Professional Documents
Culture Documents
1
1.01
1.02
1.03
FORMULA ESTRUCTURAS
DESCRIPCION
Unidad
Metrado
m2
m3
m2
220
67
120
21.68
128.74
17.89
4769.6
8625.58
2146.8
DEMOLICIONES
Demoliciones de piso, f/p
Demolicion de cimientos
Demolicion muros soga
CONCRETO ARMADO
2.01
2.01.01
2.01.02
2.01.03
Columnas
Concreto 210 kg/cm2 en columnas
Encofrado y Desencofrado
Acero fy= 4200 kg/cm2
m3
m2
kg
120
705
23,156
321.13
26.9
2.18
38535.6
18964.5
50480.08
2.02
2.02.01
2.02.02
2.02.03
Vigas
Concreto 210 kg/cm2 en vigas
Encofrado y desencofrado vigas
Acero fy= 4200 kg/cm2
m3
m2
kg
98
564
10,146
241.37
29.43
2.18
23654.26
16598.52
22118.28
m2
m2
27
91
46.26
27.69
1249.02
2519.79
3
3.01
3.02
VARIOS
Puente de adherencia
Mortero epoxico para abrazaderas
COSTO DIRECTO
Gastos Generales(10%)
Utilidad(10%)
Sub Total
IGV (19%)
TOTAL
189662.03
18966.20
18966.20
227594.44
43242.94
270837.38
0.1
1.0
0.5
hm
hm
hm
1
1.0
1.0
0.0267
0.2667
0.1333
0
10.2
9.28
7.5
0.05
0.26667
0.26667
3.75
58.74
7.8
21.68
0.27
2.47
1.00
0.00
3.75
0.19
15.66
2.08
17.93
0.1
1.0
hm
hm
hm
1
1.0
1.0
0.5
0.1333
1.3333
0.0000
0.6667
0
10.2
9.28
0.05
1.33333
1.33333
18.73
74
7.8
Lima 02
7.5
128.74
1.36
12.37
0.00
5.00
0.00
18.73
0.94
98.67
10.40
110.00
Costo Unitario:
U.M. m2
EQ: 4
Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
hh
hh
hh
hh
hh
0.1
hm
1.0
0.2000
0.0000
0.0000
2.0000
0
10.2
9.28
0.05
17.04
7.5
17.89
2.04
0.00
0.00
15.00
0.00
17.04
0.85
0.85
321.13
87.95
209.83
23.35
26.90
14.95
11.51
0.45
0.1
1.0
1
kg
kg
hm
1.0
0.0032
0.0320
0.0320
0.0000
0
10.2
9.28
8.37
0.02
1.05
0.05
2.18
0.03
0.30
0.27
0.00
0.00
0.60
1.45
1.45
0.03
1.52
1.55
0.60
0.03
0.03
0.1
2.0
1
10
gl
m3
m3
bol
gl
m3
hm
hm
hm
hm
0.5
0.5
1.0
0.41
7.42
3.35
30.00
0.00
241.36
0.0400
0.8000
0.4000
4.0000
5.2400
10.20
9.28
8.37
7.50
0.005
0.80
0.5
9.72
0.15
0.184
41.00
39.85
16.95
15.25
8.80
3.00
0.21
31.88
8.48
148.23
1.32
0.55
190.66
0.03
0.2
0.2
0.4
0
41.18
22.5
8.5
5.21
1.24
4.50
1.70
2.08
9.52
41.18
61.41 %
0.1
1.0
1.0
0.5
0.0667
0.6667
0.6667
0.3333
0
10.2
9.28
8.37
7.5
0.24
1.45
0.68
6.19
5.58
2.50
0.00
0.35
513.52 hh
29.41
14.95
78.99 %
2
43
37
Alambre negro No 8
Madera Tornillo
Equipos
Herramientas Manuales (3%)
kg
p2
hm
1.0
0.1
5.41
1.45
2.5
0.15
13.53
14.02
0.03
14.95
0.45
0.45
0.1
1.0
1
kg
kg
hm
1.0
0.0032
0.0320
0.0320
0.0000
0
10.2
9.28
8.37
0.02
1.05
0.05
2.18
0.03
0.30
0.27
0.00
0.00
0.60
1.45
1.45
0.03
1.52
1.55
0.60
0.03
0.03
Lima 02
Costo Unitario:
U.M. m2
EQ: 15
Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
hh
hh
hh
hh
hh
kg
0.1
1
0.5
0.0533
0.0000
0.5333
0.2667
0
10.2
9.28
8.37
7.5
0.5
77.11
0.54
0.00
4.46
2.00
0.00
46.26
7.01
38.56
38.56
37
Equipos
Herramientas Manuales 10%)
37
Equipos
Herramientas Manuales 5%)
hm
1.0
U.m: :
EQ: 6
Unidad Cuadrilla
hh
hh
hh
hh
hh
0.1
1.0
0.5
kg
kg
p2
hm
1.0
0.1
7.01
0.70
27.69
Costo Unitario:
10.2
9.28
0.02
3
0.58
0.05
0.70
Parcial S/.
