CS RAB failures were occurring at a cell site due to downlink power congestion. To address this, the downlink admission control algorithm parameter was changed from "Algorithm First" to "OFF". This improved the call setup success rate and eliminated further CS RAB establishment failures due to downlink power congestion as seen in the post-change call statistics.
Original Description:
Original Title
CS RAB Failure Due to DL Power Congestion - Improved by Changing DLALGOWSWITCH Parameter
CS RAB failures were occurring at a cell site due to downlink power congestion. To address this, the downlink admission control algorithm parameter was changed from "Algorithm First" to "OFF". This improved the call setup success rate and eliminated further CS RAB establishment failures due to downlink power congestion as seen in the post-change call statistics.
CS RAB failures were occurring at a cell site due to downlink power congestion. To address this, the downlink admission control algorithm parameter was changed from "Algorithm First" to "OFF". This improved the call setup success rate and eliminated further CS RAB establishment failures due to downlink power congestion as seen in the post-change call statistics.
Report for CS RAB Failure due to DL Power Congestion
and Improved by canging DLAL!"S#I$C% "FF
Parameter Detail Analysis& In 'eteor R(C on 'osaic pro)ect CS RAB get bad of * Site+ So to improve DLAL!"#SI$C% "FF parameter canged and due to cange,, CS RAB get "-. /.* Failures Reason Analysis Analyse te counter related to CS RABs and it is found tat many call are failing on counter & ,, Number of Failed CS RAB Establishments for Cell (DL Power Congestion) (none) !n " #arti$ular Cell %% Balliguille &ill'" $is counter means tat tere is DL power congestion in te downlin0. Pre -PI attaced attaced for refernece of Balligullie %ill 1* Cluster Name Start time Call Setu# Su$$ess Rate(CS) Number of Failed CS RAB Establishments for Cell (DL Power Congestion) (none) BallyguileHill_MMC_F1_1 11/28/2012 18:00 98.02% 44 BallyguileHill_MMC_F2_1 11/28/2012 19:00 97.17% 3 BallyguileHill_MMC_F1_1 11/28/2012 19:00 96.37% 17 BallyguileHill_MMC_F2_1 11/28/2012 20:00 97.00% 2 BallyguileHill_MMC_F1_1 11/28/2012 20:00 96.87% 14 BallyguileHill_MMC_F2_1 11/28/2012 21:00 96.99% 3 BallyguileHill_MMC_F1_1 11/28/2012 21:00 96.37% 13 BallyguileHill_MMC_F1_1 11/28/2012 22:00 98.00% 1 BallyguileHill_MMC_F1_1 11/28/2012 23:00 99.48% 2 /.2 Action $a0en to Improve& (o )m#ro*e DL Power $ongestion%% " #arameter related to CAC Algorithm is $hanged+ ,a-e DL CAC Algorithm Swit$h %%%% !FF %%%from%%% Algorithm First state DESCR)P()!N !F PARA,E(ER+ *. In "FF condition & DL CAC algoritm is disable. 2. In Algoritm First condition& $e load factor prediction is "(. If Algoritm first applied tan after reacing load factor+ new calls are re)ected. #ile if we disable it tan it can ta0e new call. #e ma0e it "FF most of te time at te time of more load on site+ wile Algoritm First is used wen we ave more sites nearby and reacing certain load3tresold+ it can transfer calls to near by B$S /.4 *.4 .P) Anal/sed & -PI analysed after cange and Improvement found & -PI A$$AC%5D for refernece& Cluster Name Start time Call Setu# Su$$ess Rate(CS) Number of Failed CS RAB Establishments for Cell (DL Power Congestion) (none) BallyguileHill_MMC_F1 _1 11/30/2012 18:00 99.42% 0 BallyguileHill_MMC_F1 _2 11/30/2012 18:00 100.00% 0 BallyguileHill_MMC_F1 _1 11/30/2012 19:00 99.65% 0 BallyguileHill_MMC_F1 _2 11/30/2012 19:00 100.00% 0 BallyguileHill_MMC_F1 _1 11/30/2012 20:00 99.75% 0 BallyguileHill_MMC_F1 _2 11/30/2012 20:00 100.00% 0 BallyguileHill_MMC_F1 _1 11/30/2012 21:00 99.04% 0 BallyguileHill_MMC_F1 _2 11/30/2012 21:00 100.00% 0 BallyguileHill_MMC_F1 _1 11/30/2012 22:00 99.60% 0 BallyguileHill_MMC_F1 _2 11/30/2012 22:00 100.00% 0 BallyguileHill_MMC_F1 _1 11/30/2012 23:00 99.58% 0 BallyguileHill_MMC_F1 _2 11/30/2012 23:00 100.00% 0 "01 DL Power $ongestion #roblem get resol*ed after $hanging this #arameter