ID

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66

Fuel system erection & commissioning


Fuel piping erection
Fuel piping pressure test
Fuel piping flushing/blowing
HSD tank erection
HSD unloading system commissioning
HSD filling
HSD piping circulation
Electrical and I&C system erection & commissioning
Back feed power
Power system commissioning
Earthing works
BOP erection & commissioning
DM water available
Aux. steam available
Open cycle cooling water available
Firefighting system available
Compressing air available
Exhaust System available
GT erection preparation
GT mech. preparation
GT elec. and I&C preparation
GT erection
GT on-base mech. erection
Lube oil filling
Lube oil flashing
Lube oil flushing accetpance
Low wall
Load shaft coupling
Final alignment of GTG
Painting of GT
Air inlet duct internal cleaning
Air filter house internal cleaning
Air filter installtion
Cladding installtion of HSFO Pipeline
Painting of air inlet duct
ventilation system erection
GT drainage piping
GT off-base mech. erection
HSFO forwarding skid installation
HSFO filtering skid installation
HSFO heater skid installation
HSD forwarding skid installation
HSD filtering skid installation
Cooling water skid installation
Cooling water piping installation
Cooling water piping pressure test
Cooling water piping flushing/blowing
Water injection water skid installation
Water injection piping installation
Water injection piping pressure test
Water injection piping flushing/blowing
Water washing skid installation
Water washing piping installation
Water washing piping pressure test
Water washing piping flushing/blowing
CO2 skid installation
Interconnection CO2 piping with skid and enclosure
CO2 system pressure test
Exhaust frame blower
Jacking oil skid
GT elec. erection
Cable laying
Cable connection works
Cable testing
Cable Testing for APU System

Duration

% Work
Complete
131 days 0%
105 days 95%
3 days 0%
4 days 0%
90 days 0%
10 days 0%
2 days 0%
5 days 0%
13 days 0%
1 day 100%
5 days 100%
5 days 100%
120 days 0%
95 days 0%
10 days 0%
100 days 90%
111 days90%
95 days 90%
120 days 90%
31 days 0%
31 days 100%
31 days 100%
102 days 0%
57 days 0%
1 day 100%
8 days 100%
3 days 100%
25 days 0%
2 days 100%
20 days 100%
10 days 50%
5 days 80%
5 days 80%
4 days 0%
5 days 0%
10 days 40%
15 days 100%
7 days 100%
77 days 0%
5 days 100%
5 days 100%
5 days 100%
5 days 100%
5 days 100%
3 days 100%
20 days 100%
1 day 0%
3 days 0%
5 days 100%
20 days 100%
4 days 100%
3 days 0%
2 days 100%
20 days 100%
2 days 100%
3 days 0%
5 days 100%
31 days 100%
5 days 100%
2 days 100%
5 days 100%
26 days 0%
7 days 90%
12 days 70%
7 days 0%
4 days 100%

Start
Wed 1/1/14
Wed 1/1/14
Wed 4/16/14
Mon 4/21/14
Wed 1/1/14
Fri 4/25/14
Mon 5/5/14
Wed 5/7/14
Sat 3/15/14
Sat 3/15/14
Sun 3/16/14
Sun 3/23/14
Wed 1/1/14
Wed 1/1/14
Thu 4/10/14
Wed 1/1/14
Wed 1/1/14
Wed 1/1/14
Wed 1/1/14
Wed 1/1/14
Wed 1/1/14
Wed 1/1/14
Sat 2/1/14
Tue 3/18/14
Tue 3/18/14
Wed 3/19/14
Thu 3/27/14
Fri 3/28/14
Sun 3/30/14
Tue 4/1/14
Thu 4/10/14
Tue 4/15/14
Sun 4/20/14
Sat 5/10/14
Sun 4/20/14
Thu 4/10/14
Sun 3/23/14
Sat 3/22/14
Sat 2/1/14
Sat 2/1/14
Sat 2/1/14
Sat 2/1/14
Sat 2/1/14
Sat 2/1/14
Sat 4/5/14
Sat 2/1/14
Thu 4/10/14
Fri 4/11/14
Sat 2/1/14
Sat 2/1/14
Fri 4/11/14
Tue 4/15/14
Mon 3/24/14
Sat 2/1/14
Mon 4/14/14
Wed 4/16/14
Sat 2/1/14
Sat 3/1/14
Tue 4/1/14
Mon 3/24/14
Sat 2/1/14
Fri 3/21/14
Fri 3/21/14
Fri 3/28/14
Wed 4/9/14
Wed 4/9/14

