You are on page 1of 23

A ABC

CONTRAC
GTC/501/

1 Pur
2 Sco
3 Org
3.1
4 Abb
5 Ref
6 Doc
6.1
6.2
6.3
6.4
7 Too
8 Ma
9 Pla
10 S
11 B
12 H
12.1
12.2
13 W
13.1
13.2
13.3
13.4
13.5
13
13
13
13
13
13.6
14 Acc

CD |G
CT No.
/2012
rpose ..........
ope .............
ganization, R
Work Forc
breviation an
ferences ......
cuments and
Check List
Test Form
KM Appro
ITP ..........
ols and/ or t
terial Requi
nt and Equi
Site Planning
Briefing Shee
HSE Require
Risk Ass
Specific
Work Metho
Partial D
Partial D
Partial D
Partial D
Procedu
.5.1 Proce
.5.2 Proce
.5.3 Proce
.5.4 Proce
.5.5 Proce
PD Mea
ceptance Cri
RID
On
DOCU
G501-ALS
..................
..................
Responsibilit
ce ...............
nd Definition
..................
d Records ...
t ..................
ms ................
ovals (Mater
..................
est Instrume
rements .....
pment requ
g and Prepa
et ...............
ements ........
sessment ....
c Emergency
odology .......
Discharge (P
Discharge (P
Discharge (P
Discharge (P
ure of testing
edure for PD
edure for PD
edure for PD
edure for PD
edure for PD
asurement a
iteria ..........
Met
line Partial
MENT No.
S-AYT-KM-00
Ta
...................
...................
ties & Superv
...................
n ................
...................
...................
...................
...................
rial, drawing
...................
ents ............
...................
irements ....
rations .......
...................
...................
...................
y Procedures
...................
PD) Measur
PD) Measur
PD) Measur
PD) measure
g for Switch
D measurem
D measurem
D measurem
D measurem
D measurem
nd Localizat
...................

hod Statem
Discharge M
021
ble of Conte
...................
...................
vision .........
...................
...................
...................
...................
...................
...................
gs, Work ord
...................
...................
...................
...................
...................
...................
...................
...................
s .................
...................
ement CVI T
ement Ultra
ement TEV a
ement throu
hgears, RMU
ent on Switc
ent on RING
ent on Trans
ent on Trans
ent on Feed
tion ............
...................
ment
Measureme
REV
7
ents
...................
...................
...................
...................
...................
...................
...................
...................
...................
der, Personn
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
Technique: ..
asonic Techn
and Acousti
ugh HFCT:...
Us, TRF, Cab
chgears: .....
G MAIN UN
sformer (Oil
sformer (Dry
er Pillar: .....
...................
...................
ent


...................
...................
...................
...................
...................
...................
...................
...................
...................
nel, etc) .......
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
nique: ..........
c: ................
...................
bles, SW & F
...................
IT: ..............
l): ...............
y): ..............
...................
...................
...................
S
Pag
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
FD Pillars: ...
...................
...................
...................
...................
...................
...................
...................
SHEET
ge 1 of 23

........... 2
........... 2
........... 2
........... 2
........... 2
........... 3
........... 3
........... 3
........... 3
........... 3
........... 4
........... 4
........... 4
........... 4
........... 4
........... 5
........... 5
........... 6
........... 8
........... 9
........... 9
......... 10
......... 11
......... 13
......... 13
......... 13
......... 15
......... 17
......... 18
......... 19
......... 19
......... 21
A ABC

CONTRAC
GTC/501/

1 Pur
2 Sco
T
o
3 Org
T

T

T
3.1 W
4 Abb
T
CD |G
CT No.
/2012
rpose
The object
Diagnostic
Unit, Tran
insulation
ageing pro
document
mentioned
ope
The scope o
of Switchge
ganization, R
The Site Su
method stat

The Project
monitor sup

The Project
basis.
WORK FORC
1 Als
1 Sa
1 PD
1 Sk
breviation a
The below t
1
2
3
4
5
6
7
8
9
10
RID
On
DOCU
G501-ALS
tive is to c
Test to ass
nsformer Sw
over a perio
ocess. This
describes th
above and t
of this docum
ar, RMU, Tr
Responsibil
upervisors /
tement.
t QHSE Ma
pervision and
QHSE Man
CE
stom Team
afety Officer
D technician
killed technic
and Definitio
able explain
QHSE
PPE
KM
RMU
PD
SF6
L-O-A
LV
HV
SAT
Met
line Partial
MENT No.
S-AYT-KM-00
carry out t
sess overall
witch, Fee
od of time
reduces the
he method o
the way to i
ment is to de
ransformers
ities & Supe
/ Site Engin
anager is th
d complianc
nager will re
Leader
(From Sub-
n (From Sub
cian (From S
on
s the abbrev
Quality H
Persona
Kahram
Ring Ma
Partial D
Sulphur
Limitatio
Low Volt
High Vo
Site Acce

hod Statem
Discharge M
021
the online
health of M
der Switch
deteriorates
e reliability
of PD measu
nterpret the
efine the pro
and LV Fee
ervision
neer shall b
he custodian
e with the p
eview and a
- contractor)
- contractor
Sub- contrac
viation & def
Health Safet
l Protective
aa
ain Unit
Discharge
Hexafluorid
on Of access
tage
ltage
eptance Tes
ment
Measureme
REV
7
Partial Disc
Medium Vo
h, Transfor
s due to ext
and availa
urement in l
e result and
ocedure for
der Pillars.
be responsi
n and safet
procedure.
audit this M
)
r)
ctor)
finitions use
ty &Environm
Equipment
de
s
t
ent


charge (PD
oltage Switc
mers and
ternal and
ability of th
live conditio
give recomm
Partial Disc

