You are on page 1of 41

230458122.xls.

ms_office/cover 1/41
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
B
S
R
MAHO.
BSR
BUILDING SCHEDULE OF RATES
P.M. JAYANTHA KIRIMETIYAWA
"SHAMALEE BRIDAL & DESIGNS"
IHALAGAMA ROAD
KIRIMETIYAWA
\\vboxsrv\conversion_tmp\scratch_1\230458122.xls.ms_office230458122.xls.ms_office 2/41
INTRODUCTORY NOTES
1 EXCAVATION
2 ANTI TERMITE TREATEMENT
3 EARTH WORK
4 EARTH WORK SUPPORT
5 CONCRETE
6 TIMBER FORMWORK
7 STEEL REINFORCEMENT
8 BRICK WORK
9 HOLLOW BLOCK MASONARY
10 RANDOME RUBBLE MASONARY
11 PRESSED TILING
12 WALL TILING & TERRAZZO TILES
13 ROOFING
14 ROOF PLUMBING
15 CEILING
16 DOORS & WINDOWS
17 IRONMONGERY
18 PLASTERING
19 PAINTING & DECORATING
20 PLUMBING-PVC
21 EXTERNAL DRAINAGE
22 PLUMBING-CI
23 MANHOLE & GULLEYS
24 SANITORY FITTINGS
25 GUTTERS & DOWNPIPES
CONTENTS PAGE No.
I N D E X
230458122.xls.ms_office NOTE-1 3/41
-01-
NOTE
MARK-UP OF 35% ON BASIC RATES AS OVERHEAD & PROFIT ALLOWANCE
THE RATES IN THIS BSR ANALYSIS ARE THE BASIC RATES
THIS RATE IS COMPOUNDED TAKING IN TO ACCOUNT,
1.THE MARKET PRICE ON THE MATERIALS THAT MAKE UP THE ITEM OF WORK.
2.THE COST OF TRANSPORT OF EACH MATERIAL TO THE SITE
3.THE WEGES OF THE LABOUR RWQUIRED IN CARRYING-OUT THE WORK, AND
4.THE COST OF ANY PLANT REQUIRED.
IN CARRYIN-OUT A WORK, BESIDES THE BASIC COST,THERE ARE OTHER COSTS THAT HAVE TO BE INCURRED BY THE
CONTRACTOR. THIS COSTS CANNOT BE CONSIDERED AS DIRECT PRODUCTIVE WORK.THIS COSTS CANNOT BE
CALCULATED IN TERMS OF MATERIALS & LABOUR COST ARE TERMED AS OVERHEADS ON A JOB. AND, CAN BE
GROUPED UNDER MAIN SUB HEADS THUS...
1. JOB-OVERHEAD S - THAT VARY WITH AND ARE COUSED DIRECTLY TO THE INDIVIDUAL JOB.
2.GENERAL OVERHEAD - WIHICH INCLUDE COSTS OF MAINTAINING AN OFFICE,WORK SHOP & YARD IN WHICH TO
DO BUSINESS WHETHER OR NOT THERE IS A JOB UNDER WAY & SUCH EXPENSES ARE CONTINUOUS & MAY BE
SHARED BY THE JOB TURNOVER.
THE COMMON ITEM THAT MAKE UP THIS OVERHEADS ARE LISTED IN IN NEXT PAGES OF THE ANALYSIS. THE
OVERHEAD ITEM INVILVED IN A JOB IS ASSESSED AS A PERCENTAGE OF THE BASIC COST OF THE JOB.THESE
PRCENTAGES HAVE BEEN ARRIVED AT FROM RECORDS OF EXPENDITURE INCURRED IN SUCH ACTIVITIES OVER A
PERIOD OF TIME.
FROM THE DETAILS IN NEXT PAGES IT WILL BE SEEN THAT THE JOB OVERHEADS IS ABOUT 25% OF THE BASIC COST
OF THE WORK.
PROFIT
10% OF THE BASIC COST IS ALLOWD AS PROFIT ANDTOTAL MARK-UP OF THE BASIC COST IS 35%.
(25% FOR JOB OVERHEAD + 10% FOR PROFITS)
THUS IT WILL BE SEEN THAT ON THE BASIC COST OF A WORK , A CONTRACTOR IS ALLOWED A MARK-UP OF 35% OF
WHICH 25% IS IS THE COST OF SERVICING THE CONTRACT AND, 10% AS CONTRACTO'R PROFIT.
IT WILL BE SEEN THAT THE 25% OVERHEADS IS MADE UP OF 19% AS JOB OVERHEADS & 6% AS GENERAL
OVERHEADS.
THE JOB OVERHEADS ARE INCURRED AT THE SITE & ARE APPLICABLE TO TO ALL CLASSES OF CONTRACTORS.
THE GENARAL OVERHEADS HOWEVER , WILL DIPEND ON THE SIZE OF THE CONTRACTORS ORGANISATION AND
THE FACILITIES MAINTAINED BY THE ORGANISATION.
THUS ANY REDUCTION IN THE OVERHEADS ALLOWANCE TO A CONTRACTOR COULD ONLY WITHIN THIS 6% AS
GENERAL OVERHEADS & THAT ANY REDUCTION WILL BE MARGINAL.
230458122.xls.ms_office NOTE-1 4/41
-02-
THIS COMMITTEE IS OF THE OPINION THAT ALL CONTRACTORS(IRRESPECTIVE OF SIZE OF THERE ORGANISATION)
SHOULD BE ALLOWED A MARK-UP OF 35% ON THE BASIC COST AS OVERHEADS & PROFIT ALLOWANCE.
ORIGINALY THIS MINISTRY HAD SAID THE MARK-UP AS 30% (IN 1.78) AND ON REPRESENTATION MADE, IT WAS
INCREASED TO 35%(IN THE YEAR 1979-1980) & LATER IT WAS REDUCED TO 25% AND AGAIN TO 22% ETC. WE
BELIEVE THAT THIS WAS ONE OF THE OF THE DETERIORATION OF THE STANDARD OF BUILDING WORK.
IN ORDER TO ENSURE QUALITY & STRICT COMPLIANCE WITH SPECIFICATION, THE COMMITTEE RECOMMENDED
35% MARK-UP ON THE BASIC RATES.
230458122.xls.ms_officeNOTE-2 5/41
MATERIAL & LABOUR ANALYSIS FOR BUILDING WORK
ANALYSIS FOR BASIC RATES
THE MATERIAL & LABOUR COMPORNENT REQUIRED FOR THE VARIOUS ITEM OF WORK INCUDING THE MINIMAL
PLANT REQUIRED FOR SAME IS DETAILED IN THE ANALYSIS OF THE BASIC RATES WHICH HAVE BEEN INCLUDED IN
THE FOLLOWING PAGES.
BASIC RATE
THE BASIC RATE IS ANALYSED UNDER THE FOLLOWING HEADINGS.
(A)- MATERIALS
THE QUANTITIES OF MATERIAL REQUIRED FOR THE ITEMS ARE COMPUTED FROM KNOWN DATA & EXPERIENCE.
THEIR TOTAL VALUE IS CALCULATED ON THE BASIC OF CURRENT COST OF PURCASE AT SOURCES OF SUPPLY.
UNLESS OTHERWISE STATED WESTAGE IS ALLOWED IN THE NORMS.
230458122.xls.ms_office 230458122.xls.ms_office/EXCAVATION 6/41
EXCAVATION
PER SQUARE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
UN-SKILLED LABOURER 10.00 DAYS 650.00 6,500.00
RATE PER 10 SQUARE 6,500.00
650.00
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
UN-SKILLED LABOURER 0.63 DAYS 650.00 406.25
406.25
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
UN-SKILLED LABOURER 1.00 DAYS 650.00 650.00
650.00
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
UN-SKILLED LABOURER 2.25 DAYS 650.00 1,462.50
RATE PER 1 CUBE 1,462.50
1,462.50
REMOVING TOP SOIL TO A DEPTH NOT EXCEEDING 6" & DEPOSITTING AS DIRECTED WITHIN SITE 001
CONSIDER AN AREA OF 10.00 SQRS. OR 5.00 CUBES OF EXCAVATION
RATE PER 1 CUBE
003
EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN SOFT/LOOSE SOIL FROM 0'-00" TO 5'-00"
DEEP & DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"(EARTH WORK
SUPPORT TO BE PAID SEPARATELY WHERE NECESSARY)
RATE PER 01 SQUARE
002
EXCAVATION OVER SITE REDUCED LEVEL, IN ANY MATERIAL EXCEPT ROCK REQUIRING BLASTING
INCLUDING DEPOSITING & LEVELING AS DIRECTED UP TO DISTANCE NOT EXCEEDING 30'-00"
RATE PER 1 CUBE
RATE PER 1 CUBE
004
EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN ORDINARY SOIL FROM 0'-00" TO 5'-00" DEEP
& DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"
230458122.xls.ms_office 230458122.xls.ms_office/EXCAVATION 7/41
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
UN-SKILLED LABOURER 3.50 DAYS 650.00 2,275.00
RATE PER 1 CUBE 2,275.00
2,275.00
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
UN-SKILLED LABOURER 3.00 DAYS 650.00 1,950.00
RATE PER 1 CUBE 1,950.00
1,950.00
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
UN-SKILLED LABOURER 2.50 DAYS 650.00 1,625.00
RATE PER 1 CUBE 1,625.00
1,625.00
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
BLASTING POWDER 0.75 lbs. 650.00 487.50
FUSE 10.00 l.Ft. 60.00 600.00
JUMPER STEEL 1.00 lbs. 150.00 150.00
FUEL & FORGE (20% OF MATE.COST) 247.50
SKILLED LABOURER 1.00 DAYS 1,000.00 1,000.00
UN-SKILLED LABOURER 2.00 DAYS 650.00 1,300.00
RATE PER 1 CUBE 3,785.00
3,785.00
005
EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN HARD/DENSE SOIL FROM 0'-00" TO 5'-00"
DEEP & DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"
RATE PER 1 CUBE
007
EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN SOPFT DISTINTEGRATED ROCK UP TO DEPTH
OF 5'-00"& DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"
RATE PER 1 CUBE
006
EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN MUD/WET SOIL FROM 0'-00" TO 5'-00" DEEP
& DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"(EARTH WORK
SUPPORT & DEWATERINGTO BE PAID SEPARATELY WHERE NECESSARY)
RATE PER 1 CUBE
RATE PER 1 CUBE
008
EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN HARD ROCK UP TO DEPTH OF 5'-00"&
DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"
230458122.xls.ms_officeBACKFILL 8/41
BACKFILLING & COMPACTING
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
UN-SKILLED LABOURER 1.00 DAYS 650.00 650.00
RATE PER 01 CUBE 650.00
650.00
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
IMPORTED MATERIAL 1.00 CUBE 150.00 150.00
ALLOW FOR 15% FOR
COMPACTION
0.15 CUBE 150.00 22.50
-
LABOURE
UN-SKILLED LABOURER 1.25 DAY 600.00 750.00
RATE PER 1 CUBE 922.50
922.50
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
UN-SKILLED LABOURER 2.00 DAYS 650.00 1,300.00
RATE PER 01 CUBE 1,300.00
1,300.00
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
IMPORTED MATERIAL 1.00 CUBE 150.00 150.00
ALLOW FOR 15% FOR
COMPACTION
0.15 CUBE 150.00 22.50
-
LABOURE
UN-SKILLED LABOURER 2.00 DAY 600.00 1,200.00
RATE PER 1 CUBE 1,372.50
1,372.50
RATE PER 1 CUBE
013
FILLING UNDER FLOORS INCLUDING LEVELING,WATERING & COMPACTING IN 3" LAYERS
WITH AVAILABLE & SELECTED EARTH AT SITE.
011 BACKFILLING TO TRENCH WITH SELECTED EARTH AVAILABLE AT SITE
RATE PER 01 CUBE
012 BACKFILLING TO TRENCH WITH IMPORTED MATERIAL
RATE PER 01 CUBE
014
FILLING UNDER FLOORS INCLUDING LEVELING,WATERING & COMPACTING IN 3" LAYERS
WITH IMPORTED & SELECTED EARTH .
RATE PER 1 CUBE
230458122.xls.ms_officeCONCRETE 9/41
CONCRETE
019
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CEMENT 13.00 50kg BAGS 760.00 9,880.00
SAND 0.53 CUBE 6,500.00 3,445.00
1-1/2" METAL 0.92 CUBE 6,000.00 5,520.00
WATER 110.00 GALs. 15.00 1,650.00
MACHINARY
CONCRETE MIXER(HIRE) 0.33 DAY 1,200.00 400.00
LABOURE
SKILLED LABOURER 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 6.00 DAY 600.00 3,600.00
25,395.00
25,395.00
8,973.50
NOTE A. WATER AVAILABLE AT SITE
B. IF WATER IS NOT AVAILABLE, ALLOWANCES SHOULD BE MADE FOR TRANSPORT OF WATER
C. SAND-INCLUDES 15% FOR BULKING
020
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CEMENT 14.00 50kg BAGS 760.00 10,640.00
SAND 0.60 CUBE 6,500.00 3,900.00
1-1/2" METAL 0.90 CUBE 6,500.00 5,850.00
WATER 110.00 GALs. 15.00 1,650.00
MACHINARY
CONCRETE MIXER(HIRE) 0.33 DAY 1,200.00 400.00
LABOURE
SKILLED LABOURER 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 6.00 DAY 600.00 3,600.00
26,940.00
26,940.00
9,519.43
NOTE A. WATER AVAILABLE AT SITE
B. IF WATER IS NOT AVAILABLE, ALLOWANCES SHOULD BE MADE FOR TRANSPORT OF WATER
C. SAND-INCLUDES 15% FOR BULKING
021
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CEMENT 18.00 50kg BAGS 760.00 13,680.00
SAND 0.50 CUBE 6,500.00 3,250.00
1-1/2" METAL 0.88 CUBE 7,000.00 6,160.00
WATER 120.00 GALs. 15.00 1,800.00
MACHINARY
CONCRETE MIXER(HIRE) 0.33 DAY 1,200.00 400.00
LABOURE
SKILLED LABOURER 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 6.00 DAY 600.00 3,600.00
29,790.00
29,790.00
10,526.50
NOTE A. WATER AVAILABLE AT SITE
B. IF WATER IS NOT AVAILABLE, ALLOWANCES SHOULD BE MADE FOR TRANSPORT OF WATER
C. SAND-INCLUDES 15% FOR BULKING
MIXING COPNCRETE 1:2-1/2:5(1")
RATE PER 1 CUBE
RATE PER 1 CUBE
RATE PER 1 m3
MIXING COPNCRETE 1:3:6(1-1/2")
RATE PER 1 CUBE
RATE PER 1 m3
RATE PER 1 CUBE
MIXING COPNCRETE 1:2:4(3/4")
RATE PER 1 CUBE
RATE PER 1 CUBE
RATE PER 1 m3
230458122.xls.ms_officeCONCRETE 10/41
022
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CEMENT 23.00 50kg BAGS 760.00 17,480.00
SAND 0.42 CUBE 6,500.00 2,730.00
1-1/2" METAL 0.82 CUBE 7,000.00 5,740.00
WATER 150.00 GALs. 15.00 2,250.00
MACHINARY
CONCRETE MIXER(HIRE) 0.33 DAY 1,200.00 400.00
LABOURE
SKILLED LABOURER 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 6.00 DAY 600.00 3,600.00
33,100.00
33,100.00
11,696.11
NOTE A. WATER AVAILABLE AT SITE
B. IF WATER IS NOT AVAILABLE, ALLOWANCES SHOULD BE MADE FOR TRANSPORT OF WATER
C. SAND-INCLUDES 15% FOR BULKING
023
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CEMENT 31.00 50kg BAGS 760.00 23,560.00
SAND 0.44 CUBE 6,500.00 2,860.00
1-1/2" METAL 0.96 CUBE 7,000.00 6,720.00
WATER 200.00 GALs. 15.00 3,000.00
MACHINARY
CONCRETE MIXER(HIRE) 0.33 DAY 1,200.00 400.00
LABOURE
SKILLED LABOURER 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 6.00 DAY 600.00 3,600.00
41,040.00
41,040.00
14,501.77
NOTE A. WATER AVAILABLE AT SITE
B. IF WATER IS NOT AVAILABLE, ALLOWANCES SHOULD BE MADE FOR TRANSPORT OF WATER
C. SAND-INCLUDES 15% FOR BULKING
024
PER SQUARE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 0.17 CUBE 21,695.00 3,615.83
ADD FOR WASTAGE 15% 542.38
LABOURE
SKILLED LABOURER 0.13 DAY 900.00 112.50
UN-SKILLED LABOURER 0.50 DAY 600.00 300.00
4,570.71
NOTE:-
025
PER SQUARE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 0.25 CUBE 21,695.00 5,423.75
ADD FOR WASTAGE 10% 542.38
LABOURE
SKILLED LABOURER 0.13 DAY 900.00 112.50
UN-SKILLED LABOURER 0.75 DAY 600.00 450.00
6,528.63
MIXING COPNCRETE 1:1-1/2:3(3/4")
RATE PER 1 CUBE
RATE PER 1 CUBE
RATE PER 1 m3
MIXING COPNCRETE 1:12(3/4")
RATE PER 1 CUBE
RATE PER 1 CUBE
RATE PER 1 m3
2" TK. CEMENT CONCRETE SCREED IN FOUNDATION AT DEPTH NOT EXCEEDING 5'-00"
RATE PER 1 SQUARE
FOR LAYING CONCRETE AT DEPTHS MORE THAN 5'-00", ADD 1/6 DAY UNSKILLED LABOURER FOR EACH
ADDITIONAL 5'-00" OR PART THEREOF PER SQUARE.
3" TK. CEMENT CONCRETE SCREED IN FOUNDATION AT DEPTH NOT EXCEEDING 5'-00"
RATE PER 1 SQUARE
230458122.xls.ms_officeCONCRETE 11/41
NOTE:-
026
PER SQUARE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 0.50 CUBE 21,695.00 10,847.50
ADD FOR WASTAGE 5% 542.38
LABOURE
SKILLED LABOURER 0.50 DAY 900.00 450.00
UN-SKILLED LABOURER 1.25 DAY 600.00 750.00
12,589.88
NOTE:-
B. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER
027
PER 0.45 CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 0.45 CUBE 25,290.00 11,380.50
ADD FOR WASTAGE 10% 1,138.05
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
CURING
JUTE HESSIAN 10.00 SQ.FT. 25.00 250.00
WATER 170.00 GALS. 15.00 2,550.00
UN-SKILLED LABOURER 1.00 DAY 600.00 600.00
20,418.55
45,374.56
16,033.41
NOTE:- A. FOR COLUMN IN 1st FLOOR ADD 3% TO GROUND FLOOR RATE.
B. FOR COLUMN IN 2nd FLOOR ADD 5% TO GROUND FLOOR RATE.
C. FOR COLUMN IN 3rd FLOOR ADD 7% TO GROUND FLOOR RATE.
E. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER
028
PER 0.45 CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 0.45 CUBE 25,290.00 11,380.50
ADD FOR WASTAGE 10% 1,138.05
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
CURING
JUTE HESSIAN 80.00 SQ.FT. 25.00 2,000.00
WATER 140.00 GALS. 15.00 2,100.00
UN-SKILLED LABOURER 0.50 DAY 600.00 300.00
21,418.55
47,596.78
16,818.65
NOTE:- A. FOR COLUMN IN 1st FLOOR ADD 3% TO GROUND FLOOR RATE.
B. FOR COLUMN IN 2nd FLOOR ADD 5% TO GROUND FLOOR RATE.
C. FOR COLUMN IN 3rd FLOOR ADD 7% TO GROUND FLOOR RATE.
E. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER
FOR LAYING CONCRETE AT DEPTHS MORE THAN 5'-00", ADD 1/4 DAY UNSKILLED LABOURER FOR EACH
ADDITIONAL 5'-00" OR PART THEREOF PER SQUARE.
6" TK. CEMENT CONCRETE FLOOR(MASS CONCRETE)
RATE PER 1 SQUARE
A.WATER AVAILABLE AT SITE
CEMENT CONCRETE IN 4.5"X6" COLUMNS IN GROUND FLOOR
RATE PER 0.45 CUBE
RATE PER 1.00 CUBE
D.WATER AVAILABLE AT SITE
CEMENT CONCRETE IN 6"X6" COLUMNS IN GROUND FLOOR
RATE PER 0.45 CUBE
RATE PER 1.00 CUBE
D.WATER AVAILABLE AT SITE
RATE PER 1 m3
RATE PER 1 m3
C
O
N
S
I
D
E
R

