You are on page 1of 15

Activity Name

Start

Finish

OD

RD

03/01/13 A

08/05/14

523

159

03/31/14

08/05/14

127

127

03/31/14

08/05/14

127

127

Major Milestone

03/31/14

08/05/14

127

127

Major Milestone

03/31/14

Application for CRE Permit

08/05/14
03/31/14*

127
0

127
0

Initial Interconnection Completion (Contractual)

03/31/14*

Initial Interconnection Completion (Expected - Only 48" Pipeline(Red Line) Completion excl. F

05/19/14

> Initial Interconnection Completion (Expected - excl. East Side of Fence)

06/11/14

> Initial Interconnection Completion (Expected - incl. Fence Work)

07/15/14

Energizing

04/01/14

Mechanical Completion (for Compression Station)

05/31/14

Transfer Piping Work Finish

06/08/14

CRE Permit Approval

06/09/14

Gas Introduction to Compression Area - IIC(Only 48" Pipeline) + 45 days(Hot Tapping)

07/03/14

Substantial Completion (Contractual)

05/05/14*

Substantial Completion (Expected)

08/05/14

04/27/14

05/18/14

20

20

04/27/14

05/18/14

20

20

05/11/14

05/18/14
05/11/14

6
0

6
0

InterGen Altamira Compression Station_MPR_February


Milestones
Project Management

Construction
Mechanical
Compression Station (or Common)
Gas Compressor Installation Completion
Leak Test Start for Natural Gas Line (S-02~S-06)

05/18/14
04/27/14

04/27/14
04/27/14

0
0

0
0

03/01/13 A

04/14/14

410

46

03/01/13 A

04/14/14

410

46

03/01/13 A

04/14/14

410

46

Metering System - Manufacturing & Inspection

03/01/13 A
03/01/13 A
03/01/13 A

04/14/14
04/14/14
03/10/14

410
410
229

46
46
11

Metering System - Transportation

03/11/14

04/14/14

35

35

03/01/14 A
03/01/14 A

03/26/14
03/26/14

14
14

26
26

08/23/13 A

08/05/14

323

159

12/26/13 A

07/15/14

194

138

12/26/13 A

07/15/14

194

138

Civil DWG Issue (for Excavation)

01/03/14 A
01/03/14 A

03/06/14
03/06/14

63
7

7
7

Piping DWG Issue (Plot Plan, Piping Arrangement, ISO)

01/03/14 A

03/04/14

14

03/06/14*

Interconnection Zone
Pig Launcher & Receiver Installation Completion (Not yet decided)

Procurement
Compression Station (or Common)
Instrument
Equipment
Metering System with Alarm System

ESD Valves (36") - New


ESD Valves - Transportation

Construction
Interconnection Zone
New Schedule with New Valves
Engineering

Design Approval (Expected)

Mar
17

Apr
18

May
19

Jun
20

> Initial Interconnection Completion (Expected - incl. Fence W


Energizing
Mechanical Completion (for Compression Station)
Transfer Piping Work Finish
CRE Permit Approval
Gas Introduction to Compression Area - IIC(Only 48" Pipeline) + 45 days
Substantial Completion (Contractual)
Substantial Completion (Expected)

Gas Compressor Installation Completion


Leak Test Start for Natural Gas Line (S-02~S-06)
Pig Launcher & Receiver Installation Completion (Not yet decided)

Metering System - Manufacturing & Inspection, Metering System - Manufacturing & Inspection
Metering System - Transportation
ESD Valves - Transportation, ESD Valves - Transportation

Civil DWG Issue (for Excavation), Civil DWG Issue (for Excavation)
Piping DWG Issue (Plot Plan, Piping Arrangement, ISO), Piping DWG Issue (Plot Plan, Piping Arrangement, ISO)
Design Approval (Expected)

26
11

New G/H Ball Valve (48") - Transportation

02/28/14 A

03/25/14

26

26

Existing Pipe Hot Cutting - 5 Points (2 for Elbows, 3 for Pipes)

01/10/14 A
03/01/14 A

04/26/14
03/05/14

107
5

58
3

Spool Transportation From Area 3 to LGCS Shop

03/06/14

03/06/14

Hot Cutting at the Shop - 4 Points

03/07/14

03/08/14

Shop Welding - 4 Points

03/09/14

03/14/14

Re-setting Existing Line (North)

01/10/14 A

03/13/14

14

Field Cold Cutting - 3 Points (2 for Elbows, 1 for 48x48 Tee)

03/14/14

03/18/14

Pipe Cold Cutting 1 Point (48" Header Line - Fitting)

03/14/14

03/15/14

Pipe Cold Cutting 1 Point (48" Header Line - Fitting)

48" Header Line Transportation to LGCS Shop

03/16/14

03/16/14

48" Header Line Transportation to LGCS Shop

Remaining Work
Critical Remaining Work

Oct
24

> Initial Interconnection Completion (Expected - excl. East Side of Fence)

44
25

Milestone

Sep
23

Initial Interconnection Completion (Expected - Only 48" Pipeline(Red Line) Completion excl. Fence Work

03/25/14
03/10/14

Actual Work

Aug
22

Initial Interconnection Completion (Contractual)

02/09/14 A
02/09/14 A

48" By-pass Line

Jul
21

Application for CRE Permit

New G/H Ball Valve (24") - Transportation

Procurement

2014

New G/H Ball Valve (24") - Transportation, New G/H Ball Valve (24") - Transportation
New G/H Ball Valve (48") - Transportation, New G/H Ball Valve (48") - Transportation
Existing Pipe Hot Cutting - 5 Points (2 for Elbows, 3 for Pipes), Existing Pipe Hot Cutting - 5 Points (2 for Elbows, 3 for Pipes)
Spool Transportation From Area 3 to LGCS Shop
Hot Cutting at the Shop - 4 Points

Project Overall Schedule

Shop Welding - 4 Points


Re-setting Existing Line (North), Re-setting Existing Line (North)
Field Cold Cutting - 3 Points (2 for Elbows, 1 for 48x48 Tee)

Date

Revision

Checked

Approved

Page 1 of 15
03/03/14

ISSUED FOR MONTHLY PROGRESS REPORT

H.S. LEE

J.L. NABORS

Activity Name

Start

Finish

OD

RD

48" Header Line Cold Cutting and Re-welding

03/17/14

03/26/14

10

10

Short Pipe Cutting & Counter Flange Spool Re-welding at XV-1003


48" Header Line Re-installation (Field)

03/19/14

03/24/14

03/27/14

03/30/14

Spool Transportation from LGCS Shop to Area 3

03/15/14

03/17/14

Spool Transportation from LGCS Shop to Area 3

Excavation and Sand Bedding (48" Bypass Line)

03/16/14

03/18/14

Excavation and Sand Bedding (48" Bypass Line)

Field Welding - 9 Points (2 for Elbow-Pipe, 4 for Pipe-Pipe, Incl. 160mm Short Pipes)

03/19/14

04/07/14

20

20

RAM-100 Coating & Holiday Test

04/08/14

04/11/14

48" By-pass Backfilling & Compaction

04/12/14*

04/26/14

15

15

Concrete Pouring for Anchor Block Work for 48" Line

04/29/14
04/29/14

05/19/14
05/01/14

21
3

21
3

Form Removal for Anchor Block Work for 48" Line

05/08/14

05/09/14

Backfilling & Compaction for Anchor Block Work for 48" Line

05/10/14

05/19/14

10

10

Pig & Valve Foundation Removal (48", 36" and 24")

02/26/14 A
02/26/14 A

06/18/14
03/06/14

113
5

111
7

Pig & Valve Foundation Work (48", 36" and 24")

03/07/14

03/26/14

20

20

Anchor Block Work for 48" Line (North & South)

Interconnection 36" & 24" Piping Work

[Additional Purchasing] 24" Elbow 4EA and 36" Elbow 1EA - On-site

Mar
17

Apr
May
18
19
48" Header Line Cold Cutting and Re-welding

Jun
20

2014

Jul
21

Aug
22

Sep
23

Short Pipe Cutting & Counter Flange Spool Re-welding at XV-1003


48" Header Line Re-installation (Field)

Field Welding - 9 Points (2 for Elbow-Pipe, 4 for Pipe-Pipe, Incl. 160mm Short Pipes)
RAM-100 Coating & Holiday Test
48" By-pass Backfilling & Compaction
Concrete Pouring for Anchor Block Work for 48" Line
Form Removal for Anchor Block Work for 48" Line
Backfilling & Compaction for Anchor Block Work for 48" Line
Pig & Valve Foundation Removal (48", 36" and 24"), Pig & Valve Foundation Removal (48", 36" and 24")
Pig & Valve Foundation Work (48", 36" and 24")

03/31/14*

Excavation for 36" & 24" Line

04/24/14

05/03/14

10

10

Sand Bedding & Compaction for 36" & 24" Line

05/04/14

05/06/14

Pipe Cold Cutting, Fit-up, Welding and Re-welding (36" Line)

04/24/14

05/28/14

35

35

Pipe Cold Cutting, Fit-up, Welding and Re-welding (36" Line)

Pipe Cold Cutting, Fit-up, Welding and Re-welding (24" Line)

04/24/14

05/28/14

35

35

Pipe Cold Cutting, Fit-up, Welding and Re-welding (24" Line)

NDE for 36" & 24" Line

05/05/14

05/29/14

25

25

NDE for 36" & 24" Line

RAM-100 Coating & Holiday Test

05/30/14

06/05/14

36" & 24" Line Backfilling & Compaction

06/09/14

06/18/14

10

10

Painting for A/G 36" & 24" Piping

06/09/14

06/13/14

Valve Unloading (24" Valves)

