Example
Location:
Irvine, California
Contract:
OTI-12345678
Engineer:
Filename:
EXAMPLE
ETAP
Page:
12.5.0C
Date:
09-30-2013
SN:
ETAP-OTI
Revision:
Base
Config.:
Normal
Design
Design
Number of Buses:
Number of Branches:
None
Swing
V-Control
Load
Total
11
XFMR2
XFMR3
Reactor
Line/Cable
Impedance
Tie PD
Total
Method of Solution:
Newton-Raphson Method
99
Precision of Solution:
0.0001000
System Frequency:
60.00 Hz
Unit System:
English
Project Filename:
EXAMPLE
Output Filename:
E:\DemoFiles\EXAMPLE-ANSI\LFreport.lfr
ETAP
Project:
Example
Location:
Irvine, California
Contract:
OTI-12345678
Engineer:
Filename:
EXAMPLE
Page:
12.5.0C
Adjustments
Apply
Tolerance
Individual
Adjustments
/Global
Transformer Impedance:
Yes
Individual
Reactor Impedance:
Yes
Individual
No
No
Cable Length:
No
Apply
Temperature Correction
Percent
Individual
Adjustments
/Global
Yes
Individual
Cable Resistance:
Yes
Individual
Degree C
Date:
09-30-2013
SN:
ETAP-OTI
Revision:
Base
Config.:
Normal
ETAP
Project:
Example
Location:
Irvine, California
Contract:
OTI-12345678
Engineer:
Filename:
EXAMPLE
Page:
12.5.0C
Date:
09-30-2013
SN:
ETAP-OTI
Revision:
Base
Config.:
Normal
Initial Voltage
Sub-sys
MW
Constant Z
Mvar
MW
Constant I
% Mag.
Ang.
Bus1
0.480
100.0
0.0
Bus2
0.480
100.0
0.0
0.647
0.370
0.256
0.018
0.311
0.162
0.179
0.000
0.000
-0.450
LVBus
kV
Constant kVA
Mvar
MW
0.480
97.1
-3.5
34.500
100.0
0.0
MCC1
0.480
97.9
-3.1
0.304
0.137
Sub2A
13.800
101.5
-1.2
0.998
-0.616
Sub2B
13.800
100.0
1.4
1.908
0.763
Sub 3
4.160
99.8
-0.5
Sub3 Swgr
4.160
99.6
-0.5
0.407
0.185
Sub22
3.450
100.0
0.0
1.785
1.106
1.301
0.806
Sub23
3.450
100.0
0.0
0.298
0.184
0.128
0.079
6.602
2.148
1.919
0.597
Main Bus
Generation Bus
ID
kV
Voltage
Type
Sub-sys
Generation
% Mag.
Angle
Main Bus
34.500
Swing
100.0
0.0
Sub2B
13.800
Voltage Control
100.0
1.4
MW
Mvar
6.300
6.300
Mvar
0.000
MW
0.000
Mvar Limits
% PF
Max
5.286
0.000
Generic
Min
-2.534
0.000
Mvar
0.000
ETAP
Project:
Example
Location:
Irvine, California
Contract:
OTI-12345678
Engineer:
Filename:
EXAMPLE
Page:
12.5.0C
Date:
09-30-2013
SN:
ETAP-OTI
Revision:
Base
Config.:
Normal
Length
Library
T (C)
% Tol.
#/Phase
5.0MCUS3
750
222.0
0.0
75
0.022300
0.036400
Cable14
1.0MCUN3
250
100.0
0.0
75
0.055200
0.037900
Size
Adj. (ft)
Cable2
ETAP
Project:
Example
Location:
Irvine, California
Contract:
OTI-12345678
Engineer:
Filename:
EXAMPLE
Page:
12.5.0C
Date:
09-30-2013
SN:
ETAP-OTI
Revision:
Base
Config.:
Normal
Transformer
ID
Rating
Phase
% Z1
X1/R1
+ 5%
- 5%
% Tap Setting
% Tol.
Prim.
Sec.
Adjusted
Phase Shift
Prim. kV
Sec. kV
%Z
Type
T2
3-Phase
10.000
34.500
13.800
6.90
23.00
-1.50
2.10
6.9000
Dyn
0.000
T3
3-Phase
0.750
4.160
0.480
5.75
18.00
5.7500
Dyn
0.000
T4
3-Phase
1.500
4.160
0.480
5.75
7.10
5.7500
Dyn
0.000
T22
3-Phase
5.000
13.800
3.450
6.50
12.14
6.5000
Dyn
0.000
T23
3-Phase
5.000
13.800
3.450
6.50
12.14
6.5000
Dyn
0.000
3-Phase
1.000
4.160
0.480
7.20
28.00
-2.500
7.2000
Dyn
0.000
XFMR 3
MVA
Z Variation
Angle
Transformer
ID
T1
Rating
Winding
MVA
Tap
kV
Impedance
% Z1
Phase Shift
X1/R1
MVAb
% Tol.
