Professional Documents
Culture Documents
Production en ineer
Summery
WORK EXPERIENCE
Jan, 2014 Present
)rascomci
Pr !ess eng"neer
Suez, Egypt
I prepare a daily production report of EFCI, EFCII and EBIC Daily Monitoring of catalyst performance of ammonia plants. Daily monitoring of steam consumptions, analysis, and the boilers efficiencies. Accurately measure short stoppage time. Identify losses from break do ns. Do case studies.
Ju#, 2011 Present
)rascomci
Pr $u!t" n eng"neer
Suez, Egypt
I orked as a production engineer in the !rascomci industrial company "Egyptian Fertili#er Company$% In the ammonia plant. &here, I ha'e orked in the front, back end, compressor house, steam system and utilities. &here I (esponsible for smooth and safe running of the plant ,Familiar of all startup and shutdo n actions, )roubleshooting actions, Implementation of *ermit to &ork and )raining for +e Employees. Before that I ha'e orked a commissioning engineer in the period of recei'ing a ne boiler from )B, "boiler -./ tons 0* steam$. I had attended flushing of lines, boiler hydro test1 dry out, blo ing of 0* steam lines.
%ay, 200& ' Jan, 2011
Suez, Egypt
I had orked in the plant at the pre commissioning, commissioning of the ammonia plant "EFCII$, for brief I had attended all acti'ity of commissioning. )hen I had attended first start up of ammonia plant, compressors and utilities in the DC2. (esponsible for smooth, safe running of the plant, startup and shutdo n and troubleshooting actions.
%ar, 2002 ' %ay, 200&
Suez Egypt
I had orked in oriental petrochemical "polypropylene plant$ in the 3uality control lab.
E$u!at" n
*CS + !,em"!a# eng"neer"ng
C,em"!a#s eng"neer"ng .P/ ' g $ E#s, r u- a!a$emy, Egypt Jan, 200& ' Jun, 2011 Jan, 1001 ' Ju#y, 1000
.P/ e2!e##ent
I3 S-"##s
W"n$ 4s 5 O++"!e t #s /$6an!e$
C mment:
I am proud to inform you that, I ha'e completed my education hile I orked at !*C 4 !CI.