no description unit price


fanlight catches nos 50.00
" dia pvc elbows/bend/socket no 9.25
" dia. PVC TEES no 7.00
" dia TEE no 12.00
" dia. PVC elbows/bend/socket no 12.25
1" dia. PVC elbows/bend/socket no 18.25
1" dia. PVC TEES no 20.00
1" dia. PVC elbows/bend/socket no 37.00
1" dia. PVC TEE no 30.00
1" dia. PVC elbows/bend/socket no 60.00
1"dia. PVC TEE no 52.00
2" dia. PVC TEE no 80.00
2" dia. PVC elbows/bend/socket no 126.00
2" dia. PVC elbows/bend/socket no 305.00
2" dia. PVC TEE no 146.00
3" dia. PVC elbows/bend/socket no 510.00
3" dia. PVC tees no 335.00
acid gal 200.00
anticorrosive ltr 230.00
asbestos corrugated sheet sq.ft 26.00
asbestos flat sheet sq.ft 15.00
beading x l.ft 1.50
beading 1x halmilla l.ft 10.00
bidet no b
binding wire 16 BWG lbs 35.00
bitumen gal 75.00
blacksmith days 550.00
blasting powder lbs 300.00
blue ozs 10.00
boiled lime cwts 350.00
bolt 16mm, 18" long nos 75.00
brackets no
Brass bolt 4" nos 45.00
brass nails 1 kg 100.00
brass panel pin doz 5.00
brass screw 1 doz 35.00
brass screw 4" nos 12.00
brass screws nos 1.25
brass screws doz 1.75
brass screws 1" no 2.35
brass screws 1" no 3.75
brick work 4 sq
bricks nos 2.80
brush 2" nos 167.00
brush 3" nos 210.00
brush 6" nos 403.00
But hinges 5x2 brass nos 87.50
C.I.cistern with 1 flush pipe chain nos 1550.00
C.I.pipe 4" l.ft 155.00
C.I.pipe 4" l.ft 155.00
carpenter days 600.00
Casement fasteners nos 40.00
Casement stays nos 40.00
cement cwts 485.00
cement block 16x8x4 nos 30.00
cement block 16x8x8 nos 45.00
cistern no
clay tile nos 11.00
clip and nail for " pvc nos 6.75
clip and nail for " pvc nos 8.00
clip and nail for 1" pvc nos 10.75
clip and nail for 1" pvc nos 14.50
clip and nail for 1" pvc nos 20.50
clip and nail for 2" pvc nos 29.75
clip and nail for 3" pvc nos 132.75
clip nos 25.00
clout nails " lbs 50.00
coir brush 6" nos 40.00
coloured pigment lb 150.00
colouring powder lb 150.00
concrete 1 2 4 cube 14965.33
concrete 1 3 6 (1) cube 12233.33
cotton waste lb 12.50
cove moulding halmilla 2x2 l.ft 35.00
cover slab no 300.00
d d t powded lbs 100.00
Door closer(hydraulic) nos 1650.00
dowels M.S. 5/8" nos 15.00
Draw rings nos 15.00
earth cube 600.00
elbow no b
emulsion lit 312.50
enamel ltr 380.00
end cap no 38.00
eves gutter length no 425.00
EW pipe 4" no 80.00
excavation cube b
fibre/plastic plug nos 2.00
fibre/plastic plug with 4" screw nos 7.00
firewood lbs 3.00
flannel cloth yrds 65.00
floor brush nos 150.00
fuse l.ft 7.50
G.I.grating 4" nos 15.00
G.I.Sheet 8x4( 18BWG) nos 2200.00
glass pane 1/8" sq.ft 30.00
glazed tile 6x6 nos 15.00
glazier sq.ft 30.00
gutter brackets no 20.00
gutter joiner no 43.00
half round tile sq 5.00
iron screws kg
iron screws 3" nos 3.00
joiner no 43.00
jumper steel lbs 125.00
Jute Hessian sq.ft 3.50
L iron brackets nos 55.00
labour days 400.00
lead lb 150.00
low level suite complete nos 4500.00
lunumidella ceiling planks sq.ft 27.00
mason days 600.00
metal 2" cube 2000.00
metal cube 3200.00
metal 1 cube 2900.00
metal 1 cube 2600.00
mitre bend no b
mixture days 1200.00
Mortice lock with screws nos 600.00
mould oil lit 35.00
nails 2" kg 100.00
painter days 275.00
planks 1" sq.ft 110.00
plumber days 275.00
plywood sash 6'9"x2'9" nos 1400.00
pressed tile 8x8 nos 15.00
primer for wall lit 377.00
props 2x4 l.ft 25.00
pvc 3" pipe,1000 type l.ft 170.00
pvc gutter head no 105.00
pvc pipe l.ft 7.10
pvc pipe l.ft 12.50
pvc pipe 1" l.ft 18.75
pvc pipe 1" l.ft 28.50
pvc pipe 1" l.ft 42.50
pvc pipe 2" l.ft 72.00
pvc pipe 3" l.ft 170.00
pvc pipe 3 l.ft 80.00
pvc straps no
rawl plugs no 2.00
reeper 2x1 l.ft 10.00
rendering 1 2 sq
ridge tile nos 25.00
ridges 3'8" long pair 250.00
Rim lock with screws nos 300.00
roofing screws or bolt nos 3.00
roofing screws and washers nos 3.50
rubble 6-9 cube 1650.00
S.W. gulley 4" nos 450.00
salt lb 10.00
sand cube 4000.00
sand paper nos 17.50
shoe no 60.00
Sink 24x15x7 nos 1750.00
sk/labour days 550.00
slaked lime cwts 300.00
socket 1" nos 12.00
socket 3" nos 170.00
soldering lead lb 250.00
solvent cement gms 1.20
spreader no
spur stone nos 25.00
squatting pan with trap nos 750.00
stop cock nos 250.00
tap nos 250.00
tapered wooden plug nos 25.00
tarnap gal 125.00
Tee hinges 6"x12" pair 50.00
terpentine/thinner lit 100.00
terrazzo tiles 12x12 nos 75.00
Timber cu.ft 1100.00
timber 2x2 l.ft 25.00
timber 4x3 class I cu.ft 1100.00
timber base plates sq.ft 45.00
timber battens 2x1 class 1 l.ft 10.00
timber bearers 4x2 class 1 l.ft 55.00
timber bearers 4x2 class 2 l.ft 35.00
Timber cl 1 cu.ft 1100.00
timber class 11 2x1 l.ft 3.50
timber class11 cu.ft 625.00
timber class11 2x2 l.ft 12.00
timber joists 4x2 class 2 cu.ft 625.00
timber ledgers 2x2 l.ft 12.00
timber planks ", class 1 sq.ft 90.00
timber planks 1", class 1 sq.ft 110.00
timber planks 1 class1 sq.ft 140.00
timber planks 1", class 2 sq.ft 45.00
timber planks 1", class 2 sq.ft 45.00
timber plug no 5.00
timber plug 6x6x2 no 48.00
timber purlin cu.ft 1100.00
timber runners 4x2 cu.ft 1100.00
timber sash 3x1 sq.ft 180.00
timber strips2x l.ft 4.00
timber wedges nos 6.00
tinker days 325.00
Tor steel cwts 2500.00
Tower / skeleton brass bolts nos 100.00
urinal no 1650.00
Varnish lit 400.00
vibrator days 1500.00
wash basin nos 2800.00
waste plug and chain nos 150.00
water gal 0.30
wax polish lb 125.00
white cement kg 35.00
wire brush nos 65.00
wire cut bricks nos 8.75
wire nail kg 100.00
wire nail 1 lb 50.00
wire nail 2" long lb 50.00
wire nail 6" long lb 50.00
wire nails lb 50.00
wood preservative ltr 115.00
wood primer ltr 105.00
wooden plug no 15.00
yarn lbs 35.00
yellow ochre lb 10.00
Mild steel cwts 1600.00
1 Removing top soil to a depth not exceeding
6" & depositing as directed within site
sq 400.00
per sqare
consider an area of 10.00 sqrs
ie, 5.00 cubes of excavation
Labour days 10.00 400.00 4000.00
rate per sqr 400.00
2 Excavation over site to reduce level in any
material except rock requiring blasting
including depositing and levelling as
directed upto a distance not exceeding 30ft
cube 650.00
per cube
Labour days 1.63 400.00 650.00
rate per sqr 650.00
3 Excavation in trenches for walls/column
pits in soft/loose soil from 0-5ft deep and
depositing excavated material to a distance
not exceeding 30ft . (earth work support to
be paid separately).
cube 400.00
per cube
Labour days 1.00 400.00 400.00
400.00
4 Excavation in trenches for walls/column
pits in ordinary soil from 0-5ft deep and
depositing excavated material to a distance
not exceeding 30ft .
cube 900.00
per cube
Labour days 2.25 400.00 900.00
900.00
5 Excavation in trenches for walls/column
pits in hard dense soil from 0-5ft deep and
depositing excavated material to a distance
not exceeding 30ft .
cube 1400.00
per cube
Labour days 3.50 400.00 1400.00
1400.00
Construction-BSR 7
6 Excavation in trenches for walls/column
pits in mud/wet soil from 0-5ft deep and
depositing excavated material to a distance
not exceeding 30ft . (earthwork and
dewatering paid for separately)
cube 2400.00
per cube
Labour days 3.00 400.00 1200.00
1200.00
7 Excavation in trenches for walls/column
pits in soft distintegrated rock (not requiring
blasting) up to a depth of 5ft and depositing
excavated material to a distance not
exceeding 30ft .
cube 1000.00
per cube
Labour days 2.50 400.00 1000.00
1000.00
8 Excavation in trenches for walls/column
pits in hard rock requiring blasting up to a
depth of 5ft and depositing excavated
material to a distance not exceeding 30ft .