+ 5%
- 5%
7.10
39.00
15.000
Zpt =
7.20
40.00
15.000
0.000
Zst =
14.10
38.00
15.000
0.000
Primary:
15.000
34.500
Zps =
Secondary:
10.000
13.800
5.000
4.160
Tertiary:
Z Variation
Type
Angle
ETAP
Project:
Example
Location:
Irvine, California
Contract:
OTI-12345678
Engineer:
Filename:
EXAMPLE
Page:
12.5.0C
Date:
09-30-2013
SN:
ETAP-OTI
Revision:
Base
Config.:
Normal
Branch Connections
CKT/Branch
Connected Bus ID
ID
Type
From Bus
T2
2W XFMR
Main Bus
Sub2A
R
3.00
68.93
69.00
T3
2W XFMR
Sub3 Swgr
LVBus
42.53
765.49
766.67
T4
2W XFMR
Sub 3
Bus1
53.46
379.59
383.33
T22
2W XFMR
Sub2A
Sub22
10.67
129.56
130.00
T23
2W XFMR
Sub2B
Sub23
10.67
129.56
130.00
XFMR 3
2W XFMR
Sub3 Swgr
MCC1
25.06
701.55
702.00
T1
3W Xfmr
Main Bus
Sub2B
1.18
47.98
47.99
3W Xfmr
Main Bus
Sub 3
1.17
48.66
48.68
3W Xfmr
Sub2B
Sub 3
324.12
3383.37
3398.86
Cable2
Cable
Sub 3
Sub3 Swgr
Cable14
Cable
Bus1
Bus2
2.86
4.67
5.48
119.79
82.25
145.31
ETAP
Project:
Example
Location:
Irvine, California
Contract:
OTI-12345678
Engineer:
Filename:
EXAMPLE
Page:
12.5.0C
Date:
09-30-2013
SN:
ETAP-OTI
Revision:
Base
Config.:
Normal
ID
O/L Heater
Length
Equipment
Type
Library
Size
Adj. (ft)
Resistance
% Tol
#/ph
T (C)
Adj.(ohm)
% Tol
Cable13
Load1
Stat. Load
1.0MCUN1
350
67.0
0.0
75
.03900
.05000
.0000000
.0000
0.0
Cable21
MOV1
MOV
0.6MCUN3
470.0
0.0
75
.32100
.04830
.0000000
.0000
0.0
15MCUS3
1200.0
0.0
75
.20200
.05240
.0000000
.0007
0.0
Cable18
Mtr2
Ind. Motor
Overload Heater
Mtr5
Ind. Motor
Cable20
Pump 1
Ind. Motor
Cable7
Syn1
Cable12
Syn2
.0015
0.0
5.0MCUS1
350
650.0
0.0
75
.03860
.05620
.0000000
.0000
0.0
Syn. Motor
15MCUS3
1250.0
0.0
75
.32100
.05680
.0000000
.0000
0.0
Syn. Motor
1.0MCUN1
59.0
0.0
75
.16000
.05700
.0000000
.0000
0.0
ETAP
Project:
Example
Location:
Irvine, California
Contract:
OTI-12345678
Engineer:
Filename:
EXAMPLE
Page:
12.5.0C
Date:
09-30-2013
SN:
ETAP-OTI
Revision:
Base
Config.:
Normal
DC Rating
FLA
MVA
Input
Output
Input
Output
% EFF
% PF
kV
FLA
% Imax
Operating
% PF
Bypass
Switch
0.222
0.480
0.480
296.69
267.02
90.00
90.09
0.125
1688.889
150.0
90.09
No
ETAP
Project:
Example
Location:
Irvine, California
Contract:
OTI-12345678
Engineer:
Filename:
EXAMPLE
Page:
12.5.0C
Date:
09-30-2013
SN:
ETAP-OTI
Revision:
Base
Config.:
Normal
Bus
ID
Bus1
Voltage
kV
0.480
% Mag.
97.891
Generation
Ang.
