INPUT DATA

Backfill Soil Data:Angle of internal friction of soil(f)=


Slope of backfill w.r.t horz surface(b)=
Angle between earth face of wall and base(a)=

36 degree
0 degree
90 From B11 to B6.
135 From B5 to B1.

Unit wt Data:Bulk unit wt of P.C.C.(gbulk)=


Submerged unit wt of P.C.C.(gsub)=
Bulk unit wt of R.C.C.(gbulk)=
Submerged unit wt of R.C.C.(gsub)=
Bulk unit wt of backfill soil(gbulk)=
Submerged unit wt of backfill soil(gsub)=
Unit wt of sea water(gw)=

3
2.4 t/m
3
1.37 t/m
3
2.5 t/m
3
t/m
1.47
3
1.85 t/m
3
0.82 t/m
3
1.0300 t/m

Level Data Input:Finished cope level


Finished top of blockwall
Highest Astronomical Tide
Mean higher high water level
Mean lower high water level
Mean sea level
Mean higher low water level
Mean lower low water level
Lowest Astronomical Tide
Dredged bottom of foundation trench
Dredged bottom of base
Load data input:Live Load
Live Load on wall without seismic=
Live Load on wall with seismic=

Design Report-June2012
Design of Quay Wall

=
=
=
=
=
=
=
=
=
=
=

5 t/m
1.25 t/m

4
3.4
2.6
2.5
1.86
1.6
0.8
0
8
4

m CD
m CD
m CD
m CD
m CD
m CD
m CD
m CD
m CD
m CD
m CD

Fishery Harbour at Barka

Seismic Load:Horz Seismic Coeff=


Vertical Seismic coeff=

0.08
0.04

Bollard
Capacity of Bollard
Spacing of Bollard
Bollard pull per m run (considered)
Bollard pull acts at a height from top of top block

=
=
=
=

40
10.00
4.00
0.25

t
m
t/m
m

Berthing Force
Berthing Force
Spacing of Fender
Berthing Force per m run (considered)
Berthing Force acts below cope level

=
=
=
=

43.1
10.00
4.5
0.4

t
m
t/m
m

=
=

59.00 t/m2
100 t/m2
2
125 t/m

Allowable Pressure input:At Base


At interface

(in direct compression)

Factor of safety input:Non- Seismic :


Seismic

Against Sliding
Against Sliding

=
=

1.75
1.5

Against overturning = 1.5


Against overturning = 1.25

Friction Coefficient input:At Base


At interface

Design Report-June2012
Design of Quay Wall

=
=

0.60
0.60

(non seismic)
(seismic)

Fishery Harbour at Barka

4.00

WS

B11

WS

B10

WS

B9

WS

B8

1.00

1.00

WS

B7
6.00

WS

B6
RF1
WS

B5

7.00
RF2

6.50
WS

B4

RF1
RF2

6.00
WS

B3

RF1
RF2

5.50

WS

B2
WF1
WF2

Design Report-June2012
Design opf Quay wall

B1
6.00

Fishery Harbour at Barka

1.1
DESIGN BASIS
1.1.1 Level Data:Finished cope level

(+) 4.00 m CD

Highest Astronomical Tide

(+) 3.40 m CD

Mean higher high water level

(+) 2.60 m CD

Mean lower high water level

(+) 2.50 m CD

Mean sea level

(+) 1.86 m CD

Mean higher low water level

(+) 1.60 m CD

Mean lower low water level

(+) 0.80 m CD

Lowest Astronomical Tide

(+) 0.00 m CD

Dredged Harbour Lev.

(-) 4.00 m CD

Dredged bottom of base

(-) 8.00 m CD

1.1.2 Material Data:Grade of concrete

C40

Grade of steel

Fe 460

Angle of internal friction of backfill soil ( )

Bulk unit weight of backfill soil ()

1.85 t/m3

Unit weight of Reinforced Concrete Block

2.50 t/m3

Unit weight of Plain Concrete Block

2.40 t/m3

Unit weight of sea water (w)

1.03 t/m3

(a) Live load surcharge on wall & backfill

5 t/m2

(b) Capacity of Bollard

Spacing of Bollard

Bollard pull per m run (considered)

4 t/m

Bollard pull acts at a height from top of top block

0.25 m

36 degree

1.1.3 Load Data:-

40 t
10.00 m

( Considered Bollard pull is dispersed at 1:1 upto base from top)


(c) Berthing Force
Berthing Force

43.1 t

Spacing of Fender

10.00 m

Berthing Force per m run (considered)

4.5 t/m

Berthing Force acts below cope level

0.4 m

(Berthing Force not considered in the stability calculation being stabilising in nature)
1.1.4 Factor of safety:Non- Seismic :

Against Sliding

1.75

Against overturning=

1.5

1.1.5 Allowable Pressure:=

59.00 t/m2

(in direct compression)

100.00 t/m2

(in bearing)

At Base
At interface

100(A1/A2)

A1=Dispersed area through the bottom block at 2 horz & 1 vertical


A2=Loaded area
1/2

(A1/A2) <2

1.1.6 Friction Coefficient


At Base
At interface
Note:-

0.60

0.60

Soil investigation has not been carried out at the proposed location of the
fishery harbour till date of this report.It is necessary to perform soil
investigation as the first activity before commencement of construction work
to verify the geotechnical parameters considered in design.

Design Report-June 2012


Design of Quay Wall

Fishery Harbour at Barka

1.1.7

Dimension of Blocks

Block Ref
B11
B10
B9
B8
B7
B6
B5

B4

B3

B2

B1

Design Report-June 2012


Design of Quay Wall

WS
WS
WS
WS
WS
WS
WS
RF1
RF2
WS
RF1
RF2
WS
RF1
RF2
WS
RF1
RF2
WF1
WF2
BP

Block Dimensions
Along
Across
Height
Wall
Wall
(m)
(m)
(m)
1.00
4.00
1.00
1.00
4.00
1.00
1.00
5.00
1.00
1.00
5.00
1.00
1.00
5.00
1.00
1.00
6.00
1.00
1.00
6.50
1.00
1.00
0.50
0.50
1.00
0.50
0.50
1.00
6.00
1.00
1.00
0.50
0.50
1.00
0.50
0.50
1.00
5.50
1.00
1.00
0.50
0.50
1.00
0.50
0.50
1.00
5.00
1.00
1.00
0.50
0.50
1.00
0.50
0.50
1.00
0.50
0.50
1.00
0.50
0.50
1.00
5.50
1.00

Fishery Harbour at Barka

1.1.8 Calculation of Bearing Capacity of Soil


Here =

18.50 KN/m3

'=

8.2 KN/m3

36 degree

Following:IS 6403:1981
Ultimate bearing capacity for cohesionless soil is given by:Qu= q(Nq-1).Sq.dq.iq+0.5*BNSdiw'
Where q=Effective Surcharge
Nq & N=Bearing Capacity factors(Ref. Table-1)
Sq & S=Shape factor
dq & d=Depth factor
iq & i=Inclination factor
B= Width of foundation
w'=Correction for water table
For f=36from Table-1(IS:6403)
39.48
N= 60.306
Here B=

6.00

From Table-2(IS:6403)
For continuous strip, Sq & S=
dq & d=

1.0
1.0

(conservative)

For depth of foundation Df=1.0 m & w'=1(considering submerged unit weight)


q= 1 X 8.2=

8.2 Kpa

So Qu=q*(Nq-1)+0.5**B*N
Substituting appropriate valueQu= 8.2x(39.48-1)+0.5x8.2x6x60.306
1799.0636
Net safe bearing capacity=Ultimate bearing capacity/Factor of safety
Consider factor of safety=
Net safe bearing capacity=

3
1799.0636/3
= 599.6879 Kpa say

Design Report-June 2012


Design of Quay Wall

59.00t/m2

Fishery Harbour at Barka

1.1.9 Calculation of Berthing and mooring force


Computation of Mooring Force
Ship Data :
DWT

LOA

LBP

DL

MD

(t)

(m)

(m)

(m)

(m)

(t)

1000

67

62

10.8

3.9

1690

Due to wind :
As per IS 875 (Part III) - 1987 Clause No. 5.3. ,
Vb x k1x k2 x k3 =

Design wind speed =

27.5022 m/s

where,
Vb = Operating wind speed =

54 knot
=

100.008 km/hr

27.8 m/s

k1 =

k2 =

0.99

(As per IS 875 part III table 1 )

(As per IS 875 part III for terrain category 1,class c type of structure)
k3 =

(As per IS 875 part III clause 5.3.3)

Wind pressure

453.8226 N/m2

As per of IS 4651 (Part III) - 1974 Clause No. 5.3.2


Moulded depth (From Fentek manual)

Windage area =1.175Lp( DM - DL)

138.415 m2

91.08299 kN

Maximum mooring loads due to wind forces , F =

Design Report-June2012
Design of Quay Wall

Cw*Aw*p

5.8

Fishery Harbour at Barka

Due to current :
As per IS 875 (Part III) - 1987 Clause No. 5.6 ,
Design current speed = Vc =

1.4

m/s

Density of sea water = w

1.03

t/m3

Current force per square metre

1.029

kN

Exposed area to current

42.12

m2

Force due to current

43.35

kN

Density of sea water = w

1.03

t/m3

WD

displacement tonnage (MD) of the vessel =

1690

velocity of the vessel normal to the berth =

0.25

m/s

9.81

ms-2

1.45

Design Bollard pull =

SAY 102.00 KN

100.87 kN

Consider spacing of Bollard=

10.00 m

Bollard pull per m run =

10.20 KN
=

1.02 t/m

We design the structure as bollard pull =

4.0 t per m run

Computation of Berthing Force


Berthing Mode:

Difficult, sheltered, quarter point, side berthing

[For sheltered berthing condition as per table-2 of IS 4651 (Part III) - 1974 Clause No. 5.2.1.1.]
g=

acceleration due to gravity =

As per of IS 4651 (Part III) - 1974 Clause No. 5.2.1.2.


