Work Center transaction codes

CEWB: Engineering Workbench CC04: Display product structure CR01, CR02, and CR03: Create, change and display work center respectively. CA85 Replace work center CR11, CR12, and CR13: Create, Change and Display capacity respectively. CR21, CR22, and CR23: Create, Change and Display hierarchy respectively. CR60: This transaction code is used for Work center information system CR05: Work center list CR06: Cost center assignments CR07: Work center capacities CR08: Work center hierarchy CA80: Work center usage CR15: Capacity usage CR10: Work center change document CR03: Display work center CR13: Display capacity CR23: Display hierarchy

BOM

CS01, CS02, and CS03: Create, Change and Display BOM. CS11: Explode BOM level by level single and multi level CS12: Explode multi-level BOM CS13: Display summarized BOM CS03: Display single-level BOM

Routing transaction codes


CA01, CA02, and CA03: Create, Change and Display routing respectively CA11, CA12, and CA13: Create, Change and Display reference operation set respectively. CA12, CA22, and CA23: Create, Change and Display rate routing respectively. CA31, CA32, and CA33: Create, change and Display reference rate routing respectively. CA85: Replace work center CA95: Replace reference operation set/reference rate routing CA75: This transaction code is used for Replace PRT CA97: Schedule material masters

CA96: Update material masters CA99: With archiving CA98: Without archiving CA70: PRT use CA90: Reference operation set usage CA80: Work center usage CA51: Print list CA60: Routing changes CA63: Rate routing display documents CA64: Reference rate routing change documents

Capacity

CM21: Capacity leveling work center view Capacity planning table CM22: Capacity leveling work center view Capacity planning table (tabular form) CM27: Capacity leveling individual capacity view Capacity planning table CM28: Capacity leveling individual capacity view Capacity planning table (tabular form) CM31: Capacity leveling order view Capacity planning table CM23: Capacity leveling order view Capacity planning table (tabular form) CM25: Variable capacity leveling: Online CM40: Variable capacity leveling: Execute in the background CM41: Variable capacity leveling: Background log CM32: Capacity leveling project view Capacity planning table CM26 Capacity leveling project view Capacity planning table (tabular form) CN22, CN23: Capacity requirements Change, display network respectively MD12, MD13: Capacity requirements Change, display planned order respectively CM01: This transaction code is used for Capacity evaluation work center view: Load CM02: Capacity evaluation work center view: Orders CM03: Capacity evaluation work center view: Pool CM04: Capacity evaluation work center view: Backlog CM05: Capacity evaluation work center view: Overload CM07: Variable capacity evaluation CM50: Extended evaluation: Work center view CM51: Extended evaluation: Individual capacity view CM52: This transaction code is used for extended evaluation: Order view

CM53: Extended evaluation: Project view: WBS element/operation CM54: Extended evaluation: Project view: Version CM55: Extended evaluation: Work center/Version

Planning tcodes

MD25, MD26, and MD27: Create, Change and display planning calendar respectively. MDL1, MDL2, and MDL3: Create, Change and Display production lot respectively. MD01: Total planning online MDBT: Total planning in background MD03: This transaction code is used for Single-item, single-level planning MD02: Single-item, multi-level planning MD43: Interactive single-item planning MD50: Multi-level, make-to-order planning MD51: Multi-level project planning MD20, MD21: Create and Display planning file entry respectively. MD11 and MD12: Create and change planned order respectively. MD13 and MD16: Individual and collective access of planned order respectively MDLD: print MRP list. MD61, MD62, and MD63: Create, Change and display planned independent requirements respectively

MS31, MS32, and MS33: Create, Change and Display planning scenario respectively. MF50, MF52: Change and Display planning table respectively. CO01, CO02, and CO03: Create, Change, and display production control order respectively.