MCA Part-III SEM VI: Industrial Training Project Report Outline

1. College Certificate
2. Company Certificate
3. Acknowledgement
4. Company Profile
5. Problem Definition
Switch Optimization:
Technical:
I. Disconnected but occupied Interfaces on Switches.
II. Difficulty in Identifying Free ports on switch via Console.
III. Difficulty in allotting new network connections.
IV. Improper Utilization of Switch Capacity.
Commercial and Mangerial:
I. Cost Cutig regarding network hardware.
II. Network Layout of Bosch Nap
III. Miss management of Network Racks.
IV. Network Rack Key Management.

Planning & Implementing a VLAN:
Technical:
I. Need to Secure Network
II. Isolating Machine from corporate network.
III. Dealocating Assigined static IP address.

6. Existing Scenario
Switch Optimization:
Technical:
I. Connected but unused ports on switch
II. The Free Ports on switch can be identified only by visual observation
III. Scarcity of ports while allotting new network connections.
IV. Improper Utilization of Switch Capacity.
Commercial and Mangerial:
I. Need to Procure New Network Hardware.
II. Scattered (dept. Wise layout)
III. No Maintenance or preventive Maintenance of network racks
IV. Missing Standard Convention for network rack keys

Planning & Implenting a VLAN:
Technical:
I. Unsecured Network
II. Machines have access to corporate network
III. Static IP address are assigned to machines.

7. Feasibility Study
Technical Feasibility
Operational Feasibility
Economical feasibility




8. Scope of the work
Switch Optimization (Passive Networking)
Survey of existing network infrastructure
Ploting Network Racks & Connectivity on Bosch Nap Layout
Preparation of Reports
Preparing & Planning Preventive Maintenance Report
Desigining switch optimization strategy
Implementing switch Optimization
Cost Cuting.

VLAN: Planning & Implementing a VLAN (Active Networking)



9. Requirement Analysis
10. Network Infrastructure: Passive
11. Network Infrastructure: Active
12. Network Topology
13. Cabling & Cabling Standards
14. Network Connectivity Equipments
15. Network Racks
16. Process of Switch Optimization
Survey of Network Racks & Switches
Constructing a detailed Survey Report
Grading Network Racks
Traceing Ports: connected but unused & free ports
Traceing Cables (Uplink Cables)
Study of End user connectivity requirement
Switch Optimization Report
Implementation
How the Switch Optimization was Benificial to Organization?
17. Planning & Implementing a VLAN
VLAN Fundamentals
Purpose for Creation of a VLAN
IP Address Monitoring
Identifying Switch & Ports on which these machines (hosts) are connected
Realign these machines on switch in serial order
Confgiguring VLAN Settings on Switch