INSPECTION RELEASE CERTIFICATE

TWO (2) X SOOMW MONG DOUNG 1 THERMAL POWER PLANT


NAME OF SUPPLIER : Energyen
Purchase
Item or Tag No. Quantity Description
Inspection & Inspection
Released
Order No. Test Date Result
VMON-PO- 13LAA 1 OAC001 2SET Deaerator Augst.06,2013 Accepted Completed
0024M-
13LAA 1088001 2SET Storage Tank Augst.06,2013 Accepted Completed
4600039961
--- Breaks ---
Released for
1 Completed Purchase Order
o Partial Purchase Order - _% Release by this IRC
Total % Released to date Augst.06,2013
Have the vendor submitted all drawing/data and approval given
I Yes D No
We hereby certify that the above mentioned item has been inspected and I or tested, and is
confirmed to be in conformity with the condition of the contract and released for shipment.
-
Signature of Inspector : Munsoo Lee

Date of Issue : Augst.06,2013
This certificate does not relieve the above mentioned vendor from the guarantees and
obligations set forth in the Purchase Order and attachments.
r1tlllr
0 Reviewed
0 Witnessed

I I
Initial: M :;. /.-<
FOR INFORMATION Date: b6 B"'t

c 26-Jul-13 Issued For Information J.H.CHOI M.Y.JEONG H.J.HAN
B 11-Jul-13 Issued For Information J.H.CHOI M.Y.JEONG H.J.HAN
A 03-Jul-13 Issued For Information J.H.CHOI M.Y.JEONG H.J.HAN
REV. DATE DESCRIPTION DSGN CHKD APPD
VENDOR Document No.: MD1-0-V-115-08-00007
c 26-Jul-13 Issued For Information J.H.CHOI M.Y.JEONG H.J.HAN
B 11-Jul-13 Issued For Information J.A.SEO M.K.LEE J.Y.KIM
-----

A 03-Jul-13 Issued For Information J.A.SEO M.K.LEE J.Y.KIM
REV. DATE DESCRIPTION DSGN CHKD APPD
PROJECT:
TW0(2) x SOOMW MONG DUONG 1 THERMAL POWER PLANT
EMPLOYER:
VIETNAM ELECTRICITY
THRR\IA L POWER PROJECT \t\NAGRMEKT UNIT t\n.l
"'ff'PPMl.H
CONSULTANT:
JirJl!'
i
CONTRACTOR : SUB-CONTRACTOR :
HYUNDAI

't:m;ENERGYEN
ENGNEmlNG & CONSH1L<J110N
DESIGNED BY DATE TITLE:
J.H.CHOI
03-Jul-13
DEAERATOR AND STORAGE TANK
CHECKED BY DATE
PACKING LIST
M.Y.JEONG 03-Jul-13
APPROVED BY DA'fE PROJECT NUMBf:R DOCUMENT NUMBER REV
H.J.HAN 03-Jul-13 ADB/MD1-TPIP/EPC150911 MD 1-0-V-115-08-00007 c
PACKING LIST
(DOC. No.: MD1-0-V-115-08-00007_Rev.
P.O No. \'MON-P0-0024 M -4600039961
Project Name. MONG DUONG 1 THERMAL POWER PLANT Total No. of P'kg
Customer HYUNDAI Engineering & Construction Co.,Ltd. Total Net Weight 246,SOO Kgs
Vendor ENERGYEN Corporation
Total Gross Weight 251,900 Kgs
Tel I Fax No. 6:3-512-8545 I 63-542-854 7 Total 1\lcasurement 1706.0 1\J'
Section in Charge : !\like, Kim I Project 1\ fanager
Loading Port F.O.B Masan or Busan Port
..
No. Nel W"ighl (kg) Gross Weight (kg)
1\lcasurcment (m"l
Tag P'kg
No. KKS No. Description
Q'ty
of Package No.
Style
P'kg per P'kg Total per P'kg Total per P'kg Total
1 13LAA 10AC001 DEAERATOR(UNIT1) 1 1 EEN-MD1-DTR-001 SKID 25,200 25,200 25,500 25,500 101.6 101.6
2 13LAA 10BB001 STORAGE TANK(UNIT1) 1 1 EEN-MD1-DTR-002 SKID 84,900 84,900 85,500 85,500 579.4 579.4
1st PLATFORM(1/2) FOR
"'
cvon 7t::n 7t::n
1 """
nnn
"'" "'" STORAGE TANK MANHOLE(UNIT1)
4 -
1st PLATFORM(2/2) FOR
2 1 EEN-MD1-DTR-004 SKID 650 650 900 900 6.4 6.4
STORAGE TANK MANHOLE(UNIT1)
2nd PLATFORM FOR
1 1 EEN-MD1-DTR-005 SKID 2,600 2,600 2,900 2,900 36.9

5 .. -
DEAERATOR MANHOLE(UNIT1)
6
3rd PLATFORM FOR
3 1 EEN-MD1-DTR-006 SKID 1,500 1,500 1,800 1,800

20.2 -
DEAERATOR MANHOLE(UNIT1)

7
4th PLATFORM FOR
1 1 EEN-MD1-DTR-007 SKID 1,900 1,900

21.2 21.2 -
DEAERATOR (UNIT1)
8
LADDER FOR
2 1 EEN-MD1-DTR-008 SKID 400

600 600 !>- 19.8 19.8 -
1st & 2nd PLATFORM(UNIT1)
9
LADDER FOR
2 1 EEN-MD1-DTR-009

300 500 500 12.0 12.0 -
4th PLATFDRM(UNIT1)
10
STAIR WAY FOR
3 1

SKID 550 550 800 800 19.0 19.0 -
1st & 3rd PLATFORM(UNIT1)
11
MAIN PART FOR DEAERATOR &
lJ-5--
EEN-MD1-DTR-011 BOX 1,700 1,700 2,100 2,100 10.8 10.8 -

..
12
)
1 1 EEN-MD1-DTR-012 BOX 2,200 2,200 2,500 2,500 15.1 15.1
R
13 - E 1 1 EEN-MD1-DTR-013 BOX 250 250 500 500 1.7 1.7
IIT1
Em:rgyt:n Corporation
Date 2013-07-2G
PAGE 1 OF '1.'1
* l'\rmarks
DIC : Dangerous Cargo
OlD : Over Dimension
Dimension (em)
Hcmarks
(L)x(W)x(l])
1260 X 260 X 310
2840 X 425 X 480
'1t::n 1e::n 1c:n

590 X 390 X 160
360 X 350 X 160
1200 X 110 X 160
660 X 200 X 150
400 X 200 X 150
500 X 200 X 190
450 X 300 X 80 Putside Dimension
490 X 220 X 140 Putside Dimension
240 X 140 X 50 Putside Dimension
GAP-4.2-3 1/2 REV.C
PACKING LIST
(DOC. No. MD1-0-V-115-08-00007_Rev.C)
P.O No.
Project Name MONG DUONG 1 THERMAL POWER PLANT Total No. of P'kg 29
Customer HYUNDAI Engineering & Construction Co .. Ltd. Total Net Weight 21(i,500
Vendor ENERGYEN Corporation Total Gross Weight 254,900
Tel I Fax No. 63-542-8545 I 63-512-854 7 Total 170G.O
Section in Charge : Kim I Project Manager
Loading Port F.O.B Masan or Busan Port
Tag
No.
P'kg
Net Weight (kg) Gross Weight (kg)
No. ):CKS No. Description
Q'ly
of Package No.
Style
P'kg per P'kg Total pc:r P'kg Total
14 13LAA 10AC001 DEAERATOR(UNIT2) 1 1 EEN-MD1-DTR-014 SKID 25,200 25,200 25,500 25,500
15 13LAA 10BB001 STORAGE TANK(UNIT2) 1 1 EEN-MD1-DTR-015 SKID 84,900 84,900 85,500 85,500
16 -
1st PLATFORM(1/2) FOR
2 1 EEN-MD1-DTR-016 SKID 750 7/:in 1 nnn 1 nnn
17 -
1st PLATFORM(2/2) FOR
2 1 EEN-MD1-DTR-017 SKID 650 650 900 900
STORAGE TANK MANHOLE(UNIT2)
18
2nd PLATFORM FOR
1 1 EEN-MD1-DTR-018 SKID 2,600 2,600 2,900 2,900
-
DEAERATOR MANHOLE(UNIT2)
19
.. 3rd PLATFORM FOR
3 1 EEN-MD1-DTR-019 SKID 1,500 1,500 1,800 1,800
-
DEAERATOR MANHOLE(UNIT2)
20
4th PLATFORM FOR
1 1 EEN-MD1-DTR-020 SKID 1,900 1,900