cube 1860.00
per cube
mateials
blasting powder lbs 0.75 300.00 225.00
fuse l.ft 10.00 7.50 75.00
jumper steel lbs 1.00 125.00 125.00
fuel and gorge(20%) 85.00
Labour
Labour days 2.00 400.00 800.00
sk/labour days 1.00 550.00 550.00
1860.00
9 Benching rock in foundation in 3"-6"
steps.(Blasting prohibited)
sq.ft 123.13
per 10.00 sq ft
drilling,chipping and wedging
sk/labour days 1.50 550.00 825.00
steel, fuel forge(25%) 206.25
collecting and deposing
Labour days 0.50 400.00 200.00
per 10.00 sq ft 1231.25
per sq.ft 123.13
Construction-BSR 8
10 Anti-termite treatment on excavated
foundation and compacted soil under floors
sq 1806.00
per sqare
materials
d d t powded lbs 16.00 100.00 1600.00
water gal 20.00 0.30 6.00
Labour days 0.50 400.00 200.00
1806.00
11 Earthwork-backfilling & compacting with
selected earth available at site
cube 400.00
Backfilling to trenches with selected earth
available at site
per cube
Labour days 1.00 400.00 400.00
12 Backfilling to trenches with imported
material
cube 1090.00
per cube
earth delivered at site cube 1.00 600.00 600.00
Allow for compaction 15% 90.00
filling and compacting
Labour days 1.00 400.00 400.00
1090.00
13 Filling under floors including levelling
watering and compacting in 3" layers with
available and selected earth at site
cube 800.00
per cube
Labour days 2.00 400.00 800.00
14 Filling under floors including levelling
watering and compacting in 3" layers with
imported selected earth at site
cube 1490.00
per cube
earth delivered at site cube 1.00 600.00 600.00
Allow for compaction 15% 90.00
Labour days 2.00 400.00 800.00
1490.00
Construction-BSR 9
15 Cutting turf sods loading to hand cards and
transporting upto 30 yards laying and
watering for 30 days .(Royalty for turf
pegging and transport beond 30 yards paid
separately)
sq 1818.00
per sqare
Cutting turf sods loading and transporting
ti site and unloading
Labour days 2.50 400.00 1000.00
laying turf rods at site
Labour days 0.50 400.00 200.00
Watering for 30 days
Labour days 1.50 400.00 600.00
water gal 60.00 0.30 18.00
1818.00
16 Earth work support (open planking ) in
trenches upto a depth of 5ft
sq 3114.06
consider trench 15ft long 3ft wide and 5ft
depth open planking to both faces
total area-2/15'x5'=150sq.ft
per 150sq.ft
materials
timber class11(4 use) cu.ft 17.50 156.25 2734.38
Add 5% for wedges 136.72
carpenter days 1.00 600.00 600.00
Labour days 3.00 400.00 1200.00
total per 150 sq.ft 4671.09
rate per sq 3114.06
17 Earth work support (close planking ) in
trenches upto a depth of 5ft
sq 4747.92
consider trench 15ft long 3ft wide and 5ft
height open planking to both faces
total area of planking-2/15'x5'=150sq.ft
per 150sq.ft
materials
timber class11(4 use) cu.ft 30.00 156.25 4687.50
Add 5% for wedges 234.38
carpenter days 1.00 600.00 600.00
Labour days 4.00 400.00 1600.00
total per 150 sq.ft 7121.88
rate per sq 4747.92
Construction-BSR 10
18 Earth work support (close planking ) in
deep excavation in trenches upto 15ft
depth
sq 5290.28
consider trench of length of 15'width
5'6"at top, 3'6" at bottom
then area supported is 2/15'x15'=450 sq.ft
timber class11(4 use) cu.ft 100.00 156.25 15625.00
Add 5% for wedges 781.25
carpenter days 3.00 600.00 1800.00
Labour days 14.00 400.00 5600.00
total per 450 sq.ft 23806.25
rate per sq 5290.28
19 Mixing concrete 1 3 6 (1") cube 12233.33
per cube
materials
cement cwts 13.00 485.00 6305.00
sand cube 0.53 4000.00 2120.00
metal 1 cube 0.92 2600.00 2392.00
mixture days 0.33 1200.00 400.00
water gal 110.00 0.30 33.00
sk/labour days 0.33 550.00 183.33
Labour days 2.00 400.00 800.00
12233.33
20 Mixing concrete 1 2 5 (1") cube 13213.33
per cube
materials
cement cwts 14.00 485.00 6790.00
sand cube 0.60 4000.00 2400.00
metal 1 cube 0.90 2900.00 2610.00
mixture days 0.33 1200.00 400.00
water gal 100.00 0.30 30.00
sk/labour days 0.33 550.00 183.33
Labour days 2.00 400.00 800.00
13213.33
21 Mixing concrete 1 2 4 (") cube 14965.33
cement cwts 18.00 485.00 8730.00
sand cube 0.50 4000.00 2000.00
metal cube 0.88 3200.00 2816.00
mixture days 0.33 1200.00 400.00
water gal 120.00 0.30 36.00
sk/labour days 0.33 550.00 183.33
Labour days 2.00 400.00 800.00
14965.33
Construction-BSR 11
22 Mixing concrete 1 1 3 (") cube 16887.33
cement cwts 23.00 485.00 11155.00
sand cube 0.42 4000.00 1680.00
metal cube 0.82 3200.00 2624.00
mixture days 0.33 1200.00 400.00
water gal 150.00 0.30 45.00
sk/labour days 0.33 550.00 183.33
Labour days 2.00 400.00 800.00
16887.33
23 Mixing concrete 1 1 2 (") cube 21310.33
cement cwts 31.00 485.00 15035.00
sand cube 0.44 4000.00 1760.00
metal cube 0.96 3200.00 3072.00
mixture days 0.33 1200.00 400.00
water gal 200.00 0.30 60.00
sk/labour days 0.33 550.00 183.33
Labour days 2.00 400.00 800.00
21310.33
24 2" thick cement concrete 1 3 6(1) screed
in foundation at depts not exceeding 5'-0"
sq 2511.53
per square
materials
concrete 1 3 6 cube 0.17 12233.33 2038.89
Add 10% for wastage 203.89
sk/labour days 0.13 550.00 68.75
Labour days 0.50 400.00 200.00
2511.53
25 3" thick cement concrete 1 3 6(1) screed
in foundation at depts not exceeding 5'-0"
sq 3732.92
per square
materials
concrete 1 3 6 cube 0.25 12233.33 3058.33
Add 10% for wastage 305.83
sk/labour days 0.13 550.00 68.75
Labour days 0.75 400.00 300.00
3732.92
Construction-BSR 12
26 6" thick cement concrete 1 2 4() floor
(mass concrete)
sq 8691.80
per square
materials
concrete 1 2 4 cube 0.50 14965.33 7482.67
Add 5% for wastage 374.13
sk/labour days 0.50 550.00 275.00
Labour days 1.25 400.00 500.00
water gal 200.00 0.30 60.00
8691.80
27 Cement concrete 1 2 4() in 4"x6
column in ground floor
24895.33
consider 24 nos columns each 4"x6"x10'
ie .45 cubes
per .45 cubes
materials
concrete 1 2 4 cube 0.45 14965.33 6734.40
Add 10% for wastage
vibrator days 1.00 1500.00 1500.00
Labour
mason days 1.00 600.00 600.00
carpenter days 0.00 600.00 0.00
Labour days 3.00 400.00 1200.00
sk/labour(vibrator) days 1.00 550.00 550.00
curing
Jute Hessian sq.ft 105.00 3.50 367.50
water gal 170.00 0.30 51.00
Labour days 0.50 400.00 200.00
total for .45 cubes 11202.90
per cube 24895.33
Construction-BSR 13
28 Cement concrete in 6"x6" column in
ground floor 1 2 4()
cube 24680.89
consider 18 no columns 6"x6" each 10'
high. Ie 0.45cubes
per .45 cubes
materials
concrete 1 2 4 cube 0.45 14965.33 6734.40
Add 10% for wastage
vibrator days 1.00 1500.00 1500.00
Labour
mason days 1.00 600.00 600.00
carpenter
sk/labour(vibrator) days 1.00 550.00 550.00
Labour days 3.00 400.00 1200.00
curing
Jute Hessian sq.ft 80.00 3.50 280.00
water gal 140.00 0.30 42.00
Labour days 0.50 400.00 200.00
total for .45 cubes 11106.40
per cube 24680.89
29 Cement concrete in 9x9 column in ground
floor 1 2 4()
cube 24498.67
consider 8 no 9"x9" column each 10' high
.ie .45 cubes
per .45 cubes
materials
concrete 1 2 4 cube 0.45 14965.33 6734.40
vibrator days 1.00 1500.00 1500.00
Labour
mason days 1.00 600.00 600.00
sk/labour(vibrator) days 1.00 550.00 550.00
Labour days 3.00 400.00 1200.00
curing
Jute Hessian sq.ft 60.00 3.50 210.00
water gal 100.00 0.30 30.00
Labour days 0.50 400.00 200.00
total for .45 cubes 11024.40
per cube 24498.67
Construction-BSR 14
30 Cement concrete in 12x12 column in
ground floor 1 2 4 9()
cube 23405.33
consider 5 no. columns 12"x12" each 10'
high
per .50 cubes
materials
concrete 1 2 4 cube 0.50 14965.33 7482.67
Jute Hessian sq.ft 40.00 3.50 140.00
vibrator days 1.00 1500.00 1500.00
water gal 100.00 0.30 30.00
Labour
mason days 1.00 600.00 600.00
carpenter days 1.00 0.00 0.00
sk/labour(vibrator) days 1.00 550.00 550.00
Labour days 3.00 400.00 1200.00
curing
Labour days 0.50 400.00 200.00
total for .50 cubes 11702.67
rate per cube 23405.33
31 Cement concrete in 13x13 column in
ground floor(1 2 4 ())
cube 20970.24
consider 4no. Columns 13x13 each 10'
high . I.e. 0.51 cube
materials
concrete 1 2 4 cube 0.51 14965.33 7632.32
vibrator days 1.00 1500.00 1500.00
Labour
mason days 0.50 600.00 300.00
sk/labour(vibrator) days 0.50 550.00 275.00
Labour days 1.50 400.00 600.00
curing
Jute Hessian sq.ft 45.00 3.50 157.50
water gal 100.00 0.30 30.00
Labour days 0.50 400.00 200.00
total for 0.51 cube 10694.82
rate per cube 20970.24
Construction-BSR 15
32 Cement concrete 6x6 beam upto 1st floor
level (1 2 4 ())
cube 25153.11
consider 180 ft of beam 6"x6" . Ie. 0.45
cubes
per 0.45 cube
materials
concrete 1 2 4 cube 0.45 14965.33 6734.40
vibrator days 1.00 1500.00 1500.00
Labour
mason days 1.00 600.00 600.00
sk/labour(vibrator) days 1.00 550.00 550.00
Labour days 4.00 400.00 1600.00
curing
Jute Hessian sq.ft 23.00 3.50 80.50
water gal 180.00 0.30 54.00
Labour days 0.50 400.00 200.00
rate per 0.45 cube 11318.90
rate per cube 25153.11
33 Cement concrete 9x6 beam upto 1st floor
level
cube 25133.11
consider 120ft 9x6 beam . Ie. 0.45 cubes
per 0.45 cube
materials
concrete 1 2 4 cube 0.45 14965.33 6734.40
vibrator days 1.00 1500.00 1500.00
Labour
mason days 1.00 600.00 600.00
sk/labour(vibrator) days 1.00 550.00 550.00
Labour days 4.00 400.00 1600.00
curing
Jute Hessian sq.ft 23.00 3.50 80.50
water gal 150.00 0.30 45.00
Labour days 0.50 400.00 200.00
total for 0.45 cube 11309.90
rate per cube 25133.11
Construction-BSR 16
34 Cement concrete 9x9 beam upto 1st floor
level
cube 25400.89
consider 80ft length of 9x9 beam. Ie. 0.45
cubes
per 0.45 cube
materials
concrete 1 2 4 cube 0.45 14965.33 6734.40
vibrator days 1.00 1500.00 1500.00
Labour
mason days 1.00 600.00 600.00
sk/labour(vibrator) days 1.00 550.00 550.00
Labour days 4.00 400.00 1600.00
curing
Jute Hessian sq.ft 60.00 3.50 210.00
water gal 120.00 0.30 36.00
Labour days 0.50 400.00 200.00
total for 0.45 cube 11430.40
rate per cube 25400.89
35 5" thick R.C.C. floor slab in 1st floor sq 19879.33
consider 5" thick slab 10'x12'. Volume of
concrete 50.00 cu.ft
per 0.50 cube
materials
concrete 1 2 4 cube 0.50 14965.33 7482.67
vibrator days 0.50 1500.00 750.00
Labour
mason days 0.50 600.00 300.00
sk/labour(vibrator) days 0.50 550.00 275.00
Labour days 2.00 400.00 800.00
curing
Jute Hessian sq.ft 30.00 3.50 105.00
water gal 90.00 0.30 27.00
Labour days 0.50 400.00 200.00
total for 0.50 cube 9939.67
rate per cube 19879.33
Construction-BSR 17
36 6" thick R.C.C. floor slab in 1st floor sq 19844.33
consider 10'x10' panel=50cu.ft
materials
concrete 1 2 4 cube 0.50 14965.33 7482.67
vibrator days 0.50 1500.00 750.00
Labour
mason days 0.50 600.00 300.00
sk/labour(vibrator) days 0.50 550.00 275.00
Labour days 2.00 400.00 800.00
curing
Jute Hessian sq.ft 25.00 3.50 87.50
water gal 90.00 0.30 27.00
Labour days 0.50 400.00 200.00
total for 0.50 cube 9922.17
rate per cube 19844.33
37 Cement concrete in 4"x6 lintols in ground
floor
l.ft 48.25
consider 240 l.ft , ie. 45 cu.ft
materials
concrete 1 2 4 cube 0.45 14965.33 6734.40
vibrator days 1.00 1500.00 1500.00
Labour
mason days 1.00 600.00 600.00
sk/labour(vibrator) days 1.00 550.00 550.00
Labour days 4.00 400.00 1600.00
curing
Jute Hessian sq.ft 105.00 3.50 367.50
water gal 90.00 0.30 27.00
Labour days 0.50 400.00 200.00
total per 240.0 l.ft 11578.90
rate per l.ft 48.25
Construction-BSR 18
38 Cement concrete in 9x9 lintols in ground
floor
l.ft 142.77
consider 80 ft of liintol , ie. 45 cu.ft
concrete
materials
concrete 1 2 4 cube 0.45 14965.33 6734.40
vibrator days 1.00 1500.00 1500.00
Labour
mason days 1.00 600.00 600.00
sk/labour(vibrator) days 1.00 550.00 550.00
Labour days 4.00 400.00 1600.00
curing
Jute Hessian sq.ft 60.00 3.50 210.00
water gal 90.00 0.30 27.00
Labour days 0.50 400.00 200.00
total per 80 ft 11421.40
per ft 142.77
39 Cement concrete in 9x12 lintols in ground
floor
l.ft 190.07
consider 60 ft of liintol , ie. 45 cu.ft
concrete
materials
concrete 1 2 4 cube 0.45 14965.33 6734.40
vibrator days 1.00 1500.00 1500.00
Labour
mason days 1.00 600.00 600.00
sk/labour(vibrator) days 1.00 550.00 550.00
Labour days 4.00 400.00 1600.00
curing
Jute Hessian sq.ft 55.00 3.50 192.50
water gal 90.00 0.30 27.00
Labour days 0.50 400.00 200.00
total per 60 ft 11403.90
per ft 190.07
Construction-BSR 19
40 Cement concrete in12x15 lintols in ground
floor
l.ft 315.32
consider 36 ft of liintol , ie. 45 cu.ft
concrete
materials
concrete cube 0.45 14965.33 6734.40
vibrator days 1.00 1500.00 1500.00
Labour 0.00
mason days 1.00 600.00 600.00
sk/labour(vibrator) days 1.00 550.00 550.00
Labour days 4.00 400.00 1600.00
curing
Jute Hessian sq.ft 40.00 3.50 140.00
water gal 90.00 0.30 27.00
Labour days 0.50 400.00 200.00
total per 36 ft 11351.40
per ft 315.32
Construction-BSR 20
41 Sawn timber formwork to 9x9 cement
concrete column in ground floor
sq. 4588.95
per sq ft
consider column length of 5ft, contact area-
15.0 sq ft
a) making mould
1) materials
1" tk , class2, timber sq.ft 18.15 45.00 816.75
2x2 class 2 timber in yokes l.ft 17.10 12.00 205.20
2x1 class2 timber battens l.ft 16.12 3.50 56.42
wire nails lbs 1.50 50.00 75.00
2) fabricating
carpenter days 0.50 0.00 0.00
Labour days 0.50 400.00 200.00
total cost for 4 use 1353.37
per use 338.34
b) assembling
materials
bolt 16mm, 18" long ( 20 use) nos 12.00 75.00 45.00
mould oil lit 0.50 35.00 17.50
props 2x4 ( 10 use) l.ft 35.00 25.00 87.50
Labour
carpenter days 0.25 0.00 0.00
Labour days 0.25 400.00 100.00
cost of assembling per use 250.00
c) dismantling cleaning and repairing (per
use)
carpenter days 0.25 0.00 0.00
Labour days 0.25 400.00 100.00
cost of assembling per use 100.00
total cost for per use(15.0 sq.ft) ie. (a+b+c) 688.34
rate per sq 4588.95
Construction-BSR 21
42 Sawn timber formwork for concrete beam in
ground floor
sq 7202.76
consider 9x12 beam of 20ft long . Contact
area 55sq.ft
a) making mould
timber planks 1" class 2 sq.ft 60.00 45.00 2700.00
timber battens 2x1 class 2 l.ft 24.00 3.50 84.00
timber ledgers 2x2 class 2 l.ft 45.00 12.00 540.00
timber bearers 4x2, class 2 l.ft 30.00 35.00 1050.00
wire nails lbs 2.00 50.00 100.00
Labour
carpenter days 1.50 0.00 0.00
Labour days 2.00 400.00 800.00
total cost of mould 5274.00
assuming 4 use, cost per use 1318.50
Add 10% for repairs 131.85
cost per use 1450.35
b) assembling
materials
4x2 verical props class 2 l.ft 110.00 35.00 3850.00
bracing 2x2, class 2 l.ft 80.00 12.00 960.00
base plate 1" timber, class 2 sq.ft 6.00 45.00 270.00
wedges nos 22.00 6.00 132.00
5212.00
cost of materials for assembling . Assuming
an average of 6 uses . Cost of materials per
use
868.67
c) labour and sundries
Labour
carpenter days 1.00 0.00 0.00
Labour days 2.00 400.00 800.00
mould oil gal 0.50 35.00 17.50
wirenail lbs 0.50 50.00 25.00
cost per use 842.50
d) dismantling and cleaning
Labour
carpenter days 0.50 0.00 0.00
Labour days 2.00 400.00 800.00
cost of labour for dismantling per use 800.00
total cost for making the mould assembling
aligning dismantling and cleaning for 55 sq ft
per use(a+b+c+d)
3961.52
rate per sq 7202.76
Construction-BSR 22
43 Sawn timber formwork for underside of
first floor slab
sq 5861.00
consider a slab of dimensions 20ftx10ft.