2
4
N
o
s
.

C
O
L
U
M
N
S
,

4
.
5
"
X
6
"



























E
A
C
H

1
0
'
-
0
0
"

H
I
G
H
.
(
0
.
4
5
C
U
B
E
)
C
O
N
S
I
D
E
R

1
8
N
o
s
.

C
O
L
U
M
N
S
,

6
"
X
6
"

E
A
C
H

1
0
'
-
0
0
"

H
I
G
H
.
(
0
.
4
5
C
U
B
E
)
230458122.xls.ms_officeCONCRETE 12/41
029
PER 0.45 CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 0.45 CUBE 25,290.00 11,380.50
ADD FOR WASTAGE 10% 1,138.05
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
CURING
JUTE HESSIAN 60.00 SQ.FT. 25.00 1,500.00
WATER 100.00 GALS. 15.00 1,500.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
20,918.55
46,485.67
16,426.03
NOTE:- A. FOR COLUMN IN 1st FLOOR ADD 3% TO GROUND FLOOR RATE.
B. FOR COLUMN IN 2nd FLOOR ADD 5% TO GROUND FLOOR RATE.
C. FOR COLUMN IN 3rd FLOOR ADD 7% TO GROUND FLOOR RATE.
E. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER
030
PER 0.50 CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 0.50 CUBE 25,290.00 12,645.00
ADD FOR WASTAGE 5% 632.25
MACHINARY
VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
CURING
JUTE HESSIAN 40.00 SQ.FT. 25.00 1,000.00
WATER 100.00 GALS. 15.00 1,500.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
22,177.25
44,354.50
15,672.97
NOTE:- A. FOR COLUMN IN 1st FLOOR ADD 3% TO GROUND FLOOR RATE.
B. FOR COLUMN IN 2nd FLOOR ADD 5% TO GROUND FLOOR RATE.
C. FOR COLUMN IN 3rd FLOOR ADD 7% TO GROUND FLOOR RATE.
E. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER
031
PER 0.51 CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 0.51 CUBE 25,290.00 12,897.90
ADD FOR WASTAGE 5% 644.90
MACHINARY
VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
RATE PER 0.50 CUBE
RATE PER 1.00 CUBE
CEMENT CONCRETE IN 9"X9" COLUMNS IN GROUND FLOOR
RATE PER 0.45 CUBE
RATE PER 1 m3
D.WATER AVAILABLE AT SITE
C
O
N
S
I
D
E
R

5
N
o
s
.

C
O
L
U
M
N
S
,

1
2
"
X
1
2
"

E
A
C
H

1
0
'
-
0
0
"

H
I
G
H
.
C
O
N
S
I
D
E
R

8
N
o
s
.

C
O
L
U
M
N
S
,

9
"
X
9
"

E
A
C
H

1
0
'
-
0
0
"

H
I
G
H
.
(
0
.
4
5
C
U
B
E
)
RATE PER 1.00 CUBE
RATE PER 1 m3
D.WATER AVAILABLE AT SITE
CEMENT CONCRETE IN 12"X12" COLUMNS IN GROUND FLOOR
CEMENT CONCRETE IN 13.5"X13.5" COLUMNS IN GROUND FLOOR
C
O
N
S
I
D
E
R