-
DEAERATOR (UNIT2)
LADDER FOR

21 -
1st & 2nd PLATFORM(UNIT2)
2 1 EEN-MD1-DTR-021 SKID 400 600 600
22
LADDER FOR
2 1 EEN-MD1-DTR-022

300 500 500
4th PLA TFORM(UNIT2)
23
STAIR WAY FOR
3 1

SKID 550 550 800 800
1st & 3rd PLATFORM(UNIT2)
MAIN PART FOR DEAERATOR &
____,..
24 -
STORAGE TANK (UNIT2)

EEN-MD1-DTR-024 BOX 1,700 1,700 2,100 2,100
25 "'

1 1 EEN-MD1-DTR-025 BOX 2,200 2,200 2,500 2,500
-
& STORAGE TA NIT2)
INTERN RAYVALVE FOR
26 - RATOR & STORAGE 1 1 EENMD1-DTR-026 BOX 250 250 500 500
THik'll 'liT?\
6nergyen Corporation
P'kgs
Kgs
Kgs

0 Reviewed
[]' Witnessed

Date: p;...-trt
KR-'0078
Dale 20J:J-07-2ti
PAGE 2 OF 11
* Ecm(lrks
DIC : Dangc:rous Cargo
OlD : Over Dimension
Cm"l Dimension (em)

per P'kg Total (L) x (W) x (H)
101.6 101.6 1260 X 260 X 310
579.4 579.4 2840 X 425 X 480
Fi4 Fi4 ?'in y 1Fin 1t::n
6.4 6.4

36.9
v
590 X 390 X 160

20.2 360 X 350 X 160
21.2 21.2 1200 X 11 0 X 160
'
19.8 19.8 660 A X 200 X 150
12.0 12.0 400 X 200 X 150
19.0 19.0 500 X 200 X 190
10.8 10.8 450 X 300 X 80 putside Dimension
15.1 15.1 490 X 220 X 140 Putside Dimension
1.7 1.7 240 X 140 X 50 putside Dimension
GAP-4.2-3 1/2 REV.(
DETAIL PACKING LIST
P.O NO. : VMON-P0-0024M-4600039961
I Shipping Marks I
PROJECT NAfV: MONG DUONG 1 THERMAL POWER PLANT
CUSTOMER : HYUNDAI Engineering & Construction Co., Ltd.
EMPLOYER : VIETNAM ELECTRICITY
DESTINATION : VIETNAM
DESCRIPTION : DEAERATOR(UNIT1)
P'KGS NO. : EEN-MD1-DTR-001
NET WIT
GROSS WIT
25200
25500
(KGS)
(KGS)
SIZE : 1260(L) x 260(W) X 310(H) (em)
MADE IN KOREA
VENDOR NAME : ENERGYEN CORPORATION.
ITEM No.
(TAG No.)
13LAA 10AC001
EEN-DTR-001
DEAERATOR(UNIT1)
EnErgyEn Coporation
Page 4 of 44
PACKING STYLE SKID
M/0 No.
MEMO
DWG. NO
(PART NO.)
MD1-0-V-115-01-00001
HE2062
QUANTITY
1 SET
GAP-4.2-3 2/2 REV.O
DETAIL PACKING LIST
P.O NO. : VMON-P0-0024M-4600039961
I Shipping Marks I
PROJECT NAIV: MONG DUONG 1 THERMAL POWER PLANT
CUSTOMER : HYUNDAI Engineering & Construction Co.,Ltd.
EMPLOYER : VIETNAM ELECTRICITY
DESTINATION : VIETNAM
DESCRIPTION : STORAGE TANK(UNIT1)
P'KGS NO. : EEN-MD1-DTR-002
NET WIT
GROSS WIT
84900
85500
(KGS)
(KGS)
SIZE : 2840(L) x 425(W) x 480(H) (em)
MADE IN KOREA
VENDOR NAME : ENERGYEN CORPORATION.
ITEM No.
(TAG No.)
13LAA 1088001
EEN-DTR-002
STORAGE TANK(UNIT1)
Ent:rgyEn Coporation
Page 5 of 44
PACKING STYLE SKID
M/0 No.
MEMO
OWG. NO
(PART NO.)
MD1-0-V-115-01-00001
HE2062
QUANTITY
1 SET
GAP-4.2-3 2/2 REV.O
DETAIL PACKING LIST
P.O NO. : VMON-P0-0024M-4600039961
I Shipping Marks I
PROJECT NAIV: MONG DUONG 1 THERMAL POWER PLANT
CUSTOMER : HYUNDAI Engineering & Construction Co.,Ltd.
EMPLOYER : VIETNAM ELECTRICITY
DESTINATION : VIETNAM
DESCRIPTION : DEAERATOR(UNIT2)
P'KGS NO. : EEN-MD1-DTR-014
NET WIT 25200 (KGS)
GROSS WIT 25500 (KGS)
SIZE : 1260(L) x 260(W) x 310(H) (em)
MADE IN KOREA
VENDOR NAME : ENERGYEN CORPORATION.
ITEM No.
(TAG No.)
13LAA 10AC001
EEN-DTR-014
DEAERATOR(UNIT2)
EnErgyEn Coporation
Page 23 of 44
PACKING STYLE SKID
M/0 No.
MEMO
OWG. NO
(PART NO.)
MD1-0-V-115-01-00001
HE2062
QUANTITY
1 SET
GAP-4.2-3 2/2 REV.O
DETAIL PACKING LIST
P.O NO. : VMON-P0-0024M-4600039961
I Shipping Marks I
PROJECT NArv: MONG DUONG 1 THERMAL POWER PLANT
CUSTOMER : HYUNDAI Engineering & Construction Co.,Ltd.
EMPLOYER : VIETNAM ELECTRICITY
DESTINATION : VIETNAM
DESCRIPTION : STORAGE TANK(UNIT2)
P'KGS NO. : EEN-MD1-DTR-015
NETW/T
GROSS WIT
84900
85500
(KGS)
(KGS)
SIZE : 2840(L) x 425(W) x 480(H) (em)
MADE IN KOREA
VENDOR NAME : ENERGYEN CORPORATION.
ITEM No.
(TAG No.)
13LAA 1088001
EEN-DTR-015
STORAGE T ANK(UNIT2)
EnErgyEn Coporation
Page 24 of 44
PACKING STYLE SKID
M/0 No.
MEMO
DWG. NO
(PART NO.)
MD1-0-V-115-01-00001
HE2062
QUANTITY
1 SET
GAP-4.2-3 2/2 REV.O
II PAGE OF II
&:::'&Iff gt=- ,A%-y.-""'
<!&W:ffiWW%wtr'&%dit
[7
Acid Cleaning inspection Report
Project Name : TW0(2) X 500MW MONG DUONG1 THERMAL POWER PLANT DATE: 2013. 07. 02.
M/0 No. HE2062 Customer
I HYUNDAI ENGINEERING AND CONSTURCTION CO., LTD.
Item Name DEAERATOR
Item No. 13LM 1 OAC001 Dwg. No.
I
MD1-0-V-115-11-00004, Rev.C
Cleaning Machine
Jet Ceaner
0 Spray Machine 0 Air Hose
Cleaning Method Acid Cleaning & Water Flushing (DIP-180)
Surface Temperature 22.5 oc
Method Coating of The Surface by Immersion
Inspection Method Visual Inspection
Result of Inspection
Description Check Point Result Remarks
Oil, grease Accept
Welding flux Accept
Surface of The enclosure
Slag Accept
wall & water box
Abrasive particles chips Accept
Gross contamination. Accept
Witnessed I Reviewed-
Approved by

XS-
Reviewed by
. 0 . . .li
"'

