Install pipe culverts and structures on road construction works
Level 3
Credits 15
Purpose People credited with this unit standard are able to: prepare for culvert works;
prepare sites for works; prepare bedding for culverts; lay and oint pipes and
carry out initial inspection; install inlet and outlet structures; backfill trench
and apply surfacing; and inspect and clean up sites!
Subfield "ighway #onstruction and $aintenance
Domain %oad #onstruction
Status %egistered
Status date &5 'epte(ber &))6
Date version published &5 'epte(ber &))6
Planned review date 31 *ece(ber &)1&
Entr information Prere+uisite: ,nit 64-./ Locate and identify services on
civil construction sites; or de(onstrate e+uivalent
knowledge and skills!
!ccreditation 0valuation of docu(entation and visit by 1234 and
industry!
Standard settin" bod #SS$% 5nfrastructure 567
!ccreditation and &oderation !ction Plan #!&!P% reference )1)1
6his 4$4P can be accessed at http:88www!n9+a!govt!n98fra(ework8search8inde:!do!
Special notes
1 6he following legislation and regulations (ust be co(plied with: "ealth and 'afety in
0(ploy(ent 4ct 1..&; and "ealth and 'afety in 0(ploy(ent %egulations 1..5!
& 4ssess(ent against this unit standard (ust take place in a workplace environ(ent!
4ssess(ent para(eters will be dependent on co(pany and site specific e+uip(ent/
procedures/ and practices! Practices (ust reflect industry best practice and co(ply
with legislative re+uire(ents!
1ew 2ealand 3ualifications 4uthority &)14
6483 version 4
Page & of 5
3 *efinitions
Company requirements include the policy/ procedures/ and (ethodologies of the
co(pany! 6hey include legislative and regulatory re+uire(ents which (ay apply
across the co(pany or to a specific site! %e+uire(ents are docu(ented in the
co(panys health and safety plans/ traffic (anage(ent plans/ contract work
progra((es/ +uality assurance progra((es/ policies/ and procedural docu(ents!
Contract specifications include plans/ diagra(s/ and special technical conditions!
6hey do not include special ad(inistrative conditions!
Manufacturers instructions (ay include specifications/ installation/ handling/ use and
(aintenance instructions and safety data sheets!
As-built refers to what is actually constructed as opposed to that which was planned!
Benchmark is the starting set;out position fro( which control (arks are derived!
Set-out (eans to set out site by survey (ethod using pegs!
Elements and performance criteria
Element 1
Prepare for culvert works!
Performance criteria
1!1 <ocation of culvert is confir(ed fro( plans in accordance with contract
specifications!
1!& Pipe type/ class/ and dia(eter are confir(ed fro( plans in accordance with
contract specifications!
1!3 =edding (aterial and backfill are confir(ed fro( plans in accordance with
contract specifications!
1!4 #ulvert details such as inlets/ outlets/ aprons/ and reinforcing are confir(ed
fro( plans in accordance with contract specifications!
1!5 0:isting services are verified in accordance with co(pany re+uire(ents!
1!6 %esponsibilities to adoining landowners during culvert works are described in
accordance with contract specifications and co(pany re+uire(ents!
1!- Plant and labour re+uire(ents are confir(ed in accordance with plans/ contract
specifications/ and co(pany re+uire(ents!
1ew 2ealand 3ualifications 4uthority &)14
6483 version 4
Page 3 of 5
Element '
Prepare sites for works!
Performance criteria
&!1 'ites are set out in accordance with plans/ specifications/ and on;site survey
(arks!
%ange levels/ bench(arks/ align(ent/ gradients/ offsets/ (easuring
e+uip(ent/ pegs/ stakes!
&!& ,nderground services are (arked and located in accordance with service
authority re+uire(ents!
&!3 6rench is e:cavated in accordance with plans/ contract specifications/ and
co(pany re+uire(ents!
Element 3
Prepare bedding for culverts!
