NOTES:

1.Excavation to be confirmed by the Engineer before concrete blinding is laid. 2. Weak pockets of bearing strata to be dug out and filled with 1:4:8 mass concrete. 3. CONCRETE MIXES (a) Mass concrete to have a minimum works cube strength of 15N/mm^2 at 28days with 40mm Aggregate size. (b) Reinforced concrete to have a minimum works cube strength of 25N/mm^2 at 28days with 20mm maximum

B1 B1 B1 B1 B1 B1

B1

aggregate size. 4. REINFORCEMENT (a) High Yield bars to be square twisted cold formed bars to BS4461 and are marked 'Y'on these drawings.

50 230

SITE DIMENSIONS

200 150

50 230

SITE DIMENSIONS

200 150

A
C1 C1 C1 C1 C1 2 B1 C2 B1 C2 B1 B1 B1 B1 B1 C1 C1 C1 C1 C1
5000 5000 5000 5000 30000

C1

C1

(b) Mild steel bars Marked 'R' on these dwgs to be round bars to BS 4483. 5.MINIMUM COVER TO ALL STEEL IN (i) Foundation, stubcolumns, column bases & ground beams =40mm (ii)Beams =25mm (iii) Slabs = 40mm (iv) Columns =30mm (v) Bot. slab =20mm 6. GEOTECHNICAL INVESTIGATIONS SHOULD BE DONE BEFORE CONSTRUCTION

5000

B1

B1

B 3 6 4

C2

C2

5000

690
SECTION 2-2 THRU FOUNDATION

B1

B1

C2

C2

5000

B1

B1

C1

C1

690

SECTION 1-1 THRU FOUNDATION

5000

5000

STRUCTURAL & CIVIL ENGINEERS

PROPOSED WAREHOUSE AND SUPPORT FACILITIES PROJECT CLIENT TITLE AT PLOT............, BLOCK .........., MBALE. Ms OSILO GRACE, P.O.BOX........., TEL.................. FOUNDATION LAYOUT DETAILS

FOUNDATION LAY OUT

ARCHITECT DESIGNED DRAWN SCALE DRG NO.

................................

1:50, 1:25 19012008

DATE SHEET NO.

JUNE 2010 01

NOTES:
1.Excavation to be confirmed by the Engineer before concrete blinding is laid. 2. Weak pockets of bearing strata to be dug out and filled with 1:4:8 mass concrete. 3. CONCRETE MIXES (a) Mass concrete to have a minimum works cube strength of 15N/mm^2 at 28days with 40mm Aggregate size. (b) Reinforced concrete to have a minimum works cube strength of 25N/mm^2 at 28days with 20mm maximum aggregate size. 4. REINFORCEMENT (a) High Yield bars to be square twisted cold formed bars to BS4461 and are marked 'Y'on these drawings. (b) Mild steel bars Marked 'R' on these dwgs to be round bars to BS 4483. 5.MINIMUM COVER TO ALL STEEL IN (i) Foundation, stubcolumns, column bases & ground beams =40mm (ii)Beams =25mm (iii) Slabs = 40mm (iv) Columns =30mm (v) Bot. slab =20mm 6. GEOTECHNICAL INVESTIGATIONS SHOULD BE DONE BEFORE CONSTRUCTION

300

TRUSS T1 TRUSS T1

TRUSS T1

TRUSS T1 TRUSS T1

TRUSS T1 TRUSS T1

15000

2Y16 R8-200C/C 2Y16

230

TYP. SECTION THRU RING BEAM

D
5000 5000 5000 5000 30000 STRUCTURAL & CIVIL ENGINEERS
PLOT 967 MBOGO ROAD KIBULI TEL O77838691,075693987,031261050

5000

5000

ROOF AND RING BEAM LAY OUT

PROPOSED WAREHOUSE AND SUPPORT FACILITIES PROJECT CLIENT TITLE AT PLOT............, BLOCK .........., MBALE. Ms OSILO GRACE, P.O.BOX........., TEL..................