Initial: _tt
Prepared by
l
II PAGE OF II
&
WGiiiB ww q;;;;rw <&;:Ar lf C:ffV
_[7
Acid Cleaning inspection Report
Project Name : TW0(2) X 500MW MONG DUONG1 THERMAL POWER PLANT DATE: 2013. 07. 02.
M/0 No. HE2062 Customer I HYUNDAI ENGINEERING AND CONSTURCTION CO., LTD.
Item Name DEAERATOR
Item No. 13LAA10BB001 Dwg. No.
1
MD1-0-V-115-11-00004, Rev.C
Cleaning Machine
Jet Ceaner
D Spray Machine D Air Hose
Cleaning Method Acid Cleaning & Water Flushing (DIP-180)
Surface Temperature 23.4 oc
Method Coating of The Surface by Immersion
Inspection Method Visual Inspection
Result of Inspection
Description Check Point Result Remarks
Oil, grease Accept
Welding flux Accept
Surface of The enclosure
Slag Accept
wall & water box
Abrasive particles chips Accept
Gross contamination. Accept
Witnessed I Reviewe< Approved by

..
!1 ReVie:wtd
Reviewed by
0 w.inesSed
...
Initial: M l-4 J

Date: p'J. ?J1
Prepared by
-0078
CERTIFICATE OF COMPLIANCE
MANUFACTURED BY ENERGYEN CORPORATION
514-5, Osikdo-dong, Gunsan-si, Jeonbuk, Korea
( NAME AND ADDRESS OF MANIFACTIRER )
MANUFACTURED FOR HYUNDAI ENGINEERING & CONSTRUCTION
(NAME AND ADDRESS OF PURCHASER)
TYPE HORIZONTAL MFG'S SERIAL NO. HE2062-DTR-0011 HE2062-ST-001 YEAR BUILT 2013
(HORIZ. OR VERT.)
ITEM NO. 13LAA10AC001/ 13LAA 1088001 ITEM NAME STORAGE TANK! DEAERATOR
GENERAL ASSEMBLY DRAWING NO. MD1-0-V-115-01-00001 THE CHEMICAL AND PHYSICAL PROPERTIES OF
-----------------------
ALL PARTS MEET THE REQUIREMENTS OF MATeRIAL SPECIFICATION OF THE ASME BOILER AND PRESSURE VESSEL
CODE, THE DESIGN, CONSTRUCTION, AND WORKMANSHIP CONFORM TO ASME RULES, SECTION VIII, DIVISION 1
DESIGN SPECIFICATION
DESCRIPTION SPECIFICATION
MATERIAL SA516-70
NOMINAL THICKNESS(DEAERATORI STORAGE TANK) (mm) 11TI 18T
DESIGN PRESSURE [bar.g] 15 I F.V
DESIGN TEMPERATURE (DEAl STR.) ("C) 3501343
RADIOGRAPHIC EXAMINATION (SHELL I HEAD) FULL I FULL
HYDROSTATIC TEST PRESSURE [bar.g] 22.5
P.W.H.T. YES
OVERALL LENGTH (mm) 28260
WE CERTIFIY THAT THE DESIGN, FABRICATION, INSPECTION AND TESTING OF THIS UNIT CONFIRM TO THE
PURCHASER AND SPC'S SPECIFICATION AS REFERRED IN THE PURCHASE ORDER.
MANUFACTURER'S NAME ENERGYEN CORPORATION
REPRESENTATIVE
~ ~
I Q.A. DEPT. MANAGER DATE J/6 -}3>
. . ? ~
(SIGNATURE)
ENERGYEN CORPORATION
CERTIFICATE OF COMPLIANCE
MANUFACTURED BY ENERGYEN CORPORATION
514-5, Osikdo-dong, Gunsan-si, Jeonbuk, Korea
( NAME AND ADDRESS OF MANIFACTIRER )
MANUFACTURED FOR HYUNDAI ENGINEERING & CONSTRUCTION
(NAME AND ADDRESS OF PURCHASER)
TYPE HORIZONTAL MFG'S SERIAL NO. HE2062-DTR-002/ HE2062-ST-OO YEAR BUILT 2013
(HORIZ. OR VERT.)
ITEM NO. 13LAA10AC001/ 13LAA 1088001 ITEM NAME STORAGE TANK/ DEAERATOR
GENERAL ASSEMBLY DRAWING NO. MD1-0-V-115-01-00001 THE CHEMICAL AND PHYSICAL PROPERTIES OF
ALL PARTS MEET THE REQUIREMENTS OF MATERIAL SPECIFICATION OF THE ASME BOILER AND PRESSURE VESSEL
CODE, THE DESIGN, CONSTRUCTION, AND WORKMANSHIP CONFORM TO ASME RULES, SECTION VIII, DIVISION 1
DESIGN SPECIFICATION
DESCRIPTION SPECIFICATION
MATERIAL SA516-70
NOMINAL THICKNESS(DEAERATOR/ STORAGE TANK) (mm) 11T/ 18T
DESIGN PRESSURE [bar.g] 15 I F.V
DESIGN TEMPERATURE (DEN STR.) ("C) 350/343
RADIOGRAPHIC EXAMINATION (SHELL I HEAD ) FULL I FULL
HYDROSTATIC TEST PRESSURE [bar.g] 22.5
P.W.H.T. YES
OVERALL LENGTH (mm) 28260
WE CERTIFIY THAT THE DESIGN, FABRICATION, INSPECTION AND TESTING OF THIS UNIT CONFIRM TO THE
PURCHASER AND SPC'S SPECIFICATION AS REFERRED IN THE PURCHASE ORDER.
MANUFACTURER'S NAME ENERGYEN CORPORATION
REPRESENTATIVE
~ M /
I Q.A. DEPT. MANAGER DATE R/6-i3
..-?-;:;;;.
(SIGNATURE)
ENERGYEN CORPORATION
II PAGE OF
ENElRGYEN
INSPECTION REPORT
for Certificate of rust prevention dry film thickness
Project Name : TW0(2) X 500MW MONG DUONG1 THERMAL POWER PLANT DATE: 2013. 08. 06.
MIO Nlo. HE2062 Customer HYUNDAI ENGINEERING AND CONSTURCTION CO., LTD.
Item Name DEAERATOR & STORAGE TANK
Item No. 13LAA 1 OAC001 Dwg. No. MD1-0-V-115-01-00001, Rev.D
Rust Prevention & Painting Spec.
Part of Application
EXTERNAL SURFACE FOR EXTERNAL SURFACE OF UN -INSULATED AREA
SHELL AND HEAD (SADDLE, Platform Clip)
SSPC-SP-10 SSPC-SP-10
Surface Preparation
Accept Accept
PRIMER INORGANIC ZINC PRIMER INORGANIC ZINC PRIMER
Paint 2ND COAT SILICONE HIGH BUILD POLYAMIDE EPOXY
FINISH - POLYURETHANE
Range of Paint Th'k
105 fLill I 2 COAT 250 fLill I 3 COAT
I No. of Coat
Applied Painting Method AIRLESS SPRAY
Dry Film Thickness
Apparatus Dew point Humidity Drying Time
AIRLESS 19.85
oc
65% 24 hr.
Check point ( Part of Application ) Finish Color Dry film Thickness Result
DEAERATOR & STORAGE TANK
107 123 Accept
-
ttm
(105/Lfll I 2 COAT)
EXTERNAL SURFACE OF UNINSULATED AREA
RAL 9003 251 295 Accept
-
ttm
(SADDLE, PLATFORM CLIP etc) (250/Lfll I 3 COAT)
Test
Maker Model Control No. Re-cal. Date
Gauge
Elcometer 456 HJ0166 2013.11.07
1lflr

vf./
Witnessed I Reviewed by Approved by

D REHnewed
Reviewed by
(0 Witnessed
'
Initial: L.e
;
Date:


Prepared by
KR- L/'
II PAGE OF
INSPECTION REPORT
for Certificate of rust prevention dry film thickness
Project Name : TW0(2) X 500MW MONG DUONG1 THERMAL POWER PLANT DATE : 2013. 08. 06.
MIO Nlo. HE2062 Customer HYUNDAI ENGINEERING AND CONSTURCTION CO., LTD.
Item Name DEAERATOR & STORAGE TANK
Item No. 13LAA10BB001 Dwg. No. MD1-0-V-115-01-00001, Rev.D
Rust Prevention & Painting Spec.
Part of Application
EXTERNALSURFACEFOR EXTERNAL SURFACE OF UN -INSULATED AREA
SHELL AND HEAD (SADDLE, Platform Clip)
SSPC-SP-10 SSPC-SP-10
Surface Preparation
Accept Accept
PRIMER INORGANIC ZINC PRIMER INORGANIC ZINC PRIMER
Paint 2ND COAT SILICONE HIGH BUILD POLYAMIDE EPOXY
FINISH - POLYURETHANE
Range of Paint Th'k
105 /.1-frl I 2 COAT 250 /Lfr1 I 3 COAT
I No. of Coat
Applied Painting Method AIRLESS SPRAY
Dry Film Thickness
Apparatus Dew point Humidity Drying Time
AIRLESS 19.85 c 65% 24 hr.
Check point ( Part of Application ) Finish Color Dry film Thickness Result
DEAERATOR & STORAGE TANK
Grey 105 121 Accept
-
11m
(105/Lfr1 I 2 COAT)
EXTERNAL SURFACE OF UNINSULATED AREA
White 250 294 Accept
-
11m
(SADDLE, PLATFORM CLIP etc) (250/Lfr1 I 3 COAT)
Test
Maker Model Control No. Re-cal. Date
Gauge
Elcometer 456 HJ0166 2013.11.07
Witnessed I Reviewed by
nDilf
Approved by