ble for imp
ty officers d
Method State
ed in this doc
mental

S
Pag
D) Measurem
chgears, Ri
Feeder Pil
internal fac
e switchgea
n on MV eq
mendations.
harge Meas
plementation
duty to adh
ement on a
cument.
SHEET
ge 2 of 23

ment as
ng Main
llar. The
ctors and
ars. This
quipment

surement
n of this
here and
monthly
A ABC

CONTRAC
GTC/501/

5 Ref

6 Doc
6.1 CH
Ch

6.2 TE
Pa
SA
6.3 KM
Ap


Ap


W
CD |G
CT No.
/2012
11
12
ferences
Followin
Instruct
cuments an
Calibr
Appro
CHECK LIST
heck the foll
Valid
TEST FORMS
artial Discha
SAT form atta
KM APPROVA
pproved Ma
XDP
ULD-
PDS
PDS
PDS
PDS
Data
pproved Dra

Work Order:

RID
On
DOCU
G501-ALS
CVD
TEV
ng documen
ion Manual
d Records
ration certifi
oved IR Site

lowing point
Calibration
S
arge Reading
ached. See A
VALS (MATER
terials:
II
- 40
Air HVPD/
Air Mic
Air Paraboli
AIR Head P
Sheets for a
awings:
Not App

GTC/501



Met
line Partial
MENT No.
S-AYT-KM-00
Capacitiv
Transien
nts are referr
of XDPII, H
cate
Acceptance
ts before sta
Certificate o
gs should be
Annexure A
RIAL, DRAW
NDB Techno
NDB Techno
PDSAIR
c Sensor
hone
above said I
plicable
1/2012

hod Statem
Discharge M
021
ve Voltage I
nt Earth Volt
red to for pre
VPD & ULD4
Test (SAT) f
aring thermo
of PD Instru
e recorded in

WINGS, WOR
ologies Ca
ologies Ca
nstruments
ment
Measureme
REV
7
ndicators
tage
eparation of
40
forms
ography
uments
n Approved
ORK ORDER,
anada
anada
attached as
ent


f this docum
SAT form
PERSONNE
s Annexure B
S
Pag
ment;
NEL, ETC)
B
SHEET
ge 3 of 23

A ABC

CONTRAC
GTC/501/

Ap




6.4 IT
S
7 Too
mea

XDP
ULD
PDS
PDS
PDS
PDS
8 Ma
Ref
9 Pla
Not
10 Site
As p
CD |G
CT No.
/2012
pproved Per

TP
See Attache
ols and/ or t
The foll
asurement a
P II NDB
D- 40 NDB
S Air HVP
S Air Mic
S Air Parabo
S AIR Head
terial Requi
fer Point No
nt and Equi
t Applicable
e Planning a
per the appr
RID
On
DOCU
G501-ALS
rsonnel:
Mr. Nav
Mr. Bha
Mr. Tho
Mr. Sam
Mr. Pra
Mr. Anil
Mr. Thir
Mr. Sum
Mr. Deb
Mr. Jyot
Mr. Sure
Mr. Muh
ed Annexure
test Instrum
lowing Instr
at site
B Technolog
B Technolog
PD/ PDSAIR
olic Sensor
Phone
irements
.7
ipment requ

and Prepara
roved schedu
Met
line Partial
MENT No.
S-AYT-KM-00
vin Kumar (T
arathi Chand
mas Varghe
miullah Khan
bharan - HS
Augustin -
raviam - HS
mesh Pillai -
bapriya Bhat
tirdhar Oza
esh Balakris
hammed Ajm
C
ments
ruments and
ies Canad
ies Canad
R
uirements
ations
ule by Kahra

hod Statem
Discharge M
021
Team Leade
dran (Team
ese (Team Le
n (Team Lea
SE Officer (S
HSE Officer
E Officer (Su
HSE Officer
ttacharjee -
- PD techni
shna - PD te
mal PD te
d Equipment
da
da
amaa & L-O
ment
Measureme
REV
7
r)
Leader)
eader)
ader)
Sub Contract
r (Sub Contr
ub Contract
r (Sub Contr
PD technici
cian (Sub Co
echnician (S
chnician (Su
t are needed
-A list
ent


tor)
ractor)
or)
ractor)
an (Sub Con
ontractor)
Sub Contract
ub Contracto
d to conduct
S
Pag

ntractor)
tor)
or)
PD discharg
SHEET
ge 4 of 23

ge
A ABC

CONTRAC
GTC/501/

11 Brie
Par
Partial D
aging. T
12 HSE
CD |G
CT No.
/2012
efing Sheet
rtial Dischar
Discharges c
The ability to
E Requirem
On s
wor
HSE

Safety He
Sun Glass
Glove (Ge
Face Mas

RID
On
DOCU
G501-ALS

ge test need
can be cause
o measure lo
ents
site, staffs s
k and as per
E Officer to e
elmet
ses
eneral Purpo
k (General P
Met
line Partial
MENT No.
S-AYT-KM-00
d to be carrie
ed by poor d
ow levels of p
hould alway
r KM & Alsto
ensure the b
ose)
Purpose)

hod Statem
Discharge M
021
ed out to det
esign, manu
partial disch
ys wear appr
om safety ru
below items
Safet
Cove
Porta

ment
Measureme
REV
7
termine the
ufacturing fa
harge is refe
ropriate PPE
ules.
with staffs,
ty Shoes
er All (Set)
able Fire Ext
ent


quality of e
aults, mecha
rred to as se
E as deemed

tinguisher
S
Pag
lectrical insu
anical dama
ensitivity
d necessary f
SHEET
ge 5 of 23

ulation,
ge, or
for the


12.1


P
R
O
B
A
B
I
L
I
T
Y

A
N
D









Ref
1
2
3
4


1 RISK ASSESS


A
N
D

F
R
E
Q
U
E
N
C
Y

Defin
High
Mod
Low
Neg

Severity





f Hazard Ident
Authoriza
Electrical S
Civil clearance &F
KM Material
AB
CONTRA
GTC/501
SMENT
nite --------------->
h ------------------->
derate ------------>
w ------------------->
gligible ----------->
tification Prob
1
ation
Shock
Fall in trench
Damage
BCD |GRI
ACT No.
1/2012


