Professional Documents
Culture Documents
CREDIT CODE OR
NAME INTENT STRATEGY REQUIREMENTS SUBMITTAL DOCUMENTATION
PTS PHZ STANDARD
SUSTAINABLE SITES (0 prerequisite, 3 credits, 7 possible points, 3 items ½ point to 1 point, 2 possible ID points)
Encourage tenants to
SS c1
select buildings with 1.LEED Letter Template
3 Pt Select building where key
Site Selection best practices and Select a LEED certified building, 2.Copy of Base Building LEED certification
Design sustainable already exist
employed green document
ResParty
strategies
1. A building prior to development on a site documented as
1.LEED Letter Template
Rehabilitate damaged contaminated via CSA Z769 Standard for Phase II
SS c1A 1. Confirmation site was Brownfield
sites Environmental Site Assessments.
½ Pt ▪During site selection, give 2. Type of damage CSA Z769 Standard
real or perceived
Design Brownfield preference to brownfield sites. 3. remediation taken for Phase II
environmental Or 2. Defined as Brownfield by government agency
Civil Eng Redevelopment 4. Environmental Site
contamination
ResParty Letter from regulatory body certifying the site Assessments
Reduce pressure on ⋅ Both need complete Effective remediation of contamination to earn
was contaminated
undeveloped land this half point,
(thermal gradient
differences
between developed
SS c1D Heat Island and undeveloped ▪Use light colored paving OPTION 1: Provide a combination giving r 30% of the site hardscape: ▪Project site drawings
½ Pt Effect areas) to minimize 1. Shade (within 5 yrs) (June 21, noon) ▪Optional Narrative
EP 1L Non-Roof impact on micro ▪Shade paved areas with 2. Paving materials with >= 30SRI (Solar Reflectance Index) AND
Design 30% opt 1 landscaping 3. Open grid pavement system OPTION 1: 30%
Civil Eng 50% opt 2
climate & human 1. SRIs for each paving material
OPTION 2: Minimum 50% of parking spaces underground or under
ResParty 50% opt 3 and animal habitat ▪Parking deck to minimize footprint 2. Total areas of site hardscape
structured cover
OPTION 3: Minimum 50% of paving is <50% impervious open grid 3. Area of hardscape to be shaded
EP 100% opt 1 4. Area of installed SRI materials
CAGBC LEED CI v.10 Prep teeceetee 11/12/2009
EP ½ pt 1L: 100% on site parking located under cover 2. Number of Covered parking spaces
OPTION 3: 50%
1.Parking area
2.50% Area In open grid <50% impervious
Projects occupying< 75% of gross building area LEED letter template (signed), with either
Option A - zoning info, or lease documents showing
⋅ Parking provided to tenants shall not exceed minimum number of how parking allocation is within these
spots required by zoning. guidelines
⋅ Priority parking provided for van & car pools for 5% or more of
tenant occupants (assume 2 people/car - so really means for Option A ( Case 1&2)
2.5% of tenant occupants) 1.Provide Code and Requirements
SS c3.3 Option B - 2. Show Zone for 5% Priority parking
Reduce pollution and No parking provided or subsidized for tenant occupants
1 Pt Alternative ▪ Select building with minimized car
land development Option B
Design Transportation parking capacity and limited Projects occupying 75% or over of gross building area
impact from single 1.Show no new parking or none added
Architect Parking parking in the lease Option A -
occupancy vehicle
int des Availability
use. ⋅ Parking provided to tenants shall not exceed minimum number of
ResParty spots required by zoning.
⋅ Priority parking provided for van & car pools for 5% or more of
building occupants (assume 2 people/car - so really means for
2.5% of occupants)
Option B -
⋅ No new parking added for rehab projects
⋅ Preferred parking provided for van & car pools for 5% or more of
building occupants
CREDIT
NAME INTENT STRATEGY REQUIREMENTS SUBMITTAL DOCUMENTATION CODE OR STANDARD
PTS PHZ
WATER EFFICIENCY (0 prerequisites, 1 credit, 2 points. 2 ID points possible)
WE c1.1 20% less water than the water use baseline calculated for the
1 Pt building (not including irrigation) after meeting the Energy
Water use Policy Act of 1992 fixture performance requirements.