D Reviewed
1Y1 Witnessed
Reviewed by
.
:
'

:

'
initial: M. L-4
Date:



Prepared by

liD-
/_/
,
II PAGE OF
;--.
.
RUBBING OF NAME PLATE
Project Name : TW0(2) X 500MW MONG DUONG1 THERMAL POWER PLANT
M/0 No. HE2062
Customer HYUNDAI ENGINEERING AND CONSTURCTION CO., L TO.
Item Name DEAERATOR
Item No. 13LM 1 OBBOO 1 Dwg. No. MD1-0-V-115-11-00013, Rev.B
Witnessed I Reviewed by Approved by
Reviewed by
:e
Prepared by
II PAGE OF
RUBBING OF NAME PLATE
Project Name : TW0(2) X 500MW MONG DUONG1 THERMAL POWER PLANT
M/0 No. HE2062
Item Name DEAERATOR
Item No. 13LAA10BB001
Witnessed I Reviewed by .
Customer HYUNDAI ENGINEERING AND CONSTURCTION CO., L TO.
Dwg. No.
Approved by
Reviewed by
..l"f
Prepared by
MD1-0-V-115-11-00013, Rev.B
II PAGE OF
RUBBING OF NAME PLATE
Project Name : TW0(2) X 500MW MONG DUONG1 THERMAL POWER PLANT
M/0 No. HE2062
Item Name DEAERATOR
Item No. 13LAA 1 OAC001
Witnessed I Reviewed by
Customer HYUNDAI ENGINEERING AND CONSTURCTION CO .. LTD.
Dwg. No.
Approved by
Reviewed by
-.tl:>repared by
MD1-0-V-115-11-00013, Rev.B
II PAGE OF
RUBBING OF NAME PLATE
Project Name : TW0(2) X 500MW MONG DUONG1 THERMAL POWER PLANT
M/0 No. HE2062
Item Name DEAERATOR
Item No. 13LM10AC001
Witnessed I Reviewed by
Customer HYUNDAI ENGINEERING AND CONSTURCTION CO .. LTD.
Dwg. No.
Approved by
Reviewed by
J'A- -ec- Prepared by
'
MD1-0-V-115-11-00013, Rev.B
1.
2.
HYUNDAI
ENG!NEEiWJG & CONSTRUGl!ON CO.. LTD.
Outstanding Punch List
PO No.:
ITP No.:
VMON-P0-0024M-4600039961
MD1-0-V-115-05-00001
Inspection Item :
Inspection
Date:
Deaerator with Storage Tank
July. 25 -26, 2013
Painting Procedure (MD1-0-V-115-05-
00002), according to the
Deaerator (shell & head part) painting
work after blasting operation does not
remove sufficiently grit and other
loose particles on the surface of a
larae amount of dust is found.
Location: Gunsan Factory,Gunsan si,Korea
Painting Procedure (MD1-0-V-115-05-
00002) according to the dust cleaning
& paint touch-up and re-inspection will
be performed.
Energyen
Corporation
Before
packing
inspection
I . .. . ' .
1 s'ian.
All Inspection Attendees shall be stamping with signature on this action list for acknowledgement to take further corrective action.
Stamp & Sign with Date
Munsoo- Lee Company /$=f:RY-""!<!i2 K
;26. :;fvi/. 2&>1_3
Page 1 I 1
Inspection Report



Use date format: 30 / 03 / 2013
1.0 General

Project Name TW0(2) X 500 MW MONG-DUONG-1 THERMAL POWER PLANT
PO No. VMON-0024M-4600039961
Item Description Deaerator with Storage Tank
Inspection Description Visual Inspection for Welding Parts
Report No./ Rev. No.
VMON-0024M-ENE-IR-
001 Rev.0
Report Date Mar. 29, 2013
Inspection Date Mar. 28, 2013 HDECs Inspector Name Mr. Y. Bae
Employer Name Intert Moody Korea
Employers Inspector
Name
Yeon-Soo Choi
Main Supplier Name Energyen Corporation Manufacturer Name Energyen Corporation
Date Next Visit Around middle of April
Location of inspection Gunsan Factory City Gunsan-si
Country Korea Reference No.
Contact Name Mr. Si-Min PARK Phone & Fax No. 82-10-5032-1010
E-mail address smpark@energyen.co.kr


1.1 Generic Materials Description

Tag / EQt No. Description
13LAA 10AC001 &
13LAA 10BB001
Deaerator and Storage Tank 2 Sets


1.2 Summary of Findings

1) Visual Inspection for welding parts : Spot witnessed / Accepted



1.3 Order Inspection Status
Item/
Tag No.
Inspection & Test
Description
Ordered
Quantity
Presented
this Visit
Accepted this
Visit
13LAA 10AC001 &
13LAA 10BB001
Visual inspection
for Welding parts
2 Sets 2 Sets 2 Sets

Page 1 / 5


2.0 Attendees

Name Affiliation Position Tel. e-mail
Yeon-Soo Choi On behalf of MHI Inspector 82-10-6480-6448 tjsql999@daum.net
Mr. S. M. Park
ENERGYEN Corp.
QA Inspector 82-10-5032-1010 smpark@energyen.co.kr


3.0 Applicable Insp. Requirement (IR)-Forms, Codes, Standards, Drawings, Specs, Supplier
/ Manufacturers Procedure & ITP and etc.

Codes, Standards & Applicable
Procedure and etc.
Issue Title ( Doc. No./ Rev. No. ) Status
ASME Sec. I I, V, VIII & IX 2010 Ed. with 2011 Add. -
ANSI B16.5 7 16.47 2009 Ed. -
Inspection & Test Procedure A MD1-0-V-115-05-00001 A
WPS & PQR B MD1-0-V-115-05-00003 A
Quality Control Plan C MD1-0-V-115-05-00006 AN
NDE Procedure B MD1-0-V-115-05-00009 A
Drawing(Deaerator & Storage tank);
GENERAL ARRANGEMENT D MD1-0-V-115-01-00001 AN
DETAIL OF HEATER B MD1-0-V-115-11-00001 A
DETAIL OF STORAGE TANK C MD1-0-V-115-11-00002 AN
DETAIL OF NOZZLE(1/9 & 2/9) C MD1-0-V-115-11-00003 & 00004 A
DETAIL OF NOZZLE(3/9~6/9) B MD1-0-V-115-11-00005 ~00008 A
DETAIL OF NOZZLE(7/9) C MD1-0-V-115-11-00009 A
DETAIL OF NOZZLE(8/9) B MD1-0-V-115-11-00010 A
-------------------------------------------- - Blank- -----------------------------------------

In status column, indicate approval status of Supplier documents (drawings / ITP/ procedures)


4.0 Performed Activities incl. Results

I.T.P. line
number
Inspection/Monitoring Activity
Type of
Inspection
Results
4. 1) Material identification R(Monitoring) Satisfactory
4. 4) Visual Inspection of welding parts S(Spot witness) Satisfactory



Page 2 / 5

5.0 Inspection/Monitoring Details

Following inspection activities were performed at ENERGYEN Corporation in Gunsan-si, Korea
on Mar. 28, 2013 in accordance with applicable Code and approved Inspection & Test
Procedure for Deaerator and Storage tank.
The inspection activities and results are as below;
5.1 Witnessed visual inspection for welding parts
The following items were checked the general appearance & surface condition for
welding parts in accordance with the applicable Code and approved Inspection & Test
procedure (MD1-0-V-115-05-00001), and the results were found to be satisfactory within
acceptance criteria.
Check points of weldment are as follows;
- Crack, Overlap, Undercut, Bead condition of uniformity, Toe length of fillet weld,
Crater of weld, Deformation of weld seam, Thickness of reinforcement, and etc.
- Verified the gasket contact surface of flange(Serration and protection)