> 5 5
> 4 4
> 3 3
> 2 2
> 1 1

1
M
i
n
o
r

Without contr
bability Severity
1 - 5 1 - 4
3 4
4 4
3 4
3 4
D
Online Pa
DOCUMENT N
G501-ALS-AYT-K


10 15
8 12
6 9
4 6
2 3

2 3
S
e
r
i
o
u
s

M
a
j
o
r

rol
y Risk
1 - 20
12 All
16
Wear
Keep
12
Wear
Work
12
Use p
dama

Method Statem
rtial Discharge
No.
KM-0021

Ac

5 20
2 16
9 12
6 8
3 4



3 4

M
a
j
o
r

C
a
t
a
s
t
r
o
p
h
i
c






l personnel must be fa
r a helmet, security sh
a safe distance of Liv
r a helmet, security sh
k to be carrying out in
proper test kit and b
age
ment
Measurement

REV
7
ction according to
Corre
Im
Control Measu
amiliar with the basic
hoes and gloves.
ve parts
hoes and gloves.
safe location and pro
barricading of work
o the found colou
Acceptab
ction to be carrie
mmediate correct
ure
c working rules and th
oper height.
k area to avoid tripp
SHEET
Page 6 of 23

ur

ble condition
ed out under ( 2 -
tion ( without de
Prob
1
he hazards
ping and
- 3 days )
elay )
With control
bability Severity
1 - 5 1 - 4
2 2
3 2
2 3
2 2














s
y Risk
1 - 20
4
6
6
4


5
6
7
8
9
10
11
12
13
14
15
16
17
Test equipmen
Oil and SF
Feeder pillar D
AC and DC L
Hurts and i
Fire Ri
High Voltage
Weather Co

Electrical Arc
Hazar

Hazards Anima
the substatio
position snake

Health hazard
substation suc
stroke, suffo
vomiting depen
the weather c

Portable hand t
from Height

Noise pollutio
from Environ
AB
CONTRA
GTC/501
nt damage
6 Leak
Door swing
ive parts
injuries
isk
e Hazards
ondition
Flashing
rd
als Alive in
ons such
and incest
from open
ch as Heat
ocation,
nding up on
condition.
tools falling
t Hazard
on hazard
nmental
BCD |GRI
ACT No.
1/2012
3 3
3 2
4 3
2 5
3 3
2 4
2 5
4 2
4 3
2 3
3 3
4 3
2 2
D
Online Pa
DOCUMENT N
G501-ALS-AYT-K
9
Chec
kit in
6
Used
area.
12
Tight
move
10 Prope
9
Use p
test
8 . Fire
10 HV a
8 Cove
12
Ens
rat
Sa
6
Befor
Speci
perm
Emer
9 Relax
12
To av
switc
4
Use t
poten

Method Statem
rtial Discharge
No.
KM-0021
k the calibration an
good condition.
d proper shoes in oi

t feeder pillar door t
ement due to air.
er PPE and proced
proper PPE and visu

e extinguisher shoul
rea should be barri
r the test equipmen
sure and Enforceme
ting Full body suit, A
afety shoes, Helmet
re Entering the subs
ial First Aid medicin
manganate for positi
rgency local hospita
xation from continu
void the portable ha
ch gear. To follow th
the appropriate pipe
ntial work place.
ment
Measurement

REV
7
nd properly handle d
l floor and keep goo
to the stable materi
ure need to be follo
ual inspection of wo
d near to live panel
cading and sign bo
nt from weather an
ent of the Appropria
Arc rating hoot, and
t. to use avoid the E
stations clearly find
ne kept on the Firs A
ion dilute and Cotto
al number and local
ue work task. Drink
and tools kept on th
he proper safety po
es such as Ear plug
during testing and p
od ventilation in SF
ial, to avoid the do
ow and use proper P
ork place before exe
l
oard must be displa
d stop the work
ate PPE such as Ele
d Heavy rubber han
Electrical arc flashin
d out the biological
Aid box like a Potas
on rope. To follow th
l rescue team conta
more fluids (non-a
he edge of transform
rtable hand tools h
and Ear muff depe
SHEET
Page 7 of 23

pack test
F6 leak
oor
PPE
ecuting the
y
ctrical Arc
nd gloves,
ng hazard
hazard.
ssium
he
act.
lcoholic).
mer and
andling.
ending
2 2
2 3
3 2
2 2
2 2
1 1
2 2
1 1
2 1
1 1
2 1
1 1
2 2
4
6
6
4
4
1
4
1
2
1
2
1
4
A ABC

CONTRAC
GTC/501/


12.2 SP
Emerge
Neares
Neares

Emerge
















CD |G
CT No.
/2012
SPECIFIC EM
ency Num
st Muster P
st First Aid
gency Call P
1.
2.
3.