ARCHITECT DESIGNED DRAWN SCALE DRG NO.

................................

1:50, 1:10 19012008

DATE SHEET NO.

JUNE 2010 04

NOTES:
1.Excavation to be confirmed by the Engineer before concrete blinding is laid. 2. Weak pockets of bearing strata to be dug out and filled with 1:4:8 mass concrete. 3. CONCRETE MIXES (a) Mass concrete to have a minimum works cube strength of 15N/mm^2 at 28days with 40mm Aggregate size. (b) Reinforced concrete to have a minimum works cube strength of 25N/mm^2 at 28days with 20mm maximum aggregate size. 4. REINFORCEMENT (a) High Yield bars to be square twisted cold formed bars to BS4461 and are marked 'Y'on these drawings. (b) Mild steel bars Marked 'R' on these dwgs to be round bars to BS 4483.

2x3Y10-16-300 T

400

2x2Y10-17 B

5000

B.R.C MESH B.S No.A142

6900

34Y16-1/R-18-ALT

B.R.C MESH B.S No.A142

A
5000 5000 5000 5000 30000

2x3Y10-16-300 T

5.MINIMUM COVER TO ALL STEEL IN (i) Foundation, stubcolumns, column bases & ground beams =40mm (ii)Beams =25mm (iii) Slabs = 40mm (iv) Columns =30mm (v) Bot. slab =20mm 6. GEOTECHNICAL INVESTIGATIONS SHOULD BE DONE BEFORE CONSTRUCTION

5000

5000

2x2Y10-17 B

B.R.C MESH B.S No.A142

B 3 6 4

5000

2Y16 R8-200C/C

2Y16

230

TYP. SECTION THRU grid A(1-7),D(1-7),7(A-D)

5000

2985

D
STRUCTURAL & CIVIL ENGINEERS
PLOT 967 MBOGO ROAD KIBULI TEL O77838691,075693987,031261050

5000

REINFORCEMENT DETAILS - SUSPENDED FLOOR SLAB

PROPOSED WAREHOUSE AND SUPPORT FACILITIES PROJECT CLIENT TITLE AT PLOT............, BLOCK .........., MBALE. Ms OSILO GRACE, P.O.BOX........., TEL.................. SUSPENDED SLA, BEAMS AND SECTION DETAILS

ARCHITECT DESIGNED DRAWN SCALE DRG NO.

................................

1:50 , 1:10 19012008

DATE SHEET NO.

JUNE 2010 02

NOTES:

1.Excavation to be confirmed by the Engineer before concrete blinding is laid.

X
2Y16-02 2Y16-02 25R8-01-200C/C 25R8-01-200C/C

1Y16-04-at column connection

1Y16-04-at column connection 25R8-01-200C/C

2Y16-03

2. Weak pockets of bearing strata to be dug out and filled with 1:4:8 mass concrete. 3. CONCRETE MIXES (a) Mass concrete to have a minimum works cube strength of 15N/mm^2 at 28days with 40mm Aggregate size.

(b) Reinforced concrete to have a minimum works cube

strength of 25N/mm^2 at 28days with 20mm maximum

3Y16-02

3Y16-02

3Y16-02

X 5000 B E A M ( 230 X 500) on grid 1(A-D), grid 2(A-D).


B.S No.142 B.R.C MESH 18
125 125

5000

5000
50 55
38

aggregate size. 4. REINFORCEMENT (a) High Yield bars to be square twisted cold formed bars to BS4461 and are marked 'Y'on these drawings.

400

190

55

50

(b) Mild steel bars Marked 'R' on these dwgs to be round bars to BS 4483.

