You are on page 1of 59

Engenius Erectors Private Limited

.A Brief outline

Engenius Erectors Private Limited.
Formation

Founded in 1978, as a Partnership firm Engenius Enterprises, the Firm focused its
activities to cater to the growing need of Power.

The dearth for a qualified construction group in power plants, by then, gave impetus
for expanding the organisation.

With the participation of like minded engineers the Firm was converted to a Private
Limited Company Engenius Erectors.

With Quality in Service as the motto, the company steadily grew to become a reliable
organisation in the Power Plant Industry.

.


Growth
The reputation built around by the team and the confidence of the clientele
towards the company made it possible to become a main contractor for
BHEL, the leading power plant equipment supplier in India, for the
construction of Turbo-generator sets & auxiliaries of 30MW to 1000MW
capacity power plants.
Siemens, a multinational power plant equipment supplier in India for the
construction of Turbo-generator sets & auxiliaries of 25MW to 60MW
capacity power plants.
Nuclear Power Corporation of India, for the construction of 220MW to
500MW condensers and plant piping. Overhauling of their TG sets at
MAPS, RAPS, KGS and KAPS.
Jaiprakash Associates Limited for the construction of Turbo-generator
sets & auxiliaries including air cooled condensers for their captive power
plants in India.
Thermal power stations all over the country for maintenance and
renovation works.
THE ORGANISATION ..
THE ORGANISATION

Meeting challenging quality requirements
The intention was to grow and form a very stable and strong nucleus
comprising of professionals in the trade
The consistent and regular orders from clients such as Nuclear Power
Corporation, BHEL etc where quality and safety are the bye-words speaks
about the organizations quality commitments

Current Status

The projects executed so far and the present assignments on hand give
testimony to the skills of the highly experienced field personnel
.
A team consisting of 80 highly experienced engineers and field personnel
qualified in their respective trades.

A team excellently trained to meet stringent quality control and safety
requirements.

First in the field
First BHEL 600MWe Generator Stator Lifted & Placed on
Foundation in very short time through Portal Gantry Crane at North Chennai
TPS, Athipattu, Tamilnadu.


Construction of the first Fr-6FGas Turbine in Combined Cycle Power
Project at TNEB, Kovilkalappai, Mannargudi, Tamilnadu.


Execution of the first Life Extension Programme in India, for Power
Plant Equipment at Neyveli Lignite Power Corporations Thermal Station
I, Neyveli, Tamilnadu.


THE ORGANISATION ..

Construction of the first combined cycle gas based power station in
India for Ahmedabad Electricity Company Ltd. at Vatva.


Construction of the largest capacity axial flow turbo-blowers in India,
for Vishakapatnam Steel Plant at Visakhapatnam
THE ORGANISATION
Some challenging assignments...

At Neyveli Thermal Station- 1 in association with Technoprom Exports,
Russia
1. In-situ rewinding of 50 MW turbo-generator rotor,
2. In-situ repair, replacement of stator core packets for 100 MW generator stator
at Neyveli Thermal Station- 1,
3. Repair of rotor discs and re-blading of 100 MW HP Turbine rotor in-situ.

At Karnafauli Hydro Station, Bangladesh, in association with ABB Sae Sadelmi,
Italy
1. Complete changing of generator core & rewinding in-situ for 50 MW hydro-
generator
THE ORGANISATION ..
Key Members..
A. H. Mohajir, Managing Director
An electrical engineer with 42 years of experience in Power
Plant Erection and Maintenance.

P. V. Sai, Director
A mechanical engineer with considerable experience in
engineering and design of plant rotating parts.

Javeed Mehkri,Director
A commerce graduate with wide experience in marketing
Heavy Electrical Equipment.

K.Ramalingam, General Manager
A diploma engineer in electrical with 34 years of experience in
Power Plant Erection & Maintenance .



Key Members..





G.Balasubramanian, Sr.Dy.General Manager
A diploma engineer in Mechanical with 25 years of experience
in Power Plant Erection & Petro Chemicals Erection in India
and Gulf countries.

R. Nanthakumaran, Sr. Manager (Constructions)
A Graduate with 25 years of experience in Power Plant
Erection and Maintenance at various projects sites.

Dexter Horne, Sr. Manager (Constructions)
A Post-Graduate with 18 years of experience in planning and
execution.

D. Easter Raj, Sr. Manager (F & A)
A Post Graduate with 17 years of experience in Finance and
Administrative Operations.


.



Key Members..





R. Anandakrishnan, Manager (Constructions)
A Diploma in Engineering with 28 years of experience in
Power Plant Erection and Maintenance.

Akshay Kumar Ojha, Manager (Constructions)
A Graduate with 16 years of experience in Power Plant
Erection and Maintenance.

K.V.Abraham, Manager (Constructions)
A Diploma in Engineering with 37 years of experience in
Power Plant Construction.

Mukesh kumar singh, Dy Manager (Construction)
A Degree holder with 11 years experience I Power plant
Erection.

.



Key Members..





K. Tholkappian, Dy. Manager (Constructions)
A Diploma in Engineering with 17 years of experience in
Power Plant Erection and Maintenance.

V. Sundarajan, Sr. Engineer (Constructions)
A Diploma in Engineering with 11 years of experience in
Power Plant Erection and Maintenance.

A.Kaveri Mudhali, Sr. Engineer (Constructions)
A Diploma in Engineering with 6 years of experience in Power
Plant Erection and Maintenance.

S.Ganeshan, Sr. ENgineer (Constructions)
A Graduate in Engineering & M.Tech with 5 years of
experience in Power Plant Construction.




.



Our Current Assignments

Erection of Unit-2 500MW STG at NTPL, Tuticorin, Tamilnadu.
Erection of Unit-2 150MW STG at Aditya Aluminium Project, Lapanga, Orissa.
Erection of Unit-1 150MW STG at Aditya Aluminium Project, Lapanga, Orissa.
Erection of Unit-2 600MW STG at Jindal India TPL, Derang, Orissa.
Erection of Steam Water Separator 2 Nos at Bhavini, Kalpakkam, Tamilnadu.
Erection of 67.5MW STG & Blower at RINL, Vizag, Andhra pradesh.
Erection of 41MW STG at TNPL, Karur, Tamilnadu.
Erection of Unit-1 500MW STG & CCW at NTPL, Tuticorin, Tamilnadu.
Erection of 500 MW PC Piping at BHAVINI Kalpakkam PFBR, Tamilnadu.
Erection of 500 MW STG at BHAVINI Kalpakkam PFBR, Tamilnadu.