Design Reduction: 20% Calculations are based on estimate occupant usage and include
MEP eng only water closets, urinals, lavatory faucets, showerheads, Energy Policy Act
ResParty faucets, replacement aerators, metering faucets 1. Calculated occupants
(EPAct) of 1992:
Addresses energy and
2. Calculated design case water
water use in
▪High-efficiency fixtures usage (flush/flow fixtures)
commercial, institutional,
Maximize water
and residential facilities
efficiency in the ▪Occupant sensors 3. Calculated baseline water usage
WE c1.2 tenant space (flush and flow fixtures)
Water use 30% less water use Table WE 2
1 Pt ▪Use stormwater/graywater
Reduction: 30%
EP: 2 ID 4. Non-potable water supply
EP *40% projected water savings IPMVP or FEMP
Design
40% baseline *10% water use savings in the process and non-regulated water Measurement and
MEP eng 5. Narrative
20% process use, eligible for ID point Verification Guidelines
ResParty
CAGBC LEED CI v.10 Prep teeceetee 11/12/2009
Water Closets 6.0 LPF (Litres per Flush) 1.6 GPF (Gallons per Flush)
Urinals 3.8 LPF (Litres per Flush) 1.0 GPF (Gallons per Flush)
Showerheads 9.5 LPM (Litres per Minute) 2.5 GPM (Gallons per Minute)
Faucets 8.3 LPM (Litres per Minute) 2.2 GPM (Gallons per Minute)
Replacement Aerators 8.3 LPM (Litres per Minute) 2.2 GPM (Gallons per Minute)
CREDIT
NAME INTENT STRATEGY REQUIREMENTS SUBMITTAL DOCUMENTATION CODE OR STANDARD
PTS PHZ
ENERGY AND ATMOSPHERE (3 Prerequisites, 4 credits,12 points. 3 ID points possible)
1. Commissioning Authority (CA) 1. Name and company information
2. Tenant developed TPR. Design team developed BOD for the CxA
TPR (Tenant’s Project Requirements)
3. Commissioning requirements into Constr Documents 2. Confirm that the 6 required tasks
▪Owner & User requirements
4. Commissioning Plan have been completed
Verify that the ▪Environmental and sustainability goals
EA P1 5. Verify performance of the systems 3. Narrative of the systems that were
projects energy ▪Energy Efficiency Goals
0 Pts Fundamental 6. Summary commissioning report commissioned
systems are ▪Indoor Environmental quality requirements
Constr. Commissioning Provide a narrative - will be used for
installed, ▪Equipment and System expectations
CA of the Building this credit & other EA & EQ credits
calibrated & ▪Building occupant and O&M personnel reqmts Commissioned systems
tenant Energy Systems ⋅ Use drawings/diagrams
perform as BOD (Basis of Design) ▪HVAC & Controls▪
intended ▪Primary Design Assumptions (space use, Explain how HVAC works, portions
▪Lighting and daylighting controls
redundancy, diversity) ▪Standards ▪Narrative shared with other tenants or the base
▪Domestic hot water systems
descriptions building, improvements made as part
▪Renewable energy systems (PV, wind, solar, etc.)
