1 2 3
sys sub com Contractor"A" Contractor"B" Contractor"A" Contractor"B"
00 00 00 EPCforGasCompressorFacility
01 00 00 EngineeringGeneral
01 ProjectExecutionPlan
02 ProjectScheduling
03 OrganisationandManpowerPlan
04 TechnicalSpecificationandDataSheet
05 ConstructionandInstallationProcedure
06 HSEManagementPlan
07 QualityManagementPlan
08 ProcurementPlan(Local)
09 ProcurementPlan(Foreign)
10 FabricationPlan
11 SiteConstructionPlan
12 CommunityAffairPlan
13 LocalContentPlan
14 TrainingPlan
15 InterfaceManagementPlan
16 PrecommissioningandCommissioningPlan
01 01 00 ProcessEngineering
01 PFDandHeat/MaterialBalances
02 UtilityFlowDiagrams(Water,Air,Fuel,FireFighting)
03 P&ID
04 ProcessDataCalculations
05 UtilitiesReport
06 HYSYSSimulationReport
07 AsBuiltDrawings&O/MManuals
GasCompressorFacility:SampleActivitySplitofWork
WorkSplit EstimatedCost
Identifier/Title Remarks
1of8
"SAMPLE"
ContractType:
LSTKEngineeringConstructionProject
1 2 3
sys sub com Contractor"A" Contractor"B" Contractor"A" Contractor"B"
WorkSplit EstimatedCost
Identifier/Title Remarks
01 02 00 Mechanical&PipingEngineering
01 EquipmentList
02 EquipmentDataSheets
03 EquipmentSpecifications
04 EquipmentInstallationprocedures
05 EquipmentLayoutDrawings
06 PipingLayoutDrawings
07 PipingTieinandISODrawings
08 PipingStressAnalysis
09 PipingSupportDesignandDrawings
10 AcousticandVibrarionAnalysis
11 Platforms,Walkways,StairsandLadderDrawings
12 CompressorRecycleValves
13 CompressorEnclosureVentilationSystem
14 CompressorMotorVentilationSystem
15 CompressorBuildingventilationSystem
16 NoiseMitigation
17 SafetyEquipmentLayoutDrawings
18 DesignInterfaceworkwithPipelineContractor
19 PDMSModel
20 FireFightingEquipmentLayouts
21 FireProtectionandSafetyEquipmentPhilosophy
22 PreliminaryOverpressureStudy
23 PipingBulkMaterialMTO
24 AsBuiltDrawings&O/MManuals
01 03 00 Civil&StructuralEngineering
01 SiteLayoutDrawings
02 SitePreparation&TemporaryFacilityDrawings
03 FoundationLayoutDrawing
04 ConcreteFoundationDetailDrawings
05 BuildingandShelterDetailDrawing
2of8
"SAMPLE"
ContractType:
LSTKEngineeringConstructionProject
1 2 3
sys sub com Contractor"A" Contractor"B" Contractor"A" Contractor"B"
WorkSplit EstimatedCost
Identifier/Title Remarks
06 RoadPavingandDrainageLayoutDrawings
07 Road&DrainageDetailDrawings
08 PipeRackLayoutDrawings
09 PipeRackFoundationDetailDrawings
10 CivilMaterialMTO
11 AsBuiltDrawings&O/MManuals
01 04 00 ElectricalEngineering
01 ElectricalLoadList
02 ElectricalEquipmentList
03 ElectricalEquipmentDataSheets
04 ElectricalEquipmentSpecification
05 ElectricalOneLineDiagrams
06 HazardousAreaClassificationDrawings
07 ElectricalPowerSystemStudies
08 Detailedcontrolschematicandwiring
interconnectionDrawings
09 RelayingandMeteringSchematicDrawings
10 MajorCableRouteLayoutDrawings
11 CableSchedules
12 LightingDrawings
13 GroundingandLightningProtectionDrawings
14 DetailedInstallationDrawings
15 CathodicProtectionDetails
16 ElectricalBulkMaterialMTO
17 AsBuiltDrawings&O/MManuals
01 05 00 InstrumentationandControlEngineering
01 InstrumentandControlPhilosophies
02 InstrumentIndexes
03 SafetyAnalysisandFunctionalEvaluationCharts
04 I&CSFunctionalDesignSpecifications
05 Instrument&ControlBlockDiagrams
3of8
"SAMPLE"
ContractType:
LSTKEngineeringConstructionProject
1 2 3
sys sub com Contractor"A" Contractor"B" Contractor"A" Contractor"B"
WorkSplit EstimatedCost
Identifier/Title Remarks
06 Fire&GasBlockDiagrams
07 InstrumentDataSheets
08 DCSSystem
09 GasEngineGenerators
10 PAEASTiein
11 ReviewCableRoutingtoMCCBuilding
12 InstrumentBulkMaterialMTO
13 AsBuiltDrawings&O/MManuals
02 01 00 Procurement(Mechanical&Piping)
01 GasCompressorPackage
1st Stage Compressor Suction Scrubber
1st Stage Compressor
1st Stage Compressor Aftercooler
1st Stage Compressor Aftercooler Fan Motor - VTA
2nd Stage Compressor Suction Scrubber
2nd Stage Compressor