Info
4.
5.
6.
7.
8. A


RID
On
DOCU
G501-ALS
MERGENCY P
ber: 999
Point:
Centre:
Procedure
Check Pat
Inform to
If Emergen

orm follow
Caller Nam
Nature of
Exact Loca
Number o
Any Hazar
Met
line Partial
MENT No.
S-AYT-KM-00
PROCEDURE

ient Condi
Supervisor
ncy call dir
wing to the
me & Conta
Incident
ation of Inc
f Injured o
rds that m

hod Statem
Discharge M
021
ES
tion
r / HSE Of
rect 999
999 emer
act Inform
cident
or Sick
ay affect r
ment
Measureme
REV
7
fficer / Firs
rgency call
mation
esponse
ent


st Aiders
centre.
S
Pag
SHEET
ge 8 of 23

A ABC

CONTRAC
GTC/501/

13 Wo
13.1 PA
a.
b.
c.
s
d. S
e.
f.
g.
X
h.
g

T

Figure 1

CD |G
CT No.
/2012
ork Methodo
ARTIAL DISC
Check if the
Check CVI
Multimeter.
Use the refe
sensors are
Switch off t
Install the b
lead with th
Insert the X
Measure th
XDPII with
Proper grou
ground. Do
panels for g
The test Set
13.11: Capa
RID
On
DOCU
G501-ALS
ology
CHARGE (PD
re is Capacit
is working

erence mod
working pro
he Battery C
black box wit
he help of ba
DP012 prob
e PD throu
Electrical m
unding is ma
not use th
round.
tup will be a
citive Volta
Met
line Partial
MENT No.
S-AYT-KM-00
D) MEASUR
tive Voltage
properly. If
dule to calib
oper.
Charger befo
th ground sy
anana and cr
bes into the C
ugh XDPII a
eans by XDP
andatory to
e ground p
s follows;
ge Indicato

hod Statem
Discharge M
021
REMENT CV
Indicators (
f not, Alstom
rate XDP-II
ore starting
ymbol on th
rocodile clip
CVI in R-Y, Y
a shown in
P012 type of
have reliab
resent of CV
rs in the Pa
ment
Measureme
REV
7
I TECHNIQU
(CVI) install
m team lea
and make
CVI measure
e switchgea
.
Y-B, B-R seq
the Fig No
f Probes.
le reading,
VI. Do not
anels. Remo
ent


UE:
ed in the pa
ader should
it sure that
ement.
ar panel and
quence. Ref
o. 4.12 (PD
connect the
use the pa
ve these ind
S
Pag
nels.
check volta
t all the pro
d connect th
fer Fig No. 4
Measurem
e ground lea
inted surfac
dicators
SHEET
ge 9 of 23

age with
obes and
e ground
4.11
ent with
ad to S/S
ce of the


ABC

CONTRAC
GTC/501/

Figure 1


13.2
a

C









CD |G
CT No.
/2012
13.12: Inset

PARTIAL DI
a. Check U
Contact Pro

b. To meas
magneti
ULD406
Ring Ma
magneti
is PD ac
Medium
sensor.
generate
discharg


RID
On
DOCU
G501-ALS
t the XDP01

SCHARGE (
ULD-40 oper
obe:
sure Ultraso
ically couple
6 probes an
ain Units an
ic Sensor w
ctivities goi
m and it will
Use headph
ed by Surfac
ges in the he
Met
line Partial
MENT No.
S-AYT-KM-00
12 probes as
Connect the
PD) MEASU
ration with S
onic PD thro
ed on the s
d connect it
d Transform
ith two mag
ng on insid
touch the m
hones with U
ce Discharge
eadphones.

hod Statem
Discharge M
021
s shown in t
e ground lea
UREMENT U
Simulator.
ough Ultraso
switchgear
t to ULD 40
mers (oil fille
gnets and it
e the panel
metallic part
ULD40 to lis
e / PD. Verif

ULD-406
ment
Measureme
REV
7
this to take
d with bana
ULTRASONIC
onic contact
surface to
0 to measu
ed) as shown
t holds on th
s the PD w
of the pane
sten to the a
fy the readin

ent


the measur
ana and croc
C TECHNIQU
probe (mag
detect Ultra
re the PD o
n in the Figu
he panel ver
will travel th
el which will
amplified au
ng with asso
S
Page
rement of P
codile clip
UE:
gnetic) whic
asonic PD.
on the Swit
ure 3. ULD4
ry well. Wh
rough the I
be picked u
udible sound
ociated soun
SHEET
e 10 of 23


PD
h can be
Use the
tchgears,
06 is the
hen there
nsulated
up by the
d (if any)
nd due to
A ABC

CONTRAC
GTC/501/


F

F
13.3 PA

a.
s

b. T
t

T
t
s
e








c. A
CD |G
CT No.
/2012

Figure 13.21
Parabolic Se
Figure 13.22
ARTIAL DISC
PDS Air has
site. But we
TEV Circuit
metal-clad s
the form of
The On-line
the use of
switchgear
emanate fro
Figure 13.3
AA - Airborn
be detected
RID
On
DOCU
G501-ALS

1: Set up for
ensor:
2: Set up fo
CHARGE (PD
s no such sim
e can check t
Transient
switchgear a
numerical L
Partial Disc
Transient E
at strategic
om discharg
1: PD meas
ne Acoustic
using the u
Met
line Partial
MENT No.
S-AYT-KM-00
r PD measu

energy
The par
on the
pointer
point. T
to corre
pinpoin


or PD measu
D) MEASUR
mulator from
the perform
t Earth Volt
and plant. T
LED display m
charge (PD)
Earth Volta
positions. T
es occurring

surement by
Circuit A
nits airborn

hod Statem
Discharge M
021
rement by C
c. Par
that is pres
rabolic sens
ultrasound
device in o
The parabolic
ectly pinpoin
t the ultraso
urement by
REMENT TEV
m manufact
ance using s
tage (TEV) P
he unit prov
measured in
) Testing of
ge (TEV) se
These senso
g within the
Backgr
/ pane
y TEV metho
Acoustic PD
ne acoustic s
ment
Measureme
REV
7
Contact pro
rabolic sens
sent many
or works lik
sensor. The
order to ind
c sensor ena
nt the detec
ound source
Parabolic S
V AND ACOU
urer which c
simulator pr
PD signals a
vides digital
n dB.
Medium Vo
ensor attac
rs pick-up t
insulation o
round Noise
l which is no
od
signals are
sensor
ent


be (Ultrason
or enables
meters awa
ke a lens to
e sensor is
dicate the p
ables the det
ction zone i
.
Sensor (Ultra
USTIC:
can perform
rovided with
are generate
TEV-dB sen
oltage (MV)
hed to the
he high freq
of the metal
e to be mea
ot live.
generated b
S
Page
nic method)
to focus ult
ay from the
concentrat
equipped w
position of t
tection zone
in order to
asonic meth
m quick calib
h ULD-40
ed by intern
nsor measur
Switchgear
outer casin
quency pulse
clad switchg
sured on eq
by PD in air
SHEET
e 11 of 23