Erection of 600 MW STG of Unit II at North Chennai TPS, Tamil Nadu.
Erection of 250 MW Power Cycle Piping of Unit I&II at NLC TS-II Expn.
Neyveli, Tamil Nadu.
Erection of 1000 MW Secondary Cycle Piping of Unit II at Kudankulam
Nuclear TPP ,Tamil Nadu.
Erection of 250 MW STG of Unit I&II at NLC TS-II Expn. Neyveli Tamil
Nadu

Our Current Assignments
List of Erection Works Executed

LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

1. Erection, Testing & Commissioning
of TG set & Auxiliaries including
Piping at MAPS, Kalpakkam
235 MW GE
/ BHEL
BHEL for DAE Jan 79 Jul 81

2. Erection, Testing & Commissioning
of TG sets & Auxiliaries including
Piping at Bhilai Steel Plant
2 x 30 MW
SIEMENS /
BHEL
BHEL for
BSP
Feb 80 Sep 83

3. Erection , Testing & Commissioning
of TG set & Auxiliaries including
Piping at Bhilai Steel Plant
18MW
SIEMENS /
BHEL
BHEL for BSP May 81 Nov 83

4. Erection, Testing & Commissioning
of TG set & Auxiliaries including
Piping Unit I, VI at Talcher, Thermal
Station
110 MW
BHEL
BHEL for
OSEB
Nov 81 Feb 83

5. Erection, Testing & Commissioning
of TG set & Auxiliaries incl. Piping &
Inst. Unit I at RTPS, Raichur.
210 MW
KWU /
BHEL
BHEL for
KPCL
Oct 83 Mar 85

6 Erection, Testing & Commissioning
of TG sets & Auxiliaries at TNPL,
Karur
8 & 18 MW
SIEMENS
TNPL Jun 84 Oct 84


LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

7. Erection, Testing & Commissioning
of TB set & Auxiliaries including
Piping at Bhilai Steel Plant
3063 Nm
3
/
Minute
MAN-GHH
BHEL for BSP Sep 85 Mar 87

8. Erection, Testing & Commissioning
of Electrical & Instrumentation for
TB Set & Aux. at BSP Bhilai
3063 Nm /
Minute
MAN-GHH
BHEL for
BSP
Sep 85 Mar 87

9. Erection, Testing & Commissioning
of TB sets & Auxiliaries including
Piping Unit I & II, at Vizag Steel
Plant
2 x 6067
Nm/ Min.
DEMAG
BHEL for VSP Jul 87 Mar 89

10. Erection, Testing & Commissioning
of 7 Nos. BFP & Auxiliaries at Vizag
Steel Plant
330 Tonne /
Hrs. each
BHEL
BHEL for VSP Jul 87 Dec 89

11. Erection, Testing & Commissioning
of Power Cycle Piping Unit I at
Ramagundam Super Thermal
Station
500 MW
KWU /
BHEL
BHEL for
NTPC
Sep 87 Sep 88

12. Erection, Testing & Commissioning
of TG set & Auxiliaries including
Piping for Unit III, MTPS Mettur
210 MW
RUSSIAN /
BHEL
BHEL for
TNEB
Oct 87 Mar 89


LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

13. Erection, Testing & Commissioning
of 6 Nos. Cooling Water Pump at
MTP, Mettur
BHEL BHEL for
TNEB
Sep 88 Feb 90

14. Erection, Testing & Commissioning
of TG set & auxiliaries for Unit IV at
MTPS Mettur
210 MW
RUSSIAN /
BHEL
BHEL for
TNEB
Nov 88 Feb 90

15. Erection, Testing & Commissioning
of TB set incl. Piping and Insulation
of Unit III, at Vizag Steel Plant,
Vizag
6067 Nm
3
/
Minute.
DEMAG
BHEL for VSP Apr 89 Sep 90

16. Erection, Testing & Commissioning
of BFP, CEP & Piping for Unit IV at
TS-II, NLC, Neyveli
BHEL BHEL for NLC May 89 Sep 90

17. Erection, Testing & Commissioning
of Unit III TG set and auxiliaries
including Piping at RTPS, Raichur
210 MW
KWU /
BHEL
BHEL for
KPCL
Sep 89 Mar 91

18. Erection, Testing & Commissioning
of GTG sets & STG set at AECO,
Vatwa, Ahmedabad
2 x Fr. 6
GTG & 1 X
33 MW
STG
BHEL for
AECO
Nov 89 Oct 91


LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

19. Erection, testing & Commissioning
of 40 TPH Thermax Boiler at SPB,
Erode
40 TPH
Babcock
SPB-PC Dec 89 Apr 90

20. Erection, Testing & Commissioning
of Unit IV TG set & Aux. Equip-
ment incl. Piping at TTPS. Tuticorin
210 MW
KWU /
BHEL
BHEL for
TNEB
Feb 90 Feb 92

21. Erection, Testing & Commissioning
of 3 MW TG at Ponni sugars, Erode
3 MW
TRIVENI
EMCONS for
SPB
May 90 Jun 90

22. Erection, Testing & Commissioning
of Unit-VI & VII TG set & Aux.
Equipment including Piping at TS II,
NLC, Neyveli.
210 MW
KWU/
BHEL
BHEL for NLC Oct 90 Sep 92

23. Erection Testing & Commissioning
of GTG sets & STG set at Utran,
Surat
3 x Fr. 6
GTG &
45MW STG
BHEL for GEB May 91 Dec 93

24. Erection, Testing & Commissioning
of Unit-II TG set & Aux. Equipment
incl. Piping at NMTPS, Madras
210 MW
KWU /
BHEL
BHEL for
TNEB
Jan 93 Jun 95


LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

25. Erection, Testing & Commissioning
of Unit-IV TG set & Aux. Equip-
ment incl. Piping at RTPS, Raichur
210 MW
MHI, Japan
BHEL / MHI
for KPCL
Jun 93 Sep 94

26. Supply of Manpower for CBPS /
PGPP Malaysia
2 x Fr. 6
GTG sets
BHEL
BHEL for
TENEGA
Jul 93 Jan 94

27. Erection, Testing & Commissioning
of Generator, Condenser & Aux.
Incl. Piping at TATA Power Ltd.
Trombay
80 MW
BHEL
BHEL for Tata
Power
Nov 93 Mar 95

28. Erection, Test & Commissioning of
Unit-I TG set & aux. Equipment incl.
Piping at KAIGA
235 MW
BHEL
BHEL for NPC Apr 94 Sep 00

29. Erection of Sulphur smelter
Agitator, IAT & DT Acid Circulation
pumps at Coromandel Fertilizers
Ltd., Visakhapatnam
Sulphuric
Acid Plant
NICCO for
CFL
Apr 94 May 94

30. Erection of Structures & Mechanical
works for Induration Plant at
ESSAR Pelletisation Plant, Vizag
Lurgi
Pelletisation
Plant
Onaway for
ESSAR Ltd.
Jul 94 Jul 95


LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

31. Erection, Testing & Commissioning
of GTG set, Chimney & Piping at
Reliance Industries Patalganga
1x Fr. 6
GTG GE /
BHEL
BHEL for RIL Sep 94 Apr 95

32. Erection, Testing & Commissioning
of TG set & Aux. Equipment incl.
Piping at KAGITHAPURAM
10.5 MW
BHEL
BHEL for
TNPL
Dec 94 Jan 96

33. Fabrication & Erection of Unit I & II
Condensers at NPC, KAIGA
2 x 235 MW
BHPV
BHPV for NPC Dec 94 Mar 99

34. Erection, Testing & Commissioning
of Unit II TG set & Aux. Equipment
including piping at NPC. KAIGA
235 MW
BHEL
BHEL / IPCL
for NPC
Apr 95 Oct 99

35. Erection, Testing of Compressors,
Static Equipment, LP Pre-heater &
Chimney at CSU Project, Phase II,
ONGC Gandhar Petro Complex
DEMAG &
BHPV
BHPV for
ONGC
May 95 May 97

36. Erection & Commissioning of MEA
pump with drive Turbine & Aux. At
Coromandel Fert. Ltd, VIZAG
2 MW CFL May 95 May 95


LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

37. Erection & Commissioning of Main
Steam Piping at JK Corporation,
Rayagada, Orissa
12 MW J.K. Corp. Ltd. Jun 95 Dec 95