-1.9
Bus2
0.480
96.775
-2.0
LVBus
0.480
97.976
-3.0
* Main Bus
34.500
100.000
0.0
MW
Load
Mvar
0
MW
0
Load Flow
Mvar
ID
0
MW
XFMR
Mvar
Amp
%PF
Bus2
0.654
0.375
926.9
86.7
Sub 3
-0.654
-0.375
926.9
86.7
0.647
0.370
Bus1
-0.647
-0.370
926.9
86.8
0.554
0.174
Sub3 Swgr
-0.554
-0.174
712.9
95.4
2.144
2.178
Sub2A
4.000
1.532
71.7
93.4
Sub2B
-1.856
0.646
32.9
-94.4
%Tap
& Sub 3
MCC1
0.480
101.063
-2.5
Sub2A
13.800
98.861
-1.6
* Sub2B
13.800
100.000
1.1
0.487
0.137
Sub3 Swgr
-0.487
-0.137
601.9
96.3
0.998
-0.616
Main Bus
-3.995
-1.406
179.2
94.3
Sub22
2.997
2.022
153.0
82.9
6.300
0.971
1.908
0.763
Sub23
0.424
0.266
21.0
84.7
Sub 3
3.968
-0.059
166.0
-100.0
1.451
0.541
215.6
93.7
4.160
99.731
-0.6
0.000
-0.448
Sub3 Swgr
Bus1
0.658
0.398
106.9
85.6
-2.109
-0.492
301.3
97.4
Sub 3
-1.451
-0.540
215.6
93.7
Main Bus
& Sub2B
Sub3 Swgr
4.160
99.664
-0.6
0.407
0.185
LVBus
0.556
0.200
82.3
94.1
MCC1
0.488
0.155
71.2
95.3
Sub22
3.450
95.960
-3.8
2.983
1.848
Sub2A
-2.983
-1.848
612.0
85.0
Sub23
3.450
99.611
0.8
0.424
0.263
Sub2B
-0.424
-0.263
83.8
85.0
* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
-2.500
ETAP
Project:
Example
Location:
Irvine, California
Contract:
OTI-12345678
Engineer:
Filename:
EXAMPLE
Page:
12.5.0C
10
Date:
09-30-2013
SN:
ETAP-OTI
Revision:
Base
Config.:
Normal
Constant kVA
kV
Bus1
0.480
Bus2
0.480
LVBus
0.480
Main Bus
34.500
Rated Amp
1200.0
Constant Z
Mvar
0.647
0.370
0.256
0.018
MW
Constant I
Mvar
MW
Generic
Mvar
MW
Mvar
MVA
% PF
Amp
0.754
86.7
926.9
0.746
86.8
926.9
0.299
0.156
0.601
92.3
737.5
Percent
Loading
77.2
4.555
87.8
76.2
0.304
0.137
0.183
0.506
96.3
601.9
800.0
0.998
-0.616
4.477
89.2
189.5
23.7
13.800
1600.0
1.908
0.763
6.384
98.7
267.1
16.7
4.160
600.0
-0.448
2.309
91.3
321.3
53.5
Sub3 Swgr
4.160
225.0
0.407
0.185
1.548
93.7
215.6
95.8 #
Sub22
3.450
1200.0
1.785
1.106
1.198
0.742
3.509
85.0
612.0
51.0
Sub23
3.450
1200.0
0.298
0.184
0.127
0.078
0.499
85.0
83.8
7.0
MCC1
0.480
Sub2A
13.800
Sub2B
Sub 3
1200.0
MW
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 90.0% of the Continuous Ampere rating).
6.4
ETAP
Project:
Example
Location:
Irvine, California
Contract:
OTI-12345678
Engineer:
Filename:
EXAMPLE
Page:
12.5.0C
11
Date:
09-30-2013
SN:
ETAP-OTI
Revision:
Base
Config.:
Normal
Transformer
CKT / Branch
ID
Ampacity
(Amp)
275.00
Loading
Amp
Capability
(MVA)
Loading (input)
MVA
Loading (output)
MVA
Cable2
Cable
T2
Transformer
12.000
4.283
35.7
4.235
35.3
T3
Transformer
0.840
0.591
70.3
0.581
69.1
T4
Transformer
1.800
0.769
42.7
0.754
41.9
T22
Transformer
5.000
3.615
72.3
3.509
70.2
T23
Transformer
5.000
0.501
10.0
0.499
10.0
XFMR 3
Transformer
1.000
0.512
51.2
0.506
50.6
T1
3W XFMR p
22.500
1.966
8.7
3W XFMR s
15.000
3.968
26.5
3W XFMR t
7.500
2.165
28.9
215.56
%
78.39
ETAP
Project:
Example
Location:
Irvine, California
Contract:
OTI-12345678
Engineer:
Filename:
EXAMPLE
Page:
12.5.0C
12
Date:
09-30-2013
SN:
ETAP-OTI
Revision:
Base
Config.:
Normal
CKT / Branch
ID
Cable14
MW
MW
Mvar
Mvar
Losses
kW
% Bus Voltage
kvar
From
To
Vd
% Drop