03/07/14
03/11/14

03/29/14
03/11/14

23
1

23
1

Valve Unloading (48" Valves)

03/26/14

03/26/14

Actuator Installation (48", XV-1001)

03/27/14

03/27/14

Actuator Installation (48", XV-1001)

Actuator Installation (48", XV-1002)

03/28/14

03/28/14

Actuator Installation (48", XV-1002)

Actuator Installation (48", XV-1003)

03/29/14

03/29/14

Actuator Installation (24", XV-1006)

03/12/14

03/12/14

Actuator Installation (24", XV-1007)

03/13/14

03/13/14

Actuator Installation (24", XV-1007)

Actuator Installation (24", XV-1008)

03/14/14

03/14/14

Actuator Installation (24", XV-1008)

Actuator Installation (24", XV-1009)

03/15/14

03/15/14

Actuator Installation (24", XV-1010)

03/16/14

03/16/14

Actuator Installation (36", XV-1004)

03/07/14

03/07/14

Actuator Installation (36", XV-1004)

Actuator Installation (36", XV-1005)

03/08/14

03/08/14

Actuator Installation (36", XV-1005)

Valve Installation (48", XV-1001)

03/31/14
04/02/14

06/03/14
04/05/14

65
4

65
4

Valve Installation (48", XV-1002)

04/03/14

04/06/14

Valve Installation (48", XV-1003)

04/04/14

04/07/14

Valve Installation (24", XV-1006, 48" Line Header)

03/31/14

04/01/14

Valve Installation (24", XV-1007, 48" Line Header)

04/02/14

04/03/14

Valve Installation (24", XV-1008)

05/29/14

05/30/14

Valve Installation (24", XV-1009)

05/31/14

06/01/14

Valve Installation (24", XV-1010)

06/02/14

06/03/14

Valve Installation (36", XV-1004, 48" Line Header)

03/31/14

04/02/14

Valve Installation (36", XV-1005, 48" Line Header)

04/03/14

04/05/14

Water Filling

04/08/14
04/08/14

04/20/14
04/14/14

13
7

13
7

Holding Time (8 Hrs)

04/15/14

04/15/14

Water Draining

04/16/14

04/20/14

12/26/13 A
12/26/13 A

04/27/14
03/18/14

95
21

59
19

Actuator Installation

Valve Installation

Hydrotest for 48" Line

Pig Launcher & Receiver (Not Yet Decided)


PO for Repair Work of Pig Launcher & Receiver
Actual Work
Remaining Work
Critical Remaining Work

Milestone

Oct
24

[Additional Purchasing] 24" Elbow 4EA and 36" Elbow 1EA - On-site
Excavation for 36" & 24" Line
Sand Bedding & Compaction for 36" & 24" Line

RAM-100 Coating & Holiday Test


36" & 24" Line Backfilling & Compaction
Painting for A/G 36" & 24" Piping
Valve Unloading (24" Valves)
Valve Unloading (48" Valves)

Actuator Installation (48", XV-1003)


Actuator Installation (24", XV-1006)

Actuator Installation (24", XV-1009)


Actuator Installation (24", XV-1010)

Project Overall Schedule

Valve Installation (48", XV-1001)


Valve Installation (48", XV-1002)
Valve Installation (48", XV-1003)
Valve Installation (24", XV-1006, 48" Line Header)
Valve Installation (24", XV-1007, 48" Line Header)
Valve Installation (24", XV-1008)
Valve Installation (24", XV-1009)
Valve Installation (24", XV-1010)
Valve Installation (36", XV-1004, 48" Line Header)
Valve Installation (36", XV-1005, 48" Line Header)
Water Filling
Holding Time (8 Hrs)
Water Draining
PO for Repair Work of Pig Launcher & Receiver, PO for Repair Work of Pig Launcher & Receiver
Date

Revision

Checked

Approved

Page 2 of 15
03/03/14

ISSUED FOR MONTHLY PROGRESS REPORT

H.S. LEE

J.L. NABORS

Activity Name

Start

Finish

Transportation from Site to Repair Shop

03/19/14

Repair Work of Pig Launcher & Receiver (Incl. Test & Inspection)
Transportation from Repair Shop to Site

2014

OD

RD

03/20/14

03/21/14

04/09/14

20

20

04/10/14

04/11/14

Pig Launcher - Installation (Incl. Piping Work)

04/12/14

04/25/14

14

14

Pig Receiver - Installation (Incl. Piping Work)

04/14/14

04/27/14

14

14

N2 Manifold Installation

06/04/14
06/04/14

06/08/14
06/05/14

5
1

5
1

N2 Pressurization 87.5 bar

06/06/14

06/07/14

N2 Pressurization 87.5 bar

Hold Time 24 hrs

06/07/14

06/08/14

Hold Time 24 hrs

Venting

06/08/14

06/08/14

Venting

Cap Cutting & Fit-up for South Golden Joint

04/21/14
04/21/14

05/08/14
04/21/14

18
1

18
1

Welding for South Golden Joint

04/22/14

04/25/14

Welding for South Golden Joint

NDE for South Golden Joint

04/24/14

04/25/14

NDE for South Golden Joint

RAM-100 Painting & Holiday Test for South Golden Joint

04/26/14

04/28/14

Backfilling & Compaction for TP-South

04/29/14

05/08/14

10

10

Painting for South A/G Piping

04/21/14

04/27/14

Cap Cutting & Fit-up for North Golden Joint

04/21/14
04/21/14

05/08/14
04/21/14

18
1

18
1

Welding for North Golden Joint

04/22/14

04/25/14

Welding for North Golden Joint

NDE for North Golden Joint

04/24/14

04/25/14

NDE for North Golden Joint

RAM-100 Painting & Holiday Test for North Golden Joint

04/26/14

04/28/14

Backfilling & Compaction for TP-North

04/29/14

05/08/14

10

10

Painting for North A/G Piping

04/21/14

04/27/14

Fence Work (West)

04/22/14
04/22/14

07/15/14
05/21/14

85
30

85
30

Fence Work (North & South)

05/18/14

06/11/14

25

25

Fence Work (East)

06/16/14

07/15/14

30

30

01/25/14 A

06/03/14

130

96

01/25/14 A

06/03/14

130

96

Preparation for CRE Permit

01/25/14 A
01/25/14 A

05/11/14
05/10/14

106
75

72
72

Application for CRE Permit

05/11/14*

Pneumatic Test for 36" & 24" Lines (incl. Transfer Line)

48" Main Line Work (South)

48" Main Line Work (North)

Fence Work

Transfer Piping
New Schedule with New Valves (Incl. Tunneling)
Permit

Mar
17

Apr
May
18
19
Transportation from Site to Repair Shop

Jun
20

Pig Receiver - Installation (Incl. Piping Work)


N2 Manifold Installation

Cap Cutting & Fit-up for South Golden Joint

RAM-100 Painting & Holiday Test for South Golden Joint


Backfilling & Compaction for TP-South
Painting for South A/G Piping
Cap Cutting & Fit-up for North Golden Joint

RAM-100 Painting & Holiday Test for North Golden Joint


Backfilling & Compaction for TP-North
Painting for North A/G Piping
Fence Work (West)
Fence Work (North & South)
Fence Work (East)

Preparation for CRE Permit, Preparation for CRE Permit


Application for CRE Permit

36" NG Pipe Weling & Installation (Incl. NDE, Vent & RAM-100 Coating)

17
17

End Point Sealing & Insert Machine Takeout

03/16/14

03/16/14

36" Anchor Block Excavation & Lean Con'c Pouring

03/18/14
03/18/14

05/19/14
03/25/14

63
8

63
8

Re-bar & Form Work

05/01/14

05/10/14

10

10

Re-bar & Form Work

Concrete Pouring

05/11/14

05/12/14

Concrete Pouring

Form Removal

05/19/14

05/19/14

Hydro Test for Anchor Flange (6m 2EA, 12m 1EA, Anchor Flange 2EA)

03/11/14
03/11/14

06/03/14
03/18/14

85
7

85
7

Installation of Anchor Flange Spool after Hydro Test

03/26/14

03/26/14

36" NG Pipe Fit-up & Welding (Incl. Anchor Flange)

03/27/14

04/30/14

35

35

36" Boring Point Tie-in & Welding

03/27/14

03/31/14

NDE for Transfer Line

03/24/14

05/02/14

40

40

Backfilling & Compaction

05/15/14

06/03/14

20

20

08/23/13 A

08/05/14

323

159

02/10/14 A

04/28/14

87

60

03/01/14
03/01/14
03/01/14

03/10/14
03/10/14
03/10/14

10
10
10

10
10
10

02/20/14 A

04/28/14

68

60

Compression Station (or Common)


Civil Works
Fence & Gate
Gate
Gate Installation
Road
Actual Work
Remaining Work
Critical Remaining Work

Milestone

Oct
24

Pig Launcher - Installation (Incl. Piping Work)

25
25

Transfer Piping Work

Sep
23

Transportation from Repair Shop to Site

03/16/14
03/16/14

Anchor Block Work for Transfer Line

Aug
22

Repair Work of Pig Launcher & Receiver (Incl. Test & Inspection)

02/25/14 A
02/25/14 A

Tunneling Work for 36" Line

Jul
21

36" NG Pipe Weling & Installation (Incl. NDE, Vent & RAM-100 Coating), 36" NG Pipe Weling & Installation (Incl. NDE, Vent & RAM-100 Coating)
End Point Sealing & Insert Machine Takeout
36" Anchor Block Excavation & Lean Con'c Pouring

