Pile and Foundation Dimensions Pile Diameter, D = Min. Foundation depth from ground = FOS for Shaft Friction = Shaft Friction Calculations Critical Depth = 20xD = Corresponding Vertical stress = Layer Number 3 Top Depth = Thickness of Strata = Cohesion = Adhesion Factor = Corresponding Adhesion = Shaft resistance = Layer Number 4 Top Depth = Thickness of Strata = Cohesion = Adhesion Factor = Corresponding Adhesion = Shaft resistance = Layer Number 5 Top Depth = 16.50 M 2.50 M 0.00 kg/Sq.cm 0.00 14.25 T/Sq.M 7.58 T/Sq.M 59.51 T Bot. Depth = 19.00 M 12.75 M 3.75 M 0.72 kg/Sq.cm 0.60 0.432 kg/Sq.cm = 50.89 T 4.32 T/Sq.M Bot. Depth = 16.50 M 4.50 M 8.25 M 0.23 kg/Sq.cm 0.80 0.184 kg/Sq.cm = 47.69 T 1.84 T/Sq.M Bot. Depth = 12.75 M 20.00 M 19.00 T/Sq.M 1000.00 mm 20.00 M 2 Cut-off level =
Friction Angle =
Friction Angle =
Thickness of Strata = Cohesion = Adhesion Factor = p(z, mean) = Corresponding Friction comp. = Shaft resistance =
Friction Angle =
Total Ultimate Shaft resistance = End Bearing: Founding Depth = 19.00 M Dia of Pile =
158.09 T
1.00 M
Max. vertical stress to account for arching = 14.25 T/Sq.M given Nq = For Phi = 28.00 degree 16.2 qtip = 230.85 T/Sq.M (Refer IS:2911 Part 1 Section 2, Fig 1, Amendment 1, 1982) Ptip = 181.31 T 181.31 T
Cut-off level =
4.50 M
riction Angle =
0.00 degree
riction Angle =
0.00 degree
riction Angle = K0 =
28.00 degree 1
Amendment 1, 1982)
Thickness of Strata = Cohesion = Adhesion Factor = Corresponding Adhesion = Shaft resistance = Layer Number 4 Top Depth = 12.75 M
Friction Angle =
Bot. Depth = 3.75 M 0.72 kg/Sq.cm 0.60 0.432 kg/Sq.cm = 50.89 T 4.32 T/Sq.M
16.50 M
Thickness of Strata = Cohesion = Adhesion Factor = Corresponding Adhesion = Shaft resistance = Layer Number 5 Top Depth = 16.50 M
Friction Angle =
Bot. Depth = 2.50 M 0.00 kg/Sq.cm 0.00 14.25 T/Sq.M 7.58 T/Sq.M 59.51 T
19.00 M
Thickness of Strata = Cohesion = Adhesion Factor = p(z, mean) = Corresponding Friction comp. = Shaft resistance =
Friction Angle = K0 =
Total Ultimate Shaft resistance = End Bearing: Founding Depth 19.00=M Dia of Pile =
158.09 T
1.00 M
Max. vertical stress to account for arching = 14.25 T/Sq.M given Nq = For Phi = 28.00 degree 16.2 qtip = 230.85 T/Sq.M (Refer IS:2911 Part 1 Section 2, Fig 1, Amendment 1, 1982) Ptip = 181.31 T 181.31 T
4.50 M
0.00 degree
0.00 degree
28.00 degree 1