4
N
o
s
.

C
O
L
U
M
N
S
,

1
3
.
5
"
X
1
3
.
5
"

E
A
C
H

1
0
'
-
0
0
"

H
I
G
H
.
(
0
.
5
1
C
U
B
E
)
230458122.xls.ms_officeCONCRETE 13/41
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
CURING
JUTE HESSIAN 45.00 SQ.FT. 25.00 1,125.00
WATER 100.00 GALS. 15.00 1,500.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
22,567.80
44,250.58
15,636.25
NOTE:- A. FOR COLUMN IN 1st FLOOR ADD 3% TO GROUND FLOOR RATE.
B. FOR COLUMN IN 2nd FLOOR ADD 5% TO GROUND FLOOR RATE.
C. FOR COLUMN IN 3rd FLOOR ADD 7% TO GROUND FLOOR RATE.
E. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER
032
PER 0.45 CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 0.45 CUBE 25,290.00 11,380.50
ADD FOR WASTAGE 10% 1,138.05
MACHINARY
VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
CURING
JUTE HESSIAN 90.00 SQ.FT. 25.00 2,250.00
WATER 180.00 GALS. 15.00 2,700.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
24,468.55
54,374.56
19,213.62
NOTE:- A. WATER AVAILABLE AT SITE
B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER
033
PER 0.45 CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 0.45 CUBE 25,290.00 11,380.50
ADD FOR WASTAGE 10% 1,138.05
MACHINARY
VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
CURING
JUTE HESSIAN 75.00 SQ.FT. 25.00 1,875.00
WATER 150.00 GALS. 15.00 2,250.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
23,643.55
52,541.22
18,565.80
NOTE:- A. WATER AVAILABLE AT SITE
B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER
034
PER 0.45 CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 0.45 CUBE 25,290.00 11,380.50
ADD FOR WASTAGE 10% 1,138.05
MACHINARY
VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
D.WATER AVAILABLE AT SITE
CEMENT CONCRETE IN 6"X6" BEAMS 1st FLOOR LEVEL
C
O
N
S
I
D
E
R

1
8
0

L
.
F
T
.

O
F

B
E
A
M
S

6
"
X
6
"
.
(
0
.
4
5
C
U
B
E
)
RATE PER 0.45 CUBE(180L.FT.)
RATE PER 1.00 CUBE
RATE PER 1 m3
C
O
N
S
I
D
E
R

4
N
o
s
.

C
O
L
U
M
N
S
,

1
3
.
5
"
X
1
3
.
5
"

E
A
C
H

1
0
'
-
0
0
"

H
I
G
H
.
(
0
.
5
1
C
U
B
E
)
RATE PER 0.50 CUBE
RATE PER 1.00 CUBE
RATE PER 1 m3
CEMENT CONCRETE IN 9"X6" BEAMS 1st FLOOR LEVEL
C
O
N
S
I
D
E
R

1
2
0

L
.
F
T
.

O
F

B
E
A
M
S

9
"
X
6
"
.
(
0
.
4
5
C
U
B
E
)
RATE PER 0.45 CUBE(120L.FT.)
RATE PER 1.00 CUBE
RATE PER 1 m3
CEMENT CONCRETE IN 9"X9" BEAMS 1st FLOOR LEVEL
C
O
N
S
I
D
E
R

8
0

L
.
F
T
.

O
F

B
E
A
M
S

9
"
X
9
"
.
(
0
.
4
5
C
U
B
E
)
230458122.xls.ms_officeCONCRETE 14/41
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
CURING
JUTE HESSIAN 60.00 SQ.FT. 25.00 1,500.00
WATER 120.00 GALS. 15.00 1,800.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
22,818.55
50,707.89
17,917.98
NOTE:- A. WATER AVAILABLE AT SITE
B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER
035
PER 50 CU.FT.
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 50.00 CU.FT. 252.90 12,645.00
ADD FOR WASTAGE 10% 1,264.50
MACHINARY
VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
CURING
JUTE HESSIAN 30.00 SQ.FT. 25.00 750.00
WATER 90.00 GALS. 15.00 1,350.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
23,009.50
460.19
NOTE:- A. WATER AVAILABLE AT SITE
B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER
036
PER 50 CU.FT.
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 50.00 CU.FT. 252.90 12,645.00
ADD FOR WASTAGE 10% 1,264.50
MACHINARY
VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
CURING
JUTE HESSIAN 25.00 SQ.FT. 25.00 625.00
WATER 90.00 GALS. 15.00 1,350.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
22,884.50
457.69
NOTE:- A. WATER AVAILABLE AT SITE
B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER
037
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 45.00 CU.FT. 252.90 11,380.50
ADD FOR WASTAGE 10% 1,138.05
C
O
N
S
I
D
E
R

8
0

L
.
F
T
.

O
F

B
E
A
M
S

9
"
X
9
"
.
(
0
.
4
5
C
U
B
E
)
RATE PER 0.45 CUBE(80L.FT.)
RATE PER 1.00 CUBE
RATE PER 1 m3
C
O
N
S
I
D
E
R

5
"

T
K
.

S
L
A
B

1
0
'
-
0
0
"
X
1
2
'
-
0
0
"
,

V
O
L
U
M
E

O
F

C
O
N
C
R
E
T
E

5
0
.
0
0

C
U
.

F
T
.
RATE PER 50 CU.FT.(120 SQ.FT.)
RATE PER 1.00 CU.FT.
CEMENT CONCRETE IN 4.5"X6" LINTOLS IN GROUYND FLOOR

C
O
N
S
I
D
E
R

2
4
0

L
.
F
T
.

(
4
5

C
U

F
T
.
)
5" TK. R.C.C. FLOOR SLAB IN 1st FLOOR
6" TK. R.C.C. FLOOR SLAB IN 1st FLOOR
C
O
N
S
I
D
E
R

6
"

T
K
.

S
L
A
B

1
0
'
-
0
0
"
X
1
0
'
-
0
0
"

P
A
N
E
L
,

V
O
L
U
M
E

O
F

C
O
N
C
R
E
T
E

5
0
.
0
0

C
U
.

F
T
.
RATE PER 50 CU.FT.(100 SQ.FT.)
RATE PER 1.00 CU.FT.
230458122.xls.ms_officeCONCRETE 15/41
ADD FOR WASTAGE 10% 113.81
MACHINARY
VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
CURING
JUTE HESSIAN 10.00 SQ.FT. 25.00 250.00
WATER 90.00 GALS. 15.00 1,350.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
21,232.36
471.83
NOTE:- A. WATER AVAILABLE AT SITE
B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER
038
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 45.00 CU.FT. 252.90 11,380.50
ADD FOR WASTAGE 10% 1,138.05
MACHINARY
VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
CURING
JUTE HESSIAN 60.00 SQ.FT. 25.00 1,500.00
WATER 90.00 GALS. 15.00 1,350.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
22,368.55
497.08
279.61
NOTE:- A. WATER AVAILABLE AT SITE
B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER
039
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 45.00 CU.FT. 252.90 11,380.50
ADD FOR WASTAGE 10% 1,138.05
MACHINARY
VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
CURING
JUTE HESSIAN 55.00 SQ.FT. 25.00 1,375.00
WATER 90.00 GALS. 15.00 1,350.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
22,243.55
494.30
370.73
RATE PER 45 CU.FT.(240 L.FT.)
RATE PER 1.00 CU.FT.

C
O
N
S
I
D
E
R

2
4
0

L
.
F
T
.

(
4
5

C
U

F
T
.
)
CEMENT CONCRETE IN 9"X9" LINTOLS IN GROUYND FLOOR
RATE PER 45 CU.FT.(80 L.FT.)
RATE PER 1.00 CU.FT.
CEMENT CONCRETE IN 9"X12" LINTOLS IN GROUYND FLOOR
RATE PER 45 CU.FT.(60L.FT.)
RATE PER 1.00 CU.FT.
RATE PER 01 L.FT.

C
O
N
S
I
D
E
R

6
0

L
.
F
T
.

