80.70

250

0.77

1.71

36.84

0.00

40.52

23.83

300

2404.26
3148.63
4123.61

60 %

400

DI

cost of pumpset per KW for 1st stage

15000 Rs

450

DI

cost of pumpset per KW for 2nd stage

25000 Rs

Interest rate

Details of Heads

10 %

2404.26

378.22 m

0.57

0.81

17.55

0.00

19.30

2.61

350

Life of electric motar & pump

15 Year

Ground level atCWR Dantra

355.53 m

0.44

0.43

9.23

0.00

10.16

-6.54

400

Energy charges Per KWH (for 1st stage)

5.2 Rs

I.L. atPS Kotri

376.72 m

0.34

0.24

5.24

0.00

5.76

-10.93

450

Energy charges Per KWH (for 2nd stage)

7.9 Rs

TWL ofCWR Dantra

361.53 m

16 Hr

Pump suction below GL

0 m

9.12

549.07

11838.03

0.00

13021.83

13005.14

Water col in Reservoir.

5 m

4.05

78.10

1683.76

0.00

1852.14

1835.44

150

staging

0 m

2.28

19.57

422.01

0.00

464.21

447.52

200

1 m

1.46

6.69

144.27

0.00

158.70

142.01

250

-16.69 m

1.01

2.78

60.02

0.00

66.03

49.33

300

0.74

1.33

28.60

0.00

31.46

14.76

350

0.57

0.70

15.04

0.00

16.55

-0.14

400

0.45

0.40

8.54

0.00

9.39

-7.30

450

Average pumping hours


Standby KW required

Ground Level at PS Kotri

Stage-1 st

100 %

Other losses

10 %

Losses in D/S pipe line I stage


II stage

2404.26

300

combined efficiency

Pipe size
in mm

30 Year

Value of coefficient CR using Modified Hazen Williams formula


Design period

Frictional losses as per Modified Hazen William Formula


Velocity
Frictional
Frictional loss in Losses in Friction + Total head
in m/sec Head loss Per required length
d/s
other
for pump
1000 meter
connected losses in
pipe
pipe

0.00 m

Terminal Head

0.00 m

Total Static Head

Average discharge for I stage

2776 KLD

Average discharge for II stage

3636 KLD

Static Head considered for design

Average hours for I stage

14.11 Hr

Average hours for II stage

3148.63

3148.63

4123.61

4123.61

Stage-2 nd

-16.69 m
14.11 Hr

100

PS Kotri

CWR
Dantra

21560

378.221

355.528

2404.26

3148.63

4123.61

TABLE COMPARATIVE STATEMENT OF CAPITALISED COST OF RISING MAIN FOR DIFFERENT PIPE SIZES
1st Stage flow

S. No

Cost of
required
pipe
length

Cost of
Annual
pump set energy
charges

Kilo watt required

2nd Stage flow

Capitalised
Total for 1st Cost of
energy Chagres Stage
pump set
(2+3+5)

Annual
energy
charges

Capitalised Initial investment


energy
for 2nd stage
Chagres
pump and cap.
Energy Charges

Total cost
(Rs. In
Millions)
(6+10)

Economi
Pipe size cal Pipe
(mm)
Size (mm
dia)

1st Stage

2nd Stage

10

11

20.98

213.69

190.87

1451.74

1686.41

760.66

619.31

4710.48

1309.75

2996.15

100

7122.94

15213.13

28.39

30.01

26.80

203.88

262.28

107.35

87.40

664.80

184.85

447.13

150

1000.33

2147.06

35.70

7.19

6.42

48.82

91.71

26.17

21.31

162.09

45.07

136.78

200

239.55

523.50

45.94

2.16

1.93

14.69

62.80

8.31

6.76

51.44

14.30

77.10

250

72.08

166.12

56.36

4.34

61.33

2.35

17.87

4.97

66.30

300

21.28

57.71

71.54

0.07

0.06

0.48

72.08

0.86

0.70

5.35

1.49

73.57

350

2.33

17.27

85.03

-0.18

-0.16

-1.19

83.67

-0.01

-0.01

-0.05

-0.01

83.65

400

-5.84

-0.17

102.45

-0.29

-0.26

-1.99

-0.35

-2.64

-0.74

99.44

450

-9.76

-8.54

0.64

0.57

Economic size of pumping main is

100.17

300 mm dia DI

PRACTICALLY ADDOPTED SIZE

2.89

-0.43
K-7

pipe & capital investment is Rs


300 mm dia DI

66

<-------

Electrical Energy Charges (Rs.)

SP (18.65
KW)

MP (>18.65
KW 112
KW)

HT
(> 112
KW)

1st Stage
(year 2015)

5.20

5.60

6.00

2nd Stage
(year 2030)

7.90

8.50

9.10

Millions

K-7

PHED, Rajasthan

ABSTRACT OF 223902264.xls.ms_office
ABSTRACT
RISING MAIN Table - Links
Link ID
PS Kotri
TOTAL

Length
m

PUMPING STATION
PS Kotri

200mm

250mm

CWR Dantra
0
CAPACITY OF ESRs

CWR
CAPACITY IN KL

Diameter
150mm

CWR Dantra
420
CAPACITY OF PUMP
Q IN LPS
HEAD IN M
56.04
25.00

300mm
350mm
21560
0
21560