Cm =

mass coefficient =

Design Report-June2012
Design of Quay Wall

1+

x D2xLBPx w
4W D

Fishery Harbour at Barka

As per of IS 4651 (Part III) - 1974 Clause No. 5.2.1.3,


=
R =

Angle of approach =
2

2 0.5

[ ( LBP/2-LBP/4 ) + ( B/2) ]

= ( 90--aSin (B/2R) )
l=

(LBP/2-LBP/4)xcos =

r=

LBP/4
2

Ce =

10

16.41

78.90

degree

15.2

15.5

0.52

0.9

3.69

t-m

5.16

t-m

1 + (l/r) x sin ()

eccentricity coefficient =

degree

2
1 + (l/r)

Softness coefficient = CS
As per of IS 4651 (Part III) - 1974 Clause No. 5.2.1.4.
Berthing Energy =

0.5 x CM x W D x (VB)2 x CE x CS /g

Design berthing energy ( Factor of safety = 1.4)


Calculated energy is

7.24

t-m

Calculated reaction is

43.1

Hence the design is safe


Spacing of fender

10.00 m

Berthing force per m run

4.31 t

We design considering berthing force

Design Report-June2012
Design of Quay Wall

4.5 t per m run.

[ From
Fentek
manual of
marine
fendering
system ]

Fishery Harbour at Barka

1.1.10 Calculation of Active Earthpressure coefficient in seismic case


(As per clause no. 8.1 of IS: 1893-1984 part2)
Active earth pressure coefficient at Normal case Ka
Cos2(f-a)
Cos a*Cos(a+d)*[1+{Sin(f+d)*Sin(f-b)/(Cos(a+d)*Cos(a-b))}1/2]2

Active earth pressure coefficient at Seismic case Kas


(1av)*Cos2(f-l-a)

Cosl*Cos a*Cos(a+l+d)*[1+{Sin(f+d)*Sin(f-l-b)/(Cos(a+l+d)*Cos(a-b))}

From block B11 to block B6:a = Angle subtended by the earth side wall with the
vertical on the earth side
= 0.00
f = Angle of internal friction
= 0.63
d = Angle of wall friction
= 0.63
b = Inclination of backfill
= 0.00
a v = Vertical seismic coefficient
= 0.040
ah= Horz seismic coefficient
= 0.080

ldownward = Tan-1(a h/(1+a v))


-1

lupward= Tan (a h/(1-a v))


ga = Unit weight of Soil at normal case
Note:Earth pressure
Inclined Force
Horizontal Force
Moment at Base
where, lever arm

rad
rad
rad
rad

= 0.077 rad
= 0.083 rad
= 18.50 kN/m3

= ga * height of wall * (Ka or Kas)


= 0.5 * earth pr. * height of wall
= 0.5 * earth pr. * height of wall * Cos(d+a)
= Hor. Force * Lever arm * Length of wall
= 0.42*height of wall (for normal earthpressure case)
= 0.50*height of wall (for normal surcharge case)
= 0.50*height of wall (for seismic earthpressure case)
= 0.66*height of wall (for seismic surcharge case)
Due To
Earthfill Surcharge

Therefore

= 0.304
Active earth pressure coefficient at downward Seismic
case K= 0.304
= 0.285
Active earth pressure coefficient at upward Seismic case
K = 0.285

AT TOP OF BLOCK B5
a = Angle subtended by the earth side wall with the
vertical on the earth side
= 0.00
f = Angle of internal friction
= 0.63
d = Angle of wall friction
= 0.63
b = Inclination of backfill
= 0.00
a v = Vertical seismic coefficient
= 0.040
ah= Horz seismic coefficient
= 0.080

ldownward = Tan-1(a h/(1+a v))


-1

lupward= Tan (a h/(1-a v))


ga = Unit weight of Soil at normal case

Design Report-June 2012


Design of Quay Wall

rad
rad
rad
rad

= 0.077 rad
= 0.083 rad
= 18.50 kN/m3

Fishery Harbour at Barka

Note:Earth pressure
Inclined Force
Horizontal Force
Moment at Base
where, lever arm

= ga * height of wall * (Ka or Kas)


= 0.5 * earth pr. * height of wall
= 0.5 * earth pr. * height of wall * Cos(d+a)
= Hor. Force * Lever arm * Length of wall
= 0.42*height of wall (for normal earthpressure case)
= 0.50*height of wall (for normal surcharge case)
= 0.50*height of wall (for seismic earthpressure case)
= 0.66*height of wall (for seismic surcharge case)
Due To
Earthfill Surcharge

Therefore

= 0.304
Active earth pressure coefficient at downward Seismic
case K= 0.304
= 0.285
Active earth pressure coefficient at upward Seismic case
K = 0.285

FROM MID HEIGHT OF BLOCK B5 TO B1


a = Angle subtended by the earth side wall with the
vertical on the earth side
-= 0.79
f = Angle of internal friction
= 0.63
d = Angle of wall friction
= 0.42
b = Inclination of backfill
= 0.00
a v = Vertical seismic coefficient
= 0.040
ah= Horz seismic coefficient(=2*av)
= 0.080

ldownward = Tan-1(a h/(1+a v))

rad
rad
rad
rad

= 0.077 rad

-1

lupward = Tan (a h/(1-a v))


= 0.083 rad
ga = Unit weight of Soil at normal case
= 18.50 kN/m3
Note:= ga * height of wall * (Ka or Kas)
Earth pressure
Inclined Force
= 0.5 * earth pr. * height of wall
Horizontal Force
= 0.5 * earth pr. * height of wall * Cos(d+a)
Moment at Base
= Hor. Force * Lever arm * Length of wall
where, lever arm
= 0.42*height of wall (for normal earthpressure case)
= 0.50*height of wall (for normal surcharge case)
= 0.50*height of wall (for seismic earthpressure case)
= 0.66*height of wall (for seismic surcharge case)
Due To
Therefore
Earthfill Surcharge
= 0.035
Active earth pressure coefficient at downward Seismic
case K= 0.035
= 0.035
Active earth pressure coefficient at upward Seismic case
K = 0.035

Design Report-June 2012


Design of Quay Wall

Fishery Harbour at Barka

1.2

ACTUATING FORCES AND MOMENTS

1.2.1 BACKFILL EARTH


1.2.1.1 Pressure - High Water Condition
Backfill Soil Data
Block
Ref.

Height
Detail (m)

ka

ka

(horz.) bulk

Computation of Pressure (t/m2 per m run)

sub

B11 1.00 1.000 36 0 36 90

0.241 0.195

1.85

p1

p1 = 0.195 x 1.85 x 1 =

0.400 36 0 36 90

0.241 0.195

1.85

p2

0.600 36 0 36 90

0.241 0.195

1.85 0.82

B9

1.00 1.000 36 0 36 90

0.241 0.195

1.85 0.82

p6

B8

1.00 1.000 36 0 36 90

0.241 0.195

1.85 0.82

p8

B7

1.00 1.000 36 0 36 90

0.241 0.195

1.85 0.82

p10

B6

1.00 1.000 36 0 36 90

0.241 0.195

1.85 0.82

p12

0.500 36 0 24 90

0.235 0.215

1.85 0.82

p14

0.500 36 0 24 135 0.015 0.014

1.85 0.82

B4

1.00 1.000 36 0 24 135 0.015 0.014

1.85 0.82

B3

1.00 1.000 36 0 24 135 0.015 0.014

1.85 0.82

B2

1.00 1.000 36 0 24 135 0.015 0.014

1.85 0.82

B1

1.00 1.000 36 0 24 135 0.015 0.014

p24=p22+p23=
1.85 0.82 p24

B5

p2 = 0.361

p3

B10 1.00
p4

0.361
p3 =

0.51

p4 = p2 + p3 =

p5

0.722

p11
p13

1.042

p11 = 0.195 x 0.82 x 1 = 0.16

p12 = p10 + p11 =

1.201

p13 = 0.195 x 0.82 x 1 = 0.16

p15

Design Report-June 2012


Design of Quay Wall

p16=

p17

p18

p19

p20

0.095

p22 p22=p20+p21 =
0.135

0.12

p14= 1.36783

p15=

0.215 x 0.82 x 0.5 =

0.10

p20=p18+p19=

p23
p25

0.11

0.09

0.014 x 0.82 x 0.5 =

p17=

p18=p16+p17=

p21

p9 = 0.195 x 0.82 x 1 = 0.16

p10 = p8 + p9 =

1.00
p16

0.22
p7 = 0.195 x 0.82 x 1 = 0.16

0.882

p8 = p6 + p7 =

p9

0.195 x 0.82 x 0.6 =

p5 =

p6 = p4 + p5 =

p7

0.144

0.195 x 1.85 x 0.4=

p19= 0.014 x 0.82 x 1 =

0.01

p21= 0.014 x 0.82 x 1 =

0.01

p23= 0.014 x 0.82 x 1 =

0.01

p25= 0.014 x 0.82 x 1 =

0.01

0.01

Fishery Harbour at Barka

1.2.1.2

Forces & Moment - High Water Condition


Description

Actuating Force (t per m run)