1.36
12.37
0.00
5.00
0.00
18.73
1.45
2.18
2.5
0.03
6.54
1.45
8.02
18.73
0.94
0.94
7.5
FORMATO MODELO
ANALISIS DE COSTOS UNITARIOS
Partida 1.01 Demolicion de piso f/p
Rendimiento
m2/dia
m2/dia30 MO
IU
Descripcion
Mano de Obra
47
Capataz
Operario
Oficial
Peon
0.1
1.0
0.5
0.0267
0.2667
0.0000
0.1333
10.2
9.28
7.5
0.27
2.47
0.00
1.00
9.61
Operador
hh
0.00
3.75
0.85
2.08
0.00
0.00
0.00
2.93
Materiales
37
49
Equipos
Herramientas Manuales (5%)
Martillo neumatico de 24 kg
hm
hm
1.0
1.0
0.05
0.26667
0
0
0
17.04
7.8
2.93
Mejorada
COEFICIENTES DE INCIDENCIA
Item
DESCRIPCION
1
1.01
1.02
1.03
DEMOLICIONES
Demoliciones de piso, f/p m2
Demolicion de cimientos
m3
Demolicion muros soga
m2
2
2.01
2.01.01
2.01.02
2.01.03
2.02
2.02.01
2.02.02
2.02.03
3
Unidad
Mano de O
47
aceite
1
acero liso
2
220
67
120
21.68
128.74
17.89
4769.6
8625.58
2146.8
825
1254.91
2044.8
CONCRETO ARMADO
Columnas
Concreto 210 kg/cm2 en columnas
m3
Encofrado y Desencofrado m2
Acero fy= 4200 kg/cm2
kg
120
705
23,156
321.13
26.92
2.18
38535.6
18978.6
50480.08
10554
10539.75
13893.6
49.2
Vigas
Concreto 210 kg/cm2 en vigas
m3
Encofrado y desencofrado vigas
m2
Acero fy= 4200 kg/cm2
kg
98
564
10,146
241.37
29.43
2.18
23654.26
16598.52
22118.28
4035.64
8431.8
6087.6
20.58
27
91
46.26
27.69
1249.02
2519.79
189
1704.43
VARIOS
3.01 Puente de adherencia
m2
3.02 Mortero epoxico para abrazaderas
m2
COSTO DIRECTO
GG+UU(20%)
Sub Total
3825.6
627.45
694.68
35197.12
282
304.38
15421.92
3124.2
17788
2280
14527
316.8
316.8
317.25
694.68
66
129.4 121.52
253.8
304.38
53.9
1041.1
595.14
2.73
3902.8
7307.69
1860
625.2
607.6
203.84
7494.2
7630.9
18.9
85.54
131.95
37935.23
47
59560.53
69.78
Coeficiente
de Incidencia
0.26168
0.262 0.000
a
COEFICIENTES FPR
0.262
J
1911.24
50619.04 6949.8
21
30
32314 3916.3
0.008
a
34
37
446.2 2319.7
39
43
48
49
38055.1
15257
2467.6
12039.5
227611.36
1.000
0 0.01 0.167
Madera enc
Maq nac Maq imp
43
48
49
41.8
62.98
102
189676.13
37935.23
227611.36
Sumatoria
dlar $ GasolinaHerramientas
IGP
30
34
37
39
0.720
0.087
0.049
0.679
0.067
0.011
C3
D1
0.067
0.011
0.246
0.272
0.170
0.053
D2
0.053
0.064
0.830
0.262 Jr + 0.231 Ar + 0.197 (0.192 Pr + 0.720 Cr + 0.087 Dr) + 0.246 ( 0.049 Hr + 0.679 Gr + 0.272 Mr) + 0.064 (0.170ENr + 0.830EXr)
Jo
Ao
(0.192 Po + 0.72oCo + 0.087 Do)
( 0.049 Ho + 0.679 Go + 0.272 Mo)
(0.170ENo + 0.830EXo)
IU
Desc
Abrev
% Part
IU mes1 K nov
Nov-03
258,94
309.81
309.81
M de O
258.94
258.9
309.81
309.81
Set 2000
May-02
Oct-03 IU mes1
Nov-03
0.262
47
Mano O
0.231
Acero co
232.94 271.43
271.35
Acero c
229.97
232.94
271.43
271.35
0.197
5
21
30
Ag Grues
CP T I
Dlar
P 19,2
C
D
159.03 160.24
320.89 323.63
358.08 375.36
159.69
323.63
374.85
Piedra
CP T 1
Dlar
175.25
313.52
350.72
159.03
320.89
358.08
160.24
323.63
375.36
159.69
323.63
374.85
37
39
43
Herram
IGPC
Mad enc
H
G
M
233.89 234.39
282,90 292.25
342.1 363.6
234.39
292.25
363.6
Herram
250.95
233.89
234.39
234.39
Madera
349.81
342.10
363.60
363.60
48
49
