Hjh Masilah binti Hj Bandi, SeniorElectricalEngineer/UTMEnergyManager MaintenanceDivision,OfficeofAsset&Development UniversitiTeknologiMalaysia hp:0197111905,masilah@utm.my BSc of Electrical Engineering from University of Hartford, Connecticut, USA in May, 1991 MSc in Maintenance Engineering & Asset Mgmt, UniversityofManchester,UK in Sept, 2010 Registered Electrical Energy Manager (REEM) with Suruhanjaya Tenaga Malaysia (PTE 00022013), Member of Malaysian Energy Professional Association (MEPA), Certified Energy Manager from Asean Energy Management Scheme/Greentech, Graduate Member of BEM, IEM & Asean Engineer 11 years until now working at Maintenance Dept, Office of Asset & Development with 6 years heading Telecomunication Section and 2 years now heading the Electrical Infrastructure & Energy Mgmt Section, 2 years working as Research Officer in FKEUTM (20022004) 11 years working at Celcom (M) Berhad as an Electrical Engineer, Head of Unit, Head of Department and Head of Division. (19912002) Grand Prize Winner of Anugerah Inovasi Naib Canselor 2008 (won RM3,000) Top 7 finalist Anugerah Inovasi Kementerian Pengajian Tinggi 2011 Top 3 finalist of Anugerah Inovasi Naib Canselor 2010 (won RM3,000)

Content

Introduction EnergyEfficiencyPractices RoadMap

INTRODUCTION

20102012 highlights
(benchmarkyear2009) RMbillreductionRM4,434,767 RM%reduction16.8% kWhreduction14,542,426

24.3% OPTRdiscount RM1,244,180 EnergyEfficiencyIndex 149kWh/m2 EnergyEfficiencyIndexreduction10.78%


kWh%reduction

SNAPSHOTSOFUTM

UTMJB Before9 MalaysiaPLAN


25,000population(20,000studentsand5,000staff) 1145hectaresofland,572buildingsand939,163m2
grossfloorarea 49electricsubstations,220,000lighttubesand2,580 streetlights 17centralisedaircondssystem(chillers&coolingtowers) and5,873splitunitairconds Average2011electricalbillisRM1.5million/monthor RM17.6million/year

th

UTMs9th MalaysiasProject(20082012)
34newbuildings cost~RM1billion 2,527roomswithadditionalGFA=138,810m2 11newelectricsubstations total60substations 3,269newsplitunitsa/csystem total9,142unitsa/c 3chillers&CoolingTowers(~3.6MWatt) Total20sys 57,752lightstube(~2.5MWatt) Total~280,000tubes 578numbersofcompoundandstreetlightwith156
newLEDStreetLights TotalStreetLightis3,158 EstimatedincreaseinUTMelectricalbillof RM500,000/month

ElectricalusagetrendatUTMJB 2003to2012(inkWh)

ElectricalusagetrendatUTMJB 2003to2012(inRM)

UTMENERGYEFFICIENCYINDEX

EnergyConsumptioninbuildings

Energyconsumptioninbuildings

$1,027,489or 26%PEJABAT

$1,728,968 or 43%FAKULTI

$1,262,623or 31%KOLEJ

WhereandHowUTMStartSEM?

Startby BuildingPeople! Jan2011: Trainingfor30EnergyManagers

energymanagementmatrix
beforeSEMPimplementation currentstatusasofMac2013
EnergyPolicy Energypolicy,action planandregular review,have commitmentoftop managementaspart ofanenvironmental strategy Formalenergypolicy, butnoactive commitmentfrom topmanagement Organization Energymanagementhas beenfullyintegratedinto managementstructure. Cleardelegationof responsibilityforenergy consumption Energymanager accountabletoenergy committeerepresentingall users,chairedbyamember ofthemanagingboard Energymanagerinpost reportingtoadhoc committee,butline managementandauthority areunclear Energymanagementisthe parttimeresponsibilityof someonewithonlylimited authorityorinfluence Noenergymanagementor anyformaldelegationof responsibilityforenergy consumption Motivation Formalandinformal channelsof communication regularlyexploited byenergymanager andenergystaffat alllevels Energycommittee usedasmain channeltogether withdirectcontact withmajorusers Contactwithmajor usersthroughad hoccommittee chairedbysenior department manager Informalcontacts betweenengineer andafewusers InformationSystem Comprehensivesystem setstargets,monitors consumption,identified faults,quantifies savingsandprovides budgettracking M&Treportsfor individualpremises basedonsubmetering, butsavingsnot reportedeffectivelyto users Monitoringand targetingreportsbased onsupplymeterdata. Energyunithasadhoc involvementinbudget setting Costreportingbasedon invoicedata.Engineer compliesreportsfor internalusewithin technicaldepartment Noinformationsystem. Noaccountingfor energyconsumption Marketing Marketingthevalueof energyefficiencyand theperformanceof energymanagement bothwithinandoutside theorganization Investment Positivediscrimination infavorofgreen schemeswithdetailed investmentappraisalof allnewbuildand refurbishment opportunities