Pressure
Force
Pressure
(t/m2 per Height (t per m
Ref.
Block
run)
m run)
Ref
B11

B10

B9

B8

B7

B6

B5

B4

B3

B2

B1

Lever Arm (Distance of CG ) (m)


B10
&
B11

Toe

B1 &
B3 & B4 &
B2 & B3
B2
B4
B5

B5 &
B6

B6 &
B7

B7 &
B8

B8 & B9 &
B9 B10

B1 &
B2

B2 &
B3

Toe

B3 & B4 B4 & B5 B5 & B6

Moment about (t-m per m run)

B6 &
B7

B7 & B8

B8 &
B9

B9 & B10 &


Toe
B10 B11

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 & B8 & B9 &


B8
B9 B10

1.88

1.70

1.52

1.34

1.16

0.98

0.80

0.62 0.44

0.26

p1

0.361

1.00

0.18

0.18

0.18

0.18

0.18

0.18

0.18

0.18

0.18

0.18 0.18 0.18 10.42 9.42

8.42

7.42

6.42

5.42

4.42

3.42

2.42

1.42

1.42

p2

0.361

0.40

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14 0.14

9.80 8.80

7.80

6.80

5.80

4.80

3.80

2.80

1.80

0.80

1.42

1.27

1.13

0.98

0.84

0.69

0.55

0.40 0.26

0.12

p3

0.144

0.40

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03 0.03

9.77 8.77

7.77

6.77

5.77

4.77

3.77

2.77

1.77

0.77

0.28

0.25

0.22

0.20

0.17

0.14

0.11

0.08 0.05

0.02

p4

0.51

0.60

0.30

0.30

0.30

0.30

0.30

0.30

0.30

0.30

0.30

0.30 0.30

9.30 8.30

7.30

6.30

5.30

4.30

3.30

2.30

1.30

0.30

2.82

2.52

2.21

1.91

1.61

1.30

1.00

0.70 0.39

0.09

p5

0.22

0.60

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06 0.06

9.25 8.25

7.25

6.25

5.25

4.25

3.25

2.25

1.25

0.25

0.60

0.54

0.47

0.41

0.34

0.28

0.21

0.15 0.08

0.02

p6

0.72

1.00

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

8.50 7.50

6.50

5.50

4.50

3.50

2.50

1.50

0.50

6.13

5.41

4.69

3.97

3.25

2.53

1.80

1.08 0.36

0.08

0.42

p7

0.16

1.00

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

8.42 7.42

6.42

5.42

4.42

3.42

2.42

1.42

0.67

0.59

0.51

0.43

0.35

0.27

0.19

0.11 0.03

p8

0.88

1.00

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

7.50 6.50

5.50

4.50

3.50

2.50

1.50

0.50

6.61

5.73

4.85

3.97

3.09

2.20

1.32

0.44

p9

0.16

1.00

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

7.42 6.42

5.42

4.42

3.42

2.42

1.42

0.42

0.59

0.51

0.43

0.35

0.27

0.19

0.11

0.03

p10

1.04

1.00

1.04

1.04

1.04

1.04

1.04

1.04

1.04

1.04

6.50 5.50

4.50

3.50

2.50

1.50

0.50

6.77

5.73

4.69

3.65

2.60

1.56

0.52

p11

0.16

1.00

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

6.42 5.42

4.42

3.42

2.42

1.42

0.42

0.51

0.43

0.35

0.27

0.19

0.11

0.03

p12

1.20

1.00

1.20

1.20

1.20

1.20

1.20

1.20

1.20

5.50 4.50

3.50

2.50

1.50

0.50

6.61

5.41

4.21

3.00

1.80

0.60

p13

0.16

1.00

0.08

0.08

0.08

0.08

0.08

0.08

0.08

5.42 4.42

3.42

2.42

1.42

0.42

0.43

0.35

0.27

0.19

0.11

0.03

p14

1.37

0.50

0.68

0.68

0.68

0.68

0.68

0.68

4.75 3.75

2.75

1.75

0.75

3.25

2.56

1.88

1.20

0.51

p15

0.088

0.50

0.02

0.02

0.02

0.02

0.02

0.02

4.71 3.71

2.71

1.71

0.71

0.10

0.08

0.06

0.04

0.02

p16

0.095

0.50

0.05

0.05

0.05

0.05

0.05

0.05

4.25 3.25

2.25

1.25

0.25

0.20

0.15

0.11

0.06

0.01

p17

0.01

0.50

0.00

0.00

0.00

0.00

0.00

0.00

4.21 3.21

2.21

1.21

0.21

0.01

0.00

0.00

0.00

0.0003

p18

0.10

1.00

0.10

0.10

0.10

0.10

0.10

3.50 2.50

1.50

0.50

0.35

0.25

0.15

0.05

p19

0.01

1.00

0.01

0.01

0.01

0.01

0.01

3.42 2.42

1.42

0.42

0.02

0.01

0.01

0.002

p20

0.11

1.00

0.11

0.11

0.11

0.11

2.50 1.50

0.50

0.28

0.17

0.06

p21

0.01

1.00

0.01

0.01

0.01

0.01

2.42 1.42

0.42

0.01

0.01

0.002

p22

0.12

1.00

0.124

0.12

0.12

1.50 0.50

0.19

0.06

p23

0.01

1.00

0.01

0.01

0.01

1.42 0.42

0.01

0.002

p24

0.13

1.00

0.13

0.13

0.50

0.07

0.01

1.00

0.01

0.01

0.42

0.002

p25

Total

Design Report-June 2012


Design of Quay Wall

6.14

6.00

5.87

5.75

5.64

4.89

3.61

2.49

1.52 0.72 0.18

39.8

33.8

27.8

22.0

16.3

10.90

6.66

3.62 1.62

0.50

B10 &
B11
0.26

0.26

Fishery Harbourb at Barka

1.2.1.3 Pressure - Low Water Condition


Backfill Soil Data
Block
Ref.

Height
Detail (m)

ka

Computation of Pressure (t/m2 per m run)

ka(horz
bulk sub
.)

B11

1.00 1.00 36 0 36 90 0.241 0.195 1.85

p1

B10

1.00 1.00 36 0 36 90 0.241 0.195 1.85

p2

B9

1.00 1.00 36 0 36 90 0.241 0.195 1.85

0.200 36 0 36 90 0.241 0.195 1.85

B8

1.00
0.800 36 0 36 90 0.241 0.195 1.85 0.82

p1=

1.00 1.000 36 0 36 90 0.241 0.195 1.85 0.82 p10

B6

1.00 1.000 36 0 36 90 0.241 0.195 1.85 0.82

B5

1.00

p6 = p4 + p5 =

p7

p8 = p6 + p7 =

1.15

p10 = p8 + p9 =

1.28

p12

p12=p10+p11=

0.500 36 0 24 90 0.235 0.215 1.85 0.82

1.00 1.000 36 0 24 135 0.015 0.014 1.85 0.82

p18

B3

1.00 1.000 36 0 24 135 0.015 0.014 1.85 0.82

B2

1.00 1.000 36 0 24 135 0.015 0.014 1.85 0.82 p22 p22=p20+p21 =

B1

1.00 1.000 36 0 24 135 0.015 0.014 1.85 0.82 p24

0.72

p5 = 0.195 x 1.85 x 1 =

0.36

1.08

p7 = 0.195 x 1.85 x 0.2 =

0.07

p9 = 0.195 x 0.82 x 0.8 =

0.13

p11 = 0.195 x 0.82 x 1 =

0.16

p13 = 0.195 x 0.82 x 1 =

0.160

p11

1.44

p13

p14= 0.215x{1.85x(1+1+1+0.2)+0.82x(0.8+1x1.8
2) p15=
}=

p16= 0.014x{1.85x(1+1+1+0.2)+0.82x(0.8+1x 2+0.5) }=


p19

p20

p24=p22+p23=

0.36

p15

P17

p16

p3 = 0.195 x 1.85 x 1 =

p9

p14

B4

Design Report-June 2012


Design of Quay Wall

p4 = p2 + p3 =

p5

p6
p8

0.361

p2 = 0.361

p3
p4

B7

0.500 36 0 24 135 0.015 0.014 1.85 0.82

0.195 x 1.85 x 1 =

p18=p16+p17=

p20=p18+p19=

p21
0.15
0.161

0.127

p23

p25

0.14

0.121

p17= 0.014 x 0.82 x 0.5 =

p19= 0.014 x 0.82 x 1 =

0.01

p21= 0.014 x 0.82 x 1 =

0.01

p23= 0.014 x 0.82 x 1 =

0.01

p25= 0.014 x 0.82 x 1 =

0.01

0.215 x 0.82 x 0.5 = 0.09


0.01

Fishery Harbour at Barka

1.2.1.4 Forces & Moment - Low Water Condition


Description

Block
Ref

Actuating Force(t per m run)