Contact area = 2.0 sq
a) making panels
materials
timber planks 1", class 2 sq.ft 220.00 45.00 9900.00
timber runners 4x2, class 2 cu.ft 121.00 35.00 4235.00
wire nails lbs 4.00 50.00 200.00
Labour
carpenter days 3.00 0.00 0.00
Labour days 3.00 400.00 1200.00
total cost of making panels 15535.00
assuming 4 uses cost per use 3883.75
add 20% for repairs 776.75
total cost of panels per use 4660.50
b) assembling
materials
4x2 vertical timber props l.ft 690.00 35.00 24150.00
timber 2x2 l.ft 66.00 12.00 792.00
timber wedges nos 122.00 6.00 732.00
timber base plates sq.ft 33.00 45.00 1485.00
cost of materials for assembling 27159.00
assuming 6 uses , cost of materials for
assembling per use
4526.50
c) labour and sundries for assembling
carpenter days 1.00 0.00 0.00
Labour days 4.00 400.00 1600.00
mould oil gal 1.00 35.00 35.00
wire nails lbs 2.00 50.00 100.00
total cost per use for assembling 1735.00
d) dismantling and cleaning
Labour
carpenter days 0.50 0.00 0.00
Labour days 2.00 400.00 800.00
total cost for dismantling per use 800.00
total cost for assembling per use for 2.0 sq
.(a+b+c+d)
11722.00
rate per sq 5861.00
Construction-BSR 23
44 Tor steel reinforcement to lintols slab
beams or columns bent to shape laid in
position and tied with G I wire as directed
cwts 3920.63
materials
Tor steel including transport to site cwts 1.00 2500.00 2500.00
wastage 15% 375.00
binding wire 16 BWG lbs 1.50 35.00 52.50
add 1.5% of steel cost for spacers or chairs 43.13
blacksmith days 1.00 550.00 550.00
Labour days 1.00 400.00 400.00
3920.63
45 Brick work in cement sand 1:5 in
foundation upto D P C
cube 10648.00
per cube
materials
bricks nos 1450.00 2.80 4060.00
wastage 5% 203.00
cement cwts 4.00 485.00 1940.00
sand cube 0.25 4000.00 1000.00
water gal 150.00 0.30 45.00
Labour
mason days 3.00 600.00 1800.00
Labour days 4.00 400.00 1600.00
10648.00
46 Brick work in cement sand 1:8 in
foundation upto D P C
cube 10339.67
per cube
materials
bricks nos 1450.00 2.80 4060.00
wastage 5% 203.00
cement cwts 2.33 485.00 1131.67
sand cube 0.38 4000.00 1500.00
water gal 150.00 0.30 45.00
Labour
mason days 3.00 600.00 1800.00
Labour days 4.00 400.00 1600.00
10339.67
Construction-BSR 24
47 Brick work in cement sand 1:5 in 4 thick
walls in ground floor
sq 4447.50
per sq
materials
bricks nos 550.00 2.80 1540.00
wastage 5% 77.00
cement cwts 1.30 485.00 630.50
sand cube 0.10 4000.00 400.00
water gal 50.00 0.30 15.00
Labour
mason days 1.50 600.00 900.00
Labour days 2.00 400.00 800.00
scaffolding 5% 85.00
4447.50
48 9" thick brick wall cement sand 1:5 in
ground floor
sq 8429.60
per sq
materials
bricks nos 1090.00 2.80 3052.00
wastage 5% 152.60
cement cwts 3.00 485.00 1455.00
sand cube 0.20 4000.00 800.00
water gal 115.00 0.30 34.50
Labour
mason days 2.25 600.00 1350.00
Labour days 3.75 400.00 1500.00
scaffolding 3% 85.50
8429.60
49 Brick work 13 thick in cement sand 1:5
in superstructure in ground floor
sq 12611.70
per sq
materials
bricks nos 1630.00 2.80 4564.00
wastage 5% 228.20
cement cwts 4.50 485.00 2182.50
sand cube 0.30 4000.00 1200.00
water gal 170.00 0.30 51.00
Labour
mason days 3.50 600.00 2100.00
Labour days 5.50 400.00 2200.00
scaffolding 2% 86.00
12611.70
Construction-BSR 25
50 9" thick brick wall cement sand 1:8 in
superstructure in ground floor
sq 7914.35
per sq(.75cubes)
materials
bricks nos 1090.00 2.80 3052.00
wastage 5% 152.60
cement cwts 1.75 485.00 848.75
sand cube 0.30 4000.00 1200.00
water gal 115.00 0.30 34.50
Labour
mason days 2.25 600.00 1350.00
Labour days 3.00 400.00 1200.00
scaffolding 3% 76.50
7914.35
51 4 thick brick wall (wirecut) in cement
sand 1:5 in ground floor
sq 7604.75
(facing to brick work measured separately)
per sq
materials
wire cut bricks nos 550.00 8.75 4812.50
wastage 2% 96.25
cement cwts 1.20 485.00 582.00
sand cube 0.08 4000.00 320.00
water gal 30.00 0.30 9.00
Labour
mason days 1.50 600.00 900.00
Labour days 2.00 400.00 800.00
scaffolding 5% 85.00
7604.75
52 9" thick in cement and sand 1:5 with wire
cut brick
sq 14726.00
(facing to brick work measured separately)
per sq
materials
wire cut bricks nos 1080.00 8.75 9450.00
wastage 4% 378.00
cement cwts 2.50 485.00 1212.50
sand cube 0.18 4000.00 720.00
water gal 100.00 0.30 30.00
Labour
mason days 2.25 600.00 1350.00
Labour days 3.75 400.00 1500.00
scaffolding 3% 85.50
14726.00
Construction-BSR 26
53 13 thick brick wall (wire cut) in cement
sand 1:5 in ground floor
cube 22484.25
(facing to brick work measured separately)
per sq
materials
wire cut bricks nos 1630.00 8.75 14262.50
wastage 2% 285.25
cement cwts 4.50 485.00 2182.50
sand cube 0.30 4000.00 1200.00
water gal 50.00 0.30 15.00
Labour
mason days 3.75 600.00 2250.00
Labour days 5.50 400.00 2200.00
scaffolding 2% 89.00
22484.25
54 Extra over for facing including raised
pointing 1/8" thick in cement sand 1:1
mixture in ground floor
sq 4705.50
per sq
materials
cement cwts 0.50 485.00 242.50
sand cube 0.01 4000.00 40.00
acid gal 0.10 200.00 20.00
water gal 10.00 0.30 3.00
Labour
mason days 5.00 600.00 3000.00
Labour days 3.50 400.00 1400.00
4705.50
55 3" thick floor paved in cement mortor 2:5
in ground floor
sq 3765.50
per sq
materials
bricks nos 350.00 2.80 980.00
cement cwts 1.20 485.00 582.00
sand cube 0.11 4000.00 440.00
water gal 45.00 0.30 13.50
Labour
mason days 1.25 600.00 750.00
Labour days 2.50 400.00 1000.00
3765.50
Construction-BSR 27
56 Steps 1'-1"x0'-6" in brick in cement and
sand 1:5 with " thick cement and sand 1:2
rendering including necessary excavation
l.ft 128.30
per 10 l.ft
materials
bricks nos 120.00 2.80 336.00
cement cwts 0.50 485.00 242.50
sand cube 0.05 4000.00 200.00
water gal 15.00 0.30 4.50
Labour
mason days 0.50 600.00 300.00
Labour days 0.50 400.00 200.00
rate per 10 l.ft 1283.00
rate per l.ft 128.30
57 Brick drains in cement sand 1:5 , 9" wide
and 6-9" average depth including cement
rendering " thick 1:2 to exposed feces
with 1'-6" ramp including necessary
excavation
l.ft 223.60
per 10 l.ft
materials
bricks nos 140.00 2.80 392.00
cement cwts 0.80 485.00 388.00
sand cube 0.05 4000.00 200.00
water gal 20.00 0.30 6.00
Labour
mason days 1.25 600.00 750.00
Labour days 1.25 400.00 500.00
rate per 10 l.ft 2236.00
rate per l.ft 223.60
Construction-BSR 28
58 Brick drains in cement sand 1:5 , 9" wide
and 6-9" average depth including cement
rendering " thick 1:2 to exposed feces
with 1'-6" without ramp including
necessary excavation
l.ft 191.20
per 10 l.ft
materials
bricks nos 110.00 2.80 308.00
cement cwts 0.70 485.00 339.50
sand cube 0.04 4000.00 160.00
water gal 15.00 0.30 4.50
Labour
mason days 1.00 600.00 600.00
Labour days 1.25 400.00 500.00
rate per 10 l.ft 1912.00
rate per l.ft 191.20
59 8" thick hollow blocks in cement and sand
mortor 1:5 in ground floor (cavities
unfilled)
sq 7852.75
per sq
10x10 area ( size of each block 16x8x8)
materials
hollow cement block 16x8x8 nos 112.00 45.00 5040.00
wastage 5% 252.00
cement cwts 0.75 485.00 363.75
sand cube 0.06 4000.00 240.00
Labour
mason days 1.50 600.00 900.00
Labour days 2.50 400.00 1000.00
scaffolding 3% 57.00
7852.75
60 4" thick hollow block masonry in cement
and sand mortor 1"5 with cavities unfilled
sq 5312.00
per sq
10x10 area ( size of each block 16x8x4)
materials
cement block 16x8x4 nos 112.00 30.00 3360.00
wastage 5% 168.00
cement cwts 0.40 485.00 194.00
sand cube 0.03 4000.00 120.00
Labour
mason days 1.00 600.00 600.00
Labour days 2.00 400.00 800.00
scaffolding 5% 70.00
5312.00
Construction-BSR 29
61 Random rubble masonry in cement mortor
1:5 in foundation
cube 10600.00
per cube (14" tk)
materials
rubble 6-9 cube 1.30 1650.00 2145.00
cement cwts 5.00 485.00 2425.00
sand cube 0.30 4000.00 1200.00
water gal 100.00 0.30 30.00
Labour
mason days 4.00 600.00 2400.00
Labour days 6.00 400.00 2400.00
10600.00
62 Random rubble masonry in cement mortor
1:5 in superstructure
cube 11465.00
per cube (14" tk)
materials
rubble 6-9 cube 1.30 1650.00 2145.00
cement cwts 5.00 485.00 2425.00
sand cube 0.30 4000.00 1200.00
water gal 100.00 0.30 30.00
Labour
mason days 4.50 600.00 2700.00
Labour days 7.00 400.00 2800.00
scaffolding 3% 165.00
11465.00
63 Pressed floor tiles bedded in cement
mortor 1:2 and pointing in neat cement in
ground floor
sq.ft 8723.75
per sq
materials
pressed tile 8x8 nos 225.00 15.00 3375.00
wastage 5% 168.75
cement cwts 1.25 485.00 606.25
sand cube 0.07 4000.00 280.00
wax polish lb 0.25 125.00 31.25
coloured pigment lb 0.25 150.00 37.50
cotton waste lb 2.00 12.50 25.00
Labour
mason days 4.00 600.00 2400.00
Labour days 4.00 400.00 1600.00
Labour for polishing days 0.50 400.00 200.00
8723.75
64 Glazed tile fixed to walls including bedding
in cement motor 1:2 and raking in ground
floor.(specials measured separately)
sq.ft 12387.50
per sq
Construction-BSR 30
materials
glazed tile 6x6 nos 400.00 15.00 6000.00
wastage 10% 600.00
cement cwts 2.50 485.00 1212.50
sand cube 0.11 4000.00 440.00
white cement kg 1.00 35.00 35.00
Labour
mason days 4.00 600.00 2400.00
Labour days 4.00 400.00 1600.00
Labour for cleaning days 0.25 400.00 100.00
12387.50
65 Terrazzo floor tiles on " thick cement and
sand 1:2 in ground floor
sq.ft 12948.75
per sq
materials
terrazzo tiles 12x12 nos 100.00 75.00 7500.00
wastage 5% 375.00
cement cwts 1.25 485.00 606.25
sand cube 0.07 4000.00 280.00
coloured pigment lb 2.00 150.00 300.00
wax polish lb 0.50 125.00 62.50
cotton waste lb 2.00 12.50 25.00
Labour
mason days 4.00 600.00 2400.00
Labour days 3.00 400.00 1200.00
Labour for polishing days 0.50 400.00 200.00
12948.75
Construction-BSR 31
66 Timber frame work for calicut pattern tile
hip roof in single storey building consisting
of wall plate beam ridge plate rafters etc..