Form Removal
Hydro Test for Anchor Flange (6m 2EA, 12m 1EA, Anchor Flange 2EA)
Installation of Anchor Flange Spool after Hydro Test
36" NG Pipe Fit-up & Welding (Incl. Anchor Flange)
36" Boring Point Tie-in & Welding
NDE for Transfer Line
Backfilling & Compaction

Gate Installation

Project Overall Schedule

Date

Revision

Checked

Approved

Page 3 of 15
03/03/14

ISSUED FOR MONTHLY PROGRESS REPORT

H.S. LEE

J.L. NABORS

Activity Name

Start

Finish

OD

RD

Grading & Cleaning

03/01/14
03/01/14

04/08/14
03/07/14

39
7

39
7

Sub-Base Course Rolling

03/18/14

03/24/14

Final Base Course

03/25/14

03/31/14

Final Wearing

04/01/14

04/08/14

CLEANING & DRAIN

02/20/14 A
02/20/14 A

04/28/14
04/18/14

50
50

60
50

Concrete Puring

02/22/14 A

04/23/14

30

55

Finishing

03/30/14

04/28/14

30

30

03/07/14
03/07/14
03/07/14

03/13/14
03/13/14
03/13/14

7
7
7

7
7
7

Excavation

02/10/14 A
02/10/14 A
02/10/14 A

03/29/14
03/29/14
03/19/14

20
20
20

30
30
20

Foundation Installation

02/15/14 A

03/24/14

25

Backfilling

02/15/14 A

03/29/14

30

Building Works

12/10/13 A

03/31/14

119

32

MCC Building
Floor Finish

12/10/13 A
02/10/14 A
02/10/14 A

03/20/14
03/07/14
03/07/14

107
20
20

21
8
8

12/10/13 A
12/10/13 A

03/20/14
03/20/14

30
30

21
21

Ceiling, Ceiling

02/20/14 A
02/20/14 A

03/14/14
03/14/14

20
20

15
15

Roof Work, Roof Work

02/10/14 A
02/10/14 A
02/10/14 A

03/31/14
03/07/14
03/07/14

50
10
10

32
8
8

Door & Window, Door & Window

02/10/14 A
02/10/14 A

03/07/14
03/07/14

7
7

8
8

02/28/14
02/28/14

03/09/14
03/09/14

10
10

10
10

03/27/14
03/27/14

03/31/14
03/31/14

5
5

5
5

02/28/14
02/28/14

03/14/14
03/14/14

15
15

15
15

Roof Work

02/20/14 A
02/28/14
02/28/14

03/14/14
03/13/14
03/13/14

14
14
14

15
14
14

Painting

02/20/14 A
02/20/14 A

03/14/14
03/14/14

14
14

15
15

Roof Work, Roof Work

02/28/14
02/28/14
02/28/14

03/13/14
03/09/14
03/09/14

14
10
10

14
10
10

02/28/14
02/28/14

03/13/14
03/13/14

14
14

14
14

Roof Work

02/28/14
02/28/14
02/28/14

03/14/14
03/14/14
03/14/14

15
15
15

15
15
15

Clading

05/06/14

05/11/14

Final Alignment

05/06/14
05/06/14
05/06/14

05/11/14
05/11/14
05/09/14

6
6
4

6
6
4

Inspection

05/10/14

05/11/14

05/06/14
05/06/14

05/11/14
05/09/14

6
4

6
4

Asphalt Road

Concrete

Equipment Foundation
Septic Tank_(T-201)
Backfilling
Lighting Pole Foundation
Common

Tile Work
Ceiling Finish
Ceiling
Water Proofing
Roof Work
EGG Building
Opening
Door & Window
Wall Finish
Painting
Floor Finish
Painting
Ceiling Finish
Painting
Water Proofing
Roof Work
Maintenance Building
Floor Finish
Painting
Water Proofing
Roof Work
Guard House
Floor Finish
Tile Work
Water Proofing
Roof Work
Fire Water Pump Shelter
Structure
Clading

Mechanical-Rotating
Compressor
Natural Gas Compressor_(C-201A)

Natural Gas Compressor_(C-201B)


Final Alignment
Actual Work
Remaining Work
Critical Remaining Work

Milestone

Mar
17

Apr
18

May
19

Jun
20

2014

Jul
21

Aug
22

Sep
23

Oct
24

Grading & Cleaning


Sub-Base Course Rolling
Final Base Course
Final Wearing
CLEANING & DRAIN, CLEANING & DRAIN
Concrete Puring, Concrete Puring
Finishing

Backfilling

Excavation, Excavation
Foundation Installation, Foundation Installation
Backfilling, Backfilling

Tile Work, Tile Work

Painting, Painting
Painting
Painting

Tile Work

Project Overall Schedule

Final Alignment
Inspection
Final Alignment
Date

Revision

Checked

Approved

Page 4 of 15
03/03/14

ISSUED FOR MONTHLY PROGRESS REPORT

H.S. LEE

J.L. NABORS

Activity Name

Start

Finish

OD

RD

05/10/14

05/11/14

Final Alignment

05/06/14
05/06/14

05/11/14
05/09/14

6
4

6
4

Inspection

05/10/14

05/11/14

Final Alignment

05/06/14
05/06/14

05/11/14
05/09/14

6
4

6
4

Inspection

05/10/14

05/11/14

Mechanical-Stationary

02/28/14

04/27/14

59

59

Nitrogen (N2)
N2 Bottle Rack_(N-201)
Foundation Check & Padding Work

02/28/14
02/28/14
02/28/14

03/09/14
03/09/14
03/02/14

10
10
3

10
10
3

Installation

03/03/14

03/05/14

Centering & Alignment

03/06/14

03/08/14

Inspection

03/09/14

03/09/14

Foundation Check & Padding Work

02/28/14
02/28/14
02/28/14

03/08/14
03/08/14
03/02/14

9
9
3

9
9
3

Installation

03/03/14

03/05/14

Centering & Alignment

03/06/14

03/07/14

Centering & Alignment

Inspection

03/08/14

03/08/14

Inspection

Installation

02/28/14
02/28/14
02/28/14

03/14/14
03/01/14
02/28/14

15
2
1

15
2
1

Installation

Inspection

03/01/14

03/01/14

Inspection

02/28/14
02/28/14

03/14/14
03/14/14

15
15

15
15

Installation

04/15/14
04/15/14
04/15/14

04/27/14
04/27/14
04/24/14

13
13
10

13
13
10

Centering & Alignment

04/25/14

04/27/14

10/29/13 A

05/11/14

195

73

Field Installation

11/05/13 A
11/05/13 A
11/05/13 A

05/11/14
05/05/14
04/20/14

188
182
60

73
67
52

Field Installation, Field Installation

PWHT/NDE

11/25/13 A

04/25/14

57

PWHT/NDE, PWHT/NDE

Hydro & Pneumatic Test

04/26/14

05/05/14

10

10

Hydro & Pneumatic Test

04/26/14
04/26/14

05/05/14
05/05/14

10
10

10
10

Hydro & Pneumatic Test

04/26/14
04/26/14

05/05/14
05/05/14

10
10

10
10

Hydro & Pneumatic Test

04/26/14
04/26/14

05/05/14
05/05/14

10
10

10
10

Hydro & Pneumatic Test

04/26/14
04/26/14

05/05/14
05/05/14

10
10

10
10

Hydro & Pneumatic Test

Field Installation

11/25/13 A
04/09/14

05/11/14
04/24/14

168
16

59
16

PWHT/NDE

11/25/13 A

05/01/14

88

49

Hydro & Pneumatic Test

05/02/14

05/11/14

10

10

ESD Valves (36") - New


ESD Valves - Unloading & Actuator Installation

03/27/14
03/27/14

04/11/14
03/29/14

16
3

16
3

ESD Valves - Valve Installation

03/30/14

04/01/14

ESD Valves - Other Installation (Air Tank, Instrument, etc.)

04/02/14

04/08/14

ESD Valves - Loop Test & Function Test

04/09/14

04/11/14

10/29/13 A
02/06/14 A

04/15/14
04/06/14

169
60

47
38

Inspection
Natural Gas Compressor_(C-201C)

Natural Gas Compressor_(C-201D)

Column
Vent Column_(VC-201)

Tank Installation
Condensate Drain Tank_(V-201)

Raw Water Storage Tank_(T-202)


Painting
Metering Skid
Metering Skid_(M-203)

Piping Works
Natural Gas Piping Installation
Battery Limit to Separator

Gas Separator to Coalscing Filter


Hydro & Pneumatic Test
Coalscing Filter to Compressor
Hydro & Pneumatic Test
Compressor to NG Compressor Discharge Cooler
Hydro & Pneumatic Test
NG Compressor Discharge Cooler to Metering Skid
Hydro & Pneumatic Test
Metering Skid to Battery Limit

Utility Piping Installation


Plant Air Distribution System
Actual Work
Remaining Work
Critical Remaining Work

Milestone

Mar
17

Apr
18

May
19
Inspection

Jun
20

2014

Jul
21

Aug
22

Sep
23

Oct
24

Final Alignment
Inspection
Final Alignment
Inspection

Foundation Check & Padding Work


Installation
Centering & Alignment
Inspection

Foundation Check & Padding Work


Installation

Project Overall Schedule

Painting

Installation
Centering & Alignment

Field Installation
PWHT/NDE, PWHT/NDE
Hydro & Pneumatic Test
ESD Valves - Unloading & Actuator Installation
ESD Valves - Valve Installation
ESD Valves - Other Installation (Air Tank, Instrument, etc.)
ESD Valves - Loop Test & Function Test