(
4
5

C
U

F
T
.
)
RATE PER 01 L.FT.

C
O
N
S
I
D
E
R

8
0

L
.
F
T
.

(
4
5

C
U

F
T
.
)
230458122.xls.ms_officeCONCRETE 16/41
NOTE:- A. WATER AVAILABLE AT SITE
B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER
040
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 45.00 CU.FT. 252.90 11,380.50
ADD FOR WASTAGE 10% 1,138.05
MACHINARY
VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
CURING
JUTE HESSIAN 40.00 SQ.FT. 25.00 1,000.00
WATER 90.00 GALS. 15.00 1,350.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
21,868.55
485.97
607.46
NOTE:- A. WATER AVAILABLE AT SITE
B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER
RATE PER 1.00 CU.FT.
RATE PER 01 L.FT.

C
O
N
S
I
D
E
R

3
6

L
.
F
T
.

(
4
5

C
U

F
T
.
)
CEMENT CONCRETE IN 12"X15" LINTOLS IN GROUYND FLOOR
RATE PER 45 CU.FT.(36 L.FT.)
230458122.xls.ms_officeCONCRETE 17/41
MIXING COPNCRETE 1:2-1/2:5(1")
MIXING COPNCRETE 1:3:6(1-1/2")
MIXING COPNCRETE 1:2:4(3/4")
230458122.xls.ms_officeCONCRETE 18/41
MIXING COPNCRETE 1:1-1/2:3(3/4")
MIXING COPNCRETE 1:12(3/4")
2" TK. CEMENT CONCRETE SCREED IN FOUNDATION AT DEPTH NOT EXCEEDING 5'-00"
3" TK. CEMENT CONCRETE SCREED IN FOUNDATION AT DEPTH NOT EXCEEDING 5'-00"
230458122.xls.ms_officeCONCRETE 19/41
6" TK. CEMENT CONCRETE FLOOR(MASS CONCRETE)
CEMENT CONCRETE IN 4.5"X6" COLUMNS IN GROUND FLOOR
CEMENT CONCRETE IN 6"X6" COLUMNS IN GROUND FLOOR
230458122.xls.ms_officeCONCRETE 20/41
CEMENT CONCRETE IN 9"X9" COLUMNS IN GROUND FLOOR
CEMENT CONCRETE IN 12"X12" COLUMNS IN GROUND FLOOR
CEMENT CONCRETE IN 13.5"X13.5" COLUMNS IN GROUND FLOOR
230458122.xls.ms_officeCONCRETE 21/41
CEMENT CONCRETE IN 6"X6" BEAMS 1st FLOOR LEVEL
CEMENT CONCRETE IN 9"X6" BEAMS 1st FLOOR LEVEL
CEMENT CONCRETE IN 9"X9" BEAMS 1st FLOOR LEVEL
230458122.xls.ms_office FORM WORK 22/41
FORM WORK
041
PER SQ.FT.
(a).MAKING MOULD
1.MATERIALS
1" TK. CLASS II TIMBER 18.15 SQ.FT. 75 1,361.25
2"X2" CLASS II TIMBER FOR YOKES 17.1 L.FT. 25 427.50
2"X1" CLASS II TIMBER FOR BATTENS 16.12 L.FT. 16 257.92
WIRE NAILS 0.75 kgs. 110 82.50
2.FABRICATIONS
LABOURE
CARPENTER 0.50 DAY 900.00 450.00
UN-SKILLED LABOURER 0.50 DAY 600.00 300.00
TOTAL COST 2,879.17
ALLOW IN 4 USES COST 2,879.17
ALLOW IN 4 USES COST OF MOULD PER USE A 719.79
(b). ASSEMBLING(PER USE)
1.MATERIALS
16mmX18" LONG BOLTS(20 USE) 12 Nos. 18.5 222.00
MOULD OIL 0.5 Lts. 160 80.00
4"X2" PROPS 35 L.FT. 33 1,155.00
LABOURE
CARPENTER 0.25 DAY 900.00 225.00
UN-SKILLED LABOURER 0.25 DAY 600.00 150.00
COST OF ASSEMBLING PER USE B 1,832.00
. DESMANTELING,CLEANING & REPAIRING(PER USE)
LABOURE
CARPENTER 0.25 DAY 900.00 225.00
UN-SKILLED LABOURER 0.25 DAY 600.00 150.00
COST OF DESMANTELING (PER USE) C 375.00
TOTAL COST PER USE 2,926.79
2,926.79
SAWN TIMBER FORM WORK TO 9"X9" CEMENT CONCRETE COLUMN IN GROUND FLOOR
C
O
N
S
I
D
E
R

C
O
L
U
M
N

L
E
N
G
T
H

O
F

5
'
-
0
0
"


