Pressure
Force
Pressure
(t/m2 per Height (t per m
Ref.
run)
m run)

B11
B10

B9

B8

B7

B6

B5

B4

B3

B2

B1

B1 &
B2

B2 &
B3

B3 &
B4

B4 & B5 & B6 & B7 & B8 & B9 &


B5
B6
B7
B8
B9 B10

B10
&
B11

Toe

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 &


B2
B3
B4
B5
B6
B7
B8
B9 B10

Moment about (t-m per m run)


B10
&
B11

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 & B7 & B8 & B9 &


B7
B8
B9 B10

B10&
B11
0.26

p1

0.361

1.00

0.18

0.18

0.18

0.18

0.18

0.18

0.18 0.18 0.18 0.18 0.18 0.18

10.42

9.42 8.42 7.42 6.42 5.42 4.42 3.42 2.42 1.42 1.42

1.88

1.70

1.52

1.34

1.16

0.98

0.80 0.62 0.44 0.26

p2

0.361

1.00

0.36

0.36

0.36

0.36

0.36

0.36

0.36 0.36 0.36 0.36 0.36

9.50

8.50 7.50 6.50 5.50 4.50 3.50 2.50 1.50 0.50

3.43

3.07

2.71

2.35

1.99

1.62

1.26 0.90 0.54 0.18

p3

0.36

1.00

0.180

0.18

0.18

0.18

0.18

0.18

0.18 0.18 0.18 0.18 0.18

9.42

8.42 7.42 6.42 5.42 4.42 3.42 2.42 1.42 0.42

1.70

1.52

1.34

1.16

0.98

0.80

0.62 0.44 0.26 0.08

p4

0.72

1.00

0.72

0.72

0.72

0.72

0.72

0.72

0.72 0.72 0.72 0.72

8.50

7.50 6.50 5.50 4.50 3.50 2.50 1.50 0.50

6.13

5.41

4.69

3.97

3.25

2.53

1.80 1.08 0.36

p5

0.36

1.00

0.18

0.18

0.18

0.18

0.18

0.18

0.18 0.18 0.18 0.18

8.42

7.42 6.42 5.42 4.42 3.42 2.42 1.42 0.42

1.52

1.34

1.16

0.98

0.80

0.62

0.44 0.26 0.08

p6

1.08

0.20

0.22

0.22

0.22

0.22

0.22

0.22

0.22 0.22 0.22

7.90

6.90 5.90 4.90 3.90 2.90 1.90 0.90

1.71

1.49

1.28

1.06

0.84

0.63

0.41 0.19

p7

0.07

0.20

0.01

0.01

0.01

0.01

0.01

0.01

0.01 0.01 0.01

7.88

6.88 5.88 4.88 3.88 2.88 1.88 0.88

0.06

0.05

0.04

0.04

0.03

0.02

0.01 0.01

p8

1.15

0.80

0.92

0.92

0.92

0.92

0.92

0.92

0.92 0.92 0.92

7.40

6.40 5.40 4.40 3.40 2.40 1.40 0.40

6.84

5.91

4.99

4.06

3.14

2.22

1.29 0.37

p9

0.13

0.80

0.05

0.05

0.05

0.05

0.05

0.05

0.05 0.05 0.05

7.34

6.34 5.34 4.34 3.34 2.34 1.34 0.34

0.38

0.32

0.27

0.22

0.17

0.12

0.07 0.02

p10

1.28

1.00

1.28

1.28

1.28

1.28

1.28

1.28

1.28 1.28

6.50

5.50 4.50 3.50 2.50 1.50 0.50

8.34

7.05

5.77

4.49

3.21

1.92

0.64

p11

0.16

1.00

0.08

0.08

0.08

0.08

0.08

0.08

0.08 0.08

6.42

5.42 4.42 3.42 2.42 1.42 0.42

0.51

0.43

0.35

0.27

0.19

0.11

0.03

p12

1.44

1.00

1.44

1.44

1.44

1.44

1.44

1.44

1.44

5.50

4.50 3.50 2.50 1.50 0.50

7.93

6.49

5.05

3.61

2.16

0.72

p13

0.16

1.00

0.080

0.08

0.08

0.08

0.08

0.08

0.08

5.42

4.42 3.42 2.42 1.42 0.42

0.43

0.35

0.27

0.19

0.11

0.03

p14

1.766

0.50

0.88

0.88

0.88

0.88

0.88

0.88

4.75

3.75 2.75 1.75 0.75

4.20

3.31

2.43

1.55

0.66

p15

0.09

0.50

0.022

0.02

0.02

0.02

0.02

0.02

4.71

3.71 2.71 1.71 0.71

0.10

0.08

0.06

0.04

0.02

p16

0.121

0.50

0.0604

0.06

0.06

0.06

0.06

0.06

4.25

3.25 2.25 1.25 0.25

0.26

0.20

0.14

0.08

0.02

p17

0.01

0.50

0.001

0.001 0.001 0.001 0.001 0.001

4.21

3.21 2.21 1.21 0.21

0.0060 0.0046 0.0032 0.0017 0.0003

p18

0.13

1.00

0.13

0.13

0.13

0.13

0.13

3.50

2.50 1.50 0.50

0.44

0.32

0.19

0.06

p19

0.01

1.00

0.01

0.01

0.01

0.01

0.01

3.42

2.42 1.42 0.42

0.02

0.01

0.01

0.002

p20

0.14

1.00

0.138

0.14

0.14

0.14

2.50

1.50 0.50

0.34

0.21

0.07

p21

0.01

1.00

0.01

0.01

0.01

0.01

2.42

1.42 0.42

0.01

0.01

0.002

p22

0.15

1.00

0.149

0.15

0.15

1.50

0.50

0.22

0.07

p23

0.01

1.00

0.01

0.01

0.01

1.42

0.42

0.01

0.002

p24

0.16

1.00

0.16

0.16

0.50

0.08

p25

0.01

1.00

0.01

0.01

0.42

0.00

Total

Design Report-June 2012


Design of Quay Wall

Toe

Dist of CG from (m)

7.3

7.11

6.95

6.81

6.67

5.71 4.19 2.82 1.62 0.72 0.18

46.5

39.4

32.3

25.5

18.7

12.32

7.38 3.88 1.67 0.51

0.26

Fishery Harbour at Barka

1.2.2

Live Load Surcharge

1.2.2.1 Pressure
Backfill Soil Data
Block
Ref.

Height Detail
(m)

Computation of pressure (t/m2 per m run)

ka

ka (horz.)