5.2 Verified the material I.D Marking and review of Material certificates
During the witnessed visual inspection for welding part, the inspector randomly checked the
material I.D Marking on equipments, and reviewed the material test certificates for random
selected material as per the applicable Code requirements.
The results were found to be satisfactory

Verified items are as follows;
Shell plate (LWL3 & LWL4) of the storage tank for Item; 13LAA 10BB001
- Material I.D mark on plate; A516-70,/ Heat No. PP342490-04, 26t
- Reviewed mill test certificate; Certificates No.; 1
Head plate (Sliding side) of the storage tank for Item; 13LAA 10BB001;
- Material I.D mark on Head plate; SA516-70 / Heat No. PP305018-02, 30t
- Reviewed mill test certificate; Certificates No.; 121008-KPNE-51-001
Flange ( Nozzle No. P3) of the Dearetor tank for Item; 13LAA 10BB001;
- Material I.D mark on Flange; SA105 #300 WNRF 16 S/60 / Heat No. MK57361
- Reviewed mill test certificate; Certificates No.; KMK130214-1
The results were found to be satisfactory



6.0 Non-Conforming / Punch List Items noted during this visit

None


7.0 Outstanding Non-Conforming Items/problems (excluding items under 6.0)
Query No. Description
Date Raised /
Report No.
Status




Page 3 / 5


8.0 Actions required

No. Action Responsible Due date
None


9.0 Digital Pictures


Overall view of the Deaerator and Storage Tank 2 Sets (13LAA 10AC001 & 13LAA 10BB001)



Visual inspection (Shell to shell/Head joint & Weldment of nozzle and Accy part)

Verified material I.D marking
Page 4 / 5


Calibration Thickness check Shell plate Formed head

10.0 Attachments

1. Calibration Certificate
2. Mill Test Certificates



11.0 Inspector(s)

Name
Signature Tel. e-mail
Yeon Soo Choi

010-6480-6448 TJ SQL999@DAUM.NET


12.0 Time claimed for this visit

Date Inspection Time Remarks
Mar. 28, 2013 1day

Total 1day


FORM NO.QP601-04
Page 5 / 5

.IiI
Ai Ai 7'-1 AJ
<:) <:) -, "I
CALIBRATION CERTIFICATE
'}I'}ICC! E-i Ai'ti: : KM12-5001-007
799. KWANGYANG 2-DONGDONGAN-GU. CertificateNo.
ANYANG-CITY, KYUNGGI-DO. KOREA
Tel: 031-420-8881-4, Fax: 031-420-8880 liIlolxl ( 1 ) /
http://www.krcmLco.kr Page ofPages
1. .2.1 Xt(Client)
7[ t!- : ENERGYEN CORPORATION
4- :1:(Address): #646-1 Woryong-ri, Yongji-myeon, Gimje-si, Jeollabuk-do, KOREA
2. 71(Calibration Subject)
71 71 ULTRASONIC THICKNESS GAUGE
and Model Name) :OLYMPUS I 26MG
7171'ti:(Seriall\lumber) : 121409202
oWitnessed
3. ofCalibration) :26th 06, 2012
'1 ;J.l
" i.3
(.
4. (Environment)
1<1i- 0037
.g (Temperature) : (20,0 0.2) 'c (Humidity) : ( 45 2 ) % R.H.
;g(Location): _ Calibration Lab.) o Lab.) o SileCalibration)
Reviewed
5. :1:E{g(TraceabiHty)
method and/orbrief description)
The aboveinstrumentis calibrated as perstandard calibration procedureforThickness gauges. ultrasonic
(KRCMH-102-17)and by standards traceabfed tonational metrologyinstitude.
ofused standards/specifications)
Af%
Description
SURFACE PLATE
...." -_T__ ",
11361
Manufacturer and Model
NSP

Serla! Number


Calibration Calibration
Valid Until Laboratory
2012.11 KRCMI

2012.12.14.
6, Result) : Reference Calibration Results
7. Uncertainty) : Reference Calibration Results
XHMeasurements performed by)
by)

(Affirmation)
{g (Name) : Kim Seon Ju
6j
1:1
.\fI(Title):Techical Manager
(Name) :Jeon Byeong Hwan
1:1<>:jAi1= ,iP:11AIgj -gj (International La oratoryAccreditation Cooperation) {>J-.- -gj {Mutual
Recognition Arrangement)OII A1 71T-{KOLAS).iE..!f-El jj] L-I cL
The abovecalibrationcertificateis theaccreditedcalibrationitems by Korea LaboratoryAccreditation Scheme, whichsignedthe ILAC-MRA.
AccreditedbyKOLAS, RepublicofKorea
27th 06, 2012
Korea Research Center for Measuring Instruments Co., Ltd:...
. <v
note. This calibration certificate becomeinvalid. When occursudden change offactor(Overload. Temperaltlre.HI,Jr)'fiCiityet'i::;;) thar
affectedby accuracyofinstruments. _ :: - -
.lil
CALIBRATION RESULTS
799, KWANGYANG 2-DONG DONGAN-GU.
ANYANG-CITY. KYUNGGI-DO. KOREA
: KM12-5001-007
Certificate No.
Tel: 031-420-8881-4, Fax: 031-420-8880 IIlI 0 IAI ( 2 ) / (
Page of Pages http://www.krcmi.co.kr
Standard Test Block of Accuracy
Standard Test Block Length( mm )
Standard Test Block
Calibation Value( mm )
2.48 2.41
5.00 4.92
7.50 7.46
I
10.00 9.98
12.52 12.47
25.01 25.04
50.01 50.30
100.01 100.73
150.01 150.76
a note
+ Uncertainty: 0.01 mm (Confidence Level Approximatel 95 %. k = 2 ) +
-
+ Accreditation system of national calibration laboratories, clause 41: 12 th monr/'1S
-END-
Certificate No.lg kl\:!:!.2. :130115-KPNE-009-001
puSOO Mill Test Certificate/?3 g!A-I
Dateof 05, 2013
SurveyorTo:
eUu -IV,
pasco Gwangyang Works, 700 Geumho-dong, Gwangyang-si, Jeollanam-do, 545-711, Korea