C
O
N
C
R
E
T
E

A
R
E
A

1
5
.
0
0

S
Q
.
F
T
.
A+B+C
RATE PER SQUARE
230458122.xls.ms_office 230458122.xls.ms_officeBRICK WORK 23/41
BRICK WORK
045 BRICK WORK IN CEMENT-SAND 1:5 IN FOUNDATION UP TO DPC
PER CUBE
MATERIALS
BRICKS 1450 Nos. 6.50 9,425.00
WASTAGE 5% 471.25
CEMENT/50kg 4 Bgs. 840.00 3,360.00
SAND 0.25 CUBE 5,500.00 1,375.00
WATER 150 GALs. 15.00 2,250.00
LABOURE
MASON 3.00 DAY 900.00 2,700.00
UN-SKILLED LABOURER 4 DAY 600.00 2,400.00
21,981.25
046 BRICK WORK IN CEMENT-SAND 1:8 IN FOUNDATION UP TO DPC
PER CUBE
MATERIALS
BRICKS 1450 Nos. 6.50 9,425.00
WASTAGE 5% 471.25
CEMENT/50kg 2.33 Bgs. 840.00 1,960.00
SAND 0.375 CUBE 5,500.00 2,062.50
WATER 150 GALs. 15.00 2,250.00
LABOURE
MASON 3.00 DAY 900.00 2,700.00
UN-SKILLED LABOURER 4 DAY 600.00 2,400.00
21,268.75
047 BRICK WORK IN CEMENT-SAND 1:5 IN 4.5" TK. BRICK WALL IN GROUND FLOOR
PER SQUARE
MATERIALS
BRICKS 550 Nos. 6.50 3,575.00
WASTAGE 5% 178.75
CEMENT/50kg 1.3 Bgs. 840.00 1,092.00
SAND 0.1 CUBE 5,500.00 550.00
WATER 50 GALs. 15.00 750.00
LABOURE
MASON 1.50 DAY 900.00 1,350.00
UN-SKILLED LABOURER 2 DAY 600.00 1,200.00
SCAFFOLDING 5% ON LABOURE 127.50
8,823.25
048 BRICK WORK IN CEMENT-SAND 1:5 IN 9" TK. BRICK WALL IN GROUND FLOOR
PER SQUARE
MATERIALS
BRICKS 1090 Nos. 6.50 7,085.00
WASTAGE 5% 354.25
CEMENT/50kg 3 Bgs. 840.00 2,520.00
SAND 0.2 CUBE 5,500.00 1,100.00
WATER 115 GALs. 15.00 1,725.00
LABOURE
MASON 2.25 DAY 900.00 2,025.00
UN-SKILLED LABOURER 3.75 DAY 600.00 2,250.00
SCAFFOLDING 3% ON LABOURE 128.25
17,187.50
049 BRICK WORK IN CEMENT-SAND 1:5 IN 13.5" TK. IN SUPERSTRUCTURE IN GROUND FLOOR
PER SQUARE
MATERIALS
BRICKS 1630 Nos. 6.50 10,595.00
WASTAGE 5% 529.75
CEMENT/50kg 4.5 Bgs. 840.00 3,780.00
SAND 0.3 CUBE 5,500.00 1,650.00
WATER 170 GALs. 15.00 2,550.00
LABOURE
MASON 3.50 DAY 900.00 3,150.00
UN-SKILLED LABOURER 5.5 DAY 600.00 3,300.00
SCAFFOLDING 2% ON LABOURE 129.00
25,683.75
RATE PER CUBE
RATE PER CUBE
PER SQUARE
PER SQUARE
PER SQUARE
230458122.xls.ms_office 230458122.xls.ms_officeBRICK WORK 24/41
050 BRICK WORK IN CEMENT-SAND 1:8 IN 9" TK. WALL IN SUPERSTRUCTURE IN GROUND FLOOR
PER SQUARE
MATERIALS
BRICKS 1090 Nos. 6.50 7,085.00
WASTAGE 5% 354.25
CEMENT/50kg 1.75 Bgs. 840.00 1,470.00
SAND 0.3 CUBE 5,500.00 1,650.00
WATER 115 GALs. 15.00 1,725.00
LABOURE
MASON 2.25 DAY 900.00 2,025.00
UN-SKILLED LABOURER 3 DAY 600.00 1,800.00
SCAFFOLDING 3% ON LABOURE 114.75
16,224.00
051 4.5" TK. BRICK WALL (WIRE CUT) IN CEMENT-SAND 1:5 IN GROUND FLOOR
(FACINF TO BRICK WORK MEASURED SEPARATELY)
PER SQUARE
MATERIALS
BRICKS 550 Nos. 18.00 9,900.00
WASTAGE 2% 198.00
CEMENT/50kg 1.2 Bgs. 840.00 1,008.00
SAND 0.08 CUBE 5,500.00 440.00
WATER 30 GALs. 15.00 450.00
LABOURE
MASON 1.50 DAY 900.00 1,350.00
UN-SKILLED LABOURER 2 DAY 600.00 1,200.00
SCAFFOLDING 5% ON LABOURE 127.50
14,673.50
052 9" TK. BRICK WALL (WIRE CUT) IN CEMENT-SAND 1:5 IN GROUND FLOOR
(FACINF TO BRICK WORK MEASURED SEPARATELY)
PER SQUARE
MATERIALS
BRICKS 1090 Nos. 18.00 19,620.00
WASTAGE 4% 784.80
CEMENT/50kg 2.5 Bgs. 840.00 2,100.00
SAND 0.18 CUBE 5,500.00 990.00
WATER 100 GALs. 15.00 1,500.00
LABOURE
MASON 2.25 DAY 900.00 2,025.00
UN-SKILLED LABOURER 3.75 DAY 600.00 2,250.00
SCAFFOLDING 3% ON LABOURE 213.75
29,483.55
053 13.5" TK. BRICK WALL (WIRE CUT) IN CEMENT-SAND 1:5 IN GROUND FLOOR
(FACINF TO BRICK WORK MEASURED SEPARATELY)
PER SQUARE
MATERIALS
BRICKS 1630 Nos. 18.00 29,340.00
WASTAGE 2% 586.80
CEMENT/50kg 4.5 Bgs. 840.00 3,780.00
SAND 0.3 CUBE 5,500.00 1,650.00
WATER 50 GALs. 15.00 750.00
LABOURE
MASON 3.75 DAY 900.00 3,375.00
UN-SKILLED LABOURER 5.5 DAY 600.00 3,300.00
SCAFFOLDING 2% ON LABOURE 133.50
42,915.30
054 EXTRA OVER FOR FACING INCLUDING RAISED POINTING 1/8" TK. IN CEMENT-SAND 1:1 MIXTURE IN GROUND FLOOR
PER SQUARE
MATERIALS
CEMENT/50kg 0.5 Bgs. 840.00 420.00
SAND 0.01 CUBE 5,500.00 55.00
PER SQUARE
PER SQUARE
PER SQUARE
PER SQUARE
230458122.xls.ms_office 230458122.xls.ms_officeBRICK WORK 25/41
WATER 10 GALs. 15.00 150.00
ACID 0.1 GALs. 90.00 9.00
LABOURE
MASON 5.00 DAY 900.00 4,500.00
UN-SKILLED LABOURER 3.5 DAY 600.00 2,100.00
7,234.00
055 3" TK. FLOOR PAVED IN LIME MORTAR 2:5 IN GROUND FLOOR
PER SQUARE
MATERIALS
BRICKS 350 Nos. 6.00 2,100.00
SLAKED LIME 60 kg 25.00 1,500.00
SAND 0.11 CUBE 5,500.00 605.00
WATER 45 GALs. 15.00 675.00
LABOURE
MASON 1.50 DAY 900.00 1,350.00
UN-SKILLED LABOURER 2.5 DAY 600.00 1,500.00
7,730.00
056
FOR 10 L.FT'
MATERIALS
BRICKS 120 Nos. 6.00 720.00
CEMENT/50kg 0.5 BAGS 840.00 420.00
SAND 0.05 CUBE 5,500.00 275.00
WATER 15 GALs. 15.00 225.00
LABOURE
MASON 0.50 DAY 900.00 450.00
UN-SKILLED LABOURER 0.5 DAY 600.00 300.00
2,390.00
239.00
057
FOR 10 L.FT'
MATERIALS
BRICKS 140 Nos. 6.00 840.00
CEMENT/50kg 0.8 BAGS 840.00 672.00
SAND 0.05 CUBE 5,500.00 275.00
WATER 20 GALs. 15.00 300.00
LABOURE
MASON 1.25 DAY 900.00 1,125.00
UN-SKILLED LABOURER 1.25 DAY 600.00 750.00
3,962.00
396.20
058
FOR 10 L.FT'
MATERIALS
BRICKS 110 Nos. 6.00 660.00
CEMENT/50kg 0.7 BAGS 840.00 588.00
SAND 0.04 CUBE 5,500.00 220.00
WATER 15 GALs. 15.00 225.00
LABOURE
MASON 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 1.25 DAY 600.00 750.00
3,343.00
334.30
PER 10 L. FT.
PER 01 L. FT.
BRICK DRAINS IN CEMENT & SAND 1:5 9" WIDE & 6"-9" AVG. DEPTH INCLUDING CEMENT RENDERING .5" TK. 1:2 TO EXPOSED FACES