B11

1.00

1.00

36.00

0.00

36.00

90.00

0.24

0.195

plls1

plls1 = 0.195 x 5 =

0.98

B10

1.00

1.00

36.00

0.00

36.00

90.00

0.24

0.195

5.00

plls2

plls2 = 0.195 x 5 =

0.98

B9

1.00

1.00

36.00

0.00

36.00

90.00

0.24

0.195

5.00

plls3

plls3 = 0.195 x 5 =

0.98

B8

1.00

1.00

36.00

0.00

36.00

90.00

0.24

0.195

5.00

plls4

plls4 = 0.195 x 5 =

0.98

B7

1.00

1.00

36.00

0.00

36.00

90.00

0.24

0.195

5.00

plls5

plls5 = 0.195 x 5 =

0.98

B6

1.00

1.00

36.00

0.00

36.00

90.00

0.24

0.195

5.00

plls6

plls6 = 0.195 x 5 =

0.98

B5

1.00

1.00

36.00

0.00

24.00

135.00

0.41

0.38

5.00

plls7

plls7 = 0.38 x 5 =

1.90

B4

1.00

1.00

36.00

0.00

24.00

135.00

0.41

0.38

5.00

plls8

plls8 = 0.38 x 5 =

1.90

B3

1.00

1.00

36.00

0.00

24.00

135.00

0.41

0.38

5.00

plls9

plls9 = 0.38 x 5 =

1.90

B2

1.00

1.00

36.00

0.00

24.00

135.00

0.41

0.38

5.00

plls10

plls10 = 0.38 x 5 =

1.90

B1

1.00

1.00

36.00

0.00

24.00

135.00

0.41

0.38

5.00

plls11

plls11 = 0.38 x 5 =

1.90

Design Report-June 2012


Design of Quay Wall

Fishery Harbour at Barka

1.2.2.2 Live Load Surcharge Forces & Moment Description

Actuating Force(t per m run)

Dist of CG from (m)

Pressure
Force
Force
(t/m2 per m Height (t per
Ref.
m run)
run)

Toe

B1 & B2

B2 &
B3

B3 & B4 & B5 & B6 & B7 & B8 & B9 &


B4
B5
B6
B7
B8
B9 B10

B11

plls1

0.98

1.00

0.98

0.98

0.98

0.98

0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98

10.50

B10

plls2

0.98

1.00

0.98

0.98

0.98

0.98

0.98 0.98 0.98 0.98 0.98 0.98 0.98

B9

plls3

0.98

1.00

0.98

0.98

0.98

0.98

B8

plls4

0.98

1.00

0.98

0.98

0.98

B7

plls5

0.98

1.00

0.98

0.98

B6

plls6

0.98

1.00

0.98

B5

plls7

1.90

1.00

B4

plls8

1.90

B3

plls9

B2
B1

Block
Ref

B10
&
B11

B10
&
B11

Toe

B1 & B2 & B3 &


B2
B3
B4

B4 &
B5

B5 & B6

B6 &
B7

B7 & B8 & B9 & B10 &


B8
B9 B10 B11

9.50 8.50 7.50 6.50 5.50 4.50 3.50 2.50 1.50 0.50

10.24

9.26 8.29 7.31

6.34

5.36

4.39

3.41 2.44 1.46

9.50

8.50 7.50 6.50 5.50 4.50 3.50 2.50 1.50 0.50

9.26

8.29 7.31 6.34

5.36

4.39

3.41

2.44 1.46 0.49

0.98 0.98 0.98 0.98 0.98 0.98

8.50

7.50 6.50 5.50 4.50 3.50 2.50 1.50 0.50

8.29

7.31 6.34 5.36

4.39

3.41

2.44

1.46 0.49

0.98

0.98 0.98 0.98 0.98 0.98

7.50

6.50 5.50 4.50 3.50 2.50 1.50 0.50

7.31

6.34 5.36 4.39

3.41

2.44

1.46

0.49

0.98

0.98

0.98 0.98 0.98 0.98

6.50

5.50 4.50 3.50 2.50 1.50 0.50

6.34

5.36 4.39 3.41

2.44

1.46

0.49

0.98

0.98

0.98

0.98 0.98 0.98

5.50

4.50 3.50 2.50 1.50 0.50

5.36

4.39 3.41 2.44

1.46

0.49

1.90

1.90

1.90

1.90

1.90 1.90

4.50

3.50 2.50 1.50 0.50

8.55

6.65 4.75 2.85

0.95

1.00

1.90

1.90

1.90

1.90

1.90

3.50

2.50 1.50 0.50

6.65

4.75 2.85 0.95

1.90

1.00

1.90

1.90

1.90

1.90

2.50

1.50 0.50

4.75

2.85 0.95

plls10

1.90

1.00

1.90

1.90

1.90

1.50

0.50

2.85

0.95

plls11

1.90

1.00

1.90

1.90

Total

Design Report-June 2012


Design of Quay Wall

15.35

Toe

0.50
13.45

11.55

9.65 7.75 5.85 4.88 3.90 2.93 1.95 0.98

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 &


B2
B3
B4
B5
B6
B7
B8
B9 B10

Moment about (t-m per m run)

0.49

0.95
70.6

56.2 43.7 33.1

24.35

17.55

12.19

7.80 4.39 1.95

0.49

Fishery Harbour at Barka

1.2.3

UNBALANCED HYDRO-STATIC PRESSURE

1.2.3.1 Pressure - High Water Condition


Height Detail
(m)

w
2
(t/m )

B11

1.00

1.00

1.03

0.400

1.03

B10

1.00
0.600

1.03

pubh1

Block
Ref.

Design Report-June 2012


Design of Quay Wall

Pressure (t/m per m run)

B9

1.00

1.000

1.03

pubh2

B8

1.00

1.000

1.03

pubh3

B7

1.00

1.000

1.03

pubh4

B6

1.00

1.000

1.03

pubh5

B5

1.00

1.000

1.03

pubh6

B4

1.00

1.000

1.03

pubh7

B3

1.00

1.000

1.03

pubh8

B2

1.00

1.000

1.03

pubh9

B1

1.00

1.000

1.03

pubh10

pubh1= 0.62

Fishery Harbour at Barka

1.2.3.2 Force & Moments- High Water Condition

Description

Block
Ref

Actuating Force(t per m run)

Pressure
Force
Pressure
(t/m2 per Height (t per m
Ref.
run)
m run)

Toe

B1 &
B2

B2 & B3

B3 & B4 & B5 & B6 & B7 & B8 & B9 & B10 &


B4
B5
B6
B7
B8
B9
B10 B11

Dist of CG from (m)

Toe

B1 & B2

Moment about (t-m per m run)

B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 & B10 &
B3
B4
B5
B6
B7
B8
B9
B10 B11

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 & B5 & B6 & B7 & B8 & B9 &


B5
B6
B7
B8
B9 B10

B11

B10
pubh1

0.62

0.6

0.185

0.185

0.185

0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185

9.200

8.200

7.200 6.200 5.200 4.200 3.200 2.200 1.200 0.200

1.71

1.52

1.33

1.15

0.96 0.78 0.59 0.41 0.22 0.04

B9

pubh2

0.62

0.618

0.618

0.618

0.618 0.618 0.618 0.618 0.618 0.618 0.618

8.50

7.500

6.500 5.500 4.500 3.500 2.500 1.500 0.500

5.25

4.64

4.02

3.40

2.78 2.16 1.55 0.93 0.31

B8

pubh3

0.62

0.618

0.618

0.618

0.618 0.618 0.618 0.618 0.618 0.618

7.50

6.500

5.500 4.500 3.500 2.500 1.500 0.500

4.64

4.02

3.40

2.78

2.16 1.55 0.93 0.31

B7

pubh4

0.62

0.618

0.618

0.618

0.618 0.618 0.618 0.618 0.618

6.50

5.500

4.500 3.500 2.500 1.500 0.500

4.02

3.40

2.78

2.16

1.55 0.93 0.31

B6

pubh5

0.62

0.618

0.618

0.618

0.618 0.618 0.618 0.618

5.50

4.500

3.500 2.500 1.500 0.500

3.40

2.78

2.16

1.55

0.93 0.31

B5

pubh6

0.62

0.618

0.618

0.618

0.618 0.618 0.618

4.50

3.500

2.500 1.500 0.500

2.78

2.16

1.55

0.93

0.31

B4

pubh7

0.62

0.618

0.618

0.618

0.618 0.618

3.50

2.500

1.500 0.500

2.16

1.55

0.93

0.31

B3

pubh8

0.62

0.618

0.618

0.618

0.618

2.50

1.500

0.500

1.55

0.93

0.31

B2

pubh9

0.62

0.618

0.618

0.618

1.50

0.500

0.93

0.31

B1

pubh10

0.62

0.618

0.618

Total

Design Report-June2012
Design of Quay Wall

5.747

0.50
5.129

4.511 3.893 3.275 2.657 2.039 1.421 0.803 0.185

0.31
26.73

21.30 16.48

12.27 8.69 5.72 3.37 1.64 0.53 0.04

B10
&
B11

Fishery Harbour at Barka

1.2.3.3 Pressure - low Water Condition


Block
Ref.