Date

Revision

Checked

Approved

Page 5 of 15
03/03/14

ISSUED FOR MONTHLY PROGRESS REPORT

H.S. LEE

J.L. NABORS

Activity Name

Finish

A/G Pipe Fabrication & Installation

02/06/14 A

04/01/14

A/G Pipe Hydro-test

04/02/14

04/06/14

A/G Pipe Fabrication & Installation

02/10/14 A
02/10/14 A

03/12/14
03/09/14

30
30

13
10

A/G Pipe Hydro-test

03/10/14

03/12/14

A/G Pipe Fabrication & Installation

12/23/13 A
12/23/13 A

03/07/14
03/02/14

95
30

8
3

A/G Pipe Hydro-test

03/03/14

03/07/14

A/G Pipe Fabrication & Installation

12/16/13 A
12/16/13 A

03/15/14
03/10/14

103
30

16
11

A/G Pipe Hydro-test

03/11/14

03/15/14

A/G Pipe Fabrication & Installation

11/25/13 A
11/25/13 A

03/09/14
03/04/14

105
30

10
5

A/G Pipe Hydro-test

03/05/14

03/09/14

U/G Pipe Fabrication & Installation

10/29/13 A
10/29/13 A

03/31/14
03/07/14

154
61

32
8

U/G Pipe Hydro-test

03/08/14

03/13/14

A/G Pipe Fabrication & Installation

12/16/13 A

03/26/14

61

27

A/G Pipe Hydro-test

03/27/14

03/31/14

A/G Pipe Fabrication & Installation

11/25/13 A
11/25/13 A

03/31/14
03/25/14

127
44

32
26

A/G Pipe Hydro-test

03/26/14

03/31/14

U/G Pipe Hydro-test

12/16/13 A
02/28/14 A

03/31/14
03/04/14

119
5

32
5

A/G Pipe Fabrication & Installation

12/16/13 A

03/26/14

61

27

A/G Pipe Hydro-test

03/27/14

03/31/14

A/G Pipe Fabrication & Installation

12/23/13 A
12/23/13 A

04/15/14
04/10/14

134
61

47
42

A/G Pipe Hydro-test

04/11/14

04/15/14

A/G Pipe Fabrication & Installation

12/23/13 A
12/23/13 A

04/15/14
04/10/14

134
61

47
42

A/G Pipe Hydro-test

04/11/14

04/15/14

A/G Pipe Fabrication & Installation

12/23/13 A
12/23/13 A

04/15/14
04/10/14

134
61

47
42

A/G Pipe Hydro-test

04/11/14

04/15/14

A/G Pipe Fabrication & Installation

12/23/13 A
12/23/13 A

03/31/14
03/26/14

99
61

32
27

A/G Pipe Hydro-test

03/27/14

03/31/14

A/G Pipe Fabrication & Installation

11/25/13 A
11/25/13 A

03/31/14
03/26/14

127
61

32
27

A/G Pipe Hydro-test

03/27/14

03/31/14

01/06/14 A

03/13/14

79

14

MCC 1st FL System Air Conditon

01/06/14 A
01/06/14 A
01/06/14 A

03/13/14
03/13/14
03/13/14

79
51
32

14
14
14

MCC 1st FL System Air Conditon, MCC 1st FL System Air Conditon

MCC 1st FL HVAC & Exhaust Fan

01/17/14 A

03/13/14

32

14

MCC 1st FL HVAC & Exhaust Fan, MCC 1st FL HVAC & Exhaust Fan

02/28/14 A
02/28/14 A

03/13/14
03/13/14

10
10

6
6

02/28/14
02/28/14

03/04/14
03/04/14

5
5

5
5

02/17/14 A

03/29/14

30

30

AG Pipe Installation

02/17/14 A
03/03/14
03/15/14

03/29/14
03/29/14
03/29/14

30
27
15

30
27
15

Out door Hydrant

03/03/14

03/19/14

17

17

Plant Air System

Instrument Air System

Potable Water System

Raw Water System

Service Water System

Deminaeralized Water System

Oily water System

Nitrogen System

Condensate Drain System

Gas Venting System

Fuel Gas System

Seal gas System

HVAC Works
HVAC (by Building)
MCC Building

EGG Building
Air Conditon
Guard House
Air Conditon

Fire Fighting Works


Fire Fighting (by Area)
Yard

Actual Work
Remaining Work
Critical Remaining Work

Milestone

OD

RD

55

33

2014
Apr
May
Jun
18
19
20
A/G Pipe Fabrication & Installation, A/G Pipe Fabrication & Installation

Start

Mar
17

Jul
21

Aug
22

Sep
23

Oct
24

A/G Pipe Hydro-test


A/G Pipe Fabrication & Installation, A/G Pipe Fabrication & Installation
A/G Pipe Hydro-test
A/G Pipe Fabrication & Installation, A/G Pipe Fabrication & Installation
A/G Pipe Hydro-test
A/G Pipe Fabrication & Installation, A/G Pipe Fabrication & Installation
A/G Pipe Hydro-test
A/G Pipe Fabrication & Installation, A/G Pipe Fabrication & Installation
A/G Pipe Hydro-test
U/G Pipe Fabrication & Installation, U/G Pipe Fabrication & Installation
U/G Pipe Hydro-test
A/G Pipe Fabrication & Installation, A/G Pipe Fabrication & Installation
A/G Pipe Hydro-test
A/G Pipe Fabrication & Installation, A/G Pipe Fabrication & Installation
A/G Pipe Hydro-test
U/G Pipe Hydro-test, U/G Pipe Hydro-test
A/G Pipe Fabrication & Installation, A/G Pipe Fabrication & Installation
A/G Pipe Hydro-test
A/G Pipe Fabrication & Installation, A/G Pipe Fabrication & Installation
A/G Pipe Hydro-test
A/G Pipe Fabrication & Installation, A/G Pipe Fabrication & Installation
A/G Pipe Hydro-test
A/G Pipe Fabrication & Installation, A/G Pipe Fabrication & Installation
A/G Pipe Hydro-test
A/G Pipe Fabrication & Installation, A/G Pipe Fabrication & Installation
A/G Pipe Hydro-test
A/G Pipe Fabrication & Installation, A/G Pipe Fabrication & Installation
A/G Pipe Hydro-test

Air Conditon, Air Conditon


Air Conditon

Project Overall Schedule

AG Pipe Installation
Out door Hydrant
Date

Revision

Checked

Approved

Page 6 of 15
03/03/14

ISSUED FOR MONTHLY PROGRESS REPORT

H.S. LEE

J.L. NABORS

Activity Name

Start

Finish

OD

RD

03/20/14

03/22/14

Out door Hydrant

02/28/14
02/28/14

03/22/14
03/16/14

23
17

23
17

Portable Fire Extinguishers

03/20/14

03/22/14

02/17/14 A
02/17/14 A

03/07/14
03/07/14

26
26

8
8

Sprinkler System

02/17/14 A
02/17/14 A

03/22/14
03/03/14

23
22

23
4

Out door Hydrant

02/24/14 A

03/12/14

17

13

Portable Fire Extinguishers

03/20/14

03/22/14

Portable Fire Extinguishers

Sprinkler System

02/17/14 A
02/17/14 A

03/22/14
03/16/14

23
17

23
17

Sprinkler System, Sprinkler System

Out door Hydrant

02/24/14 A

03/16/14

17

17

Out door Hydrant, Out door Hydrant

Portable Fire Extinguishers

03/20/14

03/22/14

Portable Fire Extinguishers

Out door Hydrant

02/28/14
02/28/14

03/22/14
03/16/14

23
17

23
17

Portable Fire Extinguishers

03/20/14

03/22/14

Portable Fire Extinguishers

03/20/14
03/20/14

03/22/14
03/22/14

3
3

3
3

Portable Fire Extinguishers

Sprinkler System

02/28/14
03/15/14

03/22/14
03/21/14

23
7

23
7

Out door Hydrant

02/28/14

03/16/14

17

17

Portable Fire Extinguishers

03/20/14

03/22/14

08/23/13 A

05/29/14

255

91

02/28/14
02/28/14
02/28/14

03/21/14
03/21/14
03/21/14

22
22
22

22
22
22

Tray Cover Installation

02/01/14 A
05/22/14
05/22/14

05/29/14
05/29/14
05/26/14

118
8
5

76
8
5

Final Inspection

05/27/14

05/29/14

Tray & Support Installation (EGG)

02/01/14 A
02/01/14 A

04/27/14
03/26/14

86
15

44
12

Tray Cover Installation

04/20/14

04/24/14

Inspection

04/25/14

04/27/14

Conduit Installation (Fire Water Pump Shelter)

01/25/14 A
01/25/14 A
01/25/14 A

04/07/14
04/07/14
04/02/14

73
73
5

24
24
19

Inspection

04/03/14

04/07/14

Gas Compressor Unit 3&4

01/25/14 A
02/28/14 A
02/28/14 A

04/17/14
03/09/14
03/04/14

84
18
4

49
10
5

Other Euipment in Compression Area

02/28/14

03/09/14

10

10

01/25/14 A
01/25/14 A

03/12/14
03/12/14

3
3

13
13

Fire Water Pump

02/26/14 A
02/26/14 A

03/18/14
03/03/14

50
4

19
4

Oily Water Sump Pump

03/13/14

03/15/14

Gas Compressor Unit 1&2

02/28/14

03/04/14

Gas Compressor Unit 3&4

03/05/14

03/09/14

Other Euipment in Compression Area

03/10/14

03/12/14

Inspection

03/13/14

03/18/14

Patch Cord Connection

03/10/14
03/10/14

04/17/14
03/29/14

39
20

39
20

Communication Test

03/30/14

04/17/14

19

19

Portable Fire Extinguishers


Gas Compressor

Combustion TBN
Water Spray System
MCC Building

Maintenance Building

EGG Building

Guard House
Portable Fire Extinguishers
Fire Water Pump Shelter

Electrical Works
Equipment Installation
Emergency Gas Generator
Panel Installation & Cable Connection
Cable Tray Installation
Process