(Preservative treatment to be measured
separately)
sq 9383.33
per 6.0 sq
materials
Timber class 1 cu.ft 34.00 1100.00 37400.00
wastage 10% 3740.00
reeper 2x1 class 1 l.ft 660.00 10.00 6600.00
wastage 10% 660.00
wire nail 6" long lb 8.00 50.00 400.00
wire nail 2" long lb 2.00 50.00 100.00
Labour
carpenter days 7.00 600.00 4200.00
Labour days 8.00 400.00 3200.00
total for 6 sq 56300.00
per sq 9383.33
67 Roof covering with calicut pattern clay tiles
in single storeyed building
sq 24375.00
(timber frame work and ridge covering
measured separately)
per 6.0 sq
materials
clay tile nos 750.00 11.00 8250.00
Labour
carpenter days 3.00 600.00 1800.00
Labour days 3.00 400.00 1200.00
total for 6 sq 11250.00
per sq 1875.00
68 Timber frame work for corrugated asbestos
asheet roof in single storeyed building
sq 5203.47
per 3.6 sq
materials
timber purlin cu.ft 13.25 1100.00 14575.00
wastage 10% 1457.50
Labour
carpenter days 2.50 600.00 1500.00
Labour days 3.00 400.00 1200.00
per 3.6 sq 18732.50
per sq 5203.47
Construction-BSR 32
69 Roof covering with corrugated asbestos
sheet (timber frame work and ridge
covering measured separately )
sq 3492.22
per 3.6 sq
materials
asbestos corrugated sheet sq.ft 420.00 26.00 10920.00
roofing screws and washers nos 72.00 3.50 252.00
Labour
carpenter days 1.00 600.00 600.00
Labour days 2.00 400.00 800.00
per 3.6 sq 12572.00
per sq 3492.22
70 One layer half round clay tiles over
corrugated asbestos roof covering
sq 4050.00
per sq
materials
half round clay tile sq 650.00 5.00 3250.00
Labour days 2.00 400.00 800.00
4050.00
71 Asbestos close fittings ridging fixed
complete with roofing screws or bolts
(Hook)
l.ft 97.37
per 13'4" length
materials
ridges3'8"long pair 4.00 250.00 1000.00
roofing screws or bolt nos 16.00 3.00 48.00
carpenter days 0.25 600.00 150.00
Labour days 0.25 400.00 100.00
per 13'4" length 1298.00
per l.ft 97.37
72 Ridging covering with calicut pattern ridge
tiles bedded in cement lime mortor 1:1:4
l.ft 125.68
per 12 l.ft ridging
materials
ridge tile nos 9.00 70.00 630.00
cement cwts 0.33 800.00 266.67
sand cube 0.02 7200.00 144.00
slaked lime lbs 15.00 4.50 67.50
colouring powder lb 0.50 200.00 100.00
mason days 0.25 750.00 187.50
Labour days 0.25 450.00 112.50
per 12 l.ft ridging 1508.17
per l.ft 125.68
73 x9" high valance board fixed with brass
screws to ends of rafters ( for tile roofing)
l.ft 120.75
per 100 l.ft
Construction-BSR 33
materials
timber planks 1", class 1 sq.ft 75.00 110.00 8250.00
wastage 5% 412.50
brass screws 1" nos 70.00 3.75 262.50
Labour
carpenter days 3.00 600.00 1800.00
Labour days 3.00 400.00 1200.00
scaffolding 5% 150.00
total per 100 l.ft 12075.00
rate per ft 120.75
74 x9" high barge board fixed with brass
screws at 2'-0" centres to sides of rafters
l.ft 120.00
timber planks 1", class 1 sq.ft 75.00 110.00 8250.00
wastage 5% 412.50
brass screws 1" nos 50.00 3.75 187.50
Labour
carpenter days 3.00 600.00 1800.00
Labour days 3.00 400.00 1200.00
scaffolding 5% 150.00
total per 100 l.ft 12000.00
rate per ft 120.00
Construction-BSR 34
75 18 BWG (1.2mm) galvanised iron sheet
valley gutter 3'-0" girth over all once bent
with end laps not less than 9" width
including " tongued and grooved planks
laid to slope and profile on timber members
l.ft 741.75
consider 15 ft
materials
G.I.Sheet 8x4 nos 2.00 2200.00 4400.00
wood preservative gal 0.25 115.00 28.75
cement cwts 0.10 800.00 80.00
slaked lime cwts 0.05 300.00 15.00
sand cube 0.01 4000.00 40.00
planks " sq.ft 50.00 90.00 4500.00
wire nail 1 lb 2.00 50.00 100.00
labour
fixing boarding and applying wood
preservative
carpenter days 1.00 600.00 600.00
Labour days 1.00 400.00 400.00
making and fixing G.I.sheet
tinker days 0.50 325.00 162.50
mason days 0.50 600.00 300.00
building sides
mason days 0.50 600.00 300.00
Labour days 0.50 400.00 200.00
total for 15 ft 11126.25
per l.ft 741.75
Construction-BSR 35
76 18 BWG (1.2mm) galvanised iron flashing
1'-6" girth overall 3 times bent with end
laps not less than 6" lead soldered turned
and tucked up to not less than 6" into chase
out in wall and pointed in cement mortor
1:2 lower end dressed over roof covering not
less than 1'-0" wide
l.ft 204.50
consider 15 ft
materials
G.I.Sheet 8x4 nos 1.00 2200.00 2200.00
cement cwts 0.05 800.00 40.00
sand cube 0.01 4000.00 40.00
soldering lead lb 1.00 250.00 250.00
Labour
cutting bending soldering and fixing
tinker days 0.50 325.00 162.50
mason days 0.13 600.00 75.00
Labour days 0.75 400.00 300.00
total for 15 ft 3067.50
per l.ft 204.50
77 Timber framework for 4'-0"x4'-0" flat
asbestos ceiling (sheet measured separately
) comprising of 4x2 joists and 2x2 bearers
in class 1 timber
sq 6008.20
per 1.95 sq
materials
Timber cl 1 cu.ft 8.00 1100.00 8800.00
nails 2" lb 1.00 50.00 50.00
fibre/plastic plug nos 26.00 2.00 52.00
cement cwts 0.22 800.00 178.57
sand cube 0.02 4000.00 80.00
brush 2"( use) nos 1.00 41.75 41.75
tarnap gal 0.33 125.00 41.67
Labour
carpenter days 2.50 600.00 1500.00
mason days 0.50 600.00 300.00
Labour days 1.50 400.00 600.00
scaffolding 3% 72.00
total for 1.95 sq 11715.99
per sq 6008.20
78 Horizontal ceiling lining using 4'-0"x4'-0"
flat asbestos cement sheets fixed with and
including beading and cove mouldings on
timber frame work.(timber frame work and
painting measured separately)
sq 4253.08
Construction-BSR 36
per 1.95 sq
materials
asbestos flat sheet sq.ft 210.00 15.00 3150.00
cove moulding halmilla 2x2 l.ft 60.00 35.00 2100.00
beading 1x halmilla l.ft 125.00 10.00 1250.00
clout nails" lbs 0.25 50.00 12.50
brass screws 1 nos 8.00 3.75 30.00
labour
carpenter days 1.50 600.00 900.00
labour days 2.00 400.00 800.00
scaffolding 3% 51.00
per 1.95 sq 8293.50
per sq 4253.08
79 " thick tongued and grooved lunumidella
ceiling boards fixed horizontal on 4x2 class
1 timber joists at 2'-0" centres with 1"
brass nails
sq 9545.35
consider room 15'0"x13'0" (1.95sq)
materials
timber joists 4x2 (class 1) l.ft 115.00 55.00 6325.00
lunumidella ceiling planks (x6) sq.ft 215.00 27.00 5805.00
cement cwts 0.03 800.00 21.43
sand cube 0.04 4000.00 160.00
brass nails 1 kg 4.00 100.00 400.00
Labour
making holes, fixing joists, and making
good
carpenter days 1.00 600.00 600.00
mason days 1.00 600.00 600.00
Labour days 3.00 400.00 1200.00
fixing ceiling board
carpenter days 3.00 600.00 1800.00
Labour days 4.00 400.00 1600.00
scaffolding 3% 102.00
total for 1.95 sq 18613.43
per sq 9545.35
80 "x6" wide tongued and grooved
lunumidella ceiling boards fixed to
underside of roof rafters (existing) with 1"
brass nails including levelling with timber
strips where necessary
sq 6125.56
consider room 15'0"x12'0" (1.80sq)
materials
lunumidella ceiling planks sq.ft 220.00 27.00 5940.00
timber strips2x l.ft 40.00 4.00 160.00
wire nail kg 2.00 100.00 200.00
brass nails 1 kg 4.00 100.00 400.00
Construction-BSR 37
Labour
carpenter days 3.00 600.00 1800.00
Labour days 6.00 400.00 2400.00
scaffolding 3% 126.00
total for 1.80 sq 11026.00
per sq 6125.56
81 Door single hung 3'3"x7'0" high overall
with frame having 1" thick sash and
3"x2' timber frame.(glazing
ironmongery and painting measured
separately) class 1 timber
sq.ft 346.46
per 22.75 sq.ft (3'3"x7'0")
materials
frame
timber 4x3 cl I cu.ft 1.50 1100.00 1650.00
spur stone nos 2.00 25.00 50.00
fibre/plastic plug with 4" brass screw nos 6.00 7.00 42.00
dowels M.S. 5/8" nos 2.00 15.00 30.00
sash
timber planks 1 sq.ft 14.00 140.00 1960.00
timber planks 1" sq.ft 5.00 110.00 550.00
Labour
carpenter days 5.00 600.00 3000.00
Labour days 1.50 400.00 600.00
total for 22.75 sq 7882.00
per sq 346.46
Construction-BSR 38
82 Door glazed and panelled double hung
4'x7' high overall with frame including 1'
thick sash and 3x2 frame.(glazing
ironmongery and painting measured
separately)
sq.ft 295.19
per 28.00 sq.ft= 4x7
materials
frame
timber 4x3 cl I cu.ft 0.67 1100.00 733.33
spur stone nos 2.00 25.00 50.00
fibre/plastic plug with 4" brass screw nos 6.00 7.00 42.00
dowels M.S. 5/8" nos 2.00 15.00 30.00
sash
timber planks 1 sq.ft 16.00 140.00 2240.00
timber planks 1" sq.ft 7.00 110.00 770.00
Labour
carpenter days 6.00 600.00 3600.00
Labour days 2.00 400.00 800.00
per 28.00 sq.ft 8265.33
per sq 295.19
83 Plywood door single hung 3'1"x6' 11"
overall with frame having 1" thick sash
and 3"x2" frame.(ironmongery and
painting measured separately)
sq.ft 198.71
per 21.75 sq.ft (3'1"x6'11")
materials
frame
timber 4x3 cl I cu.ft 1.80 1100.00 1980.00
spur stone nos 2.00 25.00 50.00
fibre/plastic plug with 4" brass screw nos 6.00 7.00 42.00
sash
plywood sash 6'9"x2'9" nos 1.00 1400.00 1400.00
Labour
carpenter days 0.75 600.00 450.00
Labour days 0.38 400.00 150.00
mason(fixing frame) days 0.25 600.00 150.00
Labour(fixing frame) days 0.25 400.00 100.00
per 21.75 sq.ft 4322.00
per sq.ft 198.71
Construction-BSR 39
84 Door ledged braced and battened single
hung2'6"x6'6" overall with frame having
7/8" thick tongued and grooved planks and
3"x2" frame (ironmongery and
painting measured separately)
sq.ft 394.28
per 16.25 sq.ft
materials
frame
timber 4x3 cl I cu.ft 1.70 1100.00 1870.00
spur stone nos 2.00 25.00 50.00
fibre/plastic plug with 4" brass screw nos 6.00 7.00 42.00
dowels M.S. 5/8" nos 2.00 15.00 30.00
sash
timber planks 1" sq.ft 21.00 110.00 2310.00
brass screw 1 doz 3.00 35.00 105.00
Labour
carpenter days 2.25 600.00 1350.00
Labour days 1.00 400.00 400.00
mason for fixing frame days 0.25 600.00 150.00
Labour for fixing frame days 0.25 400.00 100.00
per 16.25 sq.ft 6407.00
per sq.ft 394.28
85 Windows glazed 7'x4' high overall with
frame comprising 3 nos openable sashes
and 3"x2" frame and mullions. (glazing
ironmongery and painting measured
separately)
sq.ft 368.32
per window 7x4, sashes= 28 sq.ft
materials
frame
timber 4x3 cl I cu.ft 3.20 1100.00 3520.00
fibre/plastic plug with 4" brass screw nos 4.00 7.00 28.00
sash
timber sash 3x1 sq.ft 9.25 180.00 1665.00
labour
carpenter days 6.00 600.00 3600.00
Labour days 2.50 400.00 1000.00
mason for fixing frame days 0.50 600.00 300.00
Labour for fixing frame days 0.50 400.00 200.00
per 28 sq ft 10313.00
per sq.ft 368.32
Construction-BSR 40
86 1/8" clear sheet panes exceeding 1' but not
exceeding 4 sq.ft cut and fixed with timber
beading to doors and windows
sq.ft 61.11
consider sash 3'0"x4'0" high with 3"x1"
style and 4nos glass panes
per 9.0 sq.ft
materials
glass pane 1/8" sq.ft 9.00 30.00 270.00
beading x l.ft 30.00 1.50 45.00
brass panel pin doz 4.00 5.00 20.00
Labour
glazier sq.ft 0.50 30.00 15.00
Labour days 0.50 400.00 200.00
per 9.0 sq.ft 550.00
per sq.ft 61.11
87 But hinges 5x2 brass pair 256.50
per 1pairs
But hinges 5x2 brass nos 1.50 87.50 131.25
brass screws doz 2.00 1.75 3.50
carpenter days 0.25 600.00 150.00
Labour days 0.25 400.00 100.00
per 1pairs 384.75
per pair 256.50
88 Tee hinges 6"x12" pair 302.63
per pair
Tee hinges 6"x12" pair 1.00 50.00 50.00
iron screws doz 1.50 1.75 2.63
carpenter days 0.25 600.00 150.00
Labour days 0.25 400.00 100.00
302.63
89 Rim lock nos 550.00
Rim lock with screws nos 1.00 300.00 300.00
carpenter days 0.25 600.00 150.00
Labour days 0.25 400.00 100.00
550.00
90 Mortice lock nos 1100.00
Mortice lock with screws nos 1.00 600.00 600.00
carpenter days 0.50 600.00 300.00
Labour days 0.50 400.00 200.00
1100.00
91 Casement stays nos 430.00
per 4 nos
Casement stays nos 4.00 40.00 160.00
brass screws nos 16.00 1.25 20.00
carpenter days 0.25 600.00 150.00
Labour days 0.25 400.00 100.00
430.00
Construction-BSR 41
92 Door closer(hydraulic) nos 1901.17
Door closer nos 1.00 1650.00 1650.00
brass screws nos 8.00 0.15 1.17
carpenter days 0.25 600.00 150.00
Labour days 0.25 400.00 100.00
1901.17
93 Tower / skeleton brass bolts nos 612.50
Tower / skeleton brass bolts nos 1.00 100.00 100.00
brass screws nos 10.00 1.25 12.50
carpenter days 0.50 600.00 300.00
Labour days 0.50 400.00 200.00
612.50
94 Brass bolt 4" nos 555.00
Brass bolt 4" nos 1.00 45.00 45.00
brass screws nos 8.00 1.25 10.00
carpenter days 0.50 600.00 300.00
Labour days 0.50 400.00 200.00
555.00
95 Casement fasteners nos 115.00
per 6 nos
Casement fasteners nos 4.00 40.00 160.00
brass screws nos 24.00 1.25 30.00
carpenter days 0.50 600.00 300.00
Labour days 0.50 400.00 200.00
per 6 nos 690.00
per no 115.00
96 Spring loaded fanlight catches nos 138.33
per 6 nos
fanlight catches nos 6.00 50.00 300.00
brass screws doz 2.00 15.00 30.00
carpenter days 0.50 600.00 300.00
Labour days 0.50 400.00 200.00
per 6 nos 830.00
per no 138.33
97 Draw rings nos 38.33
per 6 nos
Draw rings nos 6.00 15.00 90.00
brass screws doz 1.00 15.00 15.00
carpenter days 0.13 600.00 75.00
Labour days 0.13 400.00 50.00
per 6 nos 230.00
per no 38.33
98 " thick thick DPC in cement sand 1:2
finished with 2 coats hot tar and blinded
with sand
sq 3426.75
cement cwts 2.25 485.00 1091.25
sand cube 0.11 4000.00 440.00
Construction-BSR 42
bitumen gal 1.50 75.00 112.50
firewood lbs 10.00 3.00 30.00
water gal 10.00 0.30 3.00
mason days 1.25 600.00 750.00
labour days 2.50 400.00 1000.00
3426.75
99 5/8" thick plastering to wall in lime and
sand 2:5 including floating with lime putty
sq 2032.19
slaked lime cwts 1.30 300.00 390.00
sand cube 0.07 4000.00 280.00
water gal 10.00 0.30 3.00
mason days 1.00 600.00 600.00
Labour days 1.75 400.00 700.00
scaffolding 3% 59.19
2032.19
100 5/8" thick plastering to wall in cement sand
1:3 including cement floating
sq 2185.66
cement cwts 1.40 485.00 679.00
sand cube 0.06 4000.00 240.00
water gal 10.00 0.30 3.00
mason days 1.00 600.00 600.00
Labour days 1.50 400.00 600.00
scaffolding 3% 63.66
2185.66
101 3/8" thick plastering to soffit slab in
cement and sand 1:3 including floating
with lime putty
sq 3182.50
cement cwts 0.80 485.00 388.00
slaked lime cwts 0.06 300.00 18.00
sand cube 0.05 4000.00 200.00
water gal 5.00 0.30 1.50
mason days 2.50 600.00 1500.00
Labour days 2.50 400.00 1000.00
scaffolding 3% 75.00
3182.50
Construction-BSR 43
102 3/8" thick plastering to sides and soffit of
beam in cement and sand 1:3 includuing
floating with lime putty
sq 2603.33
cement cwts 0.80 485.00 388.00
slaked lime cwts 0.06 300.00 18.00
sand cube 0.03 4000.00 120.00
water gal 5.00 0.30 1.50
mason days 2.00 600.00 1200.00
Labour days 2.00 400.00 800.00
scaffolding 3% 75.83
2603.33
103 5/8" thick to wall in lime cement and sand
1:1:5 finished semi rough with wooden
float
sq 1947.73
cement cwts 0.80 485.00 388.00
slaked lime cwts 0.40 300.00 120.00
sand cube 0.07 4000.00 280.00
water gal 10.00 0.30 3.00
mason days 1.00 600.00 600.00
Labour days 1.25 400.00 500.00
scaffolding 3% 56.73
1947.73
104 5/8" thick plastering to wall in lime cement
and sand 1:1:5 finished smooth with lime
putty floating
sq 2421.53
cement cwts 0.80 485.00 388.00
slaked lime cwts 0.60 300.00 180.00
sand cube 0.07 4000.00 280.00
water gal 10.00 0.30 3.00
mason days 1.50 600.00 900.00
Labour days 1.50 400.00 600.00
scaffolding 3% 70.53
2421.53
105 " thick plastering in cement and sand 1:3
finished smooth
sq 1921.95
cement cwts 1.07 485.00 518.95
sand cube 0.05 4000.00 200.00
water gal 10.00 0.30 3.00
mason days 1.00 600.00 600.00
Labour days 1.50 400.00 600.00
1921.95
Construction-BSR 44
106 " thick rendering in cement and sand 1:2
in floors finished smooth
sq 2230.50
cement cwts 1.50 485.00 727.50
sand cube 0.05 4000.00 200.00
water gal 10.00 0.30 3.00
mason days 1.00 600.00 600.00
Labour days 1.50 400.00 600.00
Labour for curing days 0.25 400.00 100.00
2230.50
107 ' thick rendering in cement and sand 1:3
finished smooth
sq 2821.75
cement cwts 1.75 485.00 848.75
sand cube 0.08 4000.00 320.00
water gal 10.00 0.30 3.00
mason days 1.25 600.00 750.00
Labour days 2.00 400.00 800.00
Labour for curing days 0.25 400.00 100.00
2821.75
108 ' thick rendering in cement and sand 1:2
in floors finished smooth
sq 3064.25
cement cwts 2.25 485.00 1091.25
sand cube 0.08 4000.00 320.00
water gal 10.00 0.30 3.00
mason days 1.25 600.00 750.00
Labour days 2.00 400.00 800.00
Labour for curing days 0.25 400.00 100.00
3064.25
109 " thick rendering in cement and sand 1:2
in coloured cement floors finished smooth
sq 3814.25
cement cwts 2.25 485.00 1091.25
sand cube 0.08 4000.00 320.00
coloured pigment lb 5.00 150.00 750.00
water gal 10.00 0.30 3.00
mason days 1.25 600.00 750.00
Labour days 2.00 400.00 800.00
Labour for curing days 0.25 400.00 100.00
3814.25
Construction-BSR 45
110 " x6" skirting in cement and sand 1:3
projected or flush to walls finished with
floating including forming groove
l.ft 44.80
per 10 l.ft
cement cwts 0.10 485.00 48.50
sand cube 0.00 4000.00 12.00
coloured pigment lb 0.25 150.00 37.50
mason days 0.38 600.00 225.00
Labour days 0.31 400.00 125.00
per 10 l.ft 448.00
per l.ft 44.80
111 Prepare and apply one coat of preservative
(oil type) to structural timber including
touching up out ends etc. after fixing
sq 743.50
wood presrvative ltr 2.75 115.00 316.25
brush 3"(1/10use) nos 1.00 21.00 21.00
painter days 0.75 275.00 206.25
Labour days 0.50 400.00 200.00
743.50
112 Prepare surface of steel truss and apply two
coats of anticorosive primer
sq 1630.88
anticorrosive ltr 2.25 230.00 517.50
terpentine/thinner lit 0.15 100.00 15.00
wire brush nos 1.00 65.00 65.00
brush 2"(1/8use) nos 1.00 20.88 20.88
painter days 1.50 275.00 412.50
Labour days 1.50 400.00 600.00
1630.88
113 Apply one coat of anti-corrosive primer
and two coats enamel paint on already
shop primed and erected steel roof truss
sq 1744.37
anticorrosive ltr 0.20 230.00 46.00
enamel ltr 1.33 380.00 506.67
terpentine/thinner lit 0.20 100.00 20.00
brush 2"(1/5use) nos 1.00 33.40 33.40
painter days 2.50 275.00 687.50
Labour days 1.00 400.00 400.00
scaffolding3% 50.81
1744.37
Construction-BSR 46
114 Prepare and apply two coats primer and
finishing coat of enamel paint to mild steel
(angle/flat) gate
sq 2243.47
consider 50 sq.ft
anticorrosive ltr 1.50 230.00 345.00
enamel ltr 0.67 380.00 253.33
terpentine/thinner lit 0.20 100.00 20.00
wire brush nos 0.50 65.00 32.50
brush 2"(1/5use) nos 1.00 33.40 33.40
painter days 0.50 275.00 137.50
Labour days 0.75 400.00 300.00
per 50 sq.ft 1121.73
per sq 2243.47
115 Painting steel on new work with 2 coats of
ani-corrosive paint
sq 599.23
anticorrosive ltr 0.67 230.00 153.33
brush 2"(1/5use) nos 1.00 33.40 33.40
painter days 1.50 275.00 412.50
599.23
116 Painting new timber work with two coats
wood preservative
sq 228.40
wood presrvative ltr 0.50 115.00 57.50
brush 2"(1/5use) nos 1.00 33.40 33.40
painter days 0.50 275.00 137.50
228.40
117 Preparing and painting wood work with
primer and two coats namel painte
sq 1692.95
wood primer ltr 0.75 105.00 78.75
enamel ltr 2.50 380.00 950.00
brush 2"(1/10 use) nos 1.00 16.70 16.70
sand paper nos 2.00 17.50 35.00
painter days 1.50 275.00 412.50
Labour days 0.50 400.00 200.00
1692.95
Construction-BSR 47
118 White or colour washing 2 coats in single
storeyed
sq 209.55
per 10 sq
boiled lime cwts 0.50 350.00 175.00
salt lb 2.00 10.00 20.00
yellow ochre lb 0.50 10.00 5.00
blue ozs 2.00 10.00 20.00
brush 6"(1/3 use) nos 1.00 134.33 134.33
water gal 10.00 0.30 3.00
painter days 2.50 275.00 687.50
Labour days 2.50 400.00 1000.00
scaffolding 3% 50.63
per 10 sq 2095.46
per sq 209.55
119 White or colour washing in two storeyed
building
sq 244.31
per 10 sq
as per above 2095.46
painter days 0.50 275.00 137.50
Labour days 0.50 400.00 200.00
scaffolding 3% 10.13
per 10 sq 2443.08
per sq 244.31
120 Prepare and apply one coat of Alkali
resistant primer and two coats of emulsion
paint to walls
sq 1206.19
primer lit 0.90 377.00 339.30
emulsion lit 1.40 312.50 437.50
water gal 0.10 0.30 0.03
brush 6"(1/10 use) nos 1.00 40.30 40.30
sand paper nos 2.00 17.50 35.00
painter days 1.25 275.00 343.75
scaffolding 3% 10.31
1206.19
Construction-BSR 48
121 cement washing to walls of single storeyed
building 2 coats
sq 173.51
per 10 sq
cement sq 0.63 485.00 303.13
coir brush 6" nos 1.00 40.00 40.00
water gal 5.00 0.30 1.50
painter days 2.00 275.00 550.00
Labour days 2.00 400.00 800.00
scaffolding 3% 40.50
per 10 sq 1735.13
per sq 173.51
122 Painting walls with emulsion paint 2 coats 349.49
emulsion ist coat lit 0.17 312.50 52.08
emulsion 2nd coat lit 0.14 312.50 44.64
brush 6"(1/10 use) nos 1.00 40.30 40.30
water gal 0.10 0.30 0.03
painter days 0.75 275.00 206.25
scaffolding 3% 6.19
349.49
123 Prepare and apply one coat alkali resistant
primer and 2 coats of emulsion paint to
soffit of slabs
sq 1344.04
primer lit 0.90 377.00 339.30
emulsion lit 1.50 312.50 468.75
brush 6"(1/10 use) nos 1.00 40.30 40.30
painter days 1.75 275.00 481.25
scaffolding 3% 14.44
1344.04
124 Varnishing two coats with copal varnish
after sand papering
sq 1127.50
Varnish lit 1.80 400.00 720.00
brush 3"(1/3 use) nos 1.00 70.00 70.00
painter days 0.50 275.00 137.50
Labour days 0.50 400.00 200.00
1127.50
125 Wax polishing to timber in panels & floors sq 396.25
Wax polish lb 0.75 125.00 93.75
sand paper nos 6.00 17.50 105.00
floor brush(1/10 use) nos 1.00 15.00 15.00
flannel cloth yrds 0.50 65.00 32.50
Labour days 0.38 400.00 150.00
396.25
126 " dia PVC pipe fixed to walls (specials
paid separately)
l.ft 19.93
per 10 l.ft
Construction-BSR 49
pvc pipe l.ft 13.00 7.10 92.30
clip and nail nos 3.00 6.75 20.25
solvent cement gms 2.00 1.20 2.40
plumber days 0.13 275.00 34.38
Labour days 0.13 400.00 50.00
per 10 l.ft 199.33
per l.ft 19.93
127 " dia PVC pipes to walls (specials paid
separately)
l.ft 27.45
per 10 l.ft
pvc pipe l.ft 13.00 12.50 162.50
clip and nail nos 3.00 8.00 24.00
solvent cement gms 3.00 1.20 3.60
plumber days 0.13 275.00 34.38
Labour days 0.13 400.00 50.00
per 10 l.ft 274.48
per l.ft 27.45
128 1" dia. Pvc pipe fixed to walls (specials paid
separately)
l.ft 28.17
per 100 l.ft
pvc pipe 1" l.ft 100.00 18.75 1875.00
wastage 5% 93.75
socket 1" nos 8.00 12.00 96.00