Height Detail
(m)

Pressure (t/m2 per m run)

B11

1.00

1.00

1.030

B10

1.00

1.00

1.03

B9

1.00

1.00

1.03

0.200

1.03

B8

1.00
0.800

1.030

plubh1

plubh1=

B7

1.00

1.000

1.03

plubh2

B6

1.00

1.000

1.03

plubh3

B5

1.00

1.000

1.03

plubh4

B4

1.00

1.000

1.03

plubh5

B3

1.00

1.000

1.03

plubh6

B2

1.00

1.00

1.03

plubh7

B1

1.00

1.00

1.03

plubh8

Design Report-June2012
Design of Quay Wall

0.824

Fishery Harbour at Barka

1.2.3.4 Force & Moments- Low Water Condition

Description

Block
Ref

Pressure
Pressure
(t/m2 per
Ref.
m run)

Actuating Force(t per m run)

Height

Force
(t per m
run)

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

0.33

Dist of CG from (m)

B8 &
B9

Moment about (t-m per m run)

B9 & B10 &


Toe
B10 B11

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

7.27

6.27

5.27

4.27

3.27

2.27

1.27

0.27

6.50

5.50

4.50

3.50

2.50

1.50

0.50

5.50

4.50

3.50

2.50

1.50

0.50

4.50

3.50

2.50

1.50

0.50

3.50

2.50

1.50

0.50

2.50

1.50

0.50

1.50

0.50

B8 &
B9

B9 & B10 &


Toe
B10 B11

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 & B7 & B8 & B9 & B10 &


B7
B8
B9 B10 B11

2.40

2.07

1.74

1.41

1.08

0.75

0.42

5.36

4.53

3.71

2.88

2.06

1.24

0.41

4.53

3.71

2.88

2.06

1.24

0.41

3.71

2.88

2.06

1.24

0.41

2.88

2.06

1.24

0.41

2.06

1.24

0.41

1.24

0.41

B11
B10
B9
B8
plubh1

0.82

0.80

0.33

0.33

0.33

0.33

0.33

0.33

0.33

0.33

B7

plubh2

0.82

1.00

0.82

0.82

0.82

0.82

0.82

0.82

0.82

0.82

B6

plubh3

0.82

1.00

0.82

0.82

0.82

0.82

0.82

0.82

0.82

B5

plubh4

0.82

1.00

0.82

0.82

0.82

0.82

0.82

0.82

B4

plubh5

0.82

1.00

0.82

0.82

0.82

0.82

0.82

B3

plubh6

0.82

1.00

0.82

0.82

0.82

0.82

B2

plubh7

0.82

1.00

0.82

0.82

0.82

B1

plubh8

0.82

1.00

0.82

0.82

Total

Design Report-June2012
Design of Quay Wall

6.10

0.50
5.27

4.45

3.63

2.80

1.98

1.15

0.33

0.00

0.00

0.00

0.09

0.41
22.58 16.90 12.04

8.00

4.78

2.40

0.83 0.09 0.00

0.00

0.00

Fishery Harbour at Barka

1.4.4 BOLLARD PULL


ACTUATING FORCE AND MOMENT
Description

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

B8 &
B9

B9 & B10&
B10 B11

LOAD
(t per m
run)

Bollard Pull

0.17

0.19

0.21

0.24

0.27

0.31

0.36

0.44

0.57

0.80

1.33

LEVER
ARM
(m)

Bollard Pull

11.25

10.25

9.25

8.25

7.25

6.25

5.25

4.25

3.25

2.25

1.25

MOMENT(
t per m
run)

Bollard Pull

1.96

1.95

1.95

1.94

1.93

1.92

1.91

1.89

1.86

1.80

1.67

Design Report-June2012
Design of Quay Wall

Fishery Harbour at Barka

1.3

STABILISING LOAD AND MOMENT-NON SEISMIC


Stabiling Load

Block Ref

Toe

B1 & B2 &
B2
B3

tm/m tm/m tm/m

1.3.1.2

Moment about

B3 & B4 & B5 & B6 & B7 & B8 & B9 & B10 &


B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 &
Toe
B4
B5
B6
B7
B8
B9
B10 B11
B2
B3
B4
B5
B6
B7
B8 B9

B9 B10
&
&
B10 B11

tm/m tm/m tm/m tm/m tm/m tm/m tm/m tm/m

(m)

(m)

(m)

(m)

(m)

(m)

(m)

(m)

(m)

(m)

(m)

Live Load on
20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 2.50 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Wall
Live Load
on backfill

1.3.1.1

Distance of CG From

L 7-10

5.00

5.00

5.00

5.00

5.00

5.00

L 5-10

5.00

5.00

5.00

5.00

5.00

5.00

5.00

Total 10.00 10.00 10.00 10.00 10.00 10.00 5.00

Design Report-June2012
Design of Quay Wall

5.00

5.00

5.00

5.00

0.00

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 & B5 & B6 &


B5
B6
B7

B7 & B8 & B9 & B10 &


B8
B9
B10 B11

(t-m (t-m (t-m (t-m (t-m (t-m (t-m (t-m (t-m (t-m
(t-m per
per m per m per m per m per m per m per m per m per m per m
m run)
run) run) run) run) run) run) run) run) run) run)
50.00

40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00

5.00 4.50 4.50 4.50 4.50 4.50 4.50 4.50

25.00

22.50 22.50 22.50 22.50 22.50 22.50 22.50

6.00 5.50 5.50 5.50 5.50

30.00

27.50 27.50 27.50 27.50

55.00

50.00 50.00 50.00 50.00 22.50 22.50 22.50 0.00

0.00

Fishery Harbour at Barka

1.3.2

DUE TO SELF-WT OF STRUCTURE


Block Dimensions
Volume

Block Ref

B 11
B 10
LWL
B10
HWL
B9
LWL

B9
HWL
B8
LWL
B8
HWL
B7

B6
LWL

B6
HWL

WS

Along Across Heigh


Wall Wall
t
(m)

(m)

(m)

1.00

4.00

1.00

Block Weight at
casting Yard
Unit
Weight

(cu.m) (t/cum)

4.00

2.50

Stabiling Stabiling
Load
Unit Load
Weight
Block Weight
Upto Toe Upto Toe
(t/m run)

10.00 10.00

(t/cum) (t/m run) (t/m run)

2.50

10.00

10.00

Stabiling Load

Distance of CG From

Moment about

Toe

B1 &
B2

B2 & B3 & B4 & B5 &


B3
B4
B5
B6

B6 &
B7

B7 & B8 & B9 & B10 &


B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 & B10 &
Toe
B8
B9
B10 B11
B2
B3
B4
B5
B6
B7
B8
B9 B10 B11

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

B8 &
B9

B9 & B10 &


B10
B11

(m)

(m)

(t-m
per m
run)

(t-m
per m
run)

(t-m
(t-m
(t-m per
per m
per m
m run)
run)
run)

(t-m
(t-m
(t-m per
per m
per m
m run)
run)
run)

(t-m
(t-m
(t-m
per m per m per m
run)
run)
run)

10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 2.50 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00

2.00

25.00

20.00

20.00

20.00

20.00

20.00

20.00

20.00

20.00

20.00 20.00
19.20

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(m)

(m)

(m)

(m)

(m)

(m)

(m)

(m)

(m)