60x30x3mm SHS from Truss 1


230 200 125

18

18

18

18

18

18

3414
SECTION THRU MAXPAN SLAB M-M

0 1000
1327

1000

1000

1023

-Gauge 28 roof sheeting -40x40x3mm ties and struts -60x40x3mm rafter and tie beam -150mm Z-purlins

5mm PLATE 18 HOLES TO RECEIVE 4M16mm J-BOLTS


37

5mm welds

5.MINIMUM COVER TO ALL STEEL IN (i) Foundation, stubcolumns, column bases & ground beams =40mm (ii)Beams =25mm (iii) Slabs = 40mm (iv) Columns =30mm (v) Bot. slab =20mm

Plan A connection detail.

6. GEOTECHNICAL INVESTIGATIONS SHOULD BE DONE BEFORE CONSTRUCTION

1991 572 1630

03

03

200

1577

976

985

985

985

985

1008 15000
200 150

TRUSS T1

300

01

02 02 02

2400
75Y12-06-200C/C
6Y12-01-200c/c 6Y12-02-200c/c 6Y12-03-200c/c 6Y12-04-200c/c 6Y12-05-200c/c 6Y12-07-200c/c 6Y12-08-200c/c 6Y12-09-200c/c 6Y12-10-200c/c

900

2400

1200
SITE DIMENSIONS

230

XR8-04-175C/C

1100

4Y20-03
300

TYP. SECTION THRU X-X grid 1(A-D),2(A-D)


Y12-02
50 300

300

230

04

04

230

4Y16-04 6Y16-04+2Y12-05

01

12R8-01-175C/C

1500

2000

Z
230
04

04

05

04 04

2400

900

2400

1200
LEVEL 2
13Y12-06-200C/C

10Y12-02-150C/C

1350

1500

TREADS RISERS WAIST


Y12-07

300mm. 150mm. 150mm.


LANDING
9Y12-06-200C/C

Y12-10 Y12-09 Y12-08


00 24
200 150

10Y12-01-150C/C

300

TYP. SECTION THRU COLUMN BASE B1

04

05

04

200

STAIR CASE 1 PLAN

Y12-01
400

12R8-01-175C/C

04

04

SECTION THRU Z-Z

03 04 03

2000

SECTION THRU Z-Z

01

400

400

02 02 02
03 03 04

230
Y1 2-0 6-2 C/C
03 03

C2

X X X

Y12-05
14R8-01-175C/C

14R8-01-175C/C

230 6Y16-02+2Y12-03

4Y20-02

02

02

Y12-04

COLUMN BASE B1 (1500X1500) 6 No.s thus.


SITE DIMENSIONS

2300

01

02

02

2300

TYP. SECTION THRU Y-Y grid 1(A-D),2(A-D)


400

SECTION THRU X-X

1350

1200

XR8-04-175C/C

Y12-02

29

2 Y1

-06

-20

/C 0C

230

Y12-03

02 02

03

02 02

6Y16-03+2Y12-05 10Y12-01-150C/C
10Y12-02-150C/C

02

03

02

SECTION THRU X-X

230

STRUCTURAL & CIVIL ENGINEERS

15075

Y12-02
200 150

03

05

03

1500

04

PLOT 967 MBOGO ROAD KIBULI


15075 50 300

TEL O77838691,075693987,031261050

LEVEL 1
06 06

Y12-01
SITE DIMENSIONS
06 06 06

Y12-01
1500
50 230

03

05

03

PROPOSED WAREHOUSE AND SUPPORT FACILITIES

C1 TYP. SECTION THRU COLUMN BASE B1


690

PROJECT

AT PLOT............, BLOCK .........., MBALE.

CLIENT

Ms OSILO GRACE, P.O.BOX........., TEL..................

TITLE

FDNS,BEAMS,COLUMNS,TRUSS AND SECTION DETAILS

SECTION THRU STAIRCASE 1 PLAN

COLUMN BASE B1 (1500X1500) 14 Nos thus.

COLUMN TYPE C1 (14No.) 400x230mm

COLUMN TYPE C2 (6No.) 230x230mm

ARCHITECT

................................

DESIGNED

DRAWN

SCALE

1:25,1:10

DATE

JUNE 2010

DRG NO.

19012008

SHEET NO.

03