Finish

Total Slack

Sun 5/11/14
Tue 4/15/14
Fri 4/18/14
Thu 4/24/14
Mon 3/31/14
Sun 5/4/14
Tue 5/6/14
Sun 5/11/14
Thu 3/27/14
Sat 3/15/14
Thu 3/20/14
Thu 3/27/14
Wed 4/30/14
Sat 4/5/14
Sat 4/19/14
Thu 4/10/14
Mon 4/21/14
Sat 4/5/14
Wed 4/30/14
Fri 1/31/14
Fri 1/31/14
Fri 1/31/14
Tue 5/13/14
Tue 5/13/14
Tue 3/18/14
Wed 3/26/14
Sat 3/29/14
Mon 4/21/14
Mon 3/31/14
Sun 4/20/14
Sat 4/19/14
Sat 4/19/14
Thu 4/24/14
Tue 5/13/14
Thu 4/24/14
Sat 4/19/14
Sun 4/6/14
Fri 3/28/14
Fri 4/18/14
Wed 2/5/14
Wed 2/5/14
Wed 2/5/14
Wed 2/5/14
Wed 2/5/14
Mon 4/7/14
Thu 2/20/14
Thu 4/10/14
Sun 4/13/14
Wed 2/5/14
Thu 2/20/14
Mon 4/14/14
Thu 4/17/14
Tue 3/25/14
Thu 2/20/14
Tue 4/15/14
Fri 4/18/14
Wed 2/5/14
Mon 3/31/14
Sat 4/5/14
Tue 3/25/14
Wed 2/5/14
Tue 4/15/14
Thu 3/27/14
Tue 4/8/14
Tue 4/15/14
Sat 4/12/14

Successors

5 days
3
7 days
4
7 days
6
5 days
6
29 days
7
5 days
8
5 days
142
5 days
29 days
11
29 days
82
29 days
64 days
8 days
15,52,56,87,88,142
10 days
4
6 days
48,142
23 days
6,142
8 days
85,142,125
24 days
16 days
142
71 days
40,41,42,43,44,46,49,50,54,57,61
71 days
119 days
17 days
17 days
26
19 days
27
19 days
29,90,96
19 days
136
7 days
30
19 days
97
19 days
41 days
33
12 days
34,93
12 days
142
3 days
36 days
41 days
92
30 days
94
37 days
42 days
114 days
114 days
114 days
85
90 days
85
90 days
53 days
47
71 days
48
23 days
86,94
23 days
114 days
51
89 days
52
40 days
87,94
40 days
66 days
99 days
56
16 days
88,94
16 days
114 days
59
20 days
134,94
20 days
89
64 days
90
111 days
17 days
64
17 days
65,68,66
17 days
17 days 87,88,89,90,92,102,108,110,112,134,116,96
25 days
91,95

Page1/3

Predecessors

2
3,15
4,5,17
6
7

10

14

25
26
27
29

32
33

21
21
21
21
21
21
46
47,16
21
21
50
51,14
21
55,14
21
58
21

63
64
64

ID

67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132

Motor testing and check


Cold loop checks
Cranking motor testing
Generator PI testing
11kv cable from swtih gear
GT I&C erection
Cable laying
Cable connection works
Cable testing
Cold loop checks
Instruments calibiration
HMI installation
TCP integrity testing
TCP internal power cableing works
HMI in CCR erection
Mark VIe Installation
GT commissioning
GT mech. pre-comm.
Fuel skid function commissioning
Cooling water skid commissioning
Water injection skid commissioning
Washing water skid commissioning
Exhaust Cooling Air system
Jacking oil system
APU system
Ventilation system
Air inlet system
Piping verification check
AA System Commissioning
Hydraulic Oil System Commissioning
Mech. RFR clearance check
GT elec. pre-comm.
MCC energizing
Function test on MCC
Generator testing
Motor rotation test
G60 and T60 relay protection testing
Excitation testing
MCC Phase sequence testing
ABT/RBT testing
GLAC&GNAC testing
Generator breaker testing52G
Protection signal from switch yard
88CR breaker control system
52L line breaker circuit testing and commissioning
TQ motor limit swich test
Software verification
Software verification and audit from engineering
Elec. interface checking
88CR Start Motor Commissioning
Elec. RFR clearance check
GT I&C. pre-comm.
TCP energizing
TCP hardware check
TCP communication check
Software verification and audit from engineering
Software verification against control specification
Device hot loop check
Function testing of all system
Control and protection check
HMI screen configration
DCS interface checking
Screen modification
Servo calibration
IGV calibration
I&C. RFR clearance check