WS

1.00

4.00

1.00

4.00

2.40

9.60

9.60

2.40

9.60

9.60

9.60

9.60

9.60

9.60 9.60

9.60

9.60

9.60

9.60

9.60

2.50 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00

24.00

19.20

19.20

19.20

19.20

19.20

19.20

19.20

19.20

WS1

1.00

5.00

0.40

2.00

2.40

4.80

4.80

2.40

4.80

4.80

4.80

4.80

4.80

4.80 4.80

4.80

4.80

4.80

4.80

4.80

2.50 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00

12.00

9.60

9.60

9.60

9.60

9.60

9.60

9.60

9.60

9.60

WS2

1.00

5.00

0.60

3.00

2.40

7.20

7.20

1.37

4.11

4.11

4.11

4.11

4.11

4.11 4.11

4.11

4.11

4.11

4.11

4.11

2.50 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00

10.28

8.22

8.22

8.22

8.22

8.22

8.22

8.22

8.22

8.22

WS

1.00

5.00

1.00

5.00

2.40

12.00 12.00

2.40

12.00

12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00

3.00 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50

36.00

30.00

30.00

30.00

30.00

30.00

30.00

30.00

30.00

E10-11

1.00

1.00

2.00

2.00

1.85

3.70

3.70

WS

1.00

5.00

1.00

5.00

1.40

7.00

7.00

7.00

7.00

E10-11

1.00

1.00

1.40

1.40

1.85

2.59

2.59

2.59

2.59

E10-11(S) 1.00

1.00

0.60

0.60

0.82

0.49

10.08

0.49

0.49

0.49

2.40

12.00 12.00

15.70

3.70

3.70

3.70 3.70

3.70

3.70

3.70

3.70

5.00 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50

18.50

16.65

16.65

16.65

16.65

16.65

16.65

16.65

16.65

7.00 7.00

7.00

7.00

7.00

7.00

3.00 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50

21.00

17.50

17.50

17.50

17.50

17.50

17.50

17.50

17.50

2.59 2.59

2.59

2.59

2.59

2.59

5.00 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50

12.95

11.66

11.66

11.66

11.66

11.66

11.66

11.66

11.66

0.49 0.49

0.49

0.49

0.49

0.49

5.00 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50

2.46

2.21

2.21

2.21

2.21

2.21

2.21

2.21

2.21

WS1
WS2

1.00
1.00

5.00
5.00

0.20
0.80

1.00
4.00

2.40
2.40

2.40 2.40
9.60 12.00

2.40
1.37

2.40
5.48

2.40
5.48

2.40
5.48

2.40
5.48

2.40
5.48

2.40 2.40
5.48 5.48

2.40
5.48

2.40
5.48

2.40
5.48

2.40
5.48

3.00 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50


3.00 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50

7.20
16.44

6.00
13.70

6.00
13.70

6.00
13.70

6.00
13.70

6.00
13.70

6.00
13.70

6.00
13.70

6.00
13.70

WS

1.00

5.00

1.00

5.00

2.40

12.00 12.00

1.37

6.85

6.85

6.85

6.85

6.85

6.85 6.85

6.85

6.85

6.85

6.85

3.00 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50

20.55

17.13

17.13

17.13

17.13

17.13

17.13

17.13

17.13

6.85

6.85

17.13

WS

1.00

5.00

1.00

5.00

3.40

17.00 17.00

1.37

6.85

WS

1.00

6.00

1.00

6.00

2.40

14.40 14.40

1.37

8.22

E7-11

1.00

1.00

3.20

3.20

1.85

5.92

E7-11(S) 1.00

1.00

1.80

1.80

0.82

1.48

14.40 14.40

6.85

6.85

6.85 6.85

6.85

6.85

3.00 2.50 2.50 2.50 2.50 2.50 2.50 2.50

20.55

17.13

17.13

17.13

17.13

17.13

17.13

8.22

8.22

8.22 8.22

8.22

8.22

3.50 3.00 3.00 3.00 3.00 3.00 3.00

28.77

24.66

24.66

24.66

24.66

24.66

24.66

5.92

5.92

5.92

5.92 5.92

5.92

5.92

6.00 5.50 5.50 5.50 5.50 5.50 5.50

35.52

32.56

32.56

32.56

32.56

32.56

32.56

1.48

1.48

1.48

1.48 1.48

1.48

1.48

6.00 5.50 5.50 5.50 5.50 5.50 5.50

8.86

8.12

8.12

8.12

8.12

8.12

8.12

WS

1.00

6.00

1.00

6.00

1.37

8.22

8.22

8.22

8.22

8.22 8.22

8.22

3.50 3.00 3.00 3.00 3.00 3.00

28.77

24.66

24.66

24.66

24.66

24.66

E7-10

1.00

1.00

1.40

1.40

1.85

2.59

2.59

2.59

2.59

2.59 2.59

2.59

6.00 5.50 5.50 5.50 5.50 5.50

15.54

14.25

14.25

14.25

14.25

14.25

E7-10(S) 1.00

1.00

3.60

3.60

0.82

2.95

2.95

2.95

2.95

2.95 2.95

2.95

6.00 5.50 5.50 5.50 5.50 5.50

17.71

16.24

16.24

16.24

16.24

16.24

Design Report-June 2012


Design of Quauy Wall

2.40

15.62

6.85
8.22

13.76

Fishery Harbour at Barka

1.3.2

DUE TO SELF-WT OF STRUCTURE


Block Dimensions
Volume

Block Ref

B5

(m)

(m)

(m)

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

6.50
0.50
0.50
6.00
0.5
0.5
5.50
0.50
0.50
5.00
0.50
0.50
0.50
0.50
5.50

1.00
0.50
0.50
1.00
0.5
0.5
1.00
0.50
0.50
1.00
0.50
0.50
0.50
0.50
1.00

Unit
Weight
(cu.m) (t/cum)

B2 & B3 & B4 & B5 &


B3
B4
B5
B6

B6 &
B7

B7 & B8 & B9 & B10 &


B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 & B10 &
Toe
B8
B9
B10 B11
B2
B3
B4
B5
B6
B7
B8
B9 B10 B11

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

8.91
0.34
0.17
8.22
0.34
0.17
7.54
0.34
0.17
6.85
0.34
0.17

8.91
0.34
0.17
8.22
0.34
0.17
7.54
0.34
0.17

8.91 8.91
0.34 0.34
0.17 0.17
8.22
0.34
0.17

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

Total load &


moment LWL

107.26 107.26 99.21 91.85 83.46 75.06 65.65 65.65 50.03 43.18 19.60 10.00

Design Report-June 2012


Design of Quauy Wall

15.30

14.10

12.90

14.10

8.91
0.34
0.17
8.22
0.34
0.17
7.54
0.34
0.17
6.85
0.34
0.17
0.17
0.34
7.54

B1 &
B2

98.07 90.02 82.66 74.11 65.87 56.45 42.69 42.69 35.84 18.91 10.00

16.50

1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.37

9.42

8.73

8.05

7.36

Moment about

Toe

8.05

B1

15.60
0.60
0.30
14.40
0.60
0.30
13.20
0.60
0.30
12.00
0.60
0.30
0.30
0.60
13.20

(t/cum) (t/m run) (t/m run)

Distance of CG From

98.07

B2

2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40

(t/m run)

Stabiling Load

Total load &


moment HWL

B3

6.50
0.25
0.13
6.00
0.25
0.13
5.50
0.25
0.13
5.00
0.25
0.13
0.13
0.25
5.50

Stabiling Stabiling
Load
Unit Load
Weight
Block Weight
Upto Toe Upto Toe

8.91
0.34
0.17
8.22
0.34
0.17
7.54
0.34
0.17
6.85
0.34
0.17
0.17
0.34
7.54

B4

WS
RF1
RF2
WS
RF1
RF2
WS
RF1
RF2
WS
RF1
RF2
WF1
WF2
BP

Along Across Heigh


Wall Wall
t

Block Weight at
casting Yard

(m)

(m)

(m)

(m)

(m)

3.75
7.25
7.17
3.50
6.75
6.17
3.25
5.75
6.17
3.00
5.75
5.67
0.33
0.25
3.25

3.25
6.75
6.67
3.00
6.25
5.67
2.75
5.25
5.67
2.50
5.25
5.17

3.25
6.75
6.67
3.00
6.25
5.67
2.75
5.25
5.67

3.25 3.25
6.75 6.75
6.67 6.67
3.00
6.25
5.67

(m)

(m)

(m)

(m)

(m)

(m)

Toe

B1 &
B2

B2 &
B3

B3 &
B4

(t-m
per m
run)

(t-m
per m
run)

(t-m
(t-m
(t-m per
per m
per m
m run)
run)
run)

33.39
2.48
1.23
28.77
2.31
1.06
24.49
1.97
1.06
20.55
1.97
0.97
0.06
0.09
24.49

28.94
2.31
1.14
24.66
2.14
0.97
20.72
1.80
0.97
17.13
1.80
0.88

28.94
2.31
1.14
24.66
2.14
0.97
20.72
1.80
0.97

28.94
2.31
1.14
24.66
2.14
0.97

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

(t-m
(t-m
(t-m per
per m
per m
m run)
run)
run)

B8 &
B9

B9 & B10 &


B10
B11

(t-m
(t-m
(t-m
per m per m per m
run)
run)
run)

28.94
2.31
1.14

331.68 262.04 242.24 216.53 190.97 158.58 103.44 103.44 86.31

37.82 20.00

365.71 291.48 271.67 246.04 220.41 188.01 188.01 122.68 105.55 39.20 20.00

Fishery Harbour at Barka

1.4

SUMMARY OF TOTAL LOAD AND MOMENT - Non Seismic

1.4.1 ACTUATING FORCE AND MOMENT


FORCE
DUE TO

POSITION

Toe

B1 &
B2

B2 &
B3

B3 &
B5 &
B4 & B5
B4
B6

B6 &
B7

B7 &
B8

B8 &
B9

B9 &
B10

B10 &
B11

BACKFILL
(HIGH WATER
CONDITION)

LOAD(t/m)

6.14

6.00

5.87

5.75

5.64

4.89

3.61

2.49

1.52

0.72

0.18

MOMENT (t-m/m)

39.83

33.76

27.83

22.02

16.32

10.90

6.66

3.62

1.62

0.50

0.26

BACKFILL
(LOW WATER
CONDITION)

LOAD(t/m)

7.27

7.11

6.95

6.81

6.67

5.71

4.19

2.82

1.62

0.72

0.18

MOMENT (t-m/m)

46.47

39.37

32.34

25.46

18.72

12.32

7.38

3.88

1.67

0.51

0.26

LIVE LOAD
SURCHARGE

LOAD(t/m)

15.35

13.45

11.55

9.65

7.75

5.85

4.88

3.90

2.93

1.95

0.98

MOMENT (t-m/m)

70.55

56.15

43.65

33.05

24.35

17.55

12.19

7.80

4.39

1.95

0.49

Unbalanced
Hydraustatic Force
(High Water Condition)

LOAD(t/m)

5.75

5.13

4.51

3.89

3.28

2.66

2.04

1.42

0.80

0.19

0.00

MOMENT (t-m/m)

26.73

21.30

16.48

12.27

8.69

5.72

3.37

1.64

0.53

0.04

0.00

Unbalanced
Hydraustatic Force
(Low Water Condition)

LOAD(t/m)

6.10

5.27

4.45

3.63

2.80

1.98

1.15

0.33

0.00

0.00

0.00

MOMENT (t-m/m)

22.58

16.90

12.04

8.00

4.78

2.40

0.83

0.09

0.00

0.00

0.00

LOAD(t/m)