38. Erection, Testing & Commissioning
of Unit I TG set & Aux. Equipment
incl. Piping at Suratgarh
250 MW
KWU /
BHEL
BHEL for
RESB
Sep 95 Jun 98

39. Erection of Ball mill for Phosphoric
Acid Plant at CFL, Vizag
Phosph.
Plant
CFL Sep 95 Nov 95

40. Erection, Testing & Commissioning
of GTG set and STG set at ONGC-
CPF, Gandhar
1 x Fr. 6
1 x 12 MW
BHEL for
ONGC
Sep 96 Dec 97

41. Erection, Testing & Commissioning
of Unit VII TG set, Auxiliaries &
piping at WTPS Wanakbori
210 MW
KWU /
BHEL
BHEL for GEB Sep 96 Mar 99

42. Erection, Testing & Commissioning
of STG sets Auxiliaries. & Piping at
GAIL UPPC, Pata (UP)
1x 15.5 MW
1x 25.6 MW
BHPV for
BHEL/GAIL
Sep 96 Jun 98


LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

43. Erection, Testing & Commissioning
of GTG sets & auxiliaries at
Reliance Industries Ltd., Jamnagar
6 x 30 MW
Frame 6
BHEL for RIL Feb 97 Dec 98

44. Erection, Testing & Commissioning
of Unit I & II TG sets & auxiliaries at
JTPCL, Bellary, Karnataka
2 x 130 MW BHEL for
JTCPL
Jun 97 Jun 99

45. Erection, Testing & Commissioning
of 27 MW Combined Cycle Power
Plant at Santej, Gujarat
2 x 10 MW
1 x 7 MW
THERMAX for
Arvind Mills
Sep 97 Dec 98

46. Erection, Testing & Commissioning
of 27 MW Combined Cycle Power
Plant at Naroda, Gujarat
2 x 10 MW
1 x 7 MW
THERMAX for
Arvind Mills
Nov 97 Mar 99

47. Erection, Testing & Commissioning
of GTG sets & auxiliaries at
Kayankulam CCPP, Kerala
2 x 110 MW
Frame 9
BHEL for
NTPC
Apr 98 Feb 99

48. Erection, Alignment, Welding and
Testing of control valves at JTPCL,
Bellary, Karnataka for Energy
Overseas International Inc.
2 x 130 MW EOIL for
JTPCL
Mar 98 Mar 99


LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

49. Erection and Commissioning of 80P
Blower, Drive Turbine and Aux. Incl.
Piping and Electrical at Coromandel
Fertilisers Ltd., Vizag
4 MW Elliot
Make
CICB
For CFL
Sep 98 Oct 98

50. Erection, Testing & Commissioning
of Unit 2 TG set & Aux. Equipment
incl. Piping at Suratgarh
250 MW
KWU /
BHEL
BHEL for
RESB
Jan 99 Mar 00

51. Erection, Testing & Commissioning
of 1 No. GTG Fr-6, 2 Nos. Gas
compressors & their aux. Incl.
Piping at Kovilkalappal CCPP,
Mannargudi, Tamilnadu
GTG
Frame-6
And Gas
compressor
BHEL for
TNEB
Jun 00 Mar 01

52. Erection, Testing & Commissioning
of 1 No. 38, MW STG & its Aux.
Incl. Piping at Kovilkalappal CCPP,
Mannargudi, Tamilnadu.
38 MW
STG
BHEL for
TNEB
Jun 00 Mar 01

53. Erection, Testing & Commissioning
of 24.62 MW STG at TNPL, Karur,
Tamilnadu
24.62 MW
STG
BHEL for
TNPL
Oct 00 Apr 01


LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

54. Erection, Testing & Commissioning
of Unit 3 & 4 TG sets & Aux.
Equipments incl. Piping at
Suratgarh TPS, Rajasthan
2 x 250 MW BHEL for
RSEB
Sep 00 Unit 3 Mar 02
Unit 4 May 02

55. Erection, Testing & Commissioning
of Unit 2 TG set & Auxiliaries
Equipment Incl. Piping at Simhadri
TPS, Visakhapatnam, A P
500 MW BHEL for
NTPC
Feb 01 Sep 02

56. Material Handling, Fabrication,
Erection & commissioning of
Secondary Steam Piping at Tarapur
Atomic Power Project, Tarapur
500 MW
Unit- 3&4
BHEL for
NTPC
Feb 01 Mar06

57. Fabrication, Erection, Assy. &
Testing of Steam Condensers 2
Nos. at Tarapur Atomic Project
500 MW
Unit- 3
BHPV for
NPCIL
Feb 01 Jan06

58. Supply, Erection of Power Cycle
Piping and 12.5 MW STG Sets &
Aux. Equipment at Grasim
Industries Ltd., Ariyalur, Tamil Nadu
12.5 MW BSES for GIL Dec 02 May 03

59. Erection, Testing & Commissioning
of Unit-3 TG set & Aux. Equipment
Piping at Rihand STPP, UP
500 MW BHEL for
NTPC
May 03 Feb 05

LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

60. Erection, Testing & Commissioning
of Unit-6 TG set & Aux. Equipment
incl. Piping at Kaniha Super
Thermal Power Plant, Orissa
500 MW BHEL for
NTPC
May 03 Feb 05

61. Revamping & Commissioning of
Unit 1, 2 & 3 Turboblowers & Unit 2
STG at Mideast Integrated Steel
Ltd., Jajpur, Orissa
3 x 4 MW
DEMAG &
4.8 MW TG
Kirloskar

MISL, Orissa Nov 04 Dec 07

62. Supply of pipes, fabrication,
erection and welding of ASDV
piping including supports in Unit 4
at Tarapur Atomic Power Plant
500 MW Nuclear Power
Corp. Ltd.
Jan 05 May05

63. Erection of 27 MW Turbogenerator
Set at Birla Corp. Chanderia
Cement Plant, Chittaurgarh,
Rajasthan
27 MW
Siemens
Siemens for
Birla Corp.
Jan 05 Jul 05

64. Erection of 27 MW Turbogenerator
Set at Birla Corp. Satna Cement
Plant, Madhya pradesh
27 MW
Siemens
Siemens for
Birla Corp.
Mar 05 Sep05


LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

65. Fabrication, Erection, Testing &
Commissioning of 2 Nos. Steam
Condensers with air Evacuation
System & LP extraction Piping of
Unit 5 & 6 at Rajasthan Atomic
Power Project, Kota, Rajasthan
2x 220 MW Nuclear Power
Corp. Ltd.
Feb 05 Unit 5- Nov 09
& Unit 6 Mar
10

66. Erection of Turbogenerator set with
Air cooled & Water cooled
Condenser for Captive Power
Plant- III at Jaypee Cement Rewa,
Madhya Pradesh
38.5 MW Jayaprakash
Enterprises
Ltd.
Oct05 Sep06

67. Erection, Testing and
commissioning of TG set &
Auxiliaries at Navdurga Fuels Pvt.
Ltd., Raigarh, Chattisgarh.
4 MW
Triveni

Navdurga
Fuels Pvt. Ltd.
Oct05 Mar06

68. Erection, Testing & Commissioning
of Unit-3 & 4 TG set & Aux.
Equipment incl. Piping at Kaiga
Atomic Power Plant, Karnataka
2x 235 MW BHEL for
Nuclear Power
Corp. Ltd.
Oct05 Unit-3 : Apr07
Unit-4: Dec10


LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

69. Supply of pipes, fabrication,
erection and welding of ASDV
piping including supports in Unit 3
at tarapur Atomic power Plant
500 MW Nuclear Power
Corp. Ltd.
Nov 05 Jan06

70. Erection, Testing & Commissioning
of 2 Nos. of Turbogenerator Set at
SISCOL, Mecheri, Salem Dist.,
Tamilnadu
2x 30 MW
Siemens

JSW Power
Pvt. Ltd.
Jan06 Dec06

71. Erection, Testing & Commissioning
of Turbogenerator Set at Aryan
Coal Plant site, Chakabura, Korba
Dist., Chattisgarh
30 MW
Siemens
Siemens for
Aryan Coal
Pvt. Ltd.
Feb 06 Dec 06

72. Erection, Testing & Commissioning
of Turbogenerator Set at Vandana
Global Ltd., Raipur Dist.,
Chattisgarh
33 MW
Siemens
Vandana
Global Ltd.
Feb06 Jan07

73. Erection, Testing & Commissioning
of Unit-1 & 2 TG set & Aux.
Equipment incl. Piping at Jindal
Stainless Ltd., Duburi, Orissa
2x 125 MW BHEL for JSL May06 Nov08

LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

74. Erection & commissioning of 2 x 4
Nos. of Deck Cranes on Hull No.
11115 & 11116 (MV Good
Providence & MV Good Princess)
at Hindustan Shipyard Ltd.,
Visakhapatnam
30,000 T
Bulk
Carriers

HSL for Good
Earth Maritime
Ltd., Chennai
Sep 06 Aug07

75. Erection, Testing & Commissioning
of Unit-1 & 2 TG set & Aux.
Equipment incl. Piping at NTPC-
SAIL Power Pvt. Ltd., Bhilai,
Chattisgarh
2x 250 MW

BHEL for
NTPC SAIL
Pvt. Ltd.
Jan07 UNIT-1: Apr08
UNIT-2: Mar09

76. Erection & commissioning of 4 Nos.
of Deck Cranes on Hull No. 11117
(MV Good Pacific) at Hindustan
Shipyard Ltd., Visakhapatnam
30,000 T
Bulk Carrier

HSL for Good
Earth Maritime
Ltd., Chennai
Jan 07 Mar 07

77. Erection, Testing & Commissioning
of Turbogenerator Set with
associated Auxiliaries, piping,
Aircooled & water cooled
condensers at Captive Power Plant,
Jaypee Cement Ltd., Sidhi, Madhya
Pradesh
35MW
Siemens
Jaiprakash
Enterprises
Ltd.
Jan08 Dec08






LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

78. Erection, Testing & Commissioning
of Unit-1 & 2 Motor Driven Turbo-
Blowers & Aux. Equipment at JSW
Steel Ltd., Bellary, Karnataka
2x 40 MW
MAN Turbo
& ABB
Motor

JSW Steel Ltd Apr08 Sep08
79. Erection, Testing & Commissioning
of Turbogenerator Set with
associated Auxiliaries, piping,
Aircooled & water cooled
condensers at Captive Power Plant,
Jaypee Cement Ltd., Dalla, Uttar
Pradesh
27MW
Siemens
Jaiprakash
Enterprises
Ltd.
Apr08 Feb09

80. Erection, Testing & Commissioning
of Turbogenerator Set with
associated Auxiliaries, piping,
Aircooled & water cooled
condensers at Captive Power Plant,
Jaypee Cement Ltd., Chunnar Uttar
Pradesh
38MW Japrakash
Enterprises
Ltd.
May08 Mar09

81. Erection, Testing & Commissioning
of Unit 1 & 2 Turbogenerator Set
with Auxiliaries & associated piping
at TPS-II , Neyvelli Lignite
Corporation Ltd., Neyvelli,
Tamilnadu
2x 250 MW BHEL for NLC
Ltd.
Jul08 In progress:
delays due to
Civil fronts

LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION


82. Transportation, Erection, Testing &
Commissioning of Piping with
associate hangers and supports,
static equipment and its auxiliaries
of Unit 2 at Kudankulam Nuclear
Power Plant, Tiruneveli Dist.
Tamilnadu
2 x 1000
MW
Nulcear
BHEL for
NPCIL
Oct 08 In progress
Delay due to
non availability
of materials.

83. Transportation, Erection, Testing &
Commissioning of HP/PCP & LP
Piping incl. supply and application
of protective wrapping, coating for
CW piping, anti-corrossive painting
etc. for Unit 1 & 2 Turbogenerator
at TS-II Expansion of Neyveli
Lignite Corp. Ltd., Tamilnadu
2 x 250 MW BHEL for NLC Oct08 Unit 1-Mar 11
Unit 2- In
progress
Delay due to
non availability
of steam

84. Erection & commissioning of VMFN
Project at National Aeronautical
Lab., Bengaluru, Karnataka
L & T Powai
for NAL
Jan09 Feb09

LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

85. Erection & commissioning of 4 Nos.
of Deck Cranes on Hull No. 11118
(MV Good Piligrim) at Hindustan
Shipyard Ltd., Visakhapatnam
30,000 T
Bulk Carrier

HSL for Good
Earth Maritime
Ltd., Chennai
Feb 09 Jul09

86. Erection, Testing & Commissioning
of Steam Turbine, Generator,
Pumps, Piping & Other Auxiliaries
of Unit-3 & 4 At NTPC, Simhadri,
Visakhapatnam (AP)
2 x 500 MW BHEL for
NTPC Ltd.
Mar09 Unit 3-Mar 11
Unit 4-Mar12

87. Erection, Testing & Commissioning
of Piping of 1x 27 MW Steam
Turbine-Generator at Dalmia
Cements Ltd., Ariyalur (TN)
Piping of
1 x 27 MW
Siemens for
Dalmia
Cement Ltd.
Aug09 Mar10

88. Erection, Testing & Commissioning
of 2 x 25 MW Steam Turbine-
Generator & Auxiliaries at Empee
Sugars Ltd., Ambasamudram (TN)
2 x 25 MW Siemens for
Empee
Sugars Ltd.
Sep09 June10

89. Receipt, Unloding, Storing &
Stacking at Storage yard materials
& Component of 1 x 500 MW TG
Set in Main Plant at FBRT Site,
Bhavani, Kalpakkam (Tamilnadu)
1 x 500 MW

BHEL For
DAE
Jan 10 In progress




LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

90. Erection, Testing & Commissioning
of Steam Turbine, Generator,
Pumps, Piping & Other Auxiliaries
of Unit-2 at RTPS, Bellary,
Karnataka
1 x 500 MW BHEL for
KPCL
May10 Jan12


91. Erection, Testing & Commissioning
of 22.5 MW Turbogenerator Set
with associated Auxiliaries, piping,
Air cooled Condenser at Captive
Power Plant-II, Jaypee Cement
Ltd., Bhuj, Gujarat
22.5 MW
Siemens
Jaiprakash
Enterprises
Ltd.
May10 Apr11

92. Erection, Testing & Commissioning
of 22.5 MW Turbogenerator Set
with associated Auxiliaries, piping,
Air cooled Condenser at Captive
Power Plant-II, Jaypee Cement
Ltd., Wanakbori, Gujarat
22.5 MW
Siemens
Jaiprakash
Enterprises
Ltd.
June10 Mar11