Maq Nac
Maq Imp
MN
MX
308.49 302.42
279.31 277.68
302.42
277.68
MaqNac
MaqImp
312.11
283.03
308.49
279.31
302.42
277.68
302.42
277.68
400
350
300
250
200
150
100
0.246
50
0
Set 2000
0.064
1.000
ELABORACION FPR
1.00 Hasta 8 Formulas por Contrato
2.00 Cda Frmula hasta 8 Monomios
3.00 Cada Monomio puede agrupar hasta 3 IU
4.00 Coeficiente de Incidencia > o = 5 %
5.00 Valores se dan al milsimo ( 3 decimales)
6.00 Indices Unificados son adimensionales
7.00 Aos Bases:
Agosto 1977
indices individuales
Marzo 1979
Indices Unificados e individuales
Diciembre 1992 Indices Unificados DL 25852
VARIACION IU
VARIACION IU
M de O
Acero c
Piedra
CP T 1
Dlar
Herram
Madera
Set 2000
May-02
Oct-03
MaqNac
MaqImp
COEFICIENTES DE INCIDENCIA
Item
DESCRIPCION
1
1.01
1.02
1.03
DEMOLICIONES
Demoliciones de piso, f/p m2
Demolicion de cimientos
m3
Demolicion muros soga
m2
2
2.01
2.01.01
2.01.02
2.01.03
2.02
2.02.01
2.02.02
2.02.03
3
Unidad
Metrado
Precio Unitario
Parcial S/.
VERIFICAR
Mano de O
47
aceite
1
acero liso
2
220
67
120
21.68
128.74
17.89
4769.6
8625.58
2146.8
4769.6
8625.58
2146.8
825
1254.91
2044.8
CONCRETO ARMADO
Columnas
Concreto 210 kg/cm2 en columnas
m3
Encofrado y Desencofrado m2
Acero fy= 4200 kg/cm2
kg
120
705
23,156
321.13
26.92
2.18
38535.6
18978.6
50480.08
38535.6
18978.6
50480.08
10554
10539.75
13893.6
49.2
Vigas
Concreto 210 kg/cm2 en vigas
m3
Encofrado y desencofrado vigas
m2
Acero fy= 4200 kg/cm2
kg
98
564
10,146
241.37
29.43
2.18
23654.26
16598.52
22118.28
23654.26
16598.52
22118.28
4035.64
8431.8
6087.6
20.58
27
91
46.26
27.69
1249.02
2519.79
1249.02
2519.79
189
1704.43
189676.13
37935.23
227611.36
37935.226
0
VARIOS
3.01 Puente de adherencia
m2
3.02 Mortero epoxico para abrazaderas
m2
COSTO DIRECTO
GG+UU(20%)
Sub Total
VERIFICAR
Sumatoria
Coeficiente
de Incidencia
47
COEFICIENTES FPR
piedra
5
CP I
21
627.45
694.68
35197.12
282
304.38
15421.92
854.4
3825.6
17787.6
831.04
3124.24
14526.54
dlar $
30
Gasolina
34
2
69.78
0.000
a
2280
Herramientas
37
316.8
316.8
317.25
694.68
129.36
121.52
253.8
304.38
1041.12
595.14
2.73
0.26168 0.00031
0.262
arena
41.8
62.98
102
59560.53
acero corr
3
1911.24
50619.04
0.0084 0.22239
0.008
a
0.262
0.222
A
0.231
1685.44
21
6949.84
32314.14
18.9
85.54
30
34
37
3916.26
446.16
2319.65
0.007
b1
0.031
B1
0.038
0.142
B2
0.142
0.017
B3
0.017
P
0.192
C
0.720
0.197
0.087
0.002
c1
0.010
C1
0.012
0.049
Hormign
IGP
38
39
66
3902.8
7307.69
4769.6
8625.58
2146.8
1860
625.2
38535.6
18978.6
50480.08
607.6
203.84
23654.26
16598.52
22118.28
7494.15
53.9
7630.92
1249.02
2519.79
131.95
37935.23
37935.226
38
39
43
47
48
49
38055.126
15257.02
2467.6
12039.53
227611.36
0 0.01084
0.0529
0.011
D1
0.011
0.053
D2
0.053
1.000
0.170
0.064
0.830
0 0.16719 0.06703
0.000
0.167
C2
0.167
0.067
C3
0.067
0.679
0.246
0.272
0.720 Cr + 0.087 Dr) + 0.246 ( 0.049 Hr + 0.679 Gr + 0.272 Mr) + 0.064 (0.170ENr + 0.830EXr)
0.720 Co + 0.087 Do
(0,049 Ho + 0.679 Go + 0.272 Mo)
(0.170ENo + 0.83EXo)