)
trasound
e sensor.
te energy
with laser
the focal
e in order
correctly
hod)
bration at
nal PD in
ement in
r through
ng of the
es which
gear.
quipment
and can
A ABC

CONTRAC
GTC/501/


T












Figure 1

Figure 1

The PDS

















CD |G
CT No.
/2012
The sensor s
below. The
measured P
13.32: PD m
13.33: PD m
S Air is a han
RID
On
DOCU
G501-ALS
should be pl
LEDs will lig
PD level.
measuremen
measuremen
ndheld PD t
Met
line Partial
MENT No.
S-AYT-KM-00
aced over ve
ght to show
nt by ULD-40
nt by PDS AI
test unit com

hod Statem
Discharge M
021
ents or air g
the
0 Inbuilt Pa











IR MIC (Aco
mbine with T
ment
Measureme
REV
7
gaps in the s
arabolic Sen
oustic Airbor
TEV and Aco
ent


witchgear h
sor (Acoust
rne)
oustic in one
S
Page
housing as sh
tic Airborne)
device.
SHEET
e 12 of 23

hown
)
A ABC

CONTRAC
GTC/501/

13.4 PA

The HFC
Partial
transfor
an N-ty
line PD
access.
coupled
measure
earths
frequenc
direct, g
The sen
gives PD

Backgro
not live.

High Pa
13.5 PR
SW
13.5.1
S
S
S
CD |G
CT No.
/2012
ARTIAL DISC
CT inductive
Discharge
mers). The
pe or BNC
measureme
The HFCT s
to the plan
ements can
of the MV
cy PD curre
galvanic con
sor converts
D value in Pi
ound noise t

ass filters of

ROCEDURE
WITCHES A
Procedure fo
Step 1: Che
measureme
Step 2: PD
points indica
Step 3: PD
below fig.
RID
On
DOCU
G501-ALS
CHARGE (PD
Figure
e sensor is a
testing of
sensor outp
Point-of-Att
ents to be ta
sensor shou
t under test
be made o
V cables. Th
nt signals fl
nection to th
s the mA P
ico Coulomb
to be measu
100 kHz to
OF TESTIN
ND FD PILL
or PD measur
eck for CVI (
nt as per the
measureme
ated in below
measureme
Met
line Partial
MENT No.
S-AYT-KM-00
D) MEASUR











13.41: PD m
a high frequ
f medium
put is brough
tachment (P
aken at any
uld be conn
t and thus p
n live plan
he sensor a
owing in the
he circuit.
D currents f
b (pc).
ured on grou
be used to r
G FOR SWIT
LARS:
rement on Sw
(capacitive v
e technique
ent by TEV
w fig.
ent by Acous

hod Statem
Discharge M
021
REMENT TH











measuremen
uency curre
voltage ca
ht to the ou
POA) connec
y time, witho
ected to the
provides the
nt and cable
accurately m
e earth conn
flowing in t
unded meta
reduce the b
TCHGEARS,
witchgears:
voltage indic
mentioned
method to
stic C.P to b
ment
Measureme
REV
7
ROUGH HFC
nt by HFCT
nt transform
ables and
tside of the
ction point.
out the need
e PDS Air.
e means by
es through t
measures th
nection of th
the earth co
llic door or
background n
RMUS, TR

cators) in sw
in 13.1
be done as
be done as p
ent


CT:
Method
mer designe
plant (inc
cable box/s
This allows
d to open th
The HFCT s
which On-li
the safe con
he net (com
he MV plant
onnections o
any equipm
noise as per
RANSFORME
witchgears,
per the tec
per 13.2b on
S
Page
d for use in
cluding sw
switchgear p
high sensiti
he cable box
sensor is in
ine partial d
nnection aro
mmon mod
t without req
of the MV p
ments earth
site conditi
ERS, CABLE
if present do
chnique 13.3
n points ind
SHEET
e 13 of 23

n On-line
itchgear,
panel via
ivity, on-
x for live
ductively
discharge
ound the
de) radio
quiring a
plant and
which is
on.
S,
o the PD
3b on all
icated in
A ABC

CONTRAC
GTC/501/

S
S
Capacitive Vo



TE
Inb
He


M
TEV &
Inbuilt P
Head ph

CD |G
CT No.
/2012
Step 4: PD
(Acoustic Ai
Step 5: PD
indicated in

Switch

oltage Indicator

Bus ba
EV & Acous
built Parabo
ead phone
TEV & Ac
MIC Sensor
Acoustic (C
Parabolic Se
hone
RID
On
DOCU
G501-ALS
measureme
rborne) to b
measureme
below fig.
hgears:


ar Section
CVI
stic (C.P &
olic Sensor a
oustic (C.P
r and Head p
C.P & A.A)
ensor and
Met
line Partial
MENT No.
S-AYT-KM-00
ent by inbui
be done as p
ent by HFCT


