Programmeofstaff awarenessandregular publicitycampaigns

Somepaybackcriteria employedasforall otherinvestment

Unadoptedenergy policysetbyenergy managerorsenior departmentmanager

Someadhocstaff awarenesstraining

Investmentusingshort termpaybackcriteria only

Anunwrittensetof guidelines

Informalcontactsused topromoteenergy efficiency

Onlylowcostmeasures taken

Noexplicitpolicy

Nocontactwith users

Nopromotionofenergy efficiency

Noinvestmentin increasingenergy efficiencyinpremises

UTMEnergyManagementCommittee

Timbalan Naib Canselor (Pembangunan)

Advisor: ProfDrZainuddinManan

Energy Manager (REEM)

Ketua BPU

Timbalan Bendahari

Timbalan Pendaftar

PengarahKerja

PTJEMC

Description: REEM Registered Electrical Energy Manager BPU Bahagian Penyenggaraan dan Ubahsuai EMC PTJ - Pusat Tangung Jawab Energy Mgmt Committee

16

16

UTMPTJEnergyManagementCommittee
DirectorofWork
ResidentEnergy Manager(REM)

PTJ:Faculties
FKE FKA FKM FKK FPREE FGHT FS FP FPPSM FSKSM FTI FBB FKBSK

PTJ:Colleges
Kolej Rahman Putra Kolej Tun Fatimah Kolej Tun Razak Kolej Tun Husein On Kolej Tun DrIsmail Kolej T.Canselor Kolej Perdana Kolej 9 Kolej 10 Kolej 11 Kolej Datin SriEndon Kolej Dato OnJaafar Kolej Tun Ghaffar Baba

PTJ:Offices
CICT Library PSZ PHB IBD INSTITUT IBNUSINA ICC

UTMICEMC

ENERGYEFFICIENCYPRACTICES
1.Energy related housekeeping 2.Sustainable EnergyMgmt (SEM)Tools

Energy Efficiency practices

3.KeyFocus Area(KFA) Projects

4.
Communication

EEpractices
Housekeeping ResetcentralisedAC System(24oC&7.30 am4.30pm) Policynottouse centralisedAC duringweekend Continuous monthly/daily/ weekendchecking onStreet/Building Lightings,Centralise dACSystem,SPACE SoftstarterforAC systemproject SEMTools BimonthlyEnergy MgmtReview ElectricalBilling Management System(EBMS) TNBOPTR20% discount TNBStreet LightingTariff Correction OptimalAudit OptimalHeat OptimalWater KeyFocusArea RetrofitT5tube project ReplaceACSystem usingVRVsystem PFIoverhaulAC systemFKEusing VRVsystem PFILEDStreet LightingRetrofit Project RenewableEnergy Plan(PFISolar systemproject WindTurbinePilot Project) Communication Awareness Programat faculties,college sandoffices EnergySaving Campaign Yearlyworkshop onEnergy Management Working Procedure MonthlyEnergy Management ReporttoUMG EmailGroup& Facebook

Legend: EE:EnergyEfficiency SEM:SustainableEnergyManagement PFI:PrivateFinancingInitiatives OPTR:OffPeakTariffRider EBMS:ElectricalBillingManagementSystem UMG:UniversitysManagementGroup

1.Energy related housekeeping


Energy Efficiency practices

Housekeeping nocostinitiatives
1. Reset all A/C system temperature setting to 24oC include manually check all 17 Centralised A/C. 2. Reset scheduling on/off times at 7:30am/ 4:30 pm for A/C Centralized System . 3. Off all electrical sourced at colleges. 4. Lights delamping/switch optimisation 5. Sending monthly electrical bills to all faculties, colleges and offices (~50 bills)