in Vmag
0.654
0.375
-0.647
-0.370
7.1
4.9
97.9
96.8
1.12
T4
-0.654
-0.375
0.658
0.398
3.2
22.5
97.9
99.7
1.84
T3
-0.554
-0.174
0.556
0.200
1.5
26.9
98.0
99.7
1.69
T2
4.000
1.532
-3.995
-1.406
5.5
126.5
100.0
98.9
1.14
-0.487
-0.137
0.488
0.155
0.6
18.0
101.1
99.7
1.40
T22
XFMR 3
2.997
2.022
-2.983
-1.848
14.3
173.2
98.9
96.0
2.90
T23
0.424
0.266
-0.424
-0.263
0.3
3.2
100.0
99.6
0.39
1.451
0.541
-1.451
-0.540
0.7
1.1
99.7
99.7
0.07
T1
Cable2
-1.856
0.646
3.968
-0.059
2.5
96.0
100.0
100.0
0.00
T1
0.000
0.000
-2.109
-0.492
100.0
99.7
0.27
35.7
472.5
ETAP
Project:
Example
Location:
Irvine, California
Contract:
OTI-12345678
Engineer:
Filename:
EXAMPLE
Page:
12.5.0C
13
Date:
09-30-2013
SN:
ETAP-OTI
Revision:
Base
Config.:
Normal
ID
Losses
Library
kW
Terminal on
kvar
Bus
Bus kV
Load kV
% Vd
Operating
% Vst
Starting
Mtr2
Ind. Motor
Cable18
15MCUS3
5.4
1.4
100.00
99.73
104.26
0.27
99.26
Pump 1
Ind. Motor
Cable20
5.0MCUS1
0.3
0.4
99.66
99.57
103.55
0.10
99.05
Syn1
Syn. Motor
Cable7
15MCUS3
3.0
0.5
98.86
98.67
103.16
0.19
98.47
Mtr5
Ind. Motor
Overload Heater
101.06
101.04
105.43
0.03
100.99
Syn2
Syn. Motor
Cable12
1.0MCUN1
0.8
0.0
0.3
97.98
97.56
101.80
0.42
95.63
Load1
St. Load
Cable13
1.0MCUN1
0.8
1.1
97.98
97.52
97.52
0.46
0.00
MOV1
MOV
Cable21
0.6MCUN3
97.98
97.98
102.24
0.00
0.00
ETAP
Project:
Example
Location:
Irvine, California
Contract:
OTI-12345678
Engineer:
Filename:
EXAMPLE
Page:
12.5.0C
14
Date:
09-30-2013
SN:
ETAP-OTI
Revision:
Base
Config.:
Normal
Marginal
Loading
Bus
100.0
90.0
Cable
100.0
90.0
Reactor
100.0
90.0
Line
100.0
95.0
Transformer
100.0
95.0
Panel
100.0
95.0
Protective Device
100.0
85.0
Generator
100.0
95.0
Inverter/Charger
100.0
95.0
OverVoltage
105.0
102.0
UnderVoltage
95.0
98.0
OverExcited (Q Max.)
100.0
95.0
UnderExcited (Q Min.)
100.0
Bus Voltage
Generator Excitation
Critical Report
Rating/Limit
Unit
CB31
Device ID
LV CB
Type
Overload
Condition
800.00
Amp
Operating
926.88
% Operating
115.9
3-Phase
Phase Type
Charger1
Charger
Overload
601.41
Amp
621.45
103.3
3-Phase
Fuse3
Fuse
Overload
390.00
Amp
601.93
154.3
3-Phase
UPS-1
UPS
Overload
296.69
Amp
306.58
103.3
3-Phase
Marginal Report
Device ID
Type
Condition
Rating/Limit
Bus1
Bus
Under Voltage
0.48
Bus2
Bus
Under Voltage
Fuse2
Fuse
Overload
LVBus
Bus
Under Voltage
0.48
Sub22
Bus
Under Voltage
3.45
Sub3 Swgr
Bus
Overload
0.48
125.00
225.00
Unit
kV
kV
Operating
% Operating
Phase Type
0.47
97.9
3-Phase
0.46
96.8
3-Phase
121.56
97.2
3-Phase
kV
0.47
98.0
3-Phase
kV
3.31
96.0
3-Phase
215.56
95.8
3-Phase
Amp
Amp
Project:
Example
Location:
Irvine, California
Contract:
OTI-12345678
Engineer:
Filename:
EXAMPLE
ETAP
Page:
12.5.0C
09-30-2013
SN:
ETAP-OTI
Revision:
Base
Config.:
Normal
MW
Mvar
MVA
% PF
2.144
2.178
3.056
70.14 Lagging
6.300
0.971
6.374
98.83 Lagging
Total Demand:
8.444
3.149
9.012
93.69 Lagging
6.602
2.148
6.943
95.09 Lagging
1.806
0.529
1.882
95.97 Lagging
0.000
0.000
0.000
0.000
0.000
0.000
Apparent Losses:
0.036
0.472
System Mismatch:
0.000
0.000
Number of Iterations: 2
15
Date: