Client Name: ____ Lillian Petsche___ ______________________________________

Phone #: ____718-456-8340__________________________________________________
Email: ____misslil66@aol.com _________________________________________

Subject Property 1: ____61-20 Madison street apt.1L.__________________ B/L ___3619/27____

Violation Department(s):___ DOB and HPD_______________________________________________

DOB Violation number(s): _V 123109LBLVIO22459; _V 121311LBLVIO19331; V 030113LBLVIO14602_ _
DOB Violation number(s): _7259326; _ 290151; 290147; 290146;_ 290150; 290149; 290148 _______

Violation: ___ 1 Story Extension Created at rear, no permits issued_______________

Client Needs: _ Abatement of Violation (Work without a permit____________ _____

ISSUE 1: ECB violation # V 123109LBLVIO22459: 12/31/2009:
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION
REPORT (plus Interest + penalty amounts, to be determined)
STATEMENTS OF FACT (as of 5/23/14):
1. Boiler report was not filed in 2009
2. Last inspection was done in December 2013 and defects were found.
(penalty amounts + plus Interest, to be determined)
RECOMMENDATION:
1. Boiler defects must be rectified
2. Fines must be made current. Unless there is proof that report was filed with
no defects.
3. BY DOB, a new report in good standing showing boiler with no defects must
be filed.
CONSULTANTS NEEDED:
1. Retain Plumber to correct boiler violations and file paperwork.
2. Expeditor to submit reports to DOB if desired


www.BuildingViolation.com
T: (347) 979-7742
F: (212) 918-7964
Page 2 of 5


ISSUE 2: ECB violation # V 121311LBLVIO19331: 12/13/2011:
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION
REPORT (plus Interest + penalty amounts, to be determined)
STATEMENTS OF FACT (as of 5/23/14):
1. Boiler report was not filed in 20010
2. Last inspection was done in December 2013 and defects were found.
(penalty amounts + plus Interest, to be determined)
RECOMMENDATION:
1. Boiler defects must be rectified
2. Fines must be made current. Unless there is proof that report was filed with
no defects.
3. BY DOB, a new report in good standing showing boiler with no defects must
be filed.
CONSULTANTS NEEDED:
1. Retain Plumber to correct boiler violations and file paperwork.
2. Expeditor to submit reports to DOB if desired

ISSUE 3: ECB violation # V 123109LBLVIO22459: 03/01/2013:
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION
REPORT (plus Interest + penalty amounts, to be determined)
STATEMENTS OF FACT (as of 5/23/14):
1. Boiler report was not filed in 20011
2. Last inspection was done in December 2013 and defects were found.
(penalty amounts + plus Interest, to be determined)
RECOMMENDATION:
1. Boiler defects must be rectified
2. Fines must be made current. Unless there is proof that report was filed with
no defects.
3. BY DOB, a new report in good standing showing boiler with no defects must
be filed.


www.BuildingViolation.com
T: (347) 979-7742
F: (212) 918-7964
Page 3 of 5


CONSULTANTS NEEDED:
1. Retain Plumber to correct boiler violations and file paperwork.
2. Expeditor to submit reports to DOB if desired

ISSUE 4: HPD Violation 7259326 4/24/2008 :
1. remove the illegal fastening key operated double cylinder lock at door in the
entrance located at apt 3l, 3rd story, 1st apartment from north at east
(plus Interest + penalty amounts, to be determined)
RECOMMENDATION:
1. Hire licensed contractor to fix issue. Work permit may be needed.
2. Submit Certificate of correction to building department.
3. HPD may want to do site investigation

ISSUE 5: HPD Violation 290151 4/24/2008 :
Unit 3L
1. repair the broken or defective plastered surfaces and paint in a uniform color
ceiling at rear room of 4 sty south apt 4r. , section
(penalty amounts + plus Interest, to be determined)
RECOMMENDATION:
1. Hire licensed contractor to fix issue. Work permit may be needed.
2. Submit Certificate of correction to building department.
3. HPD may want to do site investigation

ISSUE 6: HPD Violation 290147 7/24/1990 :
Unit 4R
1. abate the nuisance consisting of vermin ceiling bathroom 4 sty south west apt
4r. located at apt 4r
(plus Interest + penalty amounts, to be determined)


www.BuildingViolation.com
T: (347) 979-7742
F: (212) 918-7964
Page 4 of 5


RECOMMENDATION:
1. Hire contract to fix issue.
2. Submit Certificate of correction to building department.

ISSUE 7: HPD Violation 290146 7/24/1990 :
Unit 4R
1. repair the broken or defective plastered surfaces and paint in a uniform color
ceiling 2 room from rear 4 sty south west apt 4r . located at apt 4r
(plus Interest + penalty amounts, to be determined)
RECOMMENDATION:
1. Hire licensed contractor to fix issue. Work permit may be needed.
2. Submit Certificate of correction to building department.
3. HPD may want to do site investigation

ISSUE 8: HPD Violation 290150 7/24/1990:
Unit 4R
1. abate the nuisance consisting of exposed electric wires ceiling 1 sty pub hall
(plus Interest + penalty amounts, to be determined)
RECOMMENDATION:
1. Hire licensed contractor to fix issue. Work permit may be needed.
2. Submit Certificate of correction to building department.
3. HPD may want to do site investigation

ISSUE 9: HPD Violation 290149 7/24/1990:
1. abate the nuisance consisting of exposed electric wires wall 2,3 & 4 sty pub
hall
(penalty amounts + plus Interest, to be determined)
RECOMMENDATION:

www.BuildingViolation.com
T: (347) 979-7742
F: (212) 918-7964
Page 5 of 5

1. Hire licensed contractor to fix issue. Work permit may be needed.
2. Submit Certificate of correction to building department.
3. HPD may want to do site investigation

ISSUE 10: HPD Violation 290148 7/24/1990:
Unit 4R
1. properly repair the broken or defective electric ceiling light fixture north east
room 4 sty south west apt 4r. located at apt 4
(penalty amounts + plus Interest, to be determined)
RECOMMENDATION:
1. Hire licensed contractor to fix issue. Work permit may be needed.
2. Submit Certificate of correction to building department.
3. HPD may want to do site investigation


















Exclusionary Clause
It is understood and agreed by the parties hereto that should Building Violations Services NYC Inc. (Aka BVSNYC) be
found liable, among other things, under the theories of breach of contract or negligence, or any other theory of
liability, its liability will be limited to the amount paid by Client for the individual service promised by BVSNYC that
is claimed to have caused or contributed to, either directly or indirectly, the damages claimed by Client. Moreover,
BVSNYC and Client waive consequential damages for claims, disputes or other matters in question as against each
other arising out of the services herein, including loss of use and lost profit.

You might also like