solvent cement gms 32.00 1.20 38.40
clip and nail 1 nos 35.00 10.75 376.25
plumber days 0.50 275.00 137.50
Labour days 0.50 400.00 200.00
per 100 l.ft 2816.90
per l.ft 28.17
129 1" dia. Pvc pipe fixed to walls (specials
paid separately)
l.ft 42.17
per 100 l.ft
pvc pipe 1" l.ft 100.00 28.50 2850.00
wastage 5% 0.00
socket 1" nos 8.00 37.00 296.00
solvent cement gms 48.00 1.20 57.60
clip and nail 1 nos 35.00 14.50 507.50
plumber days 0.75 275.00 206.25
Labour days 0.75 400.00 300.00
per 100 l.ft 4217.35
per l.ft 42.17
Construction-BSR 50
130 1" dia. Pvc pipe fixed to walls (specials
paid separately)
l.ft 62.43
per 100 l.ft
pvc pipe 1" l.ft 100.00 42.50 4250.00
wastage 5% 212.50
socket 1" nos 8.00 60.00 480.00
solvent cement gms 64.00 1.20 76.80
clip and nail 1 nos 35.00 20.50 717.50
plumber days 0.75 275.00 206.25
Labour days 0.75 400.00 300.00
6243.05
62.43
131 2" dia. Pvc pipe fixed to walls (specials paid
separately)
l.ft 102.50
per 100 l.ft
pvc pipe 2" l.ft 100.00 72.00 7200.00
wastage 5% 360.00
socket 2" nos 8.00 126.00 1008.00
solvent cement gms 112.00 1.20 134.40
clip and nail nos 35.00 29.75 1041.25
plumber days 0.75 275.00 206.25
Labour days 0.75 400.00 300.00
10249.90
102.50
132 3" dia. Pvc pipes fixed to walls (specials
paid separately )
l.ft 274.91
per 100 l.ft
pvc 3" pipe l.ft 100.00 170.00 17000.00
wastage 5% 850.00
socket 3" nos 8.00 510.00 4080.00
solvent cement gms 200.00 1.20 240.00
clip and screw nos 35.00 132.75 4646.25
plumber days 1.00 275.00 275.00
Labour days 1.00 400.00 400.00
27491.25
274.91
133 excavation for laying to 3" dia. Pvc pipes
in groung not less than 1'6" deep ,
backfilling and compacting
l.ft 9.00
per 100 l.ft
Labour days 2.25 400.00 900.00
9.00
Construction-BSR 51
134 Chasing brickwork for laying " to 1"
dia. Pvc pipes and making good average
depth 2ft (pipes and specials paid
separately)
l.ft 30.89
per 100 l.ft
cement cwts 0.10 485.00 48.50
sand cube 0.01 4000.00 40.00
mason days 3.00 600.00 1800.00
Labour days 3.00 400.00 1200.00
3088.50
30.89
135 Chasing brickwork for laying 1" to 3" dia.
Pvc pipes in ground or floor and making
good. Average depth 3" .(pipes and specials
measured separately)
l.ft 37.17
per 100 l.ft
cement cwts 0.20 485.00 97.00
sand cube 0.03 4000.00 120.00
mason days 3.50 600.00 2100.00
Labour days 3.50 400.00 1400.00
3717.00
37.17
136 " dia pvc specials viz elbows/bend/socket no 18.53
per 10 specials
" dia pvc elbows/bend/socket no 10.00 9.25 92.50
solvent cement gms 20.00 1.20 24.00
plumber days 0.25 275.00 68.75
185.25
18.53
137 " dia. PVC specials viz
elbows/bend/socket
no 22.73
per 10 specials
" dia. PVC elbows/bend/socket no 10.00 12.25 122.50
solvent cement gms 30.00 1.20 36.00
plumber days 0.25 275.00 68.75
227.25
22.73
Construction-BSR 52
138 1" dia. PVC specials viz elbows/bend/socket no 29.93
per 10 specials
1" dia. PVC elbows/bend/socket no 10.00 18.25 182.50
solvent cement gms 40.00 1.20 48.00
plumber days 0.25 275.00 68.75
299.25
29.93
139 1" dia. PVC specials viz
elbows/bend/socket
no 51.08
per 10 specials
1" dia. PVC elbows/bend/socket no 10.00 37.00 370.00
solvent cement gms 60.00 1.20 72.00
plumber days 0.25 275.00 68.75
510.75
51.08
140 1" dia. PVC specials viz
elbows/bend/socket
no 83.35
per 10 specials
1" dia. PVC elbows/bend/socket no 10.00 60.00 600.00
solvent cement gms 80.00 1.20 96.00
plumber days 0.50 275.00 137.50
833.50
83.35
141 2" dia. PVC specials viz elbows/bend/socket no 156.55
per 10 specials
2" dia. PVC elbows/bend/socket no 10.00 126.00 1260.00
solvent cement gms 140.00 1.20 168.00
plumber days 0.50 275.00 137.50
1565.50
156.55
142 2" dia. PVC specials viz
elbows/bend/socket
no 342.75
per 10 specials
2" dia. PVC elbows/bend/socket no 10.00 305.00 3050.00
solvent cement gms 200.00 1.20 240.00
plumber days 0.50 275.00 137.50
3427.50
342.75
Construction-BSR 53
143 3" dia. PVC special s viz elbows/bend/socket no 552.55
per 10 specials
3" dia. PVC elbows/bend/socket no 10.00 510.00 5100.00
solvent cement gms 240.00 1.20 288.00
plumber days 0.50 275.00 137.50
5525.50
552.55
144 " dia. PVC special viz TEES no 24.35
per 10 tees
" dia. PVC TEES no 10.00 7.00 70.00
solvent cement gms 30.00 1.20 36.00
plumber days 0.50 275.00 137.50
243.50
24.35
145 " dia specials viz TEE no 31.15
per 10 tees
" dia TEE no 10.00 12.00 120.00
solvent cement gms 45.00 1.20 54.00
plumber days 0.50 275.00 137.50
311.50
31.15
146 1" dia. PVC specials viz TEES no 40.95
per 10 tees
1" dia. PVC TEES no 10.00 20.00 200.00
solvent cement gms 60.00 1.20 72.00
plumber days 0.50 275.00 137.50
409.50
40.95
147 1" dia. PVC specials TEE no 54.55
per 10 tees
1" dia. PVC TEE no 10.00 30.00 300.00
solvent cement gms 90.00 1.20 108.00
plumber days 0.50 275.00 137.50
545.50
54.55
148 1"dia. PVC specials viz TEE no 93.90
per 10 tees
1"dia. PVC TEE no 10.00 52.00 520.00
solvent cement gms 120.00 1.20 144.00
plumber days 1.00 275.00 275.00
939.00
93.90
Construction-BSR 54
149 2" dia. PVC specials viz TEE no 132.70
per 10 tees
2" dia. PVC TEE no 10.00 80.00 800.00
solvent cement gms 210.00 1.20 252.00
plumber days 1.00 275.00 275.00
1327.00
132.70
150 2" dia. PVC specials viz TEE no 223.25
per 10 tees
2" dia. PVC TEE no 10.00 146.00 1460.00
solvent cement gms 300.00 1.20 360.00
plumber days 1.50 275.00 412.50
2232.50
223.25
151 3" dia. PVC specials viz tees no 419.45
per 10 tees
3" dia. PVC tees no 10.00 335.00 3350.00
solvent cement gms 360.00 1.20 432.00
plumber days 1.50 275.00 412.50
4194.50
419.45
152 4" dia. Glazed earthware pipes laid on 6"
thick bedding in cement concrete 1:3:6
including excavation anerage 2'0" depth
backfilling with selected excavated materials
and concrete haunching to joints.
l.ft 220.38
per 100 l.ft
materials
EW pipe 4" no 50.00 80.00 4000.00
concrete 1 3 6 (1) cube 0.75 12233.33 9175.00
yarn lbs 2.00 35.00 70.00
cement jointing cwts 0.50 485.00 242.50
excavation cube 4.00 1400.00 5600.00
Labour
laying concrete bedding
Labour days 1.50 400.00 600.00
laying and testing pipes
plumber days 2.00 275.00 550.00
Labour days 2.00 400.00 800.00
backfilling 0.00
Labour days 2.50 400.00 1000.00
per 100 l.ft 22037.50
220.38
153 4" dia. C.I .soil /vent pipe fixed verically to
walls jointed with cement caulking
.(Specials measured separately)
l.ft 212.30
Construction-BSR 55
per 6'0" length
materials
C.I.pipe 4" l.ft 6.00 155.00 930.00
wastage 10% 93.00
yarn lbs 0.31 35.00 10.94
timber plug6x6x2 no 1.00 48.00 48.00
iron screws 3" nos 2.00 3.00 6.00
cement cwts 0.02 485.00 8.66
Labour
plumber days 0.25 275.00 68.75
Labour days 0.25 400.00 100.00
scaffolding 5% 8.44
per 6'0" 1273.79
per l.ft 212.30
154 4" dia. C I pipes fixed to walls jointed with
lead caulking (specials measured
separately)
l.ft 362.02
per 6' length
C.I.pipe 4" l.ft 6.00 155.00 930.00
wastage 10% 93.00
lead lbs 6.00 150.00 900.00
yarn lbs 0.31 35.00
timber plug6x6x2 no 1.00 48.00 48.00
iron screws 3" nos 2.00 3.00 6.00
firewood lbs 0.06 3.00 0.19
Labour
plumber days 0.25 275.00 68.75
Labour days 0.25 400.00 100.00
add 10% for sundries 16.88
scaffolding 5% 9.28
per 6' length 2172.09
per l.ft 362.02
Construction-BSR 56
155 4" dia stoneware gulley with 6x6x6 gulley
box including excavation 4" cement
concrete 1 2 4 base surrounded by 4"
thick cement and sand 1:5 extended 6"
above top of gulley box including making
connection " cement and sand 1:2
rendering internally and exposed faces
finished smooth with neat cement floating
and providing G I grating on top of gulley
no 1407.64
per no
materials
S.W. gulley 4" nos 1.00 450.00 450.00
excavation cube 0.04 1400.00 56.00
brick work 4 sq 0.06 4447.50 244.61
concrete1 2 4 cube 0.01 14965.33 119.72
rendering 1 2, " sq 0.01 2230.50 22.31
G.I.grating 4" nos 1.00 15.00 15.00
mason days 0.50 600.00 300.00
Labour days 0.50 400.00 200.00
1407.64
156 Manhole 2x2 internally with invert depth
not exceeding 2ft including excavation ,
backfilling 6" cement concrete 1 2 4 base
with 3/8" dia. Mild steel rods at 4" c/c
bothways , forming channels and benching
in similar concrete 4" walls in brick in
cement 1:5 " thick cement and sand 1:2
rendering internally and exposed surfaces
including channels benching and 2" thick
RCCremovable cover slab 2'3"x2'3" inlet
and outlet connection all complete to
working order
no 5829.79
excavation cube 0.35 1400.00 490.00
concrete 1 2 4 cube 0.07 14965.33 1047.57
brick work 4 sq 0.33 4447.50 1467.68
rendering 1 2 sq 0.28 2230.50 624.54
cover slab no 1.00 300.00 300.00
mason days 1.50 600.00 900.00
Labour days 2.50 400.00 1000.00
5829.79
157 22x16 glazed fireclay wash basin with "
dia. Chromium plated pillar tap , waste
plug chromium plated waste chain and
stay including fixing wash basin on
brackets (water supply and waste water
connection measured separately)
no 3991.16
Construction-BSR 57
wash basin nos 1.00 2800.00 2800.00
tap nos 1.00 250.00 250.00
waste plug and chain nos 1.00 150.00 150.00
wooden plug no 4.00 15.00 60.00
brass screws 1 no 6.00 3.75 22.50
cement cwts 0.02 485.00 8.66
mason days 0.50 600.00 300.00
Labour days 1.00 400.00 400.00
3991.16
158 Sink 24x15x7 overall vitreous china with
rubber plug and chromoum plated chain
waste carried on iron brackets painted and
fixed to walls (water supply and waste
water connection measured separately)
nos 2448.66
Sink 24x15x7 nos 1.00 1750.00 1750.00
L iron brackets nos 2.00 55.00 110.00
cement cwts 0.02 485.00 8.66
tapered wooden plug2" tk nos 2.00 25.00 50.00
brass screws 1 no 8.00 3.75 30.00
mason days 0.50 600.00 300.00
Labour days 0.50 400.00 200.00
2448.66
159 Closet pedestal type with L/L flushing
cistern flush pipe double plastic seat cover
" dia. Stop cock trap supplied and fixed
complete to working order
nos 5601.16
low level suite complete nos 1.00 4500.00 4500.00
stop cock " nos 1.00 250.00 250.00
cement cwts 0.02 485.00 8.66
sand cube 0.00 4000.00 10.00
brass screws 1 kg 2.00 3.75 7.50
mason days 0.25 600.00 150.00
plumber days 1.00 275.00 275.00
Labour days 1.00 400.00 400.00
5601.16
Construction-BSR 58
160 Closet squatting type with trap including
high level cistern fixed complete with flush
pipe and " dia. Stop cock, all complete to
working order
nos 3734.75
squatting pan with trap nos 1.00 750.00 750.00
C.I.cistern with 1 flush pipe chain and over
flow pipe
nos
1.00 1550.00
1550.00
clip nos 1.00 25.00
wooden plug no 5.00 15.00 75.00
brass screws 1 no 12.00 3.75 45.00
stop cock nos 1.00 250.00 250.00
cement cwts 0.25 485.00 121.25
metal cube 0.01 3200.00 16.00
sand cube 0.00 4000.00 10.00
mason days 0.50 485.00 242.50
plumber days 1.00 275.00 275.00
Labour days 1.00 400.00 400.00
3734.75
Construction-BSR 59
161 Vitreous china bidet suite fixed complete to
working order
no #VALUE!
bidet no 1.00 b #VALUE!
plumber days 0.00
Labour days 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
162 4 no. Bowl type urinal with trap and 2 gal.