WITHOUT RAMP INCLUDING NECESSARY EXCAVATION.
PER 10 L. FT.
PER 01 L. FT.
STEPS 1'-1.5"X0'-6" IN BRICK IN CEMENT & SAND 1:5 WITH .5" TK. CEMENT & SAND 1:2 RENDERING INCLUDING NECESSARY EXCAVATION
PER 10 L. FT.
PER 01 L. FT.
BRICK DRAINS IN CEMENT & SAND 1:5, 9" WIDE & 6"-9" AVG. DEPTH INCLUDING CEMENT RENDERING .5" TK. 1:2 TO EXPOSED FACES
WITH 1"-6" RAMP INCLUDING NECESSARY EXCAVATION.
PER SQUARE
PER SQUARE
230458122.xls.ms_office 230458122.xls.ms_officeBRICK WORK 26/41
059
PER SQUARE 10'-00"X10'-00" AREA(SIZE OF EACH BLOCK 16"X8"X8")
MATERIALS
BLOCKS 112 Nos. 18.00 2,016.00
WASTAGE 5% 100.80
CEMENT/50kg 0.75 BAGS 840.00 630.00
SAND 0.06 CUBE 5,500.00 330.00
WATER 15 GALs. 15.00 225.00
LABOURE
MASON 1.50 DAY 900.00 1,350.00
UN-SKILLED LABOURER 2.5 DAY 600.00 1,500.00
SCAFOLDING 3% ON LABOURER 85.50
6,237.30
060
PER SQUARE 10'-00"X10'-00" AREA(SIZE OF EACH BLOCK 16"X8"X4")
MATERIALS
BLOCKS 112 Nos. 18.00 2,016.00
WASTAGE 5% 100.80
CEMENT/50kg 0.4 BAGS 840.00 336.00
SAND 0.03 CUBE 5,500.00 165.00
WATER 15 GALs. 15.00 225.00
LABOURE
MASON 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 2 DAY 600.00 1,200.00
SCAFOLDING 5% ON LABOURER 105.00
5,047.80
8" TK. HOLLOW BLOCK WORK IN CEMENT-SAND MORTAR 1:5 IN GROUND FLOOR(CAVITIES UN0FILLED)
PER SQUARE
4" TK. HOLLOW BLOCK WORK IN CEMENT-SAND MORTAR 1:5 IN GROUND FLOOR(CAVITIES UN0FILLED)
PER SQUARE
RANDOME RUBBLE MASONARY
061
PER CUBE (14" THICK)
MATERIALS
6"X9" RUBBLE 1.3 CUBE 1,750.00 2,275.00
CEMENT/50kg 5 BAGS 840.00 4,200.00
SAND 0.3 CUBE 5,500.00 1,650.00
WATER 100 GALs. 15.00 1,500.00
LABOURE
MASON 4.00 DAY 900.00 3,600.00
UN-SKILLED LABOURER 6 DAY 600.00 3,600.00
16,825.00
062
PER CUBE (14" THICK)
MATERIALS
6"X9" RUBBLE 1.3 CUBE 1,750.00 2,275.00
CEMENT/50kg 5 BAGS 840.00 4,200.00
SAND 0.3 CUBE 5,500.00 1,650.00
WATER 100 GALs. 15.00 1,500.00
LABOURE
MASON 4.50 DAY 900.00 4,050.00
UN-SKILLED LABOURER 7 DAY 600.00 4,200.00
SCAFOLDING 3% ON LABOURER 247.50
18,122.50
RANDOME RUBBLE MASONARY IN CEMENT-SAND MORTAR 1:5 IN FOUNDATION
PER CUBE
RANDOME RUBBLE MASONARY IN CEMENT-SAND MORTAR 1:5 IN SUPERSTRUCTURE
PER CUBE
0
TILING
063
PER SQUARE
MATERIALS
8"X8" PRESSED TILE 225 Nos. 75.00 16,875.00
ADD FOR WASTAGE 5% 843.75
CEMENT/50kg 1.25 BAGS 840.00 1,050.00
SAND 0.07 CUBE 5,500.00 385.00
VAX POLISH 113.40 Grms - lb GRAMS
COLOURED PIGMENT 113.40 Grms - 1 453.59237
COTTON WAST 1000 Grms -
LABOURE
MASON 4.00 DAY 900.00 3,600.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
UN-SKILLED LABOURER 0.50 DAY 600.00 300.00 POLISHING
25,453.75
064
PER SQUARE
MATERIALS
6"X6" GLAZEDD TILE 400 Nos. 45.00 18,000.00
ADD FOR WASTAGE 10% 1,800.00
CEMENT/50kg 2.5 BAGS 840.00 2,100.00
SAND 0.11 CUBE 5,500.00 605.00
WHITE CEMENT 450 Grms -
VAX POLISH 113.40 Grms - lb GRAMS
COLOURED PIGMENT 113.40 Grms - 1 453.59237
COTTON WAST 1000 Grms -
LABOURE
MASON 4.00 DAY 900.00 3,600.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
UN-SKILLED LABOURER 0.50 DAY 600.00 300.00 CLEANING
28,805.00
065
PER SQUARE
MATERIALS
12"X12" TERRAZZO TILE 100 Nos. - -
ADD FOR WASTAGE 5% -
CEMENT/50kg 1.25 BAGS 840.00 1,050.00
SAND 0.07 CUBE 5,500.00 385.00
COLOURED PIGMENT 1000 Grms -
VAX POLISH 226.80 Grms - lb GRAMS
COLOURED PIGMENT 907.18 Grms - 1 453.59237
COTTON WAST 1000 Grms -
LABOURE
MASON 4.00 DAY 900.00 3,600.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
UN-SKILLED LABOURER 0.50 DAY 600.00 300.00 POLISHING
7,135.00 PER SQUARE
PRESSED FLOOR TILES BEDDED IN .5" CEMENT MORTAR 1:2 & POINTING IN NEET CEMENT IN GROUND FLOOR
PER SQUARE
GLAZED TILES FIXED TO WALLS INCLUDING BEDDING IN CEMENT MORTAR 1:2 & RAKING IN GROUND LOOR
(SPECIALS MEASURED SEPARATELY)
PER SQUARE
TERRAZZO FLOOR TILES ON .5" TK. CEMENT & SEND 1:2 IN GROUND FLOOR.
0
230458122.xls.ms_office ROOFING 36/41
ROOFING
066
PER 6.00 SQUARES
MATERIALS
TIMBER 34 CU.FT. - -
ADD FOR WASTAGE 10% -
2"X1" REEPERS 660 L.FT. -
ADD FOR WASTAGE 5% -
WIRE NAILS 6" 4 kg -
WIRE NAILS 2" 1.00 kg -
LABOURE
CARPENTER 7.00 DAY 900.00 6,300.00
UN-SKILLED LABOURER 8.00 DAY 600.00 4,800.00
11,100.00
1,850.00
067
(TIMBER FRAME WORK & RIDGE COVERING MEASURED SEPARATELY)
PER 6.00 SQUARES
MATERIALS
TILES 750 Nos. 45.00 33,750.00
LABOURE
CARPENTER 3.00 DAY 900.00 2,700.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
38,250.00
6,375.00
068
PER 3.600 SQUARES
MATERIALS
LIMBER PURLING 13.25 CU.FT. -
ADD FOR WASTAGE 10% -
LABOURE
CARPENTER 2.50 DAY -
UN-SKILLED LABOURER 3.00 DAY -
-
-
PER 1.00 SQUARE
TIMBER FRAME WORK FOR CORRUGATED ASBESTOS SHEET ROOF IN SINGLE
STORY BUILDING
PER 3.6 SQUARE
PER 1.00 SQUARE
TIMBER FRAME WORK FOR CALICUT TILE ROOF IN SINGLE STORY BUILDING
CONSISTING OF WALL PLATE,BEAM,RIDGE PLATE,RAFTERS ETC.(PRESERVATIVE
TREATMENR TO BE MEASURED SEPARATELY)
PER 6.00 SQUARE
PER 1.00 SQUARE
ROOF COVERING WITH CALICUT PATTERN CLAY TILES IN SINGLE STORY
BUILDING
PER 6.00 SQUARE
230458122.xls.ms_office ROOFING 36/41
230458122.xls.ms_office ROOFING 37/41
069
(TIMBER FRAME WORK & RIDGE COVERING MEASURED SEPARATELY)
PER 3.6 SQUARES
MATERIALS
CORU. ASB. SHEETS 420 SQ.FT. -
ROOFING SCREW & WASHERS 72 Nos. -
LABOURE -
CARPENTER 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 2.00 DAY 600.00 1,200.00
2,100.00
583.33
070
PER SQUARE
MATERIALS
HALF ROUND CLAY TILES 650 Nos. -
LABOURE -
UN-SKILLED LABOURER 2.00 DAY 600.00 1,200.00