of project to building systems that
serve the project space
1. Confirm project meets ASHRAE
90.1 – 2004
▪Design to maximize energy or More stringent local Code
⋅ Building envelope (section 5) 3. Optional narrative
⋅ HVAC (section 6) LEED Letter Template (professional
⋅ Service water heating (section 7) engineer or other responsible party),
⋅ Power (section 8) stating compliance to ASHRAE (if
⋅ Lighting (section 9) local code - prove more stringent
⋅ Other equipment (section 10) than ASHRAE)
⋅ Energy cost budget method (ECBM) ⋅ Provide narrative re key HVAC &
Design Tenant Portion of the building to comply with:
EA P2 section 11 Std 90.1-2004 lighting initiatives employed
Mandatory provisions of Sections 5-10 of ASHRAE/IESNA ASHRAE/IESNA 90.1-
0 Pts Minimum
Minimum level of ⋅ Performance rating method – Std 90.1-2004 or More stringent Local energy code ⋅ Provide schedule of HVAC and 2004: Energy Standard
Design Energy Appendix G Std 90.1-2004 lighting equipment installed within
energy efficiency. For Buildings Except
MEP eng Performance ⋅ Within each section there are mandatory tenants scope of work, identifying
2Prescriptive requirements OR performance requirements Low-Rise Residential
ResParty provisions that must always be met, as well as equipment & its’ capacitates,
of ASHRAE/IESNA Std 90.1-2004
additional prescriptive requirements. Some efficiencies & controls, and
sections also contain a performance alternative corresponding ASHRAE Standard
⋅ The Energy Cost Budget Method (section 11) 90.1 or code mandated
allows the user to exceed some of the prescriptive requirements
elements, as long as savings are made in other 4. If simulation done according to
areas. The mandatory elements must always be Canadian Model National
met Energy Code 1997 and
applicable Commercial Buildings
Incentive Program (CBIP) -
provide their report
▪Zero use of CFC (Chlorofluorocarbons) refrigerants in new
EA P3 tenant HVAC & R systems when within scope of work
⋅ Specify new HVAC equipment that uses no CFC
0 Pts CFC Reduction Note - if don’t touch old HVAC, then not applicable Confirm project does not use CFCs
refrigerants.
EP: 1 ID in HVAC & R Reduce ozone Exemplary: ID point for attaining a quantifiable positive in HVAC installed or renovated within
Design Equipment depletion. ⋅ Retrofit existing CFC HVAC & R systems with environmental impact for items not covered within LEED scope
Exemp:ID point non CFC refrigerants
MEP eng CI; eliminated use of Ozone Depleting materials or
ResParty materials with global warning potential may qualify for ID
point
CAGBC LEED CI v.10 Prep teeceetee 11/12/2009
CREDIT
NAME INTENT STRATEGY REQUIREMENTS SUBMITTAL DOCUMENTATION CODE OR STANDARD
PTS PHZ
CREDIT
NAME INTENT STRATEGY REQUIREMENTS SUBMITTAL DOCUMENTATION CODE OR STANDARD
PTS PHZ
Reuse building
materials and
products in order
to reduce demand LEED Letter
MR c3.3 Use salvaged, refurbished or reused materials for at least
Furniture and for virgin materials 1.providing listing of value of reused
1 Pt 30% of total furniture & furnishings budget. Based on
Furnishings: and to reduce furniture/furniture,
EP 1 ID replacement cost
30% waste, thereby 2. value of additional new furniture
Arch/int
EP ≥ 60% reducing impacts If audit, provide details, including explanation
D Exemplary Performance = 60% or greater
associated with of how values where calculated
the extraction &
processing of
virgin resources
▪Use materials sum of post-consumer recycled content plus
1/2 of the pre-consumer content at least 10% of cost.
Federal Trade
1. Provide total project materials cost
▪Exclude MEP, but furniture may be included if included Commission document,
MR c4.1 Recycled Content: 2. Provide tabulation of each material
consistently across MR credits 3-7. Guides for the Use of
1 Pt 10% (post- including:
Increase demand Environmental Claims,
Arch consumer + 1/2 Establish project goal for recycled content a) Description of the material
for building Value of the recycled content portion shall be calculated by FTC 16 CFR 260.7
Int Des. pre-consumer) materials and identify material suppliers that b) Manufacturer of the material
products that dividing weight of recycled portion by total weight, and
can achieve this goal. During construction, c) Product cost
incorporate multiplying by the total cost CAN/CSA-ISO 14021-
ensure that recycled content materials are d) Pre-consumer and/or post-consumer
recycled 00
materials.