Duration

% Work
Complete
20 days 70%
7 days 0%
1 day 100%
1 day 0%
1 day 100%
36 days 0%
7 days 0%
13 days 95%
15 days 0%
10 days 85%
25 days 80%
1 day 100%
3 days 100%
1 day 100%
1 day 0%
18 days 100%
70 days 0%
23 days 0%
3 days 0%
3 days 0%
3 days 0%
3 days 0%
2 days 0%
3 days 0%
2 days 0%
3 days 0%
3 days 0%
5 days 0%
3 days 0%
3 days 0%
7 days 0%
55 days 0%
1 day 100%
15 days 100%
7 days 100%
7 days 0%
13 days 0%
10 days 0%
1 day 100%
1 day 0%
13 days 0%
5 days 0%
3 days 0%
1 day 0%
3 days 0%
1 day 0%
30 days 0%
7 days 0%
5 days 0%
3 days 0%
5 days 0%
54 days 0%
3 days 100%
3 days 100%
2 days 0%
30 days 0%
7 days 0%
10 days 0%
10 days 0%
3 days 0%
3 days 0%
1 day 0%
3 days 0%
10 days 0%
2 days 0%
6 days 0%

Start
Sat 3/22/14
Wed 4/9/14
Thu 3/27/14
Thu 3/27/14
Fri 3/28/14
Fri 3/21/14
Fri 3/21/14
Fri 3/28/14
Fri 3/28/14
Thu 4/10/14
Sat 3/22/14
Sat 3/22/14
Mon 3/24/14
Sat 3/22/14
Fri 4/25/14
Tue 4/1/14
Sat 3/22/14
Sat 4/19/14
Mon 4/21/14
Mon 4/21/14
Sat 4/19/14
Sun 4/20/14
Tue 4/22/14
Wed 4/23/14
Sat 4/19/14
Sat 4/26/14
Mon 4/28/14
Sat 4/19/14
Sun 4/20/14
Fri 5/2/14
Mon 5/5/14
Sat 3/22/14
Sat 3/22/14
Mon 3/24/14
Thu 4/3/14
Wed 4/16/14
Fri 3/28/14
Thu 5/1/14
Sun 3/23/14
Tue 4/1/14
Sat 3/29/14
Wed 4/16/14
Fri 4/25/14
Sat 4/19/14
Mon 4/28/14
Sat 4/19/14
Tue 4/1/14
Tue 4/1/14
Sun 4/20/14
Wed 4/30/14
Sun 5/11/14
Sun 3/23/14
Tue 4/8/14
Fri 4/11/14
Mon 4/14/14
Tue 4/1/14
Sun 3/23/14
Sun 4/20/14
Wed 4/30/14
Wed 4/30/14
Sat 4/19/14
Wed 4/16/14
Sun 3/30/14
Sun 4/20/14
Sun 4/20/14
Sat 5/10/14

Finish

Total Slack

Thu 4/10/14
Tue 4/15/14
Thu 3/27/14
Thu 3/27/14
Fri 3/28/14
Fri 4/25/14
Thu 3/27/14
Wed 4/9/14
Fri 4/11/14
Sat 4/19/14
Tue 4/15/14
Sat 3/22/14
Wed 3/26/14
Sat 3/22/14
Fri 4/25/14
Fri 4/18/14
Fri 5/30/14
Sun 5/11/14
Wed 4/23/14
Wed 4/23/14
Mon 4/21/14
Tue 4/22/14
Wed 4/23/14
Fri 4/25/14
Sun 4/20/14
Mon 4/28/14
Wed 4/30/14
Wed 4/23/14
Tue 4/22/14
Sun 5/4/14
Sun 5/11/14
Thu 5/15/14
Sat 3/22/14
Mon 4/7/14
Wed 4/9/14
Tue 4/22/14
Wed 4/9/14
Sat 5/10/14
Sun 3/23/14
Tue 4/1/14
Thu 4/10/14
Sun 4/20/14
Sun 4/27/14
Sat 4/19/14
Wed 4/30/14
Sat 4/19/14
Wed 4/30/14
Mon 4/7/14
Thu 4/24/14
Fri 5/2/14
Thu 5/15/14
Thu 5/15/14
Thu 4/10/14
Sun 4/13/14
Tue 4/15/14
Wed 4/30/14
Sat 3/29/14
Tue 4/29/14
Fri 5/9/14
Fri 5/2/14
Mon 4/21/14
Wed 4/16/14
Tue 4/1/14
Tue 4/29/14
Mon 4/21/14
Thu 5/15/14