2nd Stage Compressor Aftercooler
2nd Stage Compressor Aftercooler Fan Motor - VTA
Compressor Gas Engine Driver - VTA
02 Discharge Scrubber
2nd Stage Compressor Discharge Scrubber
Compressor Recycle Scrubbers - VTA
03 CompressorLube.Oil
Lube oil Tank
Compressor AC Lube Oil Pump - VTA
compressor AC Lube Oil Motor - VTA
Compressor Lube Oil Cooler -F/Motor - VTA
04 Compressor Washwater Package
Compressor washwater Motor - VTA
Compressor washwater Vessel - VTA
Compressor washwater Pump - VTA
4of8
"SAMPLE"
ContractType:
LSTKEngineeringConstructionProject
1 2 3
sys sub com Contractor"A" Contractor"B" Contractor"A" Contractor"B"
WorkSplit EstimatedCost
Identifier/Title Remarks
05 Inhibitor Injection Unit
Inhibitor Storange Tanks
Service Pumps (A/B) - VTA
Motors (A/B) - VTA
06 Metering Unit
Gas Metering Skid (A/B)
07 Utility Air System (A/B)
Air Rotary Screw compressors
Air Intake Filter
Air Compressor Motor - VTA
After Cooler Fan Motor - VTA
Coalecer/Filter (A/B)
Air Dryer(A/B)
Instrument Air Receiver
08 Nitrogen Generator Package
Booster Compressor - VTA
Nitrogen Membrane -VTA
Nitrogen Vessel - VTA
Coalesing Filters - VTA
09 Fuel Gas System
Fuel Gas Srubber (A/B)
Fuel Gas Heater (A/B)
10 FireWaterSystem
Firewater storage Tank (A/B)
Firewater pump (Diesel) A
Firewater pump motor B
Firewater J ocky pumps (A/B)
Firewater J ocky pump motors (A/B)
Firewater well pumps ( A/B)
Firewater well pumps Motors ( A/B) - VTA
11 Service & Portable Water System
5of8
"SAMPLE"
ContractType:
LSTKEngineeringConstructionProject
1 2 3
sys sub com Contractor"A" Contractor"B" Contractor"A" Contractor"B"
WorkSplit EstimatedCost
Identifier/Title Remarks
Service Water Tank
Portable Water Tank
Service Water Pump(A/B)
Service Water motor(A/B) - VTA
service portable water Pump
Service portable water motor - VTA
Process Filter
12 Diesel System
Diesel Storage Vessel
Diesel Loading Pump (A/B)
Diesel Loading Pump Motor (A/B) - VTA
Raw Diesel Filter
13 Equip. Closed Drain System
Closed Drain Vessel
Closed Drain Vessel Pumps (A/B)
Closed Drain Pump Motor (A/B) - VTA
14 Power Generation System
Main Power Generator (A/B) - VTA
Emergency Power Generator - VTA
15 Piping Bulk Materials
Pipes & Fittings
Valves
02 02 00 Procurement(Electrical)
01 Gas Engine Generator A
02 Gas Engine Generator B
03 Diesel Generator
04 Main Switchbord
05 Emergency Switchbord
06 Gas Engine Generator A Control Panel - VTA
07 Gas Engine Generator B Control Panel - VTA
08 Diesel Generator Control Panel - VTA
6of8
"SAMPLE"
ContractType:
LSTKEngineeringConstructionProject
1 2 3
sys sub com Contractor"A" Contractor"B" Contractor"A" Contractor"B"
WorkSplit EstimatedCost
Identifier/Title Remarks
09 Synchronization Panel - VTA
10 AC UPS System
11 DC UPS System
12 Generators Battery/Charger Panel - VTA
13 Battery - VTA
14 Normal lighting/Power Outlets Panel
15 UPS/Emergency Lighting Distributing Panel
16 Bulk Materials
02 03 00 Procurement(Instrument)
Refer to Instrument Index
02 04 00 Procurement(Civil & Structures)
Refer to Civil & Structures
03 01 00 Construction & Installation
01 Site preparation
02 Temporary Facility
03 Equipment Foundations
04 Compressor Shelter
05 MCC Building
06 Control & Battery Room
07 Road & Drainage System
08 Pipe Rack Foundation
09 Pipe Rack Fabrication & Installation
10 Mechanical Equipment Installation
11 Equipment Interconnection Piping
12 Piping
13 Electrical Equipment Installation
14 Cable Tray Installation
15 Power Cable Laying
16 Instrumrnt Installation
17 Control Cable Laying
18 Instrument Air Piping
7of8
"SAMPLE"
ContractType:
LSTKEngineeringConstructionProject
1 2 3
sys sub com Contractor"A" Contractor"B" Contractor"A" Contractor"B"
WorkSplit EstimatedCost
Identifier/Title Remarks
04 01 00 Pre-Commissioning & Commissioning
01 Compressor Package
02 NDE & Hydro Test
03 Electrical Equipment & Panel
04 Instrument Calibration & Test
8of8