Building

Conduit Installation
Building

Cable Pulling
2nd for Compression Area

2nd for Utility


Oily Water Sump Pump
Power & Control Cable Termination

Fiber Optic Cable Termination

Actual Work
Remaining Work
Critical Remaining Work

Milestone

Mar
17

Apr
18
Portable Fire Extinguishers

May
19

Jun
20

2014

Jul
21

Aug
22

Sep
23

Oct
24

Out door Hydrant


Portable Fire Extinguishers
Water Spray System, Water Spray System
Sprinkler System, Sprinkler System
Out door Hydrant, Out door Hydrant

Out door Hydrant

Sprinkler System
Out door Hydrant
Portable Fire Extinguishers

Panel Installation & Cable Connection

Tray Cover Installation


Final Inspection
Tray & Support Installation (EGG), Tray & Support Installation (EGG)
Tray Cover Installation
Inspection

Conduit Installation (Fire Water Pump Shelter), Conduit Installation (Fire Water Pump Shelter)
Inspection

Gas Compressor Unit 3&4, Gas Compressor Unit 3&4


Other Euipment in Compression Area
Oily Water Sump Pump, Oily Water Sump Pump
Fire Water Pump, Fire Water Pump
Oily Water Sump Pump
Gas Compressor Unit 1&2
Gas Compressor Unit 3&4

Project Overall Schedule

Other Euipment in Compression Area


Inspection
Patch Cord Connection
Communication Test
Date

Revision

Checked

Approved

Page 7 of 15
03/03/14

ISSUED FOR MONTHLY PROGRESS REPORT

H.S. LEE

J.L. NABORS

Activity Name

Start

Finish

OD

RD

08/23/13 A
02/15/14 A
02/15/14 A

04/04/14
03/24/14
03/24/14

189
25
25

36
13
13

MCC & EGG Building

08/23/13 A
09/17/13 A

04/04/14
03/29/14

149
90

36
30

Compression Area

08/23/13 A

04/04/14

149

36

02/28/14
02/28/14
02/28/14

04/02/14
04/02/14
04/02/14

34
34
34

34
34
34

12/17/13 A
03/08/14
03/08/14

03/31/14
03/28/14
03/28/14

123
21
21

32
21
21

Plant Lighting

12/17/13 A
12/17/13 A

03/31/14
03/31/14

123
28

32
32

Plant Lighting, Plant Lighting

Road Lighting

02/17/14 A

03/31/14

50

32

Road Lighting, Road Lighting

MCC Building

12/09/13 A
12/09/13 A
12/09/13 A

04/05/14
04/05/14
03/04/14

119
119
37

37
37
5

MCC Building, MCC Building

Maintenance Building

03/05/14

03/14/14

10

10

Maintenance Building

EGG Building

03/15/14

03/24/14

10

10

Guard House

03/25/14

04/05/14

12

12

03/15/14
03/15/14

03/24/14
03/24/14

10
10

10
10

MCC Building

02/28/14
02/28/14

03/21/14
03/19/14

22
20

22
20

MCC Building

Plant Area

02/28/14

03/21/14

22

22

Plant Area

UPS Panel

02/25/14 A
02/25/14 A
02/25/14 A

05/20/14
04/02/14
03/05/14

82
34
3

82
34
6

Battery with Charger

02/25/14 A

03/10/14

11

Power Transformer

03/14/14

03/19/14

Capacity & NGR Panel

03/20/14

03/23/14

MV SWGR

03/14/14

03/17/14

LV SWGR

03/18/14

03/21/14

LV MCC

03/22/14

03/28/14

Compressor VFD Panel

03/05/14

03/09/14

Emergency Gas Generator

03/25/14

04/02/14

Main Control Panel Assembly

03/13/14
03/13/14

04/12/14
03/16/14

31
4

31
4

MCC Building

03/17/14

03/30/14

14

14

EGG Building

04/08/14

04/10/14

Maintenance Building

03/31/14

04/02/14

Local Control Panel Assembly

04/03/14

04/05/14

Plant Area

04/06/14

04/07/14

Fire Water Pump Shelter

04/11/14

04/12/14

Lighting Illumination Test


Illumination Test for Building

04/25/14
04/25/14

05/20/14
05/14/14

26
20

26
20

Illumination Test for Plant Lighting

05/15/14

05/17/14

Illumination Test for Road Lighting

05/18/14

05/20/14

TEL/LAN System Test

04/30/14
04/30/14

05/14/14
05/04/14

15
5

15
5

Paging System Test

05/05/14

05/09/14

CCTV System Test

05/10/14

05/14/14

04/10/14
04/10/14

04/29/14
04/16/14

20
7

20
7

Grounding & Lightning System


Lightning System
MCC & EGG Building
Grounding System

Fire Alarm System Installation


Plant Area
Installation for Plant Area
Lighting System Installation
Building Lighting
Fire Pump Water Shelter
Other Lighting

Communication System
TEL/LAN System Installation

Paging System Installation


Fire Water Pump Shelter
CCTV System Installation

Pre-commissioning
Equipment Test

Fire Alarm Test

Communication System

Motor Rotating Test (Uncoupling)


Utility
Actual Work
Remaining Work
Critical Remaining Work

Milestone

Mar
17

Apr
18

May
19

Jun
20

2014

Jul
21

Aug
22

Sep
23

Oct
24

MCC & EGG Building, MCC & EGG Building


MCC & EGG Building, MCC & EGG Building
Compression Area, Compression Area

Installation for Plant Area

Fire Pump Water Shelter

EGG Building
Guard House
Fire Water Pump Shelter

UPS Panel, UPS Panel


Battery with Charger, Battery with Charger
Power Transformer
Capacity & NGR Panel
MV SWGR
LV SWGR
LV MCC
Compressor VFD Panel

Project Overall Schedule

Emergency Gas Generator


Main Control Panel Assembly
MCC Building
EGG Building
Maintenance Building
Local Control Panel Assembly
Plant Area
Fire Water Pump Shelter
Illumination Test for Building
Illumination Test for Plant Lighting
Illumination Test for Road Lighting
TEL/LAN System Test
Paging System Test
CCTV System Test
Utility
Date

Revision

Checked

Approved

Page 8 of 15
03/03/14

ISSUED FOR MONTHLY PROGRESS REPORT

H.S. LEE

J.L. NABORS

Activity Name

Start

Finish

Process (Air Fin Fan Cooler)

04/17/14

Process (Gas Compressor)

2014

OD

RD

04/19/14

04/20/14

04/29/14

10

10

Interlock Test

04/01/14
04/01/14

04/04/14
04/01/14

4
1

4
1

MV Power Energizing (Incomming)

04/02/14

04/02/14

MV Power Energizing (Incomming)

LV Power Energizing (SWGR)

04/03/14

04/03/14

LV Power Energizing (SWGR)

LV Power Energizing (MCC)

04/04/14

04/04/14

LV Power Energizing (MCC)

12/29/13 A

05/29/14

152

91

Tray Cover Installation

05/22/14
05/22/14
05/22/14

05/29/14
05/29/14
05/26/14

8
8
5

8
8
5

Final Inspection

05/27/14

05/29/14

Conduit Installation (Utility)

01/11/14 A
01/11/14 A
01/18/14 A

03/24/14
03/24/14
03/16/14

73
73
20

25
25
17

Conduit Installation (Compession Area)

01/11/14 A

03/19/14

30

20

Inspection

03/20/14

03/24/14

Communication Cable Laying & Connection

02/21/14 A
02/21/14 A
02/21/14 A

03/06/14
03/06/14
03/03/14

4
4
4

7
7
4

Inspection

03/04/14

03/06/14

Gas Detector Installation

01/31/14 A
01/31/14 A
01/31/14 A

03/14/14
03/14/14
03/12/14

35
35
35

15
15
13

Cable Pulling & Connection

02/03/14 A

03/14/14

15

15

2nd Cable Pulling (Utility)

01/30/14 A
01/30/14 A
01/30/14 A

03/27/14
03/27/14
03/12/14

57
30
15

28
28
13

2nd Cable Pulling (Compression Area)

01/30/14 A

03/27/14

30

28

2nd Cable Pulling (Compression Area), 2nd Cable Pulling (Compression Area)

02/15/14 A
02/15/14 A

03/27/14
03/27/14

20
20

28
28

Control Signal Cable Termination, Control Signal Cable Termination

12/29/13 A
12/29/13 A
12/29/13 A

04/13/14
04/13/14
04/13/14

96
63
63

45
45
45

Calibration

01/14/14 A
01/14/14 A

04/03/14
03/16/14

96
40

35
17

Stantion & Support Installation

02/28/14

03/17/14

18

18

Field Instrument Installation (Utility)

03/18/14

04/01/14

15

15

Field Instrument Installation (Gas Comp'r Unit 1&2)

02/28/14

03/14/14

15

15

Field Instrument Installation (Gas Comp'r Unit 3&4)

03/15/14

03/29/14

15

15

Inspection (Gas Comp'r)