Successors

Predecessors

85,86,87,88,89,91,92,102,95,96
24 days
115
64
45 days
102
38 days
102
64 days
107
32 days
0 days
74,75
0 days
76
73
0 days
124
73
9 days
115,124,130,131,132
74
0 days
125
14 days
127
45 days
119
21 days
119
25 days
35 days
18 days 6,87,88,89,90,91,93,95,96,127,110,111,112
11
0 days
5 days
97
43,44,18,65,67,82
16 days
97
48,65,67,82
16 days
97
52,65,14,67,82
18 days
97
56,65,14,67,82
17 days
97
67,65,82,60
37 days
97
27,65,61,82
35 days
97
67,66,82
19 days
97
65,67,37
11 days
97
82,33
9 days
97
38,48,52,56,59
16 days
38 days
97
67,66,82
5 days
97
65,27,67,82
142
92,93,30,86,87,96,85,88,89,90,91,94,95
5 days
15 days
105,117
49 days
117
34 days
117
32 days
116
65,67,69,70
19 days
117
33 days
117
1 day
117
99
49 days
117
59 days
117
71
32 days
117
65
23 days
117,111
15 days
116,117
65,82
19 days
117
82,109
12 days
117
65,82
22 days
30 days
117
34 days
117
76,68
18 days
11 days
117
110,65,102
142 1,103,106,108,109,110,111,112,114,115,105
1 day
15 days
120,124
79,80
9 days
121
119
23 days
128,132
120
23 days
30 days
127,129,132
38 days
125,126
76,119,75
0 days
140,132
124,77,18
0 days
132
124,138
7 days
132
123,78,82
18 days
132
121
23 days
132
123
38 days
132
76
10 days
132
76
18 days
142,141
76,125,121,123,127,128,129,130,126,131
0 days

Page2/3

ID
133
134
135
136
137
138
139
140
141
142
143
144
145
146

GT firefighting comm.
CO2 cabiner comm.
CO2 loop test
Smoke Test
CO2 Concentration Test
CO2 re-fill
GT trial run commissioning
GT false fire check
Emergency push button test
GT first fire
Off line water wash
GT No Load Test
GT first synchronization
GT trial run

Duration

% Work
Complete
14 days 0%
1 day 0%
2 days 0%
2 days 0%
3 days 0%
3 days 0%
21 days 0%
3 days 0%
1 day 0%
1 day 0%
2 days 0%
8 days 0%
2 days 0%
1 day 0%

Start
Wed 4/16/14
Wed 4/16/14
Thu 4/17/14
Tue 4/22/14
Thu 4/24/14
Sun 4/27/14
Sat 5/10/14
Sat 5/10/14
Fri 5/16/14
Sat 5/17/14
Sun 5/18/14
Tue 5/20/14
Wed 5/28/14
Fri 5/30/14

Finish

Total Slack

Tue 4/29/14
Wed 4/16/14
Fri 4/18/14
Wed 4/23/14
Sat 4/26/14
Tue 4/29/14
Fri 5/30/14
Mon 5/12/14
Fri 5/16/14
Sat 5/17/14
Mon 5/19/14
Tue 5/27/14
Thu 5/29/14
Fri 5/30/14

7 days
10 days
10 days
7 days
7 days
7 days
0 days
18 days
0 days
0 days
0 days
0 days
0 days
0 days

Page3/3

Successors

Predecessors
135
136
137
138
126,140

59,65
134
135,28
136
137

142
142
143
144
145
146

138,125
132
8,14,16,17,18,132,117,97,34,19,141,140
142
143
144
145