93. Erection, Testing & Commissioning
of Unit-1 (BF#4) Motor Driven
Turbo-Blowers & Aux. Equipment at
JSW Steel Ltd., Bellary, Karnataka
1x 40 MW
MAN Turbo
& ABB
Motor

JSW Steel Ltd Jul10 Mar11

94. Erection, Testing & Commissioning
of 2X60 MW Turbogenerator Set
with associated Auxiliaries, piping,
Air cooled Condenser at Captive
Power Plant, Jaypee Cement Ltd.,
Sidhi, Madhya Pradesh
2X60 MW
BHEL
Jaiprakash
Enterprises
Ltd.
Aug10 July12

LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

95 Erection, Testing & Commissioning
of Steam Turbine, Generator, Part
of CW Piping, CW Pumps & Other
BOI of Unit-2 at North Chennai
TPS, Athipattu, Tamil nadu.
1 x 600 MW BHEL for
TNEB
Sep11 In progress


96 Erection, Testing & Commissioning
of 30 MW Steam Turbine,
Generator with associated
Auxiliaries at Chettinadu Cements
Ltd, Kallur, Chincholi, Karnataka.
30 MW
Siemens
Chettinadu
Cements Ltd.
Jul 10 May12

97 Erection, Testing & Commissioning
of 19 MW Steam Turbine,
Generator with associated
Auxiliaries at Ponni Sugars Erode
Ltd, Erode, Tamil nadu
19 MW
Siemens
Ponni Sugars
Erode Ltd
Oct11 June12

98 Erection, Testing & Commissioning
of Steam Turbine, Generator,
auxiliaries & Other BOI at BHAVINI
Kalpakkam PFBR, Kalpakkam
Nuclear Power Project, Tamil nadu.
500 MWe

BHAVINI Dec11 In progress

99 Erection, Testing & Commissioning
of Steam Turbine, Generator, Part
of Circulating Water System&
Other BOI of Unit-1 at NTPL
Tuticorin TPS, Tuticorin, Tamilnadu.
600 MW
BHEL
BHEL for
NTPL
Jul12 In Progress

LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

100 Erection, Testing & Commissioning
of Power cycle Piping of Unit-1 at
Bhavini, Kalpakkam NPP, Tamil
nadu.
1 x 600 MW BHEL for
Bhavini
May12 In progress


101 Erection, Testing & Commissioning
of 41 MW Steam Turbine,
Generator with associated
Auxiliaries and Electrical, Control &
Instrument works at TNPL, Karur,
Tamilnadu.
41 MW
BHEL
BHEL for
TNPL
Jul 12 In Progress

102 Erection, Testing & Commissioning
of 67.5 MW Steam Turbine,
Generator with associated
Auxiliaries and Turbo Blower at
RINL, Visakapattinam, Andhra
Pradesh.
67.5 MW
BHEL
RINL Vizag. Aug12 In Progress

103 Erection of 2 Nos. Steam Water
Separator, at BHAVINI Kalpakkam
PFBR, Kalpakkam Nuclear Power
Project, Tamilnadu.
500 MWe

BHEL
BHAVINI
Sep12 In progress




104 Erection, Testing & Commissioning
of Steam Turbine, Generator, Part
of Circulating Water System&
Other BOI of Unit-1 at NTPL
Tuticorin TPS, Tuticorin, Tamilnadu.
600 MW
BHEL
BHEL for
NTPL
Jul12 In Progress

LIST OF ERECTION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

105 Erection, Testing & Commissioning
of Steam Turbine, Generator,
auxiliaries & Other BOI of Unit-2 at
Jindal India Thermal Power Ltd,
Derang, Angul, Orissa.
600 MW BHEL for
JITPL
Yet to
start



106 Erection, Testing & Commissioning
of Steam Turbine, Generator,
auxiliaries & Other BOI of Unit-1 at
AAP, Lapanga, Orissaa.
150 MW BHEL for
Aditya Alum.
Yet to
start




107 Erection, Testing & Commissioning
of Steam Turbine, Generator,
auxiliaries & Other BOI of Unit-2 at
AAP, Lapanga, Orissa.
150 MW BHEL for
Aditya Alum.
Yet to
start



108 Erection, Testing & Commissioning
of Steam Turbine, Generator,
auxiliaries & Other BOI of Unit-2 at
NTPL, Tuticorin, Tamilnadu.
500 MW BHEL for
TPP-NTPL
Yet to
start