1,200.00
071
PER 13'-4" LENGTH
MATERIALS
3'-8" LONG RIDGING 4 PAIRS -
ROOFING SCREW BOLTS 16 Nos. -
LABOURE -
CARPENTER 0.25 DAY 900.00 225.00
UN-SKILLED LABOURER 0.25 DAY 600.00 150.00
375.00
28.13
072
PER 12'-00" L.FT.
MATERIALS
RIDGE TILES 9 Nos. -
CEMENT/50kg 0.33 BAGS -
SAND 0.02 CUBE -
SLAKED LIME 7.5 kg -
COLOURING POWDER 250 GRAM -
LABOURE -
MASON 0.25 DAY 900.00 225.00
UN-SKILLED LABOURER 0.25 DAY 600.00 150.00
375.00
ROOF COVERING WITH CORRUGATED ASBSETOS SHEETS IN SINGLE STORY
BUILDING
PER 3.60 SQUARE
PER 1.00 SQUARE
ONE LAYER HALF ROUND CLAY TILES OVER ASBESTOS ROOF COVERING
RIDGE COVERING WITH CALICUT PATTERN RIDGE T ILES BEDDED IN CEMENT
LIME MORTAR 1:1:4
ASBESTOS CLOSE FITTINGS RIDGING FIXED COMPLETE WITH ROOFING SCREWS
OR BOLTS (HOOKS)
PER 1.00 SQUARE
PER 13'-4" RIDGING
PER 1-00" RIDGING
PER 12'-00" RIDGING
230458122.xls.ms_office ROOFING 37/41
230458122.xls.ms_office ROOFING 38/41
31.25
073
PER 100 L.FT.
MATERIALS
1" PLANKS 75 SQ.FT. -
ADD FOR WASTAGE 5% -
1.5" BRASS SCREWS 70 Nos. -
LABOURE -
CARPENTER 3.00 DAY 900.00 2,700.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
ADD FOR SCAFOLDING 5% ON LABOURE 225.00
4,725.00
47.25
074
PER 100 L.FT.
MATERIALS
1" PLANKS 75 SQ.FT. -
ADD FOR WASTAGE 5% -
1.5" BRASS SCREWS 50 Nos. -
LABOURE -
CARPENTER 3.00 DAY 900.00 2,700.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
ADD FOR SCAFOLDING 5% ON LABOURE 225.00
4,725.00
47.25
075 ROOF PLUMBING
CONSIDER 15'-00"
MATERIALS
G.I.SHEETS 8'X4' 2 Nos. -
WOOD PRESERVATIVE 0.25 GAL. -
CEMENT/50kg 0.1 BAGS -
SLAKED LIME 25 GRAM -
SAND 0.01 CUBE -
PLANKS 50 SQ.FT. -
1.5" WIRE NAILS 1 kg -
LABOURE
a. FIXED BOARDING & APPLYING WOOD PRESERVATIVE
CARPENTER 1.00 DAY 900 900.00
UN-SKILLED LABOURER 1.00 DAY 600 600.00
b.MAKING & FIXING G.I. SHEETS
TINKER 0.5 DAY 750 375.00
PER 1-00" RIDGING
3/4"X9" HIGH VALANCE BORD FIXED WITH BRASS SCREWS TO END OF RAFTERS
(FOE TILE ROOFING)
3/4"X9" HIGH BARGE BORD FIXED WITH BRASS SCREWS AT 2'-00" CENTERS TO
SIDES OF RAFTERS (FOE TILE ROOFING)
PER 100 L.FT.
PER 1.00 L.FT.
PER 100 L.FT.
PER 1.00 L.FT.
18 B.W.G. (1.2mm) GALVENIZED IRON SHEETS VALLY GUTTER 3'-00" GIRTH OVERALL
ONCE BENT WITH END LAPS NOT LESS THAN 9" WIDTH INCLUDING 3/4" TONGUED &
GROOVED PLANKS LAID TO SLOP & PROFILE ON TIMBER MEMBERS.
230458122.xls.ms_office ROOFING 38/41
230458122.xls.ms_office ROOFING 39/41
UN-SKILLED LABOURER 0.5 DAY 600 300.00
c. BUILDING SIDES
MASON 0.25 DAY 900 225.00
UN-SKILLED LABOURER 0.5 DAY 600 300.00
2,700.00
180.00
076
CONSIDER 15'-00" L.FT.
MATERIALS
G.I.SHEETS 8'X4' 1 Nos. -
CEMENT/50kg 0.05 BAGS -
SAND 0.01 CUBE -
SOLDERING LEAD 0.5 kg -
LABOURE -
CUTTING.BENDING, SOLDERING & FIXING -
TINKER 0.5 DAY -
MASON 0.125 DAY -
UN-SKILLED LABOURER 0.75 DAY -
-
-
077
PER 1.95 SQUARE
MATERIALS
CLASS I TIMBER 8 CU.FT. -
2" WIRE NAILS 0.5 kg -
FIBER/PLASTIC PLUGS 26 Noa. -
CEMENT/50kg 0.5 BAGS -
SAND 0.02 CUBE -
2" BRUSH 1 Noa. -
THINNER 0.33 GLS. -
LABOURE -
CARPENTER 2.50 DAY -
MASON 0.5 DAY -
UN-SKILLED LABOURER 1.5 DAY -
ADD FOR SCSFOLDING 3% ON LABOURE -
-
-
PER 01 L.FT.
PER 15 L.FT.
RATE FOR 1.00 SQUARE
18 B.W.G. (1.2mm) GALVENIZED IRON FLASHING 1'-6" GIRTH OVERALL 3 TIMES BENT
WITH END LAPS NOT LESS THAN 6" . LEAD SOLDERD,TURNED & TRUNKED UP TO NOT
LESS THAN 6" IN TO CASE CUT IN WALL & POINTED IN CEMENT MORTAR 1:2 LOWER
END DRESSED OVER ROOF COVER ING NOT LESS THAN 1'-00" WIDE
PER 15 L.FT.
PER 01 L.FT.
TIMBER FRAME WORK FOR 4'-00"X4'-00" FLAT ASBESTOS CEILING OF 4"X2" JOIST &
2"X2" BEARERS IN CLASS I TIMBER.
RATE FOR 1.95 SQUARE
230458122.xls.ms_office ROOFING 39/41
230458122.xls.ms_office ROOFING 40/41
078
PER 1.95 SQUARE
MATERIALS
FLAT ASBESTOS SHEETS 210 SQ.FT. -
HALMILLA COVER MOULD 2"X2" 60 L.FT. -
1.5"X1.5" HALMILLA BEADINGS 125 L.FT. -
CLOUT NAILS 250 GRAMS -
1.5" BRASS SCREWS 8 DOZ -
LABOURE -
CARPENTER 1.5 DAY -
UN-SKILLED LABOURER 2 DAY -
ADD FOR SCSFOLDING 3% -
-
-
079
CONSIDER ROOM 15'-00"X13'-00"
FOR 1.95 SQUARS
MATERIALS
4"X2" TIMBER JOIST 115 L.FT. -
6"X3/4" LUNUMIDELLA PLANKS 215 SQ.FT. -
CEMENT 1.5 kg -
SAND 0.04 CUBE -
BRASS NAILS 1.5" 4 kg -
LABOURE
MAKING HOLES,FIXING JOIST & MAKING GOOD
MASON 1 DAY -
CARPENTER 1 DAY -
UN-SKILLED LABOURER 3 DAY -
FIXING CEILING BOARDS
CARPENTER 3 DAY -
UN-SKILLED LABOURER 4 DAY -
ADD FOR SCSFOLDING 3% -
-
-
3/4" TK. TONGUED & GROOVED LUNUMIDELLA CEILING BOADS FIXED
HORIZONTEL ON 4"X2" CLASS I TIMBER JOIST AT 2'-00" CENTERS WITH 1.5"
BRASS NAILS.
RATE FOR 1.95 SQUARE
RATE FOR 1.00 SQUARE
HORIZONTAL CEILING LINING USING 4'-00"X4'-00" FLAT ASBESTOS CEMENT
SHEET FIXED WITH & COVER MOULDING ON TIMBER FRAME WORK(TIMBER
FRAME WORK & PAINTING MEASURED SEPARATELY)
RATE FOR 1.95 SQUARE
RATE FOR 1.00 SQUARE
230458122.xls.ms_office ROOFING 40/41
230458122.xls.ms_office ROOFING 41/41
080
CONSIDER 15'-00"X12'-00" 1.80 SQUARS
MATERIALS
CEILING PLANKS 220 SQ.FT.
2"X1/4" TIMBER STRIPS 40 L.FT.
3/4" NAILS 2 kg
1.5" BRASS NAILS 4 kg
LABOURE
CARPENTER 3 DAY -
UN-SKILLED LABOURER 6 DAY
ADD FOR SCSFOLDING 3% -
-
- RATE FOR 1.00 SQUARE
3/4" X6" WIDE TONGUED & GROOVED LUNUMIDELLA CEILING BOADS FIXED
TO UNDER SIDE OF TOOF RAFTERS,(EXISTING) WITH 1.5" BRASS NAILS,
INCLUDING LEVELING WITH TIMBER STRIPS WHERE NECESSARY.
RATE FOR 1.95 SQUARE
230458122.xls.ms_office ROOFING 41/41

You might also like