Chief of material testing ction Cho, Young-Mo
../
#11271 MYUNGDONGRI, HANRIMMYUN,
CERTIFICATE OF MATERIAL
MYONG KWANG METAL CO.,LTD. KJMHAECtrY. KYUNGNAM. SOUTH KOREA
3,1 ACCORDING TO 1S010474/EN10204:2004
TEL: 8255340-8954, FAX: 82557243500
CERTIFICATE NO. KMK130214-1 CUSTOMER ENERGYEN Co., Ltd. PAGE lofl
PRODUCT NAME FORGING N/A
PROJECT NAME N/A 2013.02.14
:,:./
C Sf ..
0:35
0.20 0.25 1.03
Mark of
Specimen
Size of Test
Specimen
G.l(mm)
V.S
I
N/A
MP.
1 I D(mm)
Min. r
Min. Min.
12.5 50.0
250 . 48S 22
',---
B T
52412 300# BLRF 20" 6
524-1-4 300# WNRF 16" (SCH60) 4
:Heat ireatment *2 Dimension &VisualInspection >.
N : 870'C X 7.7Hr5 A.C Good
*1. Direction: L=Longitudinal. T=Tangential, Tr=Transverse.
*2. Heat Treatment: N=Normalized, A=Annealed. Q=Quenched, T=Tempered, ST=$olution Treated, S=Stabilization
A.C=Air Cooled, F,C=Furnace Cooled, W.C=Water Cooled, O.C=Oil Cooled.
'3. Tensile Test: Y.S=Yield Strength, T.S=Tensile Strength, E.L=Elongation, R.A=Reduction of Area
D:Diameter, G.L=Gage length.
*4. Surface Condition: AF=As Forged, R.M=Rough Machined, F.M=Finish Machined.
N/A
I
%
I
HULL NO.
ISSUE DATE
.. ".' 1
Note
Impact 'Test
Hardness
I Notch
Min. 1 Avg.
30
.. lifD:e4
We hereby. certify that the materials herein has been t,
In accordance with the above speCification, and
with its requirements.
Y.K.NA
y}-
Prepared by
HB
Max.
187
.Remark
Remark
Certificate No.lg'a Al i2:j: :121008-KPNE-051-001
Mill Test Ar A1
Date of Issuell{-gliJ:f:Oct., 17,2012
._;>
Q{tJj 3136 PO tJj 54'13136
J:f:MACHiNERY F!NANCIAL COOPERATIV Commodity/8 ;'JLATE
v
.:storner/ll 2lj Af:MACHINERY FINANCIAL COOPERATIV
.. ... --.-,-,---------------
Weight
p
o
S
Tensile! eJ ;g A I gj
Product No.
Qua-
=2.,
00
Heat No.
YP TS EL
1:i.)(:J.800x11380
Sub Tiltal
7x2942x7122
-.7x2942x7122
Sub T:Jtai
7x2700x7122
-" Sub Tllal
20x2855x6390
... Sub Total
26x2800x7150
... Sub Total
30x1782x8104
All:\;I:I:Q.
PP30527401
A"" -r=
3
6
9
2
2
(kg) XlisEl.S'?
o
N
3.001 I SU21724 I T I 359
3,001
8,385 I SU21719 I T I 345
16,770 I SU21720 I T I 345
25,'55jk9)
5.130 SU21719I TI 361
5,130
SU21718 I T I 342
SU21719 i T 321
SU21720 I T 323
Tensile Test. Direction: Transversal. Gauge Length: 200mm (Rectangular),
YP Method . Q.2% off-set
Division L:Ladle Analysis, P:Products Analysis
Chemical Composition Unit: -2:x11100. -3:x111000, -4:x1110000. -S:x11100000
Supply Cond'tion : As-Rolled unless otherwise Heat Treated.
(l.l'n) ("!o)
526 26
523 27
526 29
524 28
531 26
519 24
521 23
D
I I -
v Chemical
C
-4
SI
-3
Mn p
-3 -4
1825 375 1114 125
1841 358 1089 146
2034 348 1089 165
PI 1990 340 1070 153
L 2027 344 1078 187
P 2002 341 1073 ',80
LI 2034 348 1089 165
P 1990 340 1070 153
LI 2132 340 1089 153
P 2090 347 156
S
-<I
26
31
34
32
32
32
34
32
33
34
Ct
-2
2
2
2
2
2
2
2
Ni
-2
.)....
B
-4
3
2
3
2
2
2
3
2
3
2

2
Cu
-3
21
19
17
16
16
15
17
16
17
16
17
Mo
-2
o
o
o
o
o
o
o
c
o
o
o
2 0
15 c
Nb
-3
o
o
o
1
a
o
Ti
-3
f:
::
V Sol-AI
-3
14
13
12
13
13
11
12
13
13
1<
12

-3
33
30
24
24
24
26
24
24
26
26
2"
2"
24
We made in accorda"nce tr:e order and abOVe speC:f i:::",2t;cn
This material has been fully killed and made by basic oxygen process
No repair welding was performed to the products.
rp :3 efo./cP - 1:6 4J:'.. h:lf:--ff/Ylk:. /(et;.J
This material has been made by vacuum degassing process. This material is fine grained steel.
Test Certificate is issued to EN 10204 3.1 .
g!J18 ;:;t2:; MAI eX,IJ} *,:il 0:1,
Sfi.EJ2EAI MeA1 *'
POSCO Chief of materia! testing section Hong, Sam Young
Inspection Report



Use date format: 30 / 03 / 2013
1.0 General

Project Name TW0(2) X 500 MW MONG-DUONG-1 THERMAL POWER PLANT
PO No. VMON-PO-0024M-4600039961
Item Description Deaerator with Storage Tank
Inspection Description Visual Inspection for Welding Parts
Report No./ Rev. No. VMON-0024M-EEC-IR-002 Report Date J une 07, 2013
Inspection Date May. 31 & J une 3~5, 2013 HDECs Inspector Name Yeon-Soo Choi
Employer Name Vietnam Electricity
Employers Inspector
Name

Main Supplier Name Energyen Corporation Manufacturer Name Energyen Corporation
Date Next Visit Around end of J une Next inspection stage
Final VI & DI (After
PWHT)
Location of inspection Gunsan Factory City Gunsan-si
Country Korea Reference No.
Contact Name Mr. Si-Min PARK Phone & Fax No. 82-10-5032-1010
E-mail address smpark@energyen.co.kr


1.1 Generic Materials Description

Tag / EQt No. Description
13LAA 10AC001 &
13LAA 10BB001
Deaerator and Storage Tank 2 Sets


1.2 Summary of Findings

1) Visual & Dimension Inspection before PWHT : Spot witnessed / Accepted



1.3 Order Inspection Status
Item/
Tag No.
Inspection & Test
Description
Ordered
Quantity
Presented
this Visit
Accepted
this Visit
13LAA 10AC001 &
13LAA 10BB001
Visual & Dimensional check
2 Sets 2 Sets 2 Sets

Page 1 / 8


2.0 Attendees

Name Affiliation Position Tel. e-mail
Yeon-Soo Choi On behalf of HEC Inspector 82-10-6480-6448 tjsql999@daum.net
Mr. S. M. Park
ENERGYEN Corp.
QA Inspector 82-10-5032-1010 smpark@energyen.co.kr


3.0 Applicable Insp. Requirement (IR)-Forms, Codes, Standards, Drawings, Specs, Supplier
/ Manufacturers Procedure & ITP and etc.

Codes, Standards & Applicable
Procedure and etc.
Issue Title ( Doc. No./ Rev. No. ) Status
ASME Sec. I I, V, VIII & IX 2010 Ed. with 2011 Add. -
ANSI B16.5 7 16.47 2009 Ed. -
Inspection & Test Procedure A MD1-0-V-115-05-00001 A
WPS & PQR B MD1-0-V-115-05-00003 A
Quality Control Plan C MD1-0-V-115-05-00006 AN
NDE Procedure B MD1-0-V-115-05-00009 A
Drawing(Deaerator & Storage tank);
GENERAL ARRANGEMENT D MD1-0-V-115-01-00001 AN
DETAIL OF HEATER B MD1-0-V-115-11-00001 A
DETAIL OF STORAGE TANK C MD1-0-V-115-11-00002 AN
DETAIL OF NOZZLE(1/8 to 8/8) C MD1-0-V-115-11-00003 ~00010 A
INSULATION SUPPORT A MD1-0-V-115-11-00012 ~00013 A
PLATFORM & LADDER(1/7 TO 7/7) B MD1-0-V-115-11-00014 ~00021 AN
ENCLOSURE WALL OF
DEAERATOR (1/2 & 2/2)
A MD1-0-V-115-11-00101 & 00102 A & AN
In status column, indicate approval status of Supplier documents (drawings / ITP/ procedures)


4.0 Performed Activities incl. Results

I.T.P. line
number
Inspection/Monitoring Activity
Type of
Inspection
Results
4. 1) Material identification R(Monitoring) Satisfactory
4. 4) Visual Inspection of welding parts S(Spot witness) Satisfactory
4. 6) RT film review (Befor PWHT) R Satisfactory
4. 7) Leak test for reinforcement pad S(Spot witness) Satisfactory
4. 8) Visual and dimensional ( Before PWHT) W Satisfactory

5.0 Inspection/Monitoring Details
Page 2 / 8


Following inspection activities were performed at ENERGYEN Corporation in Gunsan-si, Korea on
May 31& J une 03 ~05, 2013 in accordance with applicable Code and approved Inspection & Test
Procedure for Deaerator and Storage tank.
The inspection activities and results are as below;
5.1 Nondestructive Examination (Before PWHT)
Witnessed the Ultrasonic examination for randomly selected nozzles of Deareator in accordance
with the approved Inspection and Test Procedure and NDE Procedure, and the results were
found to be satisfactory.
The RT films for the Deaerator and Storage tank were reviewed in accordance with the
requirement of ASME Code and related documents, and the results were found to be
satisfactory within permissible tolerances
MT & UT examination was in progress during the final inspection but not yet finished.
Result: Satisfactory with the condition of following comments;.
Note; The UT & MT are required completly finished before PWHT. It will be verified at final
inspection stage.(See attached Outstanding Punch List-Item 5.)

5.2 Leak test for reinforcement pad
Witnessed the pad leakage test for randomly selected nozzles of Deareator in accordance with
the approved Inspection and Test Procedure, and the results were found to be satisfactory.
For storage tank 2 sets, Not performed pad leakage test for nozzle reinforcing pad because of
lack of time.