03/30/14

04/03/14

02/28/14
02/28/14
02/28/14

04/04/14
03/16/14
03/16/14

36
17
17

36
17
17

03/07/14
03/07/14

03/23/14
03/23/14

17
17

17
17

03/19/14
03/19/14

04/04/14
04/04/14

17
17

17
17

DCS/ESD/F&G System SAT

03/24/14
03/24/14
03/24/14

05/27/14
04/15/14
04/06/14

65
23
14

65
23
14

SCADA System SAT

04/02/14

04/15/14

14

14

04/28/14
04/28/14

05/27/14
05/27/14

30
30

30
30

04/13/14

05/29/14

47

47

04/13/14

05/29/14

47

47

Power Energizing

Instrumentation Works
Cable Tray Installation
Process Area

Conduit Installation
Process Area

SCADA
SCADA Cabinet Installation

Fire & Gas Detection System


Plant Gas Detection

Instrument Cable Pulling & Termination


Cable Pulling

Cable Termination
Control Signal Cable Termination
Field Instrument
In-line Instrument
Calibration, Installation and Connection
Field Instrument

Air/Impulse Piping & Tubing


Compressor Unit 1&2 Area
Installation & Connection for Comp'r Unit 1&2
Compressor Unit 3&4 Area
Installation & Connection for Comp'r Unit 3&4
Utility Area
Installation & Connection for Utility Area
Pre-commissioning
DCS Control System

Metering System
Metering System SAT

Painting Works
A/G Piping Work-Field Painting
Actual Work
Remaining Work
Critical Remaining Work

Milestone

Mar
17

Apr
18

May
19
Process (Air Fin Fan Cooler)

Jun
20

Jul
21

Aug
22

Sep
23

Oct
24

Process (Gas Compressor)


Interlock Test

Tray Cover Installation


Final Inspection

Conduit Installation (Utility), Conduit Installation (Utility)


Conduit Installation (Compession Area), Conduit Installation (Compession Area)
Inspection

Communication Cable Laying & Connection, Communication Cable Laying & Connection
Inspection

Project Overall Schedule

Gas Detector Installation, Gas Detector Installation


Cable Pulling & Connection, Cable Pulling & Connection

2nd Cable Pulling (Utility), 2nd Cable Pulling (Utility)

Calibration, Installation and Connection, Calibration, Installation and Connection


Calibration, Calibration
Stantion & Support Installation
Field Instrument Installation (Utility)
Field Instrument Installation (Gas Comp'r Unit 1&2)
Field Instrument Installation (Gas Comp'r Unit 3&4)
Inspection (Gas Comp'r)

Installation & Connection for Comp'r Unit 1&2


Installation & Connection for Comp'r Unit 3&4
Installation & Connection for Utility Area

DCS/ESD/F&G System SAT


SCADA System SAT
Metering System SAT

Date

Revision

Checked

Approved

Page 9 of 15
03/03/14

ISSUED FOR MONTHLY PROGRESS REPORT

H.S. LEE

J.L. NABORS

Activity Name

Start

Finish

Intermediate Coat

04/13/14
04/13/14

Finish Coat

2014

OD

RD

05/29/14
05/12/14

47
30

47
30

04/18/14

05/17/14

30

30

Touch-Up

04/23/14

05/22/14

30

30

Inspection

05/23/14

05/29/14

Touch-Up

04/23/14
04/23/14
04/23/14

05/19/14
05/19/14
05/12/14

27
27
20

27
27
20

Inspection

05/13/14

05/19/14

02/28/14

05/13/14

75

75

Cover Sheet Forming

02/28/14
02/28/14
02/28/14

03/29/14
03/29/14
03/19/14

30
30
20

30
30
20

Fitting Insulator Cutting

02/28/14

03/29/14

30

30

Scaffolding

02/28/14
02/28/14
02/28/14

05/13/14
05/13/14
04/08/14

75
75
40

75
75
40

Surface Cleaning

03/05/14

04/13/14

40

40

Insulation Installation

03/10/14

04/18/14

40

40

Cover Sheet Installation

03/15/14

04/23/14

40

40

Finish Work

04/24/14

05/08/14

15

15

Inspection

05/09/14

05/13/14

03/08/14

08/05/14

151

151

Flushing/Blowing & Reinstallation

03/13/14
03/13/14
03/13/14

04/16/14
04/12/14
03/17/14

35
31
5

35
31
5

Final Box-up (V-208)

03/18/14

03/18/14

Leak Test

03/19/14

03/19/14

Loop Test

04/07/14

04/09/14

Function Test (Inst.)

04/10/14

04/10/14

Motor Uncoupled Run Test

04/08/14

04/09/14

Mechaniacl Running Test (C-202A/B, A-202A/B)

04/11/14

04/12/14

Mechaniacl Running Test (C-202A/B, A-202A/B)

04/12/14

Mechanical Completion (S-09-01)

04/16/14
04/16/14

1
1

1
1

Start PA Compressor and into Normal Operation

04/16/14

Ready for Service

Flushing/Blowing & Reinstallation

04/07/14
04/07/14
04/07/14

04/18/14
04/12/14
04/11/14

12
6
5

12
6
5

Leak Test

04/12/14

04/12/14

Leak Test

04/12/14

Mechanical Completion (S-09-02)

04/18/14
04/18/14

1
1

1
1

Into Normal Operation

04/18/14

Ready for Service

Flushing/Blowing & Reinstallation

03/08/14
03/08/14
03/08/14

04/17/14
04/10/14
03/12/14

41
34
5

41
34
5

Flushing/Blowing & Reinstallation

Final Box-up (V-207, U-210A/B)

03/13/14

03/13/14

Final Box-up (V-207, U-210A/B)

Leak Test

03/14/14

03/14/14

Leak Test

Loop Test

04/07/14

04/09/14

Function Test (Inst.)

04/10/14

04/10/14

Function Test (Inst.)

04/10/14

Mechanical Completion (S-10-01)

04/17/14
04/17/14

1
1

1
1

Plant Air Service To Dryer

04/17/14

Ready for Service

Common(Compression Area)

Steel Structure Work-Field Painting


Common(Compression Area)

Insulation Works
Shop Insulation
Common(Compression Area)

Duct & V/V Insulation


Common(Compression Area)

Commissioning Works
Plant Air Compressor and Receiver (S-09-01)
Precommissioning

Mechanical Completion (S-09-01)


Commissioning
Start PA Compressor and into Normal Operation

04/16/14
04/16/14

Ready for Service


Plant Air Distribution (S-09-02)
Precommissioning

Mechanical Completion (S-09-02)


04/18/14
04/18/14

Commissioning
Into Normal Operation
Ready for Service
Instrument Air (S-10-01)
Precommissioning

Mechanical Completion (S-10-01)


04/17/14
04/17/14

Commissioning
Plant Air Service To Dryer
Ready for Service
Actual Work
Remaining Work
Critical Remaining Work

Milestone

Mar
17

Project Overall Schedule

Apr
18

May
19

Jun
20

Jul
21

Aug
22

Sep
23

Oct
24

Intermediate Coat
Finish Coat
Touch-Up
Inspection

Touch-Up
Inspection

Cover Sheet Forming


Fitting Insulator Cutting

Scaffolding
Surface Cleaning
Insulation Installation
Cover Sheet Installation
Finish Work
Inspection

Flushing/Blowing & Reinstallation


Final Box-up (V-208)
Leak Test
Loop Test
Function Test (Inst.)
Motor Uncoupled Run Test

Flushing/Blowing & Reinstallation

Loop Test

Date

Revision

Checked

Approved

Page 10 of 15
03/03/14

ISSUED FOR MONTHLY PROGRESS REPORT

H.S. LEE

J.L. NABORS

Activity Name

Start

Finish

Flushing/Blowing & Reinstallation

03/16/14
03/16/14
03/16/14

Final Box-up (V-204)

2014

OD

RD

04/19/14
04/15/14
03/20/14

35
31
5

35
31
5

03/21/14

03/21/14

Final Box-up (V-204)

Leak Test

03/22/14

03/22/14

Leak Test

Loop Test

04/12/14

04/13/14

Function Test (Inst.)

04/14/14

04/14/14

Function Test (Inst.)

Motor Uncoupled Run Test

04/10/14

04/10/14

Motor Uncoupled Run Test

Mechaniacl Running Test (P-203A/B)

04/15/14

04/15/14

Mechaniacl Running Test (P-203A/B)

04/15/14

Mechanical Completion (S-15-01)

04/19/14
04/19/14

1
1

1
1

Normal Start Potable Water Pump

04/19/14

Ready for Service

Flushing/Blowing & Reinstallation

03/10/14
03/10/14
03/10/14

04/22/14
04/19/14
03/14/14

44
41
5

44
41
5

Final Box-up (T-202)

03/15/14

03/15/14

Final Box-up (T-202)

Leak Test

03/16/14

03/16/14

Leak Test

Loop Test

04/10/14

04/11/14

Loop Test

Motor Uncoupled Run Test

04/11/14

04/11/14

Motor Uncoupled Run Test

Function Test (Inst.)

04/18/14

04/18/14

Function Test (Inst.)

Mechaniacl Running Test (P-204A/B)

04/19/14

04/19/14

Mechaniacl Running Test (P-204A/B)

04/19/14

Mechanical Completion (S-12-01)

04/22/14
04/22/14

2
2

2
2

Fill up Raw Water Tank & Pump Start

04/22/14

Ready for Service

Flushing/Blowing & Reinstallation

03/30/14
03/30/14
03/30/14

04/27/14
04/25/14
04/03/14

29
27
5

29
27
5

Leak Test

04/04/14

04/04/14

Loop Test

04/12/14

04/14/14

Function Test (Inst.)