A.A)
and
& A.A)
phone
)

hod Statem
Discharge M
021
ilt parabolic
er 13.3c on
T and Capaci











ment
Measureme
REV
7
TEV &
Inbuilt P
c sensor of U
points indic
itive sensor
Bus ba

TEV
Inbui
Head
TEV
HFC
TEV &
Inbuilt P
ent


& Acoustic (
arabolic Sens
ULD-40 or
cated in belo
to be done
ar End Cap

V & Acoustic
ilt Parabolic
d phone
V
CT
& Acoustic (
arabolic Sens
S
Page
C.P & A.A
or and Head
PDS-Air MI
ow fig.
as per 5.4 o
Cable End
c (C.P & A
c Sensor an
Cap
S
C.P & A.A
or and Head
SHEET
e 14 of 23

)
C sensor
on points
.A)
d
pacitive
ensor
)
A
P & A.A)
one
ABC

CONTRAC
GTC/501/



Circuit Bre







13.5.2
S
S
S
S
S







Ring Ma
TEV
Inbu
phon
CD |G
CT No.
/2012
eaker Trolley / B

Open


Procedure fo

Step 1: Ch
measureme
Step 2: PD
points indica
Step 3: PD
below fig.
Step 4: PD
(Acoustic Ai
Step 5: PD
indicated in
ain Unit:
TEV
HFCT
V & Acoust
uilt Paraboli
ne
RID
On
DOCU
G501-ALS
Body

n Type OCB
or PD measu
eck for CV
nt as per the
measureme
ated in below
measureme
measureme
rborne) to b
measureme
below fig.
T
tic (C.P & A
ic Sensor an
Met
line Partial
MENT No.
S-AYT-KM-00


urement on R
I (capacitiv
e technique
ent by TEV
w fig.
ent by Acous
ent by inbui
be done as p
nt by HFCT
Capac
Sens
A.A)
nd Head

hod Statem
Discharge M
021


























RING MAIN U
e voltage in
mentioned
method to
stic C.P to b
ilt parabolic
er 13.3c on
and Capacit
citive
sor
ment
Measureme
REV
7
CT Chamber

Ope
UNIT:
ndicators) i
in below fig
be done as
be done as p
c sensor of U
points indic
tive sensor t
TEV &
A.A) Inb
Sensor a
ent


r and Cable Term
en Type OCB
n RMU, if
.
per the tec
per 13.2b on
ULD-40 or
cated in belo
to be done a
& Acoustic
built Parabo
and Head ph
S
Page
mination Box
present do
chnique 13.3
n points ind
PDS-Air MI
ow fig.
as per 13.4 o
(C.P &
olic
hone
SHEET
e 15 of 23

the PD
3b on all
icated in
C sensor
on points
A
T
I
p
Acoustic
A.A)
bolic Sensor
d phone
ABC

CONTRAC
GTC/501/


SF6 RMU C










Oil Ty

TEV & Aco
nbuilt Parabo
phone
CVI
TEV &
Inbuilt
TEV
Inbu

CD |G
CT No.
/2012

CIRCUIT BREAK
RMU BUS BAR
ype RMU RMU C
oustic (C.P &
lic Sensor and
& Acoustic
Parabolic Sen
V & Acoustic (
uilt Parabolic
Head pho

RID
On
DOCU
G501-ALS
KER BODY
R & BUS BAR EN
Cable box
& A.A)
d Head
(C.P & A.A
nsor and Head
(C.P & A.A)
Sensor and
one
Met
line Partial
MENT No.
S-AYT-KM-00


















ND CAP

A)
d phone

hod Statem
Discharge M
021
















T
ment
Measureme
REV
7
SF6 F


Oil Type RMU F
T
In
H
CVI
TEV
Inbu
phon
Capacit
Senso
TEV & Acous
Inbuilt Parab
Head
ent


FEEDER / TRAN
CABLE BO
Front side
TEV & Acou
nbuilt Parab
Head phone
I
V & Acousti
ilt Parabolic
ne
tive
or
stic (C.P & A.
olic Sensor an
d phone
S
Page
NSFORMER SW
OX AND CABLE

ustic (C.P &
bolic Sensor
c (C.P & A
c Sensor an
TE
.A)
nd
SHEET
e 16 of 23

WITCH

& A.A)
r and
A.A)
nd Head
HFCT
EV
A ABC

CONTRAC
GTC/501/

13.5.3

S
S
S


L


T
A
In
H
CD |G
CT No.
/2012
Procedure fo
Step 1: PD
points indica
Step 2: PD
points indica
Step 3: PD
indicated in
Transfo
LOW VOLTAGE












TEV & Acou
ACOUSTIC
nbuilt Parab
Head phone
RID
On
DOCU
G501-ALS
or PD measu
measureme
ated in below
measureme
ated in below
measureme
below fig.
ormer (Oil):
E CABLE BOX
ustic (C.P &
A.A
bolic Sensor
Met
line Partial
MENT No.
S-AYT-KM-00
urement on T
ent by TEV
w fig.
ent by Acous
w fig.
nt by HFCT
:

& A.A)
r and

hod Statem
Discharge M
021
Transformer
method to
stic (C.P & A
and Capacit

















ment
Measureme
REV
7
(Oil):
be done as
A.A to be do
tive sensor t

HIGH VOLTAGE
TEV &
ACOU
Inbuilt
Head p
Capaci
Sens
ent


per the tec
one as per 1
to be done a
E CABLE BOX
& Acoustic (
USTIC A.A
t Parabolic S
phone
H
itive
sor
S
Page
chnique 13.3
13.2b and 1
as per 13.4 o
(C.P & A.A
Sensor and
TEV
HFCT
SHEET
e 17 of 23