Capacity automatic flushing cistern and
spreaders complete to working orders
no #VALUE!
urinal no a b #VALUE!
cistern no 0.00
rawl plugs no 0.00
spreader no 0.00
wooden plugs no 0.00
brass screws 1 no 0.00
cement cwts 0.00
sand cube 0.00
mason cube 0.00
plumber days 0.00
Labour days 0.00
0.00
0.00
0.00
163 6" dia.half round pvc eaves gutter fixed to
timber valance board including gutter
joiner and brackets fixed at 18" c/c(other
specials paid separately)
l.ft #VALUE!
eves gutter length no a b #VALUE!
joiner no 0.00
gutter brackets no 0.00
brass screws no 0.00
solvent cement gms 0.00
plumber days 0.00
Labour days 0.00
scaffolding 5% 0.00
0.00
Construction-BSR 60
0.00
0.00
0.00
0.00
0.00
164 6" dia.pvc gutter head no #VALUE!
pvc gutter head no a b #VALUE!
gutter joiner no 0.00
gutter bracket no 0.00
solvent cement gms 0.00
brass screws no 0.00
plumber days 0.00
Labour days 0.00
scaffolding 5% 0.00
0.00
0.00
0.00
0.00
0.00
0.00
165 6" dia. Pvc mitres no #VALUE!
mitre bend no a b #VALUE!
gutter joiner no 0.00
brackets no 0.00
solvent cement gms 0.00
brass screws no 0.00
plumber days 0.00
Labour days 0.00
scaffolding 5% 0.00
0.00
0.00
0.00
0.00
0.00
0.00
166 6" dia. Pvc end caps no #VALUE!
end cap no a b #VALUE!
solvent cement gms 0.00
plumber days 0.00
Labour days 0.00
scaffolding 5% 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Construction-BSR 61
0.00
0.00
167 3" dia. Pvc rain water down pipes fixed
to brick wall with wooden plugs burried in
wall(specials paid separately)
l.ft #VALUE!
pvc pipe 3 l.ft a b #VALUE!
joiner no 0.00
pvc straps no 0.00
brass screws 1" no 0.00
solvent cement gms 0.00
plumber days 0.00
labour days 0.00
scaffolding 5% 0.00
0.00
0.00
0.00
0.00
0.00
0.00
168 3" dia. Pvc l- bow no #VALUE!
elbow no a b #VALUE!
solvent cement gms 0.00
plumber days 0.00
labour days 0.00
scaffolding 5% 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
169 3" dia. Pvc shoe no #VALUE!
shoe no a b #VALUE!
solvent cement gms 0.00
plumber days 0.00
labour days 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Construction-BSR 62
0.00
170 Mild steel reinforcement to lintols slab
beams or columns bent to shape laid in
position and tied with G I wire as directed
cwts 2870.10
materials
Tor steel including transport to site cwts 1.00 1600.00 1600.00
wastage 15% 240.00
binding wire 16 BWG lbs 1.50 35.00 52.50
add 1.5% of steel cost for spacers or chairs 27.60
blacksmith days 1.00 550.00 550.00
Labour days 1.00 400.00 400.00
2870.10
Construction-BSR 63
s.no description unit
rate in
imperial 24.20%
rate in
metric
1 Removing top soil to a depth not exceeding
6" & depositing as directed within site
sq 400.00 476.00 43.00
2 Excavation over site to reduce level in any
material except rock requiring blasting
including depositing and levelling as
directed upto a distance not exceeding 30ft
cube 650.00 773.50 229.45
3 Excavation in trenches for walls/column pits
in soft/loose soil from 0-5ft deep and
depositing excavated material to a distance
not exceeding 30ft . (earth work support to
be paid separately). cube 400.00 476.00 141.20
4 Excavation in trenches for walls/column pits
in ordinary soil from 0-5ft deep and
depositing excavated material to a distance
not exceeding 30ft . cube 900.00 1071.00 317.70
5 Excavation in trenches for walls/column pits
in hard dense soil from 0-5ft deep and
depositing excavated material to a distance
not exceeding 30ft . cube 1400.00 1666.00 494.20
6 Excavation in trenches for walls/column pits
in mud/wet soil from 0-5ft deep and
depositing excavated material to a distance
not exceeding 30ft . cube 2400.00 2856.00 847.20
7 Excavation in trenches for walls/column pits
in soft distintegrated rock (not requiring
blasting) up to a depth of 5ft and depositing
excavated material to a distance not
exceeding 30ft . (earth work support to be
paid separately). cube 1000.00 1190.00 353.00
8 Excavation in trenches for walls/column pits
in hard rock requiring blasting up to a depth
of 5ft and depositing excavated material to
a distance not exceeding 30ft . (earth work
support to be paid separately).
cube 1860.00 2213.40 656.58
9 Benching rock in foundation in 3"-6"
steps.(Blasting prohibited) sq.ft 123.13 146.52 1324.63
10 Anti-termite treatment on excavated
foundation and compacted soil under floors
sq 1806.00 2149.14 194.15
11 Earthwork-backfilling & compacting cube 400.00 476.00 141.20
12 Backfilling to trenches with imported
material cube 1090.00 1297.10 384.77
13 Filling under floors including levelling
watering and compacting in 3" layers with
available and selected earth at site cube 800.00 952.00 282.40
14 Filling under floors including levelling
watering and compacting in 3" layers with
imported selected earth at site cube 1490.00 1773.10 525.97
15 Cutting turf sods loading to hand cards and
transporting upto 30 yards laying and
watering for 30 days .(Royalty for turf
pegging and transport beond 30 yards paid
separately) sq 1818.00 2163.42 195.44
16 Earth work support (open planking ) in
trenches upto a depth of 5ft sq 3114.06 3705.73 334.76
17 Earth work support (close planking ) in
trenches upto a depth of 5ft sq 4747.92 5650.02 510.40
18 Earth work support (close planking ) in
deep excavation in trenches upto 15ft
depth sq 5290.28 6295.43 568.70
19 Mixing concrete 1 3 6 (1") cube 12233.33 14557.67 4318.37
20
Mixing concrete 1 2 5 (1") cube 13213.33 15723.87 4664.31
21 Mixing concrete 1 2 4 (") cube 14965.33 17808.75 5282.76
22 Mixing concrete 1 1 3 (") cube 16887.33 20095.93 5961.23
23 Mixing concrete 1 1 2 (") cube 21310.33 25359.30 7522.55
24 2" thick cement concrete 1 3 6(1) screed
in foundation at depts not exceeding 5'-0"
sq 2511.53 2988.72 269.99
25 3" thick cement concrete 1 3 6(1) screed
in foundation at depts not exceeding 5'-0"
sq 3732.92 4442.17 401.29
26 6" thick cement concrete 1 2 4() floor
(mass concrete) sq 8691.80 10343.24 934.37
27 Cement concrete in 4"x6 column in
ground floor cube 24895.33 29625.45 8788.05
28 Cement concrete in 6"x6" column in ground
floor cube 24680.89 29370.26 8712.35
29 Cement concrete in 9x9 column in ground
floor cube 24498.67 29153.41 8648.03
30 Cement concrete in 12x12 column in
ground floor cube 23405.33 27852.35 8262.08
31 Cement concrete in 13x13 column in
ground floor cube 20970.24 24954.58 7402.49
32 Cement concrete 6x6 beam upto 1st floor
level cube 25153.11 29932.20 8879.05
33 Cement concrete 9x6 beam upto 1st floor
level cube 25133.11 29908.40 8871.99
34 Cement concrete 9x9 beam upto 1st floor
level cube 25400.89 30227.06 8966.51
35 5" thick R.C.C. floor slab in 1st floor cube 19879.33 23656.41 7017.40
36 6" thick R.C.C. floor slab in 1st floor cube 19844.33 23614.76 7005.05
37 Cement concrete in 4"x6 lintols in ground
floor l.ft 48.25 57.41 158.24
38 Cement concrete in 9x9 lintols in ground
floor l.ft 142.77 169.89 468.28
39 Cement concrete in 9x12 lintols in ground
floor l.ft 190.07 226.18 623.41
40 Cement concrete in12x15 lintols in ground
floor l.ft 315.32 375.23 1034.24
41 Sawn timber formwork to 9x9 cement
concrete column in ground floor sq 4588.95 5460.85 493.31
42 Sawn timber formwork for concrete beam
in ground floor sq 7202.76 8571.28 774.30
43 Sawn timber formwork for underside of first
floor slab sq 5861.00 6974.59 630.06
44 Tor steel reinforcement to lintols slab
beams or columns bent to shape laid in
position and tied with G I wire as directed
cwts 3920.63 4665.54 78.41
45 Brick work in cement sand 1:5 in
foundation upto D P C cube 10648.00 12671.12 3758.74
46 Brick work in cement sand 1:8 in
foundation upto D P C cube 10339.67 12304.20 3649.90
47 Brick work in cement sand 1:5 in 4 thick
walls in ground floor sq 4447.50 5292.53 478.11
48 9" thick brick wall cement sand 1:5 in
ground floor sq 8429.60 10031.22 906.18
49 Brick work 13 thick in cement sand 1:5 in
superstructure in ground floor sq 12611.70 15007.92 1355.76
50 9" thick brick wall cement sand 1:8 in
superstructure in ground floor sq 7914.35 9418.08 850.79
51 4 thick brick wall (wirecut) in cement sand
1:5 in ground floor sq 7604.75 9049.65 817.51
52 9" thick in cement and sand 1:5 with wire
cut brick sq 14726.00 17523.94 1583.05
53 13 thick brick wall (wire cut) in cement
sand 1:5 in ground floor sq 22484.25 26756.26 2417.06
54 Extra over for facing including raised
pointing 1/8" thick in cement sand 1:1
mixture in ground floor sq 4705.50 5599.55 505.84
55 3" thick floor paved in lime mortor 2:5 in
ground floor sq 3765.50 4480.95 404.79
56 Steps 1'-1"x0'-6" in brick in cement and
sand 1:5 with " thick cement and sand 1:2
rendering including necessary excavation
l.ft 128.30 152.68 420.82
57 Brick drains in cement sand 1:5 , 9" wide
and 6-9" average depth including cement
rendering " thick 1:2 to exposed feces
with 1'-6" ramp including necessary
excavation l.ft 223.60 266.08 733.41
58 Brick drains in cement sand 1:5 , 9" wide
and 6-9" average depth including cement
rendering " thick 1:2 to exposed feces
with 1'-6" without ramp including necessary
excavation l.ft 191.20 227.53 627.14
59 8" thick hollow blocks in cement and sand
mortor 1:5 in ground floor (cavities unfilled)
sq 7852.75 9344.77 844.17
60 4" thick hollow block masonry in cement
and sand mortor 1"5 with cavities unfilled sq 5312.00 6321.28 571.04
61 Random rubble masonry in cement mortor
1:5 in foundation cube 10600.00 12614.00 3741.80
62 Random rubble masonry in cement mortor
1:5 in superstructure cube 11465.00 13643.35 4047.15
63 Pressed floor tiles bedded in cement
mortor 1:2 and pointing in neat cement in
ground floor sq 8723.75 10381.26 937.80
64 Glazed tile fixed to walls including bedding
in cement motor 1:2 and raking in ground
floor.(specials measured separately)
sq 12387.50 14741.13 1331.66
65 Terrazzo floor tiles on " thick cement and
sand 1:2 in ground floor sq 12948.75 15409.01 1391.99
66 Timber frame work for calicut pattern tile
hip roof in single storey building consisting
of wall plate beam ridge plate rafters etc..