04/15/14

04/15/14

Motor Uncoupled Run Test

04/12/14

04/12/14

Mechaniacl Running Test (FP-201/202/203)

04/23/14

04/24/14

Mechaniacl Running Test (FP-201/202/203)

Flushing (Fire Water Distribution Line)

04/25/14

04/25/14

Flushing (Fire Water Distribution Line)

04/25/14

Mechanical Completion (S-13-01)

04/27/14
04/27/14

1
1

1
1

Fill Distribution Header

04/27/14

Ready for Service

Flushing/Blowing

04/01/14
04/01/14
04/01/14

04/23/14
04/15/14
04/05/14

23
15
5

23
15
5

Leak Test

04/06/14

04/06/14

Loop Test

04/15/14

04/15/14

Loop Test

04/15/14

Mechanical Completion (S-12-02)

04/23/14
04/23/14

1
1

1
1

Fill Distribution Header

04/23/14

Ready for Service

Flushing/Blowing & Reinstallation

04/01/14
04/01/14
04/01/14

04/24/14
04/06/14
04/05/14

24
6
5

24
6
5

Final Box-up (V-209)

04/06/14

04/06/14

Final Box-up (V-209)

04/06/14

Mechanical Completion (S-14-01)

04/24/14
04/24/14

1
1

1
1

Potable Water (S-15-01)


Precommissioning

Mechanical Completion (S-15-01)


04/19/14
04/19/14

Commissioning
Normal Start Potable Water Pump
Ready for Service
Raw Water Tank and Pump (S-12-01)
Precommissioning

Mechanical Completion (S-12-01)


04/21/14
04/21/14

Commissioning
Fill up Raw Water Tank & Pump Start
Ready for Service
Fire Water Pump & Distribution (S-13-01)
Precommissioning

Mechanical Completion (S-13-01)


04/27/14
04/27/14

Commissioning
Fill Distribution Header
Ready for Service
Service Water Distribution (S-12-02)
Precommissioning

Mechanical Completion (S-12-02)


04/23/14
04/23/14

Commissioning
Fill Distribution Header
Ready for Service
Demineralized Water (S-14-01)
Precommissioning

Mechanical Completion (S-14-01)


04/24/14
04/24/14

Commissioning
Fill up Tank with Demineralized Water
Actual Work
Remaining Work
Critical Remaining Work

Milestone

Mar
17

Project Overall Schedule

Apr
18

May
19

Jun
20

Jul
21

Aug
22

Sep
23

Oct
24

Flushing/Blowing & Reinstallation

Loop Test

Flushing/Blowing & Reinstallation

Flushing/Blowing & Reinstallation


Leak Test
Loop Test
Function Test (Inst.)
Motor Uncoupled Run Test

Flushing/Blowing
Leak Test

Flushing/Blowing & Reinstallation

Fill up Tank with Demineralized Water


Date

Revision

Checked

Approved

Page 11 of 15
03/03/14

ISSUED FOR MONTHLY PROGRESS REPORT

H.S. LEE

J.L. NABORS

Activity Name

Start

2014

OD

RD

04/24/14

Flushing/Blowing & Reinstallation

04/01/14
04/01/14
04/01/14

04/25/14
04/21/14
04/05/14

25
21
5

25
21
5

Final Box-up (S-202)

04/06/14

04/06/14

Final Box-up (S-202)

Loop Test

04/07/14

04/07/14

Loop Test

Function Test (Inst.)

04/08/14

04/08/14

Motor Uncoupled Run Test

04/13/14

04/13/14

Fill up Sump with Service Water for Pump MRT

04/17/14

04/18/14

Mechaniacl Running Test (P-205A/B)

04/19/14

04/19/14

Mechaniacl Running Test (P-206)

04/20/14

04/20/14

Mechaniacl Running Test (P-206)

Leak Test (Service Test with Service Water)

04/19/14

04/21/14

Leak Test (Service Test with Service Water)

04/21/14

Mechanical Completion (S-16-01)

04/25/14
04/25/14

1
1

1
1

Into Operation

04/25/14

Ready for Service

Flushing/Blowing & Reinstallation

04/16/14
04/16/14
04/16/14

06/03/14
04/22/14
04/20/14

49
7
5

49
7
5

Leak Test

04/21/14

04/21/14

Loop Test

04/22/14

04/22/14

Loop Test

04/22/14

Mechanical Completion (S-11-01)

06/03/14
06/01/14

3
1

3
1

Inerting

Ready for Service

06/01/14

Ready for Service

N2 Service for System Inerting

06/03/14

Flushing/Blowing & Reinstallation

05/06/14
05/06/14
05/06/14

07/06/14
05/24/14
05/13/14

62
19
8

62
19
8

Final Box-up (S-201A/B/C, F-201A/B/C)

05/14/14

05/15/14

Leak Test

05/18/14

05/22/14

Leak Test

Loop Test

05/23/14

05/23/14

Loop Test

Function Test (Inst.)

05/24/14

05/24/14

Function Test (Inst.)

05/24/14

Mechanical Completion (S-02-01)

Ready for Service


Oily Water (S-16-01)
Precommissioning

Mechanical Completion (S-16-01)


04/25/14
04/25/14

Commissioning
Into Operation
Ready for Service
Nitrogen Distribution (S-11-01)
Precommissioning

Mechanical Completion (S-11-01)


06/01/14
06/01/14

Commissioning
Inerting

Gas Compressor Inlet (S-02-01)


Precommissioning

Mechanical Completion (S-02-01)

Finish

Mar
17

Apr
18

May
19
Ready for Service

Jun
20

Jul
21

Aug
22

Function Test (Inst.)


Motor Uncoupled Run Test
Fill up Sump with Service Water for Pump MRT
Mechaniacl Running Test (P-205A/B)

Flushing/Blowing & Reinstallation


Leak Test

N2 Service for System Inerting

Flushing/Blowing & Reinstallation


Final Box-up (S-201A/B/C, F-201A/B/C)

06/01/14
06/01/14

07/06/14
06/05/14

36
5

36
5

Introduction of Naural Gas

07/04/14

07/06/14

Introduction of Naural Gas

07/06/14

Ready for Start-up

Flushing/Blowing & Reinstallation

04/01/14
04/01/14
04/01/14

07/06/14
05/20/14
04/07/14

97
50
7

97
50
7

Final Box-up (V-203, H-201)

04/08/14

04/08/14

Leak Test

05/18/14

05/18/14

Leak Test

Loop Test

05/19/14

05/19/14

Loop Test

Function Test (Inst.)

05/20/14

05/20/14

Function Test (Inst.)

05/20/14

Mechanical Completion (S-03-01)

Ready for Start-up


Fuel Gas System (S-03-01)
Precommissioning

Mechanical Completion (S-03-01)

Inerting

Flushing/Blowing & Reinstallation


Final Box-up (V-203, H-201)

Inerting

06/01/14
06/01/14

07/06/14
06/05/14

36
5

36
5

Introduction of Naural Gas

07/04/14

07/06/14

Introduction of Naural Gas

07/06/14

Ready for Service

Flushing/Blowing & Reinstallation

04/12/14
04/12/14
05/06/14

07/06/14
05/24/14
05/13/14

86
43
8

86
43
8

Leak Test

05/18/14

05/22/14

Leak Test

Loop Test

05/23/14

05/23/14

Loop Test

Commissioning

Ready for Service


Gas Compressor 0utlet (S-05-01)
Precommissioning

Actual Work
Remaining Work
Critical Remaining Work

Milestone

Project Overall Schedule

Oct
24

Flushing/Blowing & Reinstallation

Inerting

Commissioning

Sep
23

Inerting

Flushing/Blowing & Reinstallation

Date

Revision

Checked

Approved

Page 12 of 15
03/03/14

ISSUED FOR MONTHLY PROGRESS REPORT

H.S. LEE

J.L. NABORS

Activity Name

Start

Finish

Function Test (Inst.)

05/24/14

Complete Motor Uncoupled Run Test


Mechaniacl Running Test (A-201)

2014
Jun
20
Function Test (Inst.)

OD

RD

05/24/14

04/12/14

04/13/14

Complete Motor Uncoupled Run Test

04/14/14

04/15/14

Mechaniacl Running Test (A-201)

05/24/14

Inerting

06/01/14
06/01/14

07/06/14
06/05/14

36
5

36
5

Introduction of Naural Gas

07/04/14

07/06/14

Introduction of Naural Gas


Ready for Start-up

Mechanical Completion (S-05-01)


Commissioning

Ready for Start-up

Mar
17

Apr
18

May
19

Jul
21

Aug
22

Inerting

07/06/14

Flushing/Blowing & Reinstallation

07/06/14
05/20/14
04/07/14

97
50
7

97
50
7

Final Box-up (F-202A/B)

04/08/14

04/08/14

Leak Test

05/18/14

05/18/14

Leak Test

Loop Test

05/19/14

05/19/14

Loop Test

Function Test (Inst.)

05/20/14

05/20/14

Function Test (Inst.)