Housekeeping lowcostinitiatives
1. Change all photo sensor at feeder pillar to timer for all Street Lights. 2. Install new TNB meter based on requirement from tariff study on OPTR discount & correction of Street Light tariff. 3. Install automatic room lighting controls via EIB at identified location (ie Library, Mosque, Hall Theatre) 4. Install softstarter at AC system to reduce power surge starting time. 5. Install timer at AC System control at identified location to control the centralised system off schedule (ie FAB Studio, IVAT and Postgraduate room)

2.Sustainable EnergyMgmt (SEM)Tools


Energy Efficiency practices

1 EnergyReview

Analyze EnergyUse

Significant EnergyUse

Opportunities for improvement

1.MonthlyReporttoEMTeam/UMG 2.BimonthlymeetingwithEMteam

PenggunaantenagaelektrikfakultiUTM(inkWh) (2010vs2011vs2012)

Semuafakultimenunjukkanpenguranganpenggunaantenagajikadibandingkandengantahun 2011kecualiFAB,FPREE,FKK&FPPSM. Jumlahpengurangankategorifakultiadalah450,879kWhatau2.17%drpd2011

PenggunaantenagaelektrikdikolejUTM(inkWh) (2010vs2011vs2012)

Semuakolej(kecualiKTR&KTGB)menunjukkanpenguranganpenggunaantenagajika dibandingkandengantahun2011. Jumlahpengurangankategorikolejadalah1,294,759kWhatau8.41%drpd2011

PenggunaantenagaelektrikpejabatUTM(inkWh) (2010vs2011vs2012)

Semuapejabat(PSZ,ICC,ScholarInn,BalaiKeselamatan&PusatLatihanmenunjukkan penguranganpenggunaantenagajikadibandingkandengantahun2011. Jumlahpengurangankategorikolejadalah345,282kWhatau2.63%drpd2011

2.EBMS
DevelopmentofthesystemstartinSept2012(system structure&datacollection)andcanbeaccessviaUTMlocal intranethttp://161.139.20.111/Defaultebms.aspx Thereare539metersregisteredinthesystem. First50electricalbillstatementstartingOct2010billswere generatedtoallfaculties,collegesandofficesandhave beensenttothesePTJeverymonthsincethen. Electricalbillgenerationfor133arcadesaroundcampusis alsousingthissystem. FinalistUTMViceChancellorInnovationAward2011 (receivedRM3,000on7July,2011) Usebyall28UTMEnergyManagersandstudents,PHB DevelopmentDivisionfornewblocksandPHBService DivisionforArcadeelectricbillgeneration.

SampleofElectricbill statement

TypeofenergymeteruseinUTM
Digital kWhmeterinUTM
SchneiderPM500 SchneiderPM700

AnalogkWhmeterinUTM
3phase 1phase

TypeofenergymeterloggeruseinUTM
SchneiderPM700

PowerMonitoringSystem (2system)

PM700EnergyMeterLogger (3unit)

KyoritsuMeterLogger (3unit)

EBMS continuousimprovement
OnlineconnectiontoallSchneiderPM700 energymeterthatallowmeterremote reading. AdditionalreportingthatincludeEEIby blocks Includeinventoryforallsignificantenergy equipmentiefurnace,aircondsystem, pumpsystemetc

3.TNBTariff
ChronologyofUTMTNBtariffchanges fromtariffC1(standard) totariffC1(withOPTR) totariffC3(standard) totariffC3(withOPTR)
Yearchanged kWh peak kWh Offpeak MDC1 MDC2 kWh Street Lighting,G Jun 2006 0.234 14.4 19.5 29.00 0.123 July 2008 0.296 18.2 24.6 36.6 0.155 Mac2009 0.288 17.7 23.93 35.60 0.151 Jun2011 (C1OPTR) 0.312 0.2495 25.9 38.60 0.164 Dec 2012(C3 OPTR) 0.295 0.236 25.03 37.30 0.164

Millions Millions 2 3 3 4 4 5 5 6 6 2
Jan09 Feb09 Mar09 Apr09

3 Jan03 Mar03 May03 Jul03 Sep03 Nov03 Jan04 Mar04 May04 Jul04 Sep04 Nov04 Jan05 Mar05 May05 Jul05 Sep05 Nov05 Jan06 Mar06 May06 Jul06 Sep06 Nov06 Jan07 Mar07 May07 Jul07 Sep07