List of Maintenance Works Executed

LIST OF MAINTENANCE WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

1. Replacement of Boiler Airheaters
Economisers for Unit I at ETPS,
Ennore
60 MW TNEB Oct 79 Dec 79

2. Replace of Boiler Airheaters,
Economisers for Unit III at ETPS,
Ennore
110 MW TNEB Mar 80 May 80

3. Replacement of Boiler Airheaters,
Economisers for Unit V at ETPS,
Ennore
110 MW TNEB Jan 81 Mar 81

4. Capital Maintenance of Unit I TG
set & BFP at TTPS, Tuticorin.
210 MW BHEL for
TNEB
Sep 83 Nov 83

5. Overhauling of TG Set Unit III at
ETPS, Ennore
110 MW BHEL for
TNEB
Jan 84 Mar 84

6. Replacement of TG Rotor at TNPL,
Kagithapuram, Tamilnadu
18 MW TNPL Feb 86 Feb 86

7. Overhauling of TG set Unit VII at
TS-1, NLC, Neyveli
100 MW NLC Aug 87 Nov 87


E0524
LIST OF MAINTENANCE WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

8. Overhauling of TG set Unit I at
MAPS, Kalpakkam
235 MW NPCIL Nov 87 Jan 88

9. Capital Maintenance of TG set
Unit I at MTPS, Mettur
210 MW BHEL for
TNEB
Dec 87 Jan 88

10. Capital Maintenance of TG set
Unit II, at MAPS, Kalpakkam
235 MW MAPS Jan 88 Apr 88

11. Overhauling of TG set Unit IX at
TS-I, NLS, Neyveli
100 MW NLC Feb 89 Oct 89

12. Capital Maintenance of TG set
Unit II, at MTPS, Mettur
210 MW BHEL for
TNEB
Aug 89 Oct 89

13. Overhauling of TG set Unit III at
NLC, TS-1, Neyveli
50 MW NLC Aug 89 Nov 89

14. Overhauling to TG set Unit I at
MTPS, Mettur
210 MW BHEL for
TNEB
Oct 89 Nov 89

15. Repair & Replacement of TB II
Rotor at VSP, Vizag Steel Plant
6067 Nm/
minute
BHEL for VSP Apr 90 May 90


LIST OF MAINTENANCE WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

16. Overhauling of TG set at TNPL,
Kagithapuram
8 MW TNPL Oct 90 Nov 90

17. Overhauling of TG set Unit I at
MAPS, Kalpakkam
235 MW NPCIL Jan 91 Apr 91

18. Overhauling of Boiler Grates at
TNPL, Kagithapuram, Tamilnadu
TNPL May 91 May 91

19. Capital Maintenance of 210 MW TG
set Unit III at MTPS, Mettur
210 MW BHEL for
TNEB
Oct 91 Nov 91

20. Overhauling of TB Unit III at VSP,
Vizag
6067
Nm/min
BHEL for VSP Sep 91 Sep 91

21. Inspection of Blower Rotor TB III at
Visakhapatnam Steel Plant
6067
Nm/Min.
Blower
BHEL for VSP Sep 91 Sep 91

22. Capital Maintenance of TG set &
Aux. At TNPL, Kagithapuram
18 MW TNPL Oct 91 Oct 91

23. Repair works of Unit IV Generator
at TS II NLC, Neyveli
210 MW BHEL for NLC Nov 91 Nov 91


LIST OF MAINTENANCE WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

24. Capital Maintenance of Turbo
Blowers 1 & 2 at Visakhapatnam
Steel Plant.
6067 Nm /
min.
VSP Dec 91 Jan 92

25. Capital Maintenance of Turbo
Blowers 3 at Visakhapatnam Steel
Plant
6067 Nm /
min.
VSP Jun 92 Jun 92

26. Overhauling of TG set Unit II at
MAPS, Kalpakkam
235 MW NPCIL Jul 92 Nov 92

27. Renewal of HP module of Unit- V
TG set at NALCO, Angul, Orissa
120 MW BHEL-SAS for
NALCO
Aug 92 Oct 92

28. Overhauling of TG set Unit - II at
RTPS, Raichur, Karnataka
210 MW BHEL- SAS
for KPCL
Nov 92 Jan 93

29. Capital Maintenance of 210 MW TG
set Unit II at RTPS, Raichur.
210 MW BHEL for
KPCL
Nov 92 Jan 93

30. Replacement of Ammonia converter
cartridge & loading of catalyst at
CFL Visakhapatnam (AP)
300 TPD CFL May 93 Jun 93

31. Overhauling of IP & LP modules &
Aux. of TG Unit- I at NALCO, Angul
120 MW BHEL for
NALCO
Jul 93 Oct 93


LIST OF MAINTENANCE WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

32. Overhauling of TG set Unit-I at
MAPS, Kalpakkam, Tamilnadu
235 MW NPCIL Jul 93 Jan 94

33. Capital Maintenance of 120 MW
TG set Unit- I HP module at
NALCO, Angul, Orissa
120 MW BHEL for
NALCO
Aug 93 Oct 93

34. Overhauling of TG set 210 MW
Unit-I at MTPS, Mettur, Tamilnadu
210 MW BHEL for
TNEB
Aug 93 Oct 93

35. Capital Maintenance of TG set Unit-
III & Aux. at Vizag Steel Plant,
Visakhapatnam, Andhra Pradesh
60 MW VSP Sep 93 Oct 93

36. Overhauling of Turbo Blower at
CFL, Visakhapatnam
4 MW
Elliot Make
NICCO for
CFL
Jan 94 Mar 94

37. Capital Maintenance of TG set Unit-
I & Aux. at Vizag Steel Plant,
Visakhapatnam, Andhra Pradesh
60 MW VSP Feb 94 Mar 94




LIST OF MAINTENANCE WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

38. Overhauling of Cargo Oil Pumps &
drive Turbines of MT Visveswar-
ayya at Chokhani Dry Dock
3 x 300 HP Chokani Intl.
For SCI
Apr 94 May 94

39. Overhauling of LP Turbine Unit-II at
MAPS, Kalpakkam
235 MW NPCIL Jun 94 Sep 94

40. Overhauling of 210 MW TG set
Unit-II at MTPS, Mettur,
210 MW BHEL for
TNEB
Aug 94 Nov 94

41. Unit V Generator Field Balancing
work at TTPS, Tuticorin
210 MW BHEL for
TNEB
Aug 94 Sep 94

42. Overhauling of TG set Unit-I at
NALCO, Damanjodi.
18.5 MW NALCO Aug 94 Sep 94

43. Overhauling Grate of Boiler No.2 at
TNPL, Kagithapuram
TNPL Nov 94 Dec 94

44. Inspection & Overhauling of TG set
Unit II at MAPS, Kalpakkam
235 MW MAPS Apr.95 Sep.95


LIST OF MAINTENANCE WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

45. Overhauling of Cargo Oil pump &
Turbine of MT Sarojini Naidu at
Chokani International Limited
Shipyard, Chennai
3 x 300 HP Chokhani Intl.
For SCI
May 95 Jun 95

46. Inspection & repair of Unit-IV
Generator Rotor at RTPS, Raichur
210 MW
MHI
BHEL for
KPCL
Jun 95 Sep 95

47. Inspection & Overhauling of 5.4
MW TG set at J.K. Paper,
Rayagada, Orissa
5.4 MW J. K. Corp. Oct 95 Dec 95

48. Overhauling of TG set Unit-III and
Aux.. at NALCO, Damanjodi
18.5 MW NALCO Dec 95 Jan 96

49. Inspection & Overhauling of Unit-I
LP Turbine at MAPS, Kalpakkam
235 MW NPCIL Apr 96 Jun 96

50. Overhauling of Generator, Exciter &
Aux. Of Unit-I at VSTPP,
Vindyachal
210 MW BHEL for
NTPC
Jul 96 Aug 96

LIST OF MAINTENANCE WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

51. Overhaul of TG set Unit IV at
MTPS, Mettur
210 MW BHEL for
TNEB
Sep 96 Oct 96

52. Overhauling of TG set & Pumps
Unit- IV at RTPS, Raichur,
210 MW
MHI
BHEL for
KPCL
Sep 96 Oct 96

53. Overhauling of TG set Unit-II at
Madras Refinery Ltd.,
20 MW BHEL-SR for
MRL
Sep 96 Oct 96

54. Overhauling of TG Set Unit VI at
Korba TPS, Chattisgarh
500 MW BHEL-SAS
for NTPC
Nov 96 Dec 96

55. Overhauling of TG- II Unit and its
accessories at TPP,
Visakhapatnam Steel Plant
60 MW VSP Nov 96 Dec 96

56. Overhauling of TG set Unit III at
Mettur TPS, Tamilnadu
210 MW BHEL-SAS
for TNEB
Nov 96 Dec 96


57. Generator repair works of Unit IV
at Tuticorin TPS, Tamilnadu
210 MW BHEL-SAS
for TNEB
Sep 97 Sep 97

LIST OF MAINTENANCE WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

58. Overhauling of HP, LP Turbines of
Unit-I at Karkarpara APS, Gujarat
235 MW NPCIL Oct 97 Oct 97

59. Overhauling of TG set of Unit-I at
Kalpakkam APS, Tamilnadu
235 MW NPCIL Nov 97 Mar 98

60. Overhauling of TG set of Unit IV
at Mettur TPS, Tamilnadu
210 MW BHEL-SAS
for TNEB
Dec 97 Jan 98

61. Inspection of Condensing Turbine
at JK Corporation, Rayagada
12 MW JK Corp. Ltd. Apr 98 Apr 98

62. Overhauling of 5 Nos. of Cargo Oil
Pumps & Turbines of MT J.N. Vyas
for Hindustan shipyard Ltd.
5x 500 HP HSL for SCI Jan 99 Feb 99

63. Overhauling of 5 Nos. of Cargo Oil
Pumps & Turbines of MT R. A.
Kidwai for Hindustan Shipyard Ltd.
5x 500 HP HSL for SCI Mar 99 Apr 99