Result: Satisfactory with the condition of following comments;
Note; Pad leakage test for storage tanks will be performed by Energyen QC before PWHT,
HDEC inspector will review the report at final stage (See attached Outstanding Punch List-
Item 8.).

5.3 Witnessed visual inspection for welding part & verified the material I.D Marking
During the witnessed visual and dimension inspection for Deaerator/Storage tank, the
inspector randomly checked the material I.D Marking on equipments, and the results were
found to be satisfactory
The following items were checked the general appearance & surface condition for welding
parts in accordance with the applicable Code and approved Inspection & Test procedure
(MD1-0-V-115-05-00001), and the results were found to be satisfactory within acceptance
criteria.
Check points of weldment are as follows;
- Crack, Overlap, Undercut, Bead condition of uniformity, Toe length of fillet weld, Crater of
Weld, Deformation of weld seam, Thickness of reinforcement, and etc.

Result: Satisfactory

5.4 Visual and Dimensional inspections (Except final joint; S.C.W.L-4 & D.C.W.L-1)
The surfaces of equipments were visually inspected the general appearance & surface condition
Page 3 / 8

of weld, and the results were found to be satisfactory with no harmful defects.
And dimensional check for the deareator and storage tank was performed with vendor inspector
in accordance with approved Inspection & Test Procedure and applicable drawings.
The following items were checked during the fabrication work.
- Dimensions of the deareator and storage tank and its parts
- Verification material I.D marking and thickness check for shell plate and formed head
- Surface roughness check for gasket contact surface
- Nozzle Orientation & Projection
- Saddle dimension and BCD
- Internal attachments.

The results were found to be acceptable as condition of that the below not fabricated items
will be corrected and inspected by Energyen QC (See attached Outstanding Punch List).

The folling items could not progess the dimensional check delay the fabrication;
- Dimenional check for platform and ladder clip
- Pre-assembly check for the Shell to Platform & Ladder.
- Insulation ring of longitudinal direction is not attached to Deaerator/Storage tank
because of on turning roller
- Inside lining work for nozzle V1 & V2
(DWG No. MDI-0-V-115-11-D00009, Rev.C / SA240-304, 3t / Part No. 10)




6.0 Non-Conforming / Punch List Items noted during this visit

See attached Outstanding Punch List 2 sheets



7.0 Outstanding Non-Conforming Items/problems (excluding items under 6.0)
Query No. Description
Date Raised /
Report No.
Status







8.0 Actions required

No. Action Responsible Due date
See attached Outstanding Punch List Energyen Before PWHT






Page 4 / 8


9.0 Digital Pictures



Overall view of the Deaerator and Storage Tank 2 Sets (13LAA 10AC001 & 13LAA 10BB001)



Overall view - Visual inspection ( Internal & External parts)

Page 5 / 8

Verified material I.D marking





Page 6 / 8

Dimensional check Deaerator & Storage tanks

RT Film review

Sopt witnessed UT examination

Leak test for reinforcement pad


10.0 Attachments

1. Outstanding Punch List_20130605
2. Dimension & Pad leakage test report(13LAA10BB001 & 13LAA 10AC001)
3. Calibration Certificate (Densitometer & UT Equipment)
4. Certificate-NDE Level III
5. RT Report-Before PWHT





11.0 Inspector(s)

Name
Signature Tel. e-mail
Yeon Soo Choi

010-6480-6448 TJ SQL999@DAUM.NET
Page 7 / 8

Page 8 / 8




12.0 Time claimed for this visit

Date Inspection Time Remarks
May. 31, 2013 1 day
J une 03, 2013 1 day
J une 04 2013 1 day
J une 05 2013 1 day
.
Total 4 days


FORM NO.QP601-04
Notification No. : VMON-0024M-EEC-012 ISSUE DATE : 08 /05 /2013
FORM NO.QP601-01
NOTIFICATION NUMBERING : VMON (PO ID) (SUPPLIER INITIAL) IN-SERIAL NO.(001,002,003 ~)
WITNESS INSPECTION NOTICE




SUPPLIER
Company
Name
ENERGYEN
Address 646-1, Waryong-ri, Yongji-myeon, Gimje-si, Jeonbuk, Korea
Contact Section

Quality Assurance Dep't
Signature
Person Name

Y. bae

PLACE
OF
WITNESS
Maker &
Factory
ENERGYEN GUNSAN
FACTORY
Tel 063-465-1920
E-mail
qa@energyen.co.kr
Address 514-5, Osikdo-dong, Gunsan-si, Jeonbuk, Korea
Contact Person Section Quality Assurance Dep't Name
Si-Min Park
SUBJECT
Job No.
VMON-PO-0024M-4600039961
P/O No.
VMON-0024M-
4600039961
MR No.
HE2062
Inspection
Description
Painting inspection, Packing & Shipping inspection, for platform
and ladder
Issuing Inspection Release Certificate
Applicable
ITP/Activity No.
MD1-0-V-115-05-00001
Legend of
Inspection
Hold Witness Review of Records
Others ( SPOT WITNESS )
Date & Time
2013.08.12/ 11:00
Item Detail &
Quantity

Platform and ladder
Inspection
Program

REMARKS

Mong Duong-1 Thermal Power Plant

II PAGE OF
EJVERGYEN
INSPECTION REPORT
for Certificate of rust prevention dry film thickness
Project Name : TW0(2) X 500MW MONG DUONG1 THERMAL POWER PLANT DATE: 2013. 08. 15.
MIO Nlo. HE2062 Customer HYUNDAI ENGINEERING AND CONSTURCTION CO., LTD.
Item Name DEAERATOR & STORAGE TANK
Item No. 13LAA10BB001 Dwg. No. MD1-0-V-115-01-00001, Rev.D
Rust Prevention & Painting Spec.
EXTERNAL SURFACE OF UN - EXTERNAL SURFACE OF UN -INSULATED
Part of Application INSULATED AREA AREA
(Platforms & attachment) (Handrails & ladder)
SSPC-SP-10 SSPC-SP-10
Surface Preparation
Accept Accept

PRIMER INORGANIC ZINC PRIMER INORGANIC ZINC PRIMER
Paint 2ND COAT HIGH BUILD POLYAMIDE EPOXY HIGH BUILD POLYAMIDE EPOXY
FINISH POLYURETHANE POLYURETHANE
Range of Paint Th'k
250 fLill I 3 COAT 240 fLill I 1 COAT
I No. of Coat
Applied Painting Method AIRLESS SPRAY
Dry Film Thickness
Apparatus Dew point Humidity Drying Time
AIRLESS 19.85
oc
65% 24 hr.
Check point ( Part of Application ) Finish Color Dry film Thickness Result
EXTERNAL SURFACE OF UNINSULATED AREA
WHITE 253 295 Accept
-
/Lffi
(PLATFORM & ATTACHMENT etc) (250/Lfll I 3 COAT)
EXTERNAL SURFACE OF UNINSULATED AREA
YELLOW 241 289 Accept
(HANDRAILS & LADDER etc) (240/Lfll I 3 COAT)
-
/Lffi
Test
Maker Model Control No. Re-cal. Date
Gauge
Elcometer 456 ME30541 2014.02.05
Witnessed I Reviewed by Approved by
by

' '
Prepared by
/;5/

y
II PAGE OF
INSPECTION REPORT
for Certificate of rust prevention dry film thickness
Project Name : TW0(2) X 500MW MONG DUONG1 THERMAL POWER PLANT DATE: 2013. 08. 15.
MIO Nlo. HE2062 Customer HYUNDAI ENGINEERING AND CONSTURCTION CO., LTD.
Item Name DEAERATOR & STORAGE TANK
Item No. 13LAA 1 OAC001 Dwg. No. MD1-0-V-115-01-00001, Rev.D
Rust Prevention & Painting Spec.
Part of Application
EXTERNAL SURFACE OF UN -INSULATED AREA EXTERNAL SURFACE OF UN -INSULATED AREA
(Platforms & attachment) (Handrails & ladder)
SSPC-SP-10 SSPC-SP-10
Surface Preparation
Accept Accept
PRIMER INORGANIC ZINC PRIMER INORGANIC ZINC PRIMER
Paint 2ND COAT HIGH BUILD POLYAMIDE EPOXY HIGH BUILD POLYAMIDE EPOXY
FINISH POLYURETHANE POLYURETHANE
Range of Paint Th'k
250 JLill I 3 COAT 240 JLill I 1 COAT
I No. of Coat
Applied Painting Method AIRLESS SPRAY
Dry Film Thickness
Apparatus Dew point Humidity Drying Time
AIRLESS 19.85 c 65% 24 hr.
Check point ( Part of Application ) Finish Color Dry film Thickness Result
EXTERNAL SURFACE OF UNINSULATED AREA
WHITE 253 299 Accept
-
/1111
(PLATFORM & ATTACHMENT etc) (250Jllll I 3 COAT)
EXTERNAL SURFACE OF UNINSULATED AREA
YELLOW 240 285 Accept
(HANDRAILS & LADDER etc) (240Jllll I 3 COAT)
-
/1111
Test
Maker Model Control No. Re-cal. Date
Gauge
Elcometer 456 ME30541 2014.02.05