May09 Jun09 Jul09 Aug09 Sep09 Oct09 Nov09 Dec09 Jan10 Feb10 Mar10 Apr10 May10 Jun10 Jul10

ElectricalConsumption(kWh)Trend 2003/2009vs 2009/2012

kWh
Aug10 Sep10 Oct10 Nov10 Dec10 Jan11 Feb11 Mar11 Apr11 May11 Jun11 Jul11 Aug11 Sep11 Oct11 Nov11 Dec11 Jan12 Feb12 Mar12 Apr12 May12 Jun12 Jul12 Aug12 Sep12 Oct12

Linear(kWh)

Nov07 Jan08 Mar08 May08 Jul08 Sep08 Nov08 Jan09 Mar09 May09 Jul09 Sep09 Nov09

UTMElectricalEnergyConsumptionProfile

TARIFFMANAGEMENTPROJECT TNBOFFPEAKTARIFRIDER20%DISCOUNT

UTMsavingtodate

Month

TotalkWh

Max Demand

OffpeakkWh

OPTRdiscount

=RM1,244,180
UTMsaving2012

TotalOPTRdiscountfor2011
Jan Feb Mac Apr Mei Jun July Aug Sep Oct Nov Dec 4,526,859 4,253,059 3,886,184 3,552,528 5,532,904 4,968,513 4,156,918 3,353,580 4,564,883 5,256,647 4,652,526 4,923,403 13,610 14,134 14,438 14,411 14,968 14,284 12,186 10,883 14,476 14,665 14,621 13,782 1,276,250 1,160,126 1,442,148 1,334,753 1,486,872 1,373,591 1,120,023 956,101 1,226,865 1,391,680 1,293,776 1,421,928

RM284,165
RM79,128 RM71,928 RM89,413 RM82,755 RM92,186 RM85,163 RM69,441 RM59,278 RM76,066 RM86,284 RM80,214 RM88,160

=RM960,015
UTMsaving2011

=RM284,165
1. OPTR=OffPeakTarifRatedgnkadar RM0.25/kWh dibandingdenganKadarTarifRata RM0.312/kWh(20%discount) 2. Diskaun 20%OPTRbermula pada20/07/2011 average RM80K/sebulan

TotalOPTRdiscountfor2012 Totaldiscount20%OPTRtodate

RM960,015
RM1,244,180

ProjectStreet Lighting

ProjectOPTR

TARIFFMANAGEMENTPROJECT STREETLIGHTINGTARIFFCORRECTION

Abovetableiscalculationforonlyonefeederpillarandthepilotprojectwascommissioned
inMei2012. 2morefeederpillarswerecommissionedinDec2012 UTMwillstarttoenjoythesavingby Jan2013bil Targettedyearlysavingfor3feederpillarsareRM36,000.00

40

Summaryontariffprojects
UTMhadenjoyedsofarRM1,244,180fromthetariff
changeC1toC1withOPTR Thepercentageforyearlyreductionis4.4%or~RM1 millioncomparingTariffC1OPTRwithTariffC1standard. Whenupgradingto132kVprojectcommissioned,UTM electricbillwillreduce9.2%yearlyorapproximateRM1.8 millioncomparingwithTariffC1standardwhenthetariff changetoC3OPTR. Currently,forStreetLightingtariffcorrectionproject,UTM hadenjoyed~RM6,000foryearend2012andtargetto enjoyatleastRM50Keveryyear.

Energy Efficiency practices

3.KeyFocus Area(KFA) Projects

T5Retrofitproject

Projectcost RM1.5million

SavingofRM5.2 millionin5years

3.2VRVACREPLACEMENTPROJECT
Theprojectcoverbelowfacultieswithtotalcostof

RM5.575 million906unitsofVRVset

FKK BLOCKN01(160UNITS) FAB BLOCKB02,B05&B08(83UNITS) FGHT BLOCKC03,C04(70UNITS) FS BLOCKC10,C15,C17,C18,C19,C20,C21&C22(260UNIT) FP BLOCKC13&C14(64UNIT) FPPSM BLOCKD05&D06(97UNIT) FKM BLOCKC23,C24&C25(154UNITS) DEWANKULIAH 18UNIT