05/20/14

Mechanical Completion (S-06-01)

Inerting

06/01/14
06/01/14

07/06/14
06/05/14

36
5

36
5

Introduction of Naural Gas

07/04/14

07/06/14

Introduction of Naural Gas

07/06/14

Ready for Service

Flushing/Blowing & Reinstallation

04/16/14
04/16/14
04/16/14

06/05/14
04/23/14
04/20/14

51
8
5

51
8
5

Final Box-up (V-201)

04/21/14

04/21/14

Leak Test

04/22/14

04/22/14

Leak Test

Loop Test

04/23/14

04/23/14

Loop Test

04/23/14

Mechanical Completion (S-08-01)

06/05/14
06/05/14

5
5

5
5

Inerting

06/05/14

Ready for Operation

Flushing/Blowing & Reinstallation

04/16/14
04/16/14
04/16/14

06/06/14
04/22/14
04/20/14

52
7
5

52
7
5

Leak Test

04/21/14

04/21/14

Loop Test

04/22/14

04/22/14

Loop Test
Mechanical Completion (S-07-01)

Mechanical Completion (S-06-01)


Commissioning

Ready for Service


Condensate Drain (S-08-01)
Precommissioning

Mechanical Completion (S-08-01)


06/01/14
06/01/14

Commissioning
Inerting
Ready for Operation
Gas Venting (S-07-01)
Precommissioning

Mechanical Completion (S-07-01)

Flushing/Blowing & Reinstallation


Final Box-up (F-202A/B)

Inerting

Flushing/Blowing & Reinstallation


Final Box-up (V-201)

Flushing/Blowing & Reinstallation


Leak Test

04/22/14

Inerting

06/01/14
06/01/14

06/06/14
06/05/14

6
5

6
5

Inerting

N2 Service to Vent Header

06/06/14

06/06/14

N2 Service to Vent Header

06/06/14

Ready for Operation

Flushing/Blowing & Reinstallation

04/05/14
04/05/14
05/14/14

07/14/14
05/31/14
05/17/14

101
57
4

101
57
4

Leak Test

05/18/14

05/24/14

Loop Test

05/25/14

05/29/14

Function Test (Inst.)

05/30/14

05/31/14

Compressor Package - I&C Precommissioning & Calbration

04/05/14

04/29/14

25

25

Compressor Package - Loop Check Remote Control Console

04/30/14

05/01/14

Compressor Package - Loop Check Remote Control Console

Compressor Package - Soft Ware Loading (HMI TT4000)

05/01/14

05/01/14

Compressor Package - Soft Ware Loading (HMI TT4000)

Compressor Package - Final Alignment

04/30/14

05/02/14

05/31/14

Inerting

06/01/14
06/01/14

07/14/14
06/05/14

44
5

44
5

Introduction of Naural Gas

07/04/14

07/06/14

Commissioning

Ready for Operation


Natural Gas Compression C-201A (S-04-01)
Precommissioning

Mechanical Completion (S-04-01)


Commissioning

Actual Work
Remaining Work
Critical Remaining Work

Milestone

Project Overall Schedule

Oct
24

Mechanical Completion (S-05-01)

04/01/14
04/01/14
04/01/14

Seal Gas (S-06-01)


Precommissioning

Sep
23

Flushing/Blowing & Reinstallation


Leak Test
Loop Test
Function Test (Inst.)
Compressor Package - I&C Precommissioning & Calbration

Compressor Package - Final Alignment


Mechanical Completion (S-04-01)
Inerting
Introduction of Naural Gas
Date

Revision

Checked

Approved

Page 13 of 15
03/03/14

ISSUED FOR MONTHLY PROGRESS REPORT

H.S. LEE

J.L. NABORS

Activity Name

Start

Finish

First Crank

07/04/14

Engine wash & Ignition Test


Back-up Overspeed System Test

2014

OD

RD

07/05/14

07/07/14

07/08/14

07/09/14

07/09/14

On-line Operation Check

07/10/14

07/12/14

Engine Performance

07/12/14

07/14/14

Flushing/Blowing & Reinstallation

04/05/14
04/05/14
05/14/14

07/19/14
05/31/14
05/17/14

106
57
4

106
57
4

Leak Test

05/18/14

05/24/14

Loop Test

05/25/14

05/29/14

Function Test (Inst.)

05/30/14

05/31/14

Compressor Package - I&C Precommissioning & Calbration

04/05/14

04/29/14

25

25

Compressor Package - Loop Check Remote Control Console

04/30/14

05/01/14

Compressor Package - Loop Check Remote Control Console

Compressor Package - Soft Ware Loading (HMI TT4000)

05/01/14

05/01/14

Compressor Package - Soft Ware Loading (HMI TT4000)

Compressor Package - Final Alignment

04/30/14

05/02/14

05/31/14

Inerting

06/01/14
06/01/14

07/19/14
06/05/14

49
5

49
5

Introduction of Naural Gas

07/04/14

07/06/14

Introduction of Naural Gas

First Crank

07/04/14

07/05/14

First Crank

Engine wash & Ignition Test

07/09/14

07/10/14

Back-up Overspeed System Test

07/11/14

07/11/14

Back-up Overspeed System Test

On-line Operation Check

07/15/14

07/17/14

On-line Operation Check

Engine Performance

07/17/14

07/19/14

Flushing/Blowing & Reinstallation

04/05/14
04/05/14
05/14/14

07/24/14
05/31/14
05/17/14

111
57
4

111
57
4

Leak Test

05/18/14

05/24/14

Loop Test

05/25/14

05/29/14

Function Test (Inst.)

05/30/14

05/31/14

Compressor Package - I&C Precommissioning & Calbration

04/05/14

04/29/14

25

25

Compressor Package - Loop Check Remote Control Console

04/30/14

05/01/14

Compressor Package - Loop Check Remote Control Console

Compressor Package - Soft Ware Loading (HMI TT4000)

05/01/14

05/01/14

Compressor Package - Soft Ware Loading (HMI TT4000)

Compressor Package - Final Alignment

04/30/14

05/02/14

05/31/14

Inerting

06/01/14
06/01/14

07/24/14
06/05/14

54
5

54
5

Introduction of Naural Gas

07/04/14

07/06/14

Introduction of Naural Gas

First Crank

07/04/14

07/05/14

First Crank

Engine wash & Ignition Test

07/11/14

07/12/14

Back-up Overspeed System Test

07/13/14

07/13/14

On-line Operation Check

07/20/14

07/22/14

Engine Performance

07/22/14

07/24/14

Flushing/Blowing & Reinstallation

04/05/14
04/05/14
05/14/14

07/29/14
05/31/14
05/17/14

116
57
4

116
57
4

Leak Test

05/18/14

05/24/14

Loop Test

05/25/14

05/29/14

Function Test (Inst.)

05/30/14

05/31/14

Compressor Package - I&C Precommissioning & Calbration

04/05/14

04/29/14

25

25

Compressor Package - Loop Check Remote Control Console

04/30/14

05/01/14

Compressor Package - Loop Check Remote Control Console

Compressor Package - Soft Ware Loading (HMI TT4000)

05/01/14

05/01/14

Compressor Package - Soft Ware Loading (HMI TT4000)

Compressor Package - Final Alignment

04/30/14

05/02/14

05/31/14

Natural Gas Compression C-201B (S-04-02)


Precommissioning

Mechanical Completion (S-04-02)


Commissioning

Natural Gas Compression C-201C (S-04-03)


Precommissioning

Mechanical Completion (S-04-03)


Commissioning

Natural Gas Compression C-201D (S-04-04)


Precommissioning

Mechanical Completion (S-04-04)


Actual Work
Remaining Work
Critical Remaining Work

Milestone

Mar
17

Project Overall Schedule

Apr
18

May
19

Jun
20

Jul
21
First Crank

Aug
22

Sep
23

Oct
24

Engine wash & Ignition Test


Back-up Overspeed System Test
On-line Operation Check
Engine Performance

Flushing/Blowing & Reinstallation


Leak Test
Loop Test
Function Test (Inst.)
Compressor Package - I&C Precommissioning & Calbration

Compressor Package - Final Alignment


Mechanical Completion (S-04-02)
Inerting

Engine wash & Ignition Test

Engine Performance

Flushing/Blowing & Reinstallation


Leak Test
Loop Test
Function Test (Inst.)
Compressor Package - I&C Precommissioning & Calbration

Compressor Package - Final Alignment


Mechanical Completion (S-04-03)
Inerting

Engine wash & Ignition Test


Back-up Overspeed System Test
On-line Operation Check
Engine Performance

Flushing/Blowing & Reinstallation


Leak Test
Loop Test
Function Test (Inst.)
Compressor Package - I&C Precommissioning & Calbration

Compressor Package - Final Alignment


Mechanical Completion (S-04-04)
Date

Revision

Checked

Approved

Page 14 of 15
03/03/14

ISSUED FOR MONTHLY PROGRESS REPORT

H.S. LEE

J.L. NABORS

Activity Name

Start

Finish

Inerting

06/01/14
06/01/14

Introduction of Naural Gas

2014

OD

RD

07/29/14
06/05/14

59
5

59
5

07/04/14

07/06/14

Introduction of Naural Gas

First Crank

07/04/14

07/05/14

First Crank

Engine wash & Ignition Test

07/13/14

07/14/14

Back-up Overspeed System Test

07/15/14

07/15/14

Back-up Overspeed System Test

On-line Operation Check

07/25/14

07/27/14

On-line Operation Check

Engine Performance

07/27/14

07/29/14

07/30/14
07/30/14
07/30/14

08/05/14
08/05/14
08/05/14

7
7
7

7
7
7

Commissioning

Plant Performance Test


Plant Performance Test
Plant Performance and Reliability Test

Actual Work
Remaining Work
Critical Remaining Work

Milestone

Mar
17

Project Overall Schedule

Apr
18

May
19

Jun
20

Jul
21

Aug
22

Sep
23

Oct
24

Inerting

Engine wash & Ignition Test

Engine Performance

Plant Performance and Reliability Test

Date

Revision

Checked

Approved

Page 15 of 15
03/03/14

ISSUED FOR MONTHLY PROGRESS REPORT

H.S. LEE

J.L. NABORS