Performance criteria
3!1 >ater is re(oved fro( the area through which the culvert is to be installed in
accordance with site conditions and co(pany re+uire(ents!
%ange te(porary diversion/ te(porary su(p/ sub(ersible pu(p/ well
pointing/ sedi(ent trap!
3!& 4lign(ent and invert levels of trench are checked in accordance with contract
specifications!
%ange bench(arks/ levels/ align(ent/ gradient/ offsets/ pegs/ stakes/
pipe laser!
3!3 6rench bed is tri((ed and shaped in accordance with contract specifications!
3!4 Pipe bedding (aterial is placed in trench in accordance with contract
specifications!
Element (
<ay and oint pipes and carry out initial inspection!
Performance criteria
4!1 $ethods of lifting pipes for laying are described in accordance with
(anufacturer?s instructions and co(pany re+uire(ents!
4!& Pipes are orientated and laid ensuring continuous contact and support of collars
and barrels in accordance with contract specifications!
1ew 2ealand 3ualifications 4uthority &)14
6483 version 4
Page 4 of 5
4!3 Pipes are fir(ly bedded in accordance with contract specifications for
co(paction!
4!4 Pipes are ointed in accordance with contract specifications and (anufacturer?s
instructions!
%ange at least one of @ rubber ring/ solvent ce(ent/ butt/ ther(o butt/
bevel oint/ steel weld/ ther(o weld/ solvent weld!
4!5 #ulvert and oints are visually inspected on co(pletion of bedding to ensure
they (eet contract specifications!
Element 5
5nstall inlet and outlet structures!
Performance criteria
5!1 4rea for structure is e:cavated in accordance with contract specifications and
site conditions!
5!& Pipe ends are prepared for fitting to structure in accordance with contract
specifications!
%ange (ay include but is not li(ited to @ re(oval of collar/ scabbling/
sawcutting!
5!3 'tructures are installed in accordance with contract specifications!
%ange at least one of @ precast/ in;situ structure/ gabion basket/
rockwork/ geote:tile bag/ flu(e!
5!4 4rea around structure is backfilled/ co(pacted/ and shaped in accordance with
contract specifications!
Element )
=ackfill trench and apply surfacing!
Performance criteria
6!1 6rench is backfilled in accordance with contract specifications!
%ange (aterial type/ layer depth/ co(paction/ suitable co(paction
e+uip(ent/ testing re+uire(ents!
6!& 6rench is surfaced in accordance with contract specifications!
1ew 2ealand 3ualifications 4uthority &)14
6483 version 4
Page 5 of 5
Element *
5nspect and clean up sites!
Performance criteria
-!1 #ulvert and structures are inspected to ensure they (eet contract specifications
and co(pany re+uire(ents!
-!& 3uality assurance records are co(pleted in accordance with co(pany
re+uire(ents!
%ange includes but is not li(ited to @ as;built records!
-!3 'urplus (aterials and debris are re(oved fro( site in accordance with contract
specifications and co(pany re+uire(ents!
Please note
Providers (ust be accredited by the 3ualifications 4uthority/ or an inter;institutional body
with delegated authority for +uality assurance/ before they can report credits fro(
assess(ent against unit standards or deliver courses of study leading to that assess(ent!
5ndustry 6raining 7rganisations (ust be accredited by the 3ualifications 4uthority before
they can register credits fro( assess(ent against unit standards!
4ccredited providers and 5ndustry 6raining 7rganisations assessing against unit standards
(ust engage with the (oderation syste( that applies to those standards!
4ccreditation re+uire(ents and an outline of the (oderation syste( that applies to this
standard are outlined in the 4ccreditation and $oderation 4ction Plan A4$4PB! 6he
4$4P also includes useful infor(ation about special re+uire(ents for organisations
wishing to develop education and training progra((es/ such as (ini(u( +ualifications for
tutors and assessors/ and special resource re+uire(ents!
Comments on this unit standard
Please contact 5nfrastructure 567 askusCinfratrain!co!n9 if you wish to suggest changes to
the content of this unit standard!