100

150

200

250

50

100

120

140

160

180

20

40

60

80

N01 KWBEFORE

N01 KWAFTER

12:01:50:AM 05:16:50:AM 10:31:52:AM 03:46:52:PM 09:01:52:PM 02:18:22:AM 07:33:22:AM 12:48:22:PM 06:03:22:PM 11:18:22:PM 04:33:22:AM 09:48:22:AM 03:03:22:PM 08:18:22:PM 01:33:22:AM 06:48:22:AM 12:03:22:PM 05:18:22:PM 10:33:22:PM 03:48:22:AM 09:03:22:AM 02:18:22:PM 07:33:22:PM 12:46:50:AM 06:01:50:AM 11:16:50:AM 04:31:50:PM 09:46:50:PM 03:01:50:AM 08:16:52:AM 01:31:52:PM 06:46:52:PM 12:01:52:AM 05:16:52:AM 10:31:52:AM 03:46:52:PM 09:01:52:PM 02:16:52:AM 07:31:52:AM 12:46:52:PM 06:01:52:PM 11:16:52:PM 04:31:52:AM 09:46:52:AM 03:01:52:PM 08:16:52:PM 01:31:52:AM 06:46:52:AM 12:01:52:PM 05:16:52:PM 10:31:52:PM 03:46:52:AM 09:01:52:AM 02:16:52:PM 07:31:52:PM

12:03:32:AM 06:33:32:AM 01:03:32:PM 07:33:32:PM 02:03:32:AM 08:33:32:AM 03:03:32:PM 09:33:32:PM 04:03:32:AM 10:33:32:AM 05:03:32:PM 11:33:32:PM 06:03:32:AM 12:33:32:PM 07:03:32:PM 01:33:32:AM 08:33:32:AM 03:03:32:PM 09:33:32:PM 04:03:32:AM 10:33:32:AM 05:03:32:PM 12:03:32:AM 06:33:32:AM 01:03:32:PM 07:33:32:PM 02:03:32:AM 09:03:32:AM 04:03:32:PM 10:33:32:PM 05:03:32:AM 11:33:32:AM 06:03:32:PM 12:33:32:AM 07:03:32:AM 01:33:32:PM 08:03:32:PM 02:33:32:AM 09:03:32:AM 03:33:32:PM 10:03:32:PM 04:33:32:AM 11:03:32:AM 05:33:32:PM 12:03:32:AM 06:33:32:AM 01:03:32:PM 07:33:32:PM 02:03:34:AM 08:33:34:AM 03:03:34:PM 09:33:34:PM 04:03:34:AM 10:33:34:AM 05:33:34:PM

InprogressKFAprojectin2013
1. 2. 3. 4. PFI Overhaul AC system FKE using VRV system PFI LED Street Lighting Retrofit Project PFI Solar system project Pilot Project Wind Turbine install at A/C compressor in Data Centre 5. Continue project on Street Lighting tariff correction

Energy Efficiency practices

4.
Communication

Marketing&Motivationplatforms
Awareness Training Sharing experience
Ie : MMU,UIAM,Politech,U THM,SEDA,Bendahari IPTA,Pengarah PembangunanIPTA ie :Faculties,Colleges& Office

EnergySaving Campaign
ie : Poster,Website,Mainten anceWeek

Monthly Universitys Management Groupmeeting

EnergyMgmt Communication

UTM Transformation Project TPU.2

EnergySavingCampaigninUTM2011
No Faculty /Office 1 FKE 2 FKK 3 FBB 4 FKM 5 PSZ 6 FPPSM 7 FSKSM Programdate Savingin 2011(RM) 11Feb2011 122,699 30Mac,2011 18,669 08July,2011 3,977 03Aug,2011 53,454 16Aug,2011 28,784 21Sep,2011 535 16Nov,2011 10,392 2011 %reduced 8.9% 7.3% 4.4% 4.9% 4.2% 0.3% 3.3%