Witnessed I Reviewed by Approved by
'
' '
by
Prepared by



II PAGE OF

ENERG1l'EN
v
INSPECTION REPORT
of Platform & Ladder
Project Name : TW0(2) X 500MW MONG DUONG1 THERMAL POWER PL1
Date : 2013. 08. 15.
M/0 No. HE2062 Customer
HYUNDAI ENGINEERING AND CONSTURCTION CO., LTD.
Item Name DEAERATOR
Item No. 13LAA 1 OAC001 Dwg. No. MD1-0-V-115-11-00014, Rev.E
Material SA 36/ SA283-C Q'ty 1 SET
., (f'
!
.. ,



I
\ f!
\!


v
[ll,
-- + -
IX " /


: R
1A '
....
]\,
,T nr
g [5]
\

I
!
'
J
[4]
I
I

}f
---
__

!
-----
...... ::-:::::-----1
ccc
'
---- ---- J.-- - . = v
-
- -- _____ ,
C-------- mo
--------- ------ [' r;,
[6]
[
2
] '1_s_:_Pi !\ F Of< It,
'"''
No. DWG Tal. Act. Result No. DWG Tal. Act. Result
1 2400 3 2403 ACCEPT 5 900 3 903 ACCEPT
2 1500 3 1501 ACCEPT 6 58 3 61 ACCEPT
3 1501.9 3 1503 ACCEPT
4 918 3 915 ACCEPT
Witnessed I Reviewed by
Approved by :


'4
Reviewed by :

' ' ' L
I
Prepared by :
II PAGE
OF
v
INSPECTION REPORT
of Platform & Ladder
Project Name : TW0(2) X 500MW MONG DUONG1 THERMAL POWER PL1
Date: 2013. 08. 15.
M/0 No. HE2062 Customer
HYUNDAI ENGINEERING AND CONSTURCTION CO .. LTD.
Item Name DEAERATOR
Item No. 13LAA 1 OAC001 Dwg. No. MD1-0-V-115-11-00014, Rev.E
Material SA 36/ SA283-C Q'ty 1 SET
"'" [2]
No. DWG To!. Act. Result No. DWG Tol. Act. Result
1 5750 3 5748 ACCEPT 5 3350 3 3349 ACCEPT
2 3700 3 3700 ACCEPT 6 3500 3 3498 ACCEPT
3 4303.5 3 4305 ACCEPT
4 3677.7 3 3679 ACCEPT
Witnessed I Reviewed by

Approved by :


'
f'l
' '
Reviewed by :
' '
Prepared by :
7/
II PAGE OF
..-..,
( .
EN ERG YEN
v

.
INSPECTION REPORT
of Platform & Ladder
Project Name : TW0(2) X 500MW MONG DUONG1 THERMAL POWER PL;
Date: 2013. 08. 15.
M/0 No. HE2062 Customer
HYUNDAI ENGINEERING AND CONSTURCTION CO., LTD.
Item Name DEAERATOR
Item No. 13LAA 1 OAC001 Dwg. No. MD1-0-V-115-11-00014, Rev.E
Material SA 36/ SA283-C Q'ty 1 SET
11900 [2]
- - ------------ --- - --------------------------------
\/OJ
,q,r.''IJO,d
1200 ,,.
25
1200 ;;;;200 r ''" - r''"o
"'""""
. fl
1!>0
I g;,o 9SO I 950 I
1--
1 l
i!ll
......
-1 [3]
1[4]
I [S] -1
.
I
.,

. '
.,.!
..
'ij
...... -- ..
L
----,
t
....... .......... , ...............
---- 1-
.. ..
c:
!
I
i
150 2'00 J
2<00 I
_J ___ l ...

1- -
-----
....................... --- ....................... . ........ l
\J
- . . . --- .. ----- ii
No. DWG Tal. Act. Result No. DWG Tal. Act. Result
1 1000 3 998 ACCEPT 5 950 3 950 ACCEPT
2 11900 3 11902 ACCEPT
3 950 3 951 ACCEPT
4 950 3 950 ACCEPT
Witnessed I Reviewed by
Approved by :

7
.?-'-------
I
'
Reviewed by :
'
----A
'
Prepared by :

"7---"--
II PAGE
OF
"""'\
ENERlEilf'EN
v
INSPECTION REPORT
of Platform & Ladder
Project Name : TW0(2) X 500MW MONG DUONG1 THERMAL POWER PLANT
Date : 2013. 08. 15.
M/0 No. HE2062 Customer
HYUNDAI ENGINEERING AND CONSTURCTION CO . LTD.
Item Name DEAERATOR
Item No. 13LAA 1088001 Dwg. No. MD1-0-V-115-11-00014, Rev.E
Material SA 36/ SA283-C Q'ty 1 SET
- - ....... , ... _, ____ ,__, ______ -1 __ _. ______ .!1./
No. DWG Tal. Act. Result No. DWG Tal. Act. Result
1 1000 3 1003 ACCEPT 5 950 3 951 ACCEPT
2 11900 3 11898 ACCEPT
3 950 3 948 ACCEPT
4 950 3 951 ACCEPT
Witnessed I Reviewed by

Approved by :


' '
Reviewed by :
___,.(+--
Prepared by :

II PAGE
OF
v
INSPECTION REPORT
of Platform & Ladder
Project Name : TW0(2) X 500MW MONG DUONG1 THERMAL POWER PLANT
Date : 2013. 08. 15.
M/0 No. HE2062 Customer
HYUNDAI ENGINEERING AND CONSTURCTION CO., LTD.
Item Name DEAERATOR
Item No. 13LAA 1088001 Dwg. No. MD1-0-V-115-11-00014, Rev.E
Material SA 36/ SA283-C Q'ty 1 SET
~ [2)
No. DWG To I. Act. Result No. DWG Tol. Act. Result
1 5750 3 5752 ACCEPT 5 3350 3 3348 ACCEPT
2 3700 3 3701 ACCEPT 6 3500 3 3498 ACCEPT
3 4303.5 3 4302 ACCEPT
4 3677.7 3 3678 ACCEPT
Witnessed I Reviewed by
Approved by :
~ ' J Y L /
p---
' '
Reviewed by :
'--"
c:
Prepared by :
dcPfftts
""
II PAGE OF
--..
t
_,,_,$_
._ ... "'
v
\.a-
;p M:'*-"' Th ,._ T CJFV
INSPECTION REPORT
of Platform & Ladder
Project Name : TW0(2) X 500MW MONG DUONG1 THERMAL POWER PLANT
Date : 2013. 08. 15.
M/0 No. HE2062 Customer
HYUNDAI ENGINEERING AND CONSTURCTION CO , L TO.
Item Name DEAERATOR
Item No. 13LAA1088001 Dwg. No. MD1-0-V-115-11-00014, Rev.E
Material SA 36/ SA283-C Q'ty 1 SET

\
!
,-
\
l"'
\
()l
"" -'" "'-'
\
;/
v
[1] 1
'i- -

i1
li
t::
\
I

II
/

/ I=
A,=l
--Hi
--- :---------
IA,fJ-/ )
li;;T
g [5]
: :)1'1
' [4]
l T I =


'_[
'
' . , , I


tJ
, ___
[2] - .
, ____
:;: [6]
No. DWG Tal. Act. Result No. DWG Tal. Act. Result
1 2400 3 2401 ACCEPT 5 900 3 901 ACCEPT
2 1500 3 1502 ACCEPT 6 58 3 61 ACCEPT
3 1501.9 3 1503 ACCEPT
4 918 3 918 ACCEPT
Witnessed I Reviewed by
--:?/f'/Y'l../
Approved by :


I I
Reviewed by :

Prepared by :
r----