64. Overhauling of TG set of Unit II at
Kalpakkam APS, Tamil nadu
235 MW NPCIL Mar 99 May 99

LIST OF MAINTENANCE WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

65. Preservation, restoration & re-
assembling of Unit 1 TG at Kaiga
APS, Karnataka
235 MW NPCIL Nov 99 Jun 01

66. Hot gas path inspection of GTG- 1
& 2 at Spectrum Godavari
Combined Cycle Power Plant,
Kakinada, Andhra Pradesh
2 x 48 MW
Westing-
house
Rolls Royce
for Spectrum
GCCP
Jul 99 Aug 99

67. Overhauling of TG set of Unit-I at
Kalpakkam APS, Tamilnadu
236 MW NPCIL Jan 00 Jun 00

68. Mechanical maintenance of main
plant, Aux. & Offsite at NTPC,
Kayamkulam, Kerala
Frame-9
GTG
NTPC Feb 00 Dec 00

69. Attending to High Vibrations &
Overhauling of Unit- 2 at Kaiga
APS, Karnataka
235 MW NPCIL Feb 00 Mar 00

70. Overhauling of Emergency core
cooling Pumps and PHT pumps of
Unit 1 & 2 at KGS
Nuclear
Reactor
NPCIL Mar 00 Mar 00

71. AMC for Routine maintenance of
Pumps in Turbine areas at
Suratgarh TPS, Rajasthan
250 MW RSEB Jun 00 Jun 03


LIST OF MAINTENANCE WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

72. Hot gas path inspection of GT- 1 at
Godavari CCPP, Kakinada
48 MW
Westing-
house
Rolls Royce
for Spectrum
GCCP
Oct 00 Oct 00

73. Replacement of Rotary Dryers of A
& B Trains at Coromandel fertilizers
Ltd., Visakhapatnam
Complex
Fertiliser
Plant
L &T for CFL Nov 00 Mar 01

74. Insitu Inspection of Unit I HP & LP
Turbine Rotors at Kalpakkam APS,
Tamilnadu
235 MW NPCIL Aug 01 Aug 01

75. Repair of HP Turbine & Generator
Rotors & overhauling of TG set
Unit-I at Kaiga APS, Karnataka
235 MW NPCIL Sep 01 Oct 01

76. Overhauling of Cargo Oil Pumps
and Drive Turbines on MT
Basveshwara at Hindustan
Shipyard Ltd.
4 x 600 HP HSL for SCI Dec 01 Jan 02

77. Overhauling of HP, LP Turbines
and blade replacement in Unit-2 at
Kaiga Atomic Power Plant,
Karnataka
235 MW NPCIL Mar 02 Apr 02

LIST OF MAINTENANCE WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

78. Overhauling of Valves in reactor
and TG Areas of Unit 2 at Madras
Atomic Power Station, Kalpakkam
235 MW NPCIL Jun 02 Jan 03

79. Major Overhaul of TG-2 at NALCO,
Damanjodi, Orissa
18.5 MW NALCO Jun 02 Jun 02

80. Inspection of Gas Turbine M 701 F
at PSEG- PPN , Thirucadaiyur,
Nagipattinam, Tamilnadu
260 MW
Mitsubushi
PSEG Global Jul 02 Aug 02

81. Dismantling and Servicing of
Generator Transformer of Unit-2 at
Madras Power Station
235 MW NPCIL Oct 02 Jan 03

82. Overhauling of HP, LP Turbine and
replacement of Gasket in Unit-1 at
Kaiga A P Station, Karnataka
235 MW NPCIL Dec 02 Jan 03

83. Major Overhaul & slip ring
Replacement of TG-1 at NALCO,
Damanjodi, Orissa
18.5 MW NALCO Dec 02 Jan 03

84. Overhauling of HP, LP Turbine and
CCW Pumps & IDCT Fan Motors in
Unit 2 at Kaiga Atomic Power
Station, Karnataka
235 MW NPCIL Jan 03 Feb 03


E0524
LIST OF MAINTENANCE WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

85. Inspection and overhauling of Gas
Turbine Generator at Tanir Bavi
Power Company Pvt. Ltd.,
Mangalore, Karnataka
General
Electrical
LM 6000
GMR Tanir
Bavi Pvt. Ltd.
Apr 03 May 03
86. Overhauling of TG set in Power
Block at JK paper Mill, Rayagada,
Orissa
5.4 MW JK Corp. Ltd. May 03 May 03

87. Replacement of Generator at JK
Paper Mill, Rayagada, Orissa
12 MW JK Corp. Ltd. Jul 03 Jul 03

88. Inspection and Overhauling of Gas
Turbine Generator 1 & 2 and Minor
Inspection of Steam Turbine at
Tanir Bavi Power Company Pvt.
Ltd., Mangalore, Karnataka
General
Electrical
LM 6000
GE
International
Inc. for GMR
Tanir Bavi Pvt.
Ltd.
Feb 04 Mar 04

89. Overhauling of TG-3 Unit and
Auxiliaries at NALCO Damanjodi,
Orissa
18.5 MW NALCO May 04 May 04

90. Hot Gas Path Inspection of GT 2 at
Godavari CCPP, Kakinada, Andhra
Pradesh
48 MW
Westing
House
Rolls Royce
for Spectrum
GCCP
Aug 04 Sep 04

91. Inspection and overhauling of HP,
LP turbines, generator and
auxiliaries at Unit-3 TG set at
Rajasthan Atomic Power Station,
Rajasthan
235 MW NPCIL Aug 04 Aug 04


E0524
LIST OF MAINTENANCE WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

92. Inspection and overhauling of HP,
LP turbines, generator and
auxiliaries at Unit-4 TG set at
Rajasthan Atomic Power Station,
Rajasthan
235 MW NPCIL Apr 05 Apr 05

93. Replacement, erection &
commissioning of Rotary
Granulator A- Train at Coromandel
Fertilisers Ltd., Visakhapatnam
Complex
Fertiliser
Plant
L & T for CFL Apr 05 May 05

94. Minor Inspection of Gas Turbine
Generator Unit 1 at Tanir Bavi
Power Company Pvt. Ltd.,
Mangalore, Karnataka
General
Electrical
LM 6000
GMR Tanir
Bavi Pvt. Ltd.
Oct05 Oct05

95. Overhauling of Blower & Turbine in
sulphuric Acid Plant at Coromandel
Fertilisers Ltd., Visakhapatnam AP
4 MW Elliot
USA

CFL Apr06 Apr06

96. Inspection and overhauling of HP,
LP turbines, generator and
auxiliaries at Unit-3 TG set at
Rajasthan Atomic Power Station,
Rajasthan
235 MW NPCIL Aug06 Sep06


E0524
LIST OF MAINTENANCE WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

97. Emergency capital repair of TG-4
Turbine & Auxiliaries at RINL,
Visakhapatnam Steel Plant, AP
67.5 MW VSP Sep06 Oct06

98. De-erection of Damaged Stator
placing outside Turbine Building for
repair in Unit 3 at Kaiga Atomic
Power Station, Karnataka
235 MW NPCIL Dec07 Jan08



99. Replacement of Kaiga # 3
Generator with Generator of Kaiga
# 4 at Kaiga Atomic Power Station,
Karnataka
235 MW NPCIL Jan 08 Mar08

100. Capital Repair of TG-3 Turbine &
Auxiliaries at RINL, Visakhapatnam
Steel Plant, AP
60 MW VSP Mar08 Apr08

101. Inspection of HP & LP rotors and
generator of unit 2 TG set at MAPS,
Kalpakkam, Tamilnadu
235 MW

NPCIL Aug08 Sep08

102. Inspection of Turbine HP & LP
Rotor & Generator of Unit 1 of 235
MW TG Set at MAPS, Kalpakkam
APS, Tamilnadu
235 MW NPCIL Nov09 Nov09