EnergySavingCampaign&Sharing ExperienceActivitiesin2012
1. 2. 3. 4. 5. 6. 7. 8.
Multimedia University Visit UTM on SEMP 20/03/2012 Energy Saving Campaign at Fakulti Pendidikan 21/03/2012 Induksi Staf baru UTM 30/3/2012 Induksi Staf baru UTM 02/4/2012 UTM SEMP at UTHM Open Day 25/04/2012 Energy Saving Campaign at KTGB 26/04/2012 Politeknik Melaka Visit UTM on SEMP 24/05/2012 Mesyuarat Pengarah-Pengarah Pembinaan IPTA di UTeM 28/06/2012 9. US Conference in 06/2012 10. Mesyuarat Bendahari-Bendahari IPTA di Tasik Kenyir 01/07/2012 11. Bengkel SEDA on SEMP 11/07/2012 12. UIA Visit on UTM SEMP 09/10/2012 13. Induksi Staf baru UTM 02/11/2012 14. Helsinki Metropolia University Finland Visit 5/11/2012

Sharingexperiencewithotherorganization

Mesyuarat Pengarah-Pengarah Pembangunan IPTA 27 Jun, 2012 AEMAS Conference, 18 Jul, 2011 Bengkel Energy SEDA, 11 Jul, 2012 Mesyuarat Bendahari-Bendahari IPTA , 1 Jul, 2012

2nd STAR EnergyManagementGoldStandard Awardfortheachievementofenergysaving


29January2013@MarriotHotel,Putrajaya

WinnerofASEANEnergyAwardSep2012
Largebuildingcategory
5Sept2012@PhnomPenh,Cambodia

CongratulationstoUTM. AwardedEnergyManagement GoldStandardCertificationunder AEMAS* TheFirstoftheTwoShowcase OrganisationswithSustainable EnergyManagementSystemin Malaysia.

*ASEAN Energy Management Accreditation Scheme

10July,2012@KLCC

AwarenessCampaigninFKKon30Mac,2011

WEPLEDGE

AwarenessCampaigninFBBon8Jul,2011

ASEANEnergy Award2012 Oneofthe10 UTMkey achievements appearedin BeritaHarian newspaperon 5th Dec,2012
59

20November2012

Highlights: UTMgrandprojectentitled'AOneStop CentreforSustainableEnergy Management'wasannouncedWinnerof 'ASEANEnergyAward2012 Large BuildingCategory'byASEANCentrefor Energy(ACE) UTMwasawardedEnergyManagement GoldStandard UTMwasthefirstorganisationwhohas trained30ofitsstaffascertifiedEnergy Managers UTMhassavedRM800,000inyear2010 andRM1.7millioninyear2011 UTM'sproprietaryinhouseElectrical BillingManagementSystem(EBMS)

60

FMMConferenceonEnergyEfficiency& Conservation2012
July19,2012;RoyaleChulanKualaLumpur

61

MMUVisit 20032012

62

Kempen Pengurangan Pembaziran 24&25Okt,2011

63

ENERGYSAVINGAWARENESSATCOLLEGES

Penggunaanperalatanelektrik

ROADMAP

SEMPMETHODOLOGY
A.BuildingHousekeeping&BestPractices (ie ElectricalTariffReview,TNBOPTRScheme,Retimeofcentralised a/csystem operation,EACElectricalBillstatementsystem,Operation&MaintenancePolicy) B.SETTINGUP SUSTAINABLEENERGY MANAGEMENTSYSTEM Developmentofenergy policy Developmentofanenergy managementcommittee Establishmentofenergy accountingcenter(EAC)& appointmnt ofHeadof EAC EstablishmentofEnergy EfficiencyIndexforoverall organizationandeachEAC Establishmentofoverall& EACworkingprocedure Establishmentofreporting andmonitoringsystem C.ENERGYAUDIT& RECOMMENDATIONFOR IMPROVEMENT Overallenergysurvey Establishbuildingenergy balancesandexisting equipmentdetails Evaluatingsystems performance Settingthepracticalutility benchmarktargetsand buildingbenchmarking Recommendationsfor improvementviaUTM TransformationProjects Economicanalysis D.OTHERS Energysavingandpolicy posters Workingmanuals booklet EnergyManagerin houseworkshop ProvidingEnergy Awarenessseminar Installationofelectrical meters

successfactors

Understanding

Commitment

Engagement

Enjoy the challenges

Teamwork

Long term, sustainability

Concludingremarks
The approach adopted so far has worked Overall energy consumption, EEI and cost has decreased at the background of increase in tariff and number of students Less cost but maximum impact Teamwork and the top management commitment has been the CSF in building the people and the culture, and in sustaining the energy & cost reduction Engagement of campus community works

Thankyou
Remember: Keep it simple The best of luck with your future efforts to improve your energy performance