installed. ▪ Calculation - deduct MEP & MRc 3.1 & 3.2 & 3.3 recycled content %
Environmental labels
MR c4.2 Recycled Content: e) Source of the data
and Declarations is
1 Pt 20% (post- Use materials sum of post-consumer recycled content plus deemed equivalent to
EP 1 ID consumer + 1/2 1/2 of the pre-consumer content at least 20% of cost. the FTC standard
Arch pre-consumer) EP 30% of cost or greater
Int Des.. EP 30%
Use materials/products that have been manufactured within
500 miles of the site for minimum 20% of cost. 1. Provide the project's total project cost
MR c5.1 Regional Materials
1 Pt Manufactured
*EP 40% of cost or greater . 2. Complete regional materials calculation
EP 1 ID Regionally Run a preliminary calculation during design
▪If only a fraction of a product/material extracted/ table including
Arch 20% Increase demand to set appropriate target. Establish goal for
harvested/recover and manufactured locally, then only that a) Product name for each tracked material
Int Des.. EP 40% for building locally sourced materials, and identify
percentage by weight shall contribute to the regional value. b) Product cost
products that are materials and suppliers. During construction,
Divisions 2-10 only. c) Percentage of product by weight that
extracted and ensure that specified local materials are
meets both extraction and manufacture criteria
Regional Materials manufactured installed.
d) Distance from extractions / harvest /
MR c5.2 Extracted, within the region. Use materials/products that have been extracted, harvested or
recovery site and project site
1 Pt Processed & recovered, and manufactured within 500 miles of the site for
e) Distance between manufacturing location
EP 1 ID manufactured minimum 10% of cost.
and project site.
Arch Regionally $ value of construction & Division 12
f) Total value of project
Int Des.. 10% *EP 20% of cost or greater
EP 20%
CAGBC LEED CI v.10 Prep teeceetee 11/12/2009
CREDIT
NAME INTENT STRATEGY REQUIREMENTS SUBMITTAL DOCUMENTATION CODE OR STANDARD
PTS PHZ
CREDIT
NAME INTENT STRATEGY REQUIREMENTS SUBMITTAL DOCUMENTATION CODE OR STANDARD
PTS PHZ
1. Provide a copy of projects IAQ Plan.
2. Confirm if permanently installed AHU's
Adapt IAQ plan to (1) protect HVAC system
were used during construction.
during construction ▪avoid using permanent Develop Indoor Air Quality (IAQ) Management Plan for
3. Provide 18 photos to highlight the
AHUs (Air Handling Units) during construction or construction and pre-occupancy phase of the bldg as follows: SMACNA
implemented construction SMACNA IAQ
use MERV (Min. Efficiency Rating Value) 8 or IAQ Guidelines for
practices.
better filters, (2) control pollutant sources ▪spec 1. Meet or exceed Control Measure of the SMACNA IAQ Occupied Buildings
4. List all filtration media.
Construction materials that have low volatile organic Guidelines for Occupied Buildings under Construction. Under Construction
a) Manufacturer
EQ c3.1 IAQ compounds (VOC), exhaust fumes (3) interrupt 2. Protect on-site or installed absorptive materials from
b) Model number
1 Pt Management contamination pathways ▪depressurize work moisture damage. ANSI/ASHRAE 52.2-
c) MERV rating
Constr. Plan: During areas, provide temp barriers, (4) institute 3. Permanent Air Handler unitss during construction 1999: Method of Testing
d) Location of installed filter installed
Construction housekeeping activities ▪protect porous must have filters with MERV 8 per AHSRAE 52.2-1999. General Ventilation Air-
during construction; confirm each was
surfaces, dust control, and (5) schedule the 4. Replace all filtration media immediately prior to Cleaning Devices for
replaced prior to final occupancy.
installation of materials to avoid contamination occupancy; coordinate wit EQ credits 3.2 and 5, Removal Efficiency by
5. Declare the 5 design approaches of the
of absorptive materials such as insulation, installing only a single set of final filtration media. Particle Size
standard used during building construction;
carpeting, ceiling tile and drywall. Select
include a brief listing of some of the
member of GC's team as IAQ mgr.
important design approaches employed.