103. Removal and re-installation of
Generator Rotor in Unit -4 at Kaiga
Atomic Power Station, Karnataka
235 MW NPCIL Mar 10 Apr10



E0524
LIST OF MAINTENANCE WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

104 Removal and re-assembly of Gas
Turbine Generator Unit 1 at GMR
Energy Ltd, Barge Mounted Power
Plant, East Godavari,
Andhrapradesh
GMR Energy
Ltd
Jul 10 Aug 10

105 Removal, Inspection & installation
of HP & LP Rotor, inspection of
bearings, maintenance works on
generator of Unit 2 of 235 MW TG
Set at MAPS, Kalpakkam,
Tamilnadu
235 MW NPCIL Nov 10 Jan 11



106 Servicing of Reduction Gear Box of
Gas Turbine Generator Unit 3 at
GMR Energy Ltd, Barge Mounted
Power Plant, East Godavari,
Andhrapradesh
GMR Energy
Ltd
May 11 May 11

107 In-situ inspection of HP & LP
Turbine, bearings, overhauling of
generator, HP Governor Valves of
Unit 1 of 235 MW TG Set at MAPS,
Kalpakkam, Tamilnadu
235 MW NPCIL Jun 11 Jul 11

108 Dismantling, overhauling & box up
of Unit-3 Turbine, Generator & its
governing system at Kaiga Atomic
Power Station-3, Karnataka.
235 MW

NPCIL Jul 11 Aug 11

E0524
LIST OF MAINTENANCE WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

109 Dismantling, Inspection and boxing
up of DE & NDE bearings of
Generator. Inspection of PMG &
Clearence check at GMR Energy
Ltd, Barge Mounted Power Plant,
East Godavari, Andhrapradesh
GMR Energy
Ltd
May12 May 12













E0524
List of Rehabilitation Works Executed

LIST OF REHABILITATION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

1. Retrofit of Boiler Air heaters,
Economisers & Super heaters for
Unit III & IV at ETPS. Ennore
110 MW BHEL for
TNEB
Nov 83 Mar 84

2. Rehabilitation, testing &
Commissioning of 4 MW TG set at
SPB, Erode
4 MW
Brown
Boveri
EMCONS for
SPB
Mar 90 Apr 90

3. Rehabilitation / Life Extension Work
of TG sets Unit I and IX at TS-1,
NLC, Neyveli.
50 MW &
100 MW
RUSSIAN
TPE / ABL for
NLC
Sep 92 Aug 94

4. Repair & reblading of 100 MW HP
Rotor Unit VIII at TS-1, NLC,
Neyveli
100 MW NLC Nov 93 Dec 93

5. Core repair and Rewinding of
Generator Stator Unit VII at TS-1,
NLC, Neyveli
100 MW TPE / ABL for
NLC
Mar 94 Sep 94

6. RLA study of Boilers Unit II, III, IV &
V at Dhuvaran TPS, Dhuvaran
31.75 MW ABB-ABL for
GEB
Feb 95 Feb 96


LIST OF REHABILITATION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

7. Rehabilitation, Erection, Testing &
Commissioning of Turbo Alternator
at J. K. Corporation Ltd. Rayagada,
Orissa
12 MW J K Corp. Jun 95 Dec 95

8. Retrofitting of Boiler Burners for
Cargo Oil Tanker Ship MT Sarojini
Naidu (SAACKE Gmbh-Burners) at
Chokani International Limited,
Shipyard, Chennai
CIL Jul 95 Aug 95

9. Rehabilitation work of Unit I & II
Hydro Generators at Karnafulli
HPP, Bangladesh
60 MW ABB Italy Jul 95 Dec 95

10. Reblading of LP Rotor of Unit III at
TTPS, Tuticorin
210 MW ABB India Jul 95 Jul 95

11 Life Extension Work of Boiler Unit
VIII A & VIIA at TS-1, NLC, Neyveli
50 MW ABL for NLC Nov 95 Aug 97

12. Pressure Hull Survey of Submarine
INS Vagli for Hindustan Shipyard
Ltd.
HSL for Indian
Navy
May 98 Jun 98


LIST OF REHABILITATION WORKS EXECUTED
S/No. TYPE OF WORK PERFORMED
PLANT
CAPACITY
/ MAKE
CUSTOMER
DETAIL
DATE
OF
START
DATE OF
COMPLETION

13. Retrofitting of Bentley Axial
Displacement probe in place of
hydraulic relay device on steam
driven turboblower at Neelachal
Ispat Nigam Ltd., Duburi Orissa
12 MW
MAN Turbo
Power
Concept for
NINL
Aug06 Aug06

14. Conversion of oxygen Compressor
Train to Nitrogen service in Air
Separation Plant of RINL,
Visakhapatnam Steel Plant, AP
67,000
NM
3
/Hr.
MAN TURBO
for VSP
Dec06 Dec06

15. Retrofitting of Woodward Electronic
Governor in place of hydraulic
governor device on SKODA
Turbogenerator set as Essar Power
Ltd., Pellet Plant, Visakhapatnam
AP
35 MW Power
Concept Ltd.
for EPL
Oct07 Oct07








LIST OF CLIENTS.
1. Bharat Heavy Electricals Limited (Chennai, Nagpur, New Delhi, Secunderabad, Hyderabad)
2. Nuclear Power Corporation of India Limited ( MAPS, RAPS, TAPP, KGS, KAPS)
3. Tamilnadu Electricity Board (Ennore Thermal Power Station, Tamilnadu)
4. Neyveli Lignite Corporation (Neyveli, Tamilnadu)
5. Tamilnadu Newsprint & Papers Limited (Kagithapuram, Tamilnadu)
6. SPB Projects and Consultancy Limited (Chennai)
7. RINL, Vishakapatnam Steel Plant (Visakhapatnam, Andhra Pradesh)
8. National Aluminium Company Limited (Damanjodi, Orissa)
9. ACC-Babcock Limited (New Delhi)
10. Technoprom Exports (New Delhi)
11. Chokani International Limited (Chennai)
12. Onaway Engineering (Visakhapatnam)
13. Bharat Heavy Plates & Vessels Limited (Visakhapatnam, Andhra Pradesh)
14. Coromandel Fertilizers Limited (Visakhapatnam, Andhra Pradesh)
15. J.K. Paper Mills (Rayagada, Orissa)
16. ABB India (Chennai)
17. ABB Sae Sadelmi (Italy)
18. Hindustan Shipyard Limited (Visakhapatnam, Andhra Pradesh)
19. Shipping Corporation of India (Mumbai)
20. Energy Overseas International INC.
21. BSES Limited, NOIDA (Uttar Pradesh)
22.

LIST OF CLIENTS.



22. Rolls Royce Industrial Power India Ltd (Kakinada, Andhra Pradesh)
23. GE Power Services (India) Pvt. Ltd, New Delhi
24. Demag Delaval Industrial Turbomachinery Pvt. Ltd., ( Now SIEMENS Vadodara, Gujarat)
25. Jayaprakash Associates Limited (New Delhi)
26. JSW Steel Limited, Tornagallu (Bellari, Karnataka)
27. MAN Turbo India Pvt. Ltd ( Vadodara, Guajrat)
28. GMR Energy Limited (Kakinada, Andra Pradesh)

You might also like