3b on all
3.3C) on
on points
A)
V
A ABC

CONTRAC
GTC/501/

13.5.4

S
S
S
1

T

H

S
HFCT
TEV
AC
CD |G
CT No.
/2012
Procedure fo
Step 1: PD
Points indic
Step 2: PD
(Acoustic Ai
Step 3: PD
13.4 on poin
Transforme

HIGH VOLTAGE
SIDE GRILLS OF
COUSTIC A
Sensor an
RID
On
DOCU
G501-ALS
or PD measur
measureme
ated in below
measureme
rborne) to b
measureme
nts indicated
er (Dry):
E CABLE BOX
OF TRANSFORME
CA
SE
ACOUS
Inbuilt P
Sensor a
phone
A.A Inbuilt P
nd Head ph
Met
line Partial
MENT No.
S-AYT-KM-00
rement on Tr
ent by TEV
w fig.
ent by inbui
be done as p
ent by HFCT
d in below fi

ER
APACITIVE
ENSOR
STIC A.A
Parabolic
and Head
Parabolic
hone

hod Statem
Discharge M
021
ransformer (
method to
ilt parabolic
er 13.3c on
and Capaci
ig.

































E
ment
Measureme
REV
7
(Dry):
be done as
c sensor of U
points indic
itive sensor

LOW VOLTAGE
SIDE
ent


per the tec
ULD-40 or
cated in belo
to be done a
E CABLE BOX
E VIEW OF TRAN
ACOU
Inbuilt
and He
ACOU
Inbuilt
and He
S
Page
chnique 13.3
PDS-Air MI
ow fig.
as per the te

NSFORMER
USTIC A.A
t Parabolic
ead phone
TEV
STIC A.A
Parabolic S
ad phone
TEV
SHEET
e 18 of 23

3b on all
C sensor
echnique
Sensor
V
Sensor
V
A ABC

CONTRAC
GTC/501/

13.5.5


13.6 PD
It is
in ord
instru
using
opera

Met

PD l
1.
2.
3. T
4. S
CD |G
CT No.
/2012
Procedure fo

PD measure
HVPD PDS

Feeder
D MEASURE
proven in th
der to succe
ument and t
g the instrum
ations.
hod 1: PD L
localization
Measure the
Record the v
The Panel w
Switching o
ACOUST
And
RID
On
DOCU
G501-ALS
or PD measur
ement by A
AIR MIC on
r Pillar:
EMENT AND
he field that
ssfully locali
the switchin
ment for loca
Localization
in the MV S
e PD in each
values of ea
with higher v
peration sho
TIC SENSOR
d PDS AIR M
Met
line Partial
MENT No.
S-AYT-KM-00
rement on Fe
Acoustic met
points indic
D LOCALIZAT
PD localizat
ize PD in the
g operations
alization of P
n
witchgears
h panel using
ch method
value of PD w
ould be done
R ULD40
MIC

hod Statem
Discharge M
021
eeder Pillar:
thod to be
cated in belo
TION
tion by using
e distributio
s to be adop
PD to be per
should be fi
g TEV, AE a

will be ident
e to isolate t
ment
Measureme
REV
7

done using
ow fig.
g an Instrum
n network e
pted. The tw
rformed in c
rst made in
and HFCT as
tified as PD
the PD in or
ent


ULD40 A
ment alone is
equipments
wo methods m
ombination
the followin
s shown in t
with source
rder to confir
S
Page
Acoustic sen
s very difficu
a combinat
mentioned b
with switch
ng fashion.
the Figure 1
e.
rm it.
SHEET
e 19 of 23

nsor and
ult and
tion of
below for
hing

below
A ABC

CONTRAC
GTC/501/

Fig

M


o
s
s

T
1.
2.
3.
t


CD |G
CT No.
/2012
gure 1: PD L
Method 2: P
PD Localiza
between the
of PD localiz
substation h
should be us

The steps ar
Find the pan
Install 4 TEV
Look into th
the nearest
Figure 2:
RID
On
DOCU
G501-ALS
Localization
PD Localizat
ation throug
e two TEV se
zation throu
have been ca
sed.
re as follows
nel with hig
V Sensors as
he Signals on
sensor first.
: PD Localiz
Met
line Partial
MENT No.
S-AYT-KM-00
n through M
tion through
h HVPD Lon
ensors are m
gh this tech
arried out by
s;
hest value o
s shown in t
n the screen
. For Examp
ation using

hod Statem
Discharge M
021
Method 1
h Time of Fl
ngshot migh
more than 2
hnique is not
y method no
of PD
the Figure 2
. The PD pu
le as shown
TOF with L
ment
Measureme
REV
7
light
ht be utilized
meters. (Ba
t achievable
o.1) PD Loca
to the HVP
lse close to
n in the Figu
LONGSHOT
ent


d only when
ased on our
and PD loca
alization usin
D Longshot
the source o
re 2 below.

S
Page

the distance
present exp
alization in t
ng Time of F

of PD will re


SHEET
e 20 of 23

e
eriences
the
Flight
each to
A ABC

CONTRAC
GTC/501/

14 Acc
The seve

Under g
to subst

Partial
consider
criteria a

Guidelin

Severity
0
1
2
3

Guidelin

Severity
0
1
2
3

Guidelin

Severity
0
1
2
3
Guidelin
CD |G
CT No.
/2012
ceptance Cri
erity Criteria

iven conditi
tation.
Discharge
rations. Sinc
as per site c
ne for PD lev
y
PD Valu
(dB)
0 - 15
16 30
31 45
>45
ne for PD lev
y PD Value
(dB)
0 15
16 25
26 35
>35
ne for PD lev
y PD Va
(dB)
0 5
6 10
11 20
>20
ne for PD lev
RID
On
DOCU
G501-ALS
iteria
a is taken as
on with sim
(PD) mea
ce there are
ondition.
vels using C
ue
Condi
No PD
0 Mode
5
High
PD
Very H
vels using T
e Cond
No P
Mode
High
PD
Very
vels using A
lue Condit
No PD
Moder
High
PD
Very H
vels using A
Met
line Partial
MENT No.
S-AYT-KM-00
per the deta
milar panels a
asured can
no standard
CVD method
tion
D
rate PD
Level of
High PD
TEV method
dition
D
erate PD
Level of
High PD
Acoustic met
tion
D
rate PD
Level of
High PD
Acoustic met