CREDIT CODE OR
NAME INTENT STRATEGY REQUIREMENTS SUBMITTAL DOCUMENTATION
PTS PHZ STANDARD
All carpets and carpet cushions installed in the building interior shall meet 1. List of each carpet and cushion product
Specify requirements for product
Low-Emitting the testing and product requirement of the and confirm that product complies with CRI Carpet and Rug
EQ c4.3 testing/certification. Select products
Materials Green Label Plus testing program Institute (CRI)
1 Pt certified under the Green Label Plus
Carpet Carpet and Rug Institute's Green Label Plus Program. Green Label Plus
Constr. Program or for which testing has been
Systems 2. Narrative to describe special Testing Program
done by independent lab.
All carpet adhesive shall meet the requirements of EQ Credit 4.1. circumstances
Low-Emitting 1. List of each composite wood and
Materials agrifiber product installed and confirm
EQ c4.4 Composite Specify wood/agrifiber products that Composite wood and Agrifiber products (particleboard, MDF, plywood,
product does not contain any added urea-
1 Pt Wood & contain no added urea-formaldehyde wheat board, strawboard, panel substrates, door cores) used on the
formaldehyde.
Constr. Agrifiber resins. interior of the bldg shall contain NO added urea-formaldehyde resins.
Products 2. Narrative
CREDIT CODE OR
NAME INTENT STRATEGY REQUIREMENTS SUBMITTAL DOCUMENTATION
PTS PHZ STANDARD
Greenguard (within
the certification
All systems furniture and related seating that has been manufactured, period established
refurbished or refinished within one year prior to occupancy must meet by Greenguard
one of the referenced standards. Institute)
GreenGuard Indoor Air Quality certified US EPA’s
Reduce the quantity of
OR Environmental
indoor air S furniture seating
Calculated indoor air contaminants are less than Table 1 for systems Technology
Low-Emitting contaminants that are TVOC 0.5 mg/m3 LEED CIST architect, interior designer or
EQ c4.5 furniture and seating as determined by Verification (ETV)
Materials odorous, potentially 0.25mg/m3 ORP declaring the all systems furniture &
1 Pt EPA ETV Large Chamber Test Protocol for Measuring Emissions of Large Chamber Test
Furnishings irritating and/or harmful Formaldehyde 50ppb 25 ppb related seating comply with one of the two
Constr. VOC’s and Aldehydes testing protocol conducted in an independent air Protocol for
and Furniture to the comfort and Tot. Aldehyde 100 ppb 50 ppb standards in the required time frame.
quality testing lab Measuring
wellbeing of installers 4 PCH 0.0065 mg/m3 0.0032 mg/m3
Emissions of VOC’s
and occupants.
1) Refurbishment of systems furniture or seating which occurred within 12 and Aldehydes
months of occupancy must meet this credit testing protocol
2) Occasional furniture & work tools excluded from this credit conducted in an
3) Older salvaged furniture excluded, but could count to MRc 3.3 independent air
quality testing lab
Design the space to maximize Line of sight may be drawn through interior glazing. For private 1. Template calculation spreadsheet to
Daylighting &
daylighting and view opportunities. offices, the entire square footage of the office can be counted if 75% demonstrate overall access to views from
EQ c8.3. Views
Strategies to consider include lower or more of the area has direct line of sight to perimeter vision glazing. occupied spaces
1 Pt Views for
partition heights, interior shading 2. Drawings
Design 90% of
devices, interior glazing, and If less than 75% of the area has direct line of sight then only the area 3. Narrative describing any special occupancy
Spaces
automatic photocell-based controls. with the direct line of sight will be counted towards meeting the credit areas
and not the whole office area.
To support and encourage the Educate the project team members about green
design integration required by a building design and construction and application 1. Name of LEED AP
ED c2
LEED for New Construction of the LEED Rating System early in life of the At least one principal participant of the project team shall be a 2. Company
1 Pt LEED AP
green building project and to project. Consider assigning the LEED AP as a LEED Accredited Professional. 3. Description of his role
Constr.
streamline the application and facilitator of an integrated design & construction 4. Certificate.
certification process. process.