(Preservative treatment to be measured
separately) sq 9383.33 11166.17 1008.71
67 Roof covering with calicut pattern clay tiles
in single storeyed building sq 24375.00 29006.25 2620.31
68 Timber frame work for corrugated asbestos
asheet roof in single storeyed building
sq 5203.47 6192.13 559.37
69 Roof covering with corrugated asbestos
sheet (timber frame work and ridge
covering measured separately ) sq 3492.22 4155.74 375.41
70 One layer half round clay tiles over
corrugated asbestos roof covering sq 4050.00 4819.50 435.38
71 Asbestos close fittings ridging fixed
complete with roofing screws or bolts
(Hook) l.ft 97.37 115.88 319.39
72 Ridging covering with calicut pattern ridge
tiles bedded in cement lime mortor 1:1:4
l.ft 125.68 149.56 412.23
73 Ridging covering with calicut pattern ridge
tiles bedded in cement lime mortor 1:1:4
l.ft 120.75 143.69 396.06
74 x9" high barge board fixed with brass
screws at 2'-0" centres to sides of rafters l.ft 120.00 142.80 393.60
75 18 BWG (1.2mm) galvanised iron sheet
valley gutter 3'-0" girth over all once bent
with end laps not less than 9" width
including " tongued and grooved planks
laid to slope and profile on timber members
l.ft 741.75 882.68 2432.94
76 18 BWG (1.2mm) galvanised iron flashing
1'-6" girth overall 3 times bent with end laps
not less than 6" lead soldered turned and
tucked up to not less than 6" into chase out
in wall and pointed in cement mortor 1:2
lower end dressed over roof covering not
less than 1'-0" wide
l.ft 204.50 243.36 670.76
77 Timber framework for 4'-0"x4'-0" flat
asbestos ceiling (sheet measured
separately ) comprising of 4x2 joists and
2x2 bearers in class 1 timber sq 6008.20 7149.76 645.88
78 Horizontal ceiling lining using 4'-0"x4'-0" flat
asbestos cement sheets fixed with and
including beading and cove mouldings on
timber frame work.(timber frame work and
painting measured separately)
sq 4253.08 5061.16 457.21
79 " thick tongued and grooved lunumidella
ceiling boards fixed horizontal on 4x2 class
1 timber joists at 2'-0" centres with 1"
brass nails sq 9545.35 11358.96 1026.12
80 "x6" wide tongued and grooved
lunumidella ceiling boards fixed to
underside of roof rafters (existing) with 1"
brass nails including levelling with timber
strips where necessary sq 6125.56 7289.41 658.50
81 Door single hung 3'3"x7'0" high overall with
frame having 1" thick sash and 3"x2'
timber frame.(glazing ironmongery and
painting measured separately) class 1
timber sq.ft 346.46 412.29 3727.37
82 Door glazed and panelled double hung
4'x7' high overall with frame including 1'
thick sash and 3x2 frame.(glazing
ironmongery and painting measured
separately) sq.ft 295.19 351.28 3175.78
83 Plywood door single hung 3'1"x6' 11"
overall with frame having 1" thick sash
and 3"x2" frame.(ironmongery and
painting measured separately) sq.ft 198.71 236.47 2137.83
84 Door ledged braced and battened single
hung2'6"x6'6" overall with frame having 7/8"
thick tongued and grooved planks and
3"x2" frame (ironmongery and painting
measured separately) sq.ft 394.28 469.19 4241.79
85 Windows glazed 7'x4' high overall with
frame comprising 3 nos openable sashes
and 3"x2" frame and mullions. (glazing
ironmongery and painting measured
separately) sq.ft 368.32 438.30 3962.55
86 1/8" clear sheet panes exceeding 1' but not
exceeding 4 sq.ft cut and fixed with timber
beading to doors and windows sq.ft 61.11 72.72 657.46
87 But hinges 5x2 pair 256.50 305.24 256.50
88 Tee hinges 6"x12" pair 302.63 360.12 302.63
89 Rim lock no 550.00 654.50 550.00
90 Mortice lock no 1100.00 1309.00 1100.00
91 Casement stays no 430.00 511.70 430.00
92 Door closer no 1901.17 2262.39 1901.17
93 Tower / skeleton brass bolts no 612.50 728.88 612.50
94 Brass bolt 4" no 555.00 660.45 555.00
95 Casement fasteners no 115.00 136.85 115.00
96 Spring loaded fanlight catches no 138.33 164.62 138.33
97 Draw rings no 38.33 45.62 38.33
98 " thick thick DPC in cement sand 1:2
finished with 2 coats hot tar and blinded
with sand sq 3426.75 4077.83 368.38
99 5/8" thick plastering to wall in lime and sand
2:5 including floating with lime putty
sq 2032.19 2418.31 218.46
100 5/8" thick plastering to wall in cement sand
1:3 including cement floating sq 2185.66 2600.94 234.96
101 3/8" thick plastering to soffit slab in cement
and sand 1:3 including floating with lime
putty sq 3182.50 3787.18 342.12
102 3/8" thick plastering to sides and soffit of
beam in cement and sand 1:3 includuing
floating with lime putty sq 2603.33 3097.96 279.86
103 5/8" thick to wall in lime cement and sand
1:1:5 finished semi rough with wooden float
sq 1947.73 2317.80 209.38
104 5/8" thick plastering to wall in lime cement
and sand 1:1:5 finished smooth with lime
putty floating sq 2421.53 2881.62 260.31
105 " thick plastering in cement and sand 1:3
finished smooth sq 1921.95 2287.12 206.61
106 " thick rendering in cement and sand 1:2
in floors finished smooth sq 2230.50 2654.30 239.78
107 ' thick rendering in cement and sand 1:3
finished smooth sq 2821.75 3357.88 303.34
108 ' thick rendering in cement and sand 1:2
in floors finished smooth sq 3064.25 3646.46 329.41
109 " thick rendering in cement and sand 1:2
in coloured cement floors finished smooth
sq 3814.25 4538.96 410.03
110 " x6" skirting in cement and sand 1:3
projected or flush to walls finished with
floating including forming groove l.ft 44.80 53.31 146.94
111 Prepare and apply one coat of preservative
(oil type) to structural timber including
touching up out ends etc. after fixing
sq 743.50 884.77 79.93
112 Prepare surface of steel truss and apply
two coats of anticorosive primer sq 1630.88 1940.74 175.32
113 Apply one coat of anti-corrosive primer and
two coats enamel paint on already shop
primed and erected steel roof truss sq 1744.37 2075.80 187.52
114 Prepare and apply two coats primer and
finishing coat of enamel paint to mild steel
(angle/flat) gate sq 2243.47 2669.73 241.17
115 Painting steel on new work with 2 coats of
ani-corrosive paint sq 599.23 713.09 64.42
116 Painting new timber work with two coats
wood preservative sq 228.40 271.80 24.55
117 Painting new timber work with two coats
wood preservative sq 1692.95 2014.61 181.99
118 White or colour washing 2 coats in single
storeyed sq 209.55 249.36 22.53
119 White or colour washing in two storeyed
building sq 244.31 290.73 26.26
120
Prepare and apply one coat of Alkali
resistant primer and two coats of
emulsion paint to walls sq 1206.19 1435.37 129.67
121
cement washing to walls of single
storeyed building 2 coats sq 173.51 206.48 18.65
122
Painting walls with emulsion paint 2
coats sq 349.49 415.90 37.57
123
Prepare and apply one coat alkali
resistant primer and 2 coats of emulsion
paint to soffit of slabs sq 1344.04 1599.40 144.48
124 Varnishing two coats with copal varnish
after sand papering sq 1127.50 1341.73 121.21
125 Wax polishing to timber in panels & floors
sq 396.25 471.54 42.60
126 " dia PVC pipe fixed to walls (specials
paid separately) l.ft 19.93 23.72 65.38
127 " dia PVC pipes to walls (specials paid
separately) l.ft 27.45 32.66 90.03
128
1" dia. Pvc pipe fixed to walls (specials
paid separately) l.ft 28.17 33.52 92.39
129
1" dia. Pvc pipe fixed to walls
(specials paid separately) l.ft 42.17 50.19 138.33
130
1" dia. Pvc pipe fixed to walls
(specials paid separately) l.ft 62.43 74.29 204.77
131
2" dia. Pvc pipe fixed to walls (specials
paid separately) l.ft 102.50 121.97 336.20
132 3" dia. Pvc pipes fixed to walls (specials
paid separately ) l.ft 274.91 327.15 901.71
133 excavation for laying to 3" dia. Pvc pipes
in groung not less than 1'6" deep ,
backfilling and compacting l.ft 9.00 10.71 29.52
134 Chasing brickwork for laying " to 1" dia.
Pvc pipes and making good average depth
2ft (pipes and specials paid separately)
l.ft 30.89 36.75 101.30
135 Chasing brickwork for laying 1" to 3" dia.
Pvc pipes in ground or floor and making
good. Average depth 3" .(pipes and
specials measured separately) l.ft 37.17 44.23 121.92
136 " dia pvc specials viz elbows no 18.53 22.04 18.53
137 " dia. PVC specials viz elbows no 22.73 27.04 22.73
138 1" dia. PVC specials viz elbows no 29.93 35.61 29.93
139 1" dia. PVC specials viz elbows no 51.08 60.78 51.08
140 1" dia. PVC specials viz elbows no 83.35 99.19 83.35
141 2" dia. PVC specials viz elbows no 156.55 186.29 156.55
142 2" dia. PVC specials viz elbows no 342.75 407.87 342.75
143 3" dia. PVC special s viz elbows no 552.55 657.53 552.55
144 " dia. PVC special viz TEES no 24.35 28.98 24.35
145 " dia specials viz TEE no 31.15 37.07 31.15
146 1" dia. PVC specials viz TEES no 40.95 48.73 40.95
147 1" dia. PVC specials TEE no 54.55 64.91 54.55
148 1"dia. PVC specials viz TEE no 93.90 111.74 93.90
149 2" dia. PVC specials viz TEE no 132.70 157.91 132.70
150 2" dia. PVC specials viz TEE no 223.25 265.67 223.25
151 3" dia. PVC specials viz tees no 419.45 499.15 419.45
152 4" dia. Glazed earthware pipes laid on 6"
thick bedding in cement concrete 1:3:6
including excavation anerage 2'0" depth
backfilling with selected excavated
materials and concrete haunching to joints.
l.ft 220.38 262.25 722.83
153 4" dia. C.I.soil /vent pipe fixed verically to
walls jointed with cement caulking
.(Specials measured separately) l.ft 212.30 252.63 696.34
154 4" dia. C I pipes fixed to walls jointed with
lead caulking (specials measured
separately) l.ft 362.02 430.80 1187.41
155 4" dia stoneware gulley with 6x6x6 gulley
box including excavation 4" cement
concrete 1 2 4 base surrounded by 4"
thick cement and sand 1:5 extended 6"
above top of gulley box including making
connection " cement and sand 1:2
rendering internally and exposed faces
finished smooth with neat cement floating
and providing G I grating on top of gulley
no 1407.64 1675.09 1407.64
156 Manhole 2x2 internally with invert depth not
exceeding 2ft including excavation ,
backfilling 6" cement concrete 1 2 4 base
with 3/8" dia. Mild steel rods at 4" c/c
bothways , forming channels and benching
in similar concrete 4" walls in brick in
cement 1:5 " thick cement and sand 1:2
rendering internally and exposed surfaces
including channels benching and 2" thick
RCCremovable cover slab 2'3"x2'3" inlet
and outlet connection all complete to
working order no 5829.79 6937.45 5829.79
157 22x16 glazed fireclay wash basin with "
dia. Chromium plated pillar tap , waste plug
chromium plated waste chain and stay
including fixing wash basin on brackets
(water supply and waste water connection
measured separately) no 3991.16 4749.48 3991.16
158 Sink 24x15x7 overall vitreous china with
rubber plug and chromoum plated chain
waste carried on iron brackets painted and
fixed to walls (water supply and waste
water connection measured separately)
no 2448.66 2913.91 2448.66
159 Closet pedestal type with L/L flushing
cistern flush pipe double plastic seat cover
" dia. Stop cock trap supplied and fixed
complete to working order no 5601.16 6665.38 5601.16
160 Closet squatting type with trap including
high level cistern fixed complete with flush
pipe and " dia. Stop cock, all complete to
working order no 3734.75 4444.35 3734.75
161
162
163
164
165
166
167
168
169
170 Mild steel reinforcement to lintols slab
beams or columns bent to shape laid in
position and tied with G I wire as
directed
cwts
2870.10 3415.42 57.40
171
172
173
24.20%
51.17
273.0455
168.028
378.063
588.098
1008.168
420.07
781.3302
1576.307
231.0326
168.028
457.8763
336.056
625.9043
232.5677
398.3664
607.3772
676.7588
5138.856
5550.525
6286.488
7093.862
8951.832
321.2872
477.5334
1111.899
10457.78
10367.7
10291.15
9831.878
8808.967
10566.07
10557.67
10670.15
8350.712
8336.009
188.3115
557.2501
741.8617
1230.744
587.0414
921.4128
749.7684
93.31088
4472.905
4343.384
568.9464
1078.357
1613.352
1012.443
972.8376
1883.824
2876.298
601.9511
481.7016
500.7806
872.7555
746.2918
1004.563
679.5376
4452.742
4816.103
1115.986
1584.671
1656.469
1200.363
3118.172
665.6542
446.7425
518.0963
380.0715
490.5563
471.3114
468.384
2895.199
798.2044
768.5989
544.0749
1221.089
783.6117
4435.572
3779.175
2544.018
5047.729
4715.434
782.3748
305.235
360.1238
654.5
1309
511.7
2262.388
728.875
660.45
136.85
164.6167
45.61667
438.367
259.9679
279.6006
407.1213
333.0304
249.1634
309.7742
245.8655
285.3367
360.9724
391.9942
487.9379
174.8634
95.11224
208.6297
223.149
286.9955
76.65692
29.21807
216.5706
26.80615
31.25314
154.3022
22.19659
44.70898
171.936
144.2354
50.69028
77.80053
107.1331
109.9492
164.6116
243.6787
400.0741
1073.038
35.1288
120.5503
145.0819
22.04475
27.04275
35.61075
60.77925
99.1865
186.2945
407.8725
657.5345
28.9765
37.0685
48.7305
64.9145
111.741
157.913
265.6675
499.1455
860.1677
828.6401
1413.019
1675.092
6937.448
4749.481
2913.906
6665.381
4444.353
68.30838