hod Statem
Discharge M
021
ails below,
a criteria can
be analy
d criteria for
d:
Recommen
Discharge w
Some conce
Some conce
Major conc
replace
d:
Recommen
Discharge w
Some conc
Some conc
Major con
replace
thod (Conta
Recommen
Discharge w
Some conce
Some conce
Major con
replace
thod (Air Bo
ment
Measureme
REV
7

n be establis
sed keepin
r Pass / Fail
dation
within accep
ern, monitor
ern, regular
cern locate
ndation
within accep
ern, monito
ern, regular
cern locate
act Probe):
ndation
within accep
ern, monito
ern, regular
cern locate
orne):
ent


shed which
g the follo
it is recomm
ptable limits
ring recomm
monitoring
PD and t
ptable limits
ring recomm
monitoring
e PD and

ptable limits
ring recomm
monitoring
e PD and
S
Page
may vary su
owing crite
mended to r

mended
recommend
then repair
s
mended
recommend
then repai

mended
recommend
then repair
SHEET
e 21 of 23

ubstation
eria into
refine the
ded
r or
ded
r or
ded
r or
A ABC

CONTRAC
GTC/501/


Severity
0
1
2
3

Note
Acoustic
SWGR,
Verify w
If there
could be

Guidelin

Severity
0
1
2
3

Sr
1 Su
2 In
3 Ou
4 Ou
5 LV
6 LV
7 Tr
CD |G
CT No.
/2012
y PD Va
(dB)
0 10
11 20
21 30
>30
c - Airborne
RMU and O
with headpho
is no tracki
e the case of
ne for PD lev
y PD V
XLPE (pC
0 600
>1200-3
>3000-7
>20000
PD MEASU
ubstations
door 11kV S
utdoor Swgr
utdoor Swgr
V Feeder Pill
V Panels (KM
ansformers
RID
On
DOCU
G501-ALS
lue Condit
No PD
Moder
High
PD
Very H
e: The ULD-
OIL & DRY
one of ULD 4
king / PD se
f shear noise
vels using H
Value
C)
PD V
(pC)
0-30
3000 >300
7800 >780
>300
UREMENT T
Asset
Swgr (with V
r [RMU & Sw
r [RMU & Sw
ars
M and Consu
- Oil Type w
Met
line Partial
MENT No.
S-AYT-KM-00
tion
D
rate PD
Level of
High PD
-40 inbuilt p
Y TYPE TRAN
40 and PDS
ensed or hea
e and in this
HFCT metho
Value PILC

00
00-7800
00-20000
000
O BE CARRI
t
VCBs/OCBs)
witches - (O
witches - (S
umer)
with Conserv

hod Statem
Discharge M
021
Recommen
Discharge w
Some conce
Some conce
Major con
replace
parabolic se
NSFORMER
S Air the pres
ard through
s case select
od:
Condition
No PD
Moderate
PD
High
Level of
PD
Very High
PD
IED OUT ON
)
il type)]
F6 type)]
vators
ment
Measureme
REV
7
ndation
within accep
ern, monito
ern, regular
cern locate
ensors to be
RS as indicat
sence of surf
h the headph
t the severity
Recomme
Discharge
Some con

Some c
recomme
Major con
or replace
N FOLLOWI
(If possible
(If possible
ent


ptable limits
ring recomm
monitoring
e PD and
e used for P
ated in the f
rface tracking
hone and th
y criteria 1.
endation
e within acce
ncern, monit
concern, r
nded
ncern locate
e
NG ASSETS
Partial Disc




e by TEV & U

e by TEV & U
S
Page

mended
recommend
then repair
PD measure
figures give
ng / PD.
he value is h

eptable limit
toring recom
regular mo
e PD and the
S
charge



Ultrasonic me
Ultrasonic me
SHEET
e 22 of 23

ded
r or
ement on
en above.
high, this
ts
mmended
onitoring
en repair
ethod)
ethod)
A ABC

CONTRAC
GTC/501/




Sr.
1
2
3
4
5
6

8 Tr
wi
9 Tr
10 Tr
11 Pa
CD |G
CT No.
/2012
QUANTITY
Description
11kV Switc
11kV switch
(RMU + Ext
Oil Filled Fr
Sealed Distr
Cast Resin D
LV Feeder P
Package Su
ansformer -
ith Gas Blan
ansformer -
ansformer C
ackage Units
RID
On
DOCU
G501-ALS
Y OF EQUIPM
n
hgear Panel
hgear at out
tensible swit
ee Breathin
ribution Tran
Distribution
Pillars in Dist
bstations
Oil type her
nket
Dry type (C
Cable boxes
s
Met
line Partial
MENT No.
S-AYT-KM-00
MENTS
ls (for appro
tdoor substa
tches)
g / Oil Filled
nsformers (r
Transforme
tribution Su
rmetically se
Cast Resin)


hod Statem
Discharge M
021
ox 3800-400
ations as one
d Hermetica
radiator / co
ers.
ubstations.
ealed

ment
Measureme
REV
7
00 SStns)
e set
lly
orrugated).
(If possible
ent



e by TEV & U



S
Page
Quan
21
7
14
10
90
3
Ultrasonic me



SHEET
e 23 of 23

ntity
1000
200
4000
000
000
300
ethod)