0.17

0.19

0.21

0.24

0.27

0.31

0.36

0.44

0.57

0.80

1.33

MOMENT (t-m/m)

1.96

1.95

1.95

1.94

1.93

1.92

1.91

1.89

1.86

1.80

1.67

BOLLARD PULL

Design Report-June 2012


Design of Quay Wall

Fishery Harbour at Barka

1.4.2 STABILISING FORCE AND MOMENT


FORCE
DUE TO

POSITION

Toe

B1 &
B2

B2 &
B3

B3 &
B5 &
B4 & B5
B4
B6

B6 &
B7

B7 &
B8

B8 &
B9

82.66

74.11

42.69

42.69

35.84 18.91 10.00

B9 &
B10

B10 &
B11

SELF-WT
(HIGH WATER
CONDITION)

LOAD(t/m)

98.07

90.02

MOMENT (t-m/m)

331.68

262.04 242.24 216.53 190.97 158.58 103.44 103.44 86.31 37.82 20.00

SELF-WT
(LOW WATER
CONDITION)

LOAD(t/m)

107.26

99.21

MOMENT (t-m/m)

365.71

291.48 271.67 246.04 220.41 188.01 188.01 122.68 105.55 39.20 20.00

LIVE LOAD
SURCHARGE
on Wall

LOAD(t/m)

20.00

20.00

20.00

20.00

20.00

20.00

20.00

20.00

20.00 20.00 20.00

MOMENT (t-m/m)

50.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00 40.00 40.00

LIVE LOAD
SURCHARGE
on backfill

LOAD(t/m)

10.00

10.00

10.00

10.00

10.00

10.00

5.00

5.00

5.00

0.00

0.00

MOMENT (t-m/m)

55.00

50.00

50.00

50.00

50.00

22.50

22.50

22.50

0.00

0.00

0.00

Design Report-June 2012


Design of Quay Wall

91.85

83.46

65.87

75.06

56.45

65.65

65.65

50.03

43.18 19.60 10.00

Fishery Harbour at Barka

1.5

LOAD COMBINATION-NON SEISMIC


LOAD Case Ref.

1.0 WALL +
BACKFILL
HWL

LWL

2.0 1.0 +

Load Reference

3.0 1.0 +

4.0 1.0 +

Design Report-June 2012


Design of Quay Wall

B10 & B11

t/m

11.88

11.13

10.38

9.64

8.92

7.55

5.65

3.91

2.33

0.91

0.18

tm/m

66.56

55.06

44.30

34.29

25.01

16.62

10.03

5.26

2.15

0.54

0.26

Stabilising Load

t/m

Stabilising Moment

tm/m

Actuating Force

98.07

90.02

82.66

74.11

65.87

56.45

42.69

42.69

35.84

18.91

10.00

331.68

262.04

242.24

216.53

190.97

158.58

103.44

103.44

86.31

37.82

20.00

t/m

13.37

12.38

11.40

10.43

9.48

7.69

5.34

3.15

1.62

0.72

0.18

Actuating Moment

tm/m

69.06

56.27

44.38

33.46

23.51

14.72

8.21

3.97

1.67

0.51

0.26

Stabilising Load

t/m

107.26

99.21

91.85

83.46

75.06

65.65

65.65

50.03

43.18

19.60

10.00

Stabilising Moment

tm/m

365.71

291.48

271.67

246.04

220.41

188.01

188.01

122.68

105.55

39.20

20.00

Actuating Force

t/m

27.23

24.58

21.93

19.29

16.67

13.40

10.52

7.81

5.25

2.86

1.16

tm/m

137.11

111.21

87.95

67.34

49.36

34.17

22.22

13.06

6.54

2.49

0.74

t/m

108.07

100.02

92.66

84.11

75.87

66.45

47.69

47.69

40.84

18.91

10.00

Stabilising Moment

tm/m

386.68

312.04

292.24

266.53

240.97

181.08

125.94

125.94

86.31

37.82

20.00

Actuating Force

t/m

28.72

25.83

22.95

20.08

17.23

13.54

10.21

7.05

4.55

2.67

1.16

Actuating Moment

tm/m

139.61

112.42

88.03

66.51

47.86

32.27

20.40

11.77

6.06

2.46

0.74

Stabilising Load

t/m

117.26

109.21

101.85

93.46

85.06

75.65

70.65

55.03

48.18

19.60

10.00

Stabilising Moment

tm/m

420.71

341.48

321.67

296.04

270.41

210.51

210.51

145.18

105.55

39.20

20.00

Actuating Force

t/m

27.23

24.58

21.93

19.29

16.67

13.40

10.52

7.81

5.25

2.86

1.16

tm/m

137.11

111.21

87.95

67.34

49.36

34.17

22.22

13.06

6.54

2.49

0.74

t/m

128.07

120.02

112.66

104.11

95.87

86.45

67.69

67.69

60.84

38.91

30.00

tm/m

436.68

352.04

332.24

306.53

280.97

221.08

165.94

165.94

126.31

77.82

60.00

28.72

25.83

22.95

20.08

17.23

13.54

10.21

7.05

4.55

2.67

1.16

Actuating Force

t/m

Actuating Moment

tm/m

139.61

112.42

88.03

66.51

47.86

32.27

20.40

11.77

6.06

2.46

0.74

Stabilising Load

t/m

137.26

129.21

121.85

113.46

105.06

95.65

90.65

75.03

68.18

39.60

30.00

Stabilising Moment

tm/m

470.71

381.48

361.67

336.04

310.41

250.51

250.51

185.18

145.55

79.20

60.00

Actuating Force

t/m

11.88

11.13

10.38

9.64

8.92

7.55

5.65

3.91

2.33

0.91

0.18

tm/m

66.56

55.06

44.30

34.29

25.01

16.62

10.03

5.26

2.15

0.54

0.26

t/m

118.07

110.02

102.66

94.11

85.87

76.45

62.69

62.69

55.84

38.91

30.00

tm/m

381.68

302.04

282.24

256.53

230.97

198.58

143.44

143.44

126.31

77.82

60.00

LL
Surcharge HWL Actuating Moment
on Wall
Stabilising Load
Only
Stabilising Moment

LWL

B9 &
B10

Actuating Moment

LL
Surcharge HWL Actuating Moment
on Backfill
Stabilising Load
& Wall
Stabilising Moment

LWL

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8 B8 & B9

Actuating Force

LL
Surcharge HWL Actuating Moment
on Backfill
Stabilising Load

LWL

Toe

Actuating Force

t/m

13.37

12.38

11.40

10.43

9.48

7.69

5.34

3.15

1.62

0.72

0.18

Actuating Moment

tm/m

69.06

56.27

44.38

33.46

23.51

14.72

8.21

3.97

1.67

0.51

0.26

Stabilising Load

t/m

127.26

119.21

111.85

103.46

95.06

85.65

85.65

70.03

63.18

39.60

30.00

Stabilising Moment

tm/m

415.71

331.48

311.67

286.04

260.41

228.01

228.01

162.68

145.55

79.20

60.00

Fishery Harbour at Barka

LOAD Case Ref.

1.0 WALL
1.0 + +
5.0
Bollard Pull
HWL

LWL

6.0 2.0 +
Bollard Pull
HWL

LWL

7.0 3.0 +
Bollard Pull
HWL

LWL

8.0 4.0 +
Bollard Pull
HWL

LWL

Design Report-June 2012


Design of Quay Wall

Load Reference

Toe

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8 B8 & B9

B9 &
B10

B10 & B11

Actuating Force

t/m

12.06

11.32

10.59

9.88

9.18

7.85

6.01

4.35

2.90

1.71

1.51

Actuating Moment

tm/m

68.52

57.01

46.25

36.24

26.95

18.54

11.94

7.15

4.01

2.34

1.92

Stabilising Load

t/m

Stabilising Moment

tm/m

Actuating Force

98.07

90.02

82.66

74.11

65.87

56.45

42.69

42.69

35.84

18.91

10.00

331.68

262.04

242.24

216.53

190.97

158.58

103.44

103.44

86.31

37.82

20.00

t/m

13.54

12.57

11.61

10.67

9.74

7.99

5.70

3.60

2.20

1.52

1.51

Actuating Moment

tm/m

71.01

58.22

46.32

35.40

25.44

16.64

10.12

5.86

3.53

2.31

1.92

Stabilising Load

t/m

107.26

99.21

91.85

83.46

75.06

65.65

65.65

50.03

43.18

19.60

10.00

Stabilising Moment

tm/m

365.71

291.48

271.67

246.04

220.41

188.01

188.01

122.68

105.55

39.20

20.00

Actuating Force

t/m

27.41

24.77

22.14

19.53

16.93

13.70

10.88

8.25

5.82

3.66

2.49

Actuating Moment

tm/m

139.07

113.16

89.90

69.29

51.30

36.09

24.13

14.95

8.39

4.29

2.41

Stabilising Load

t/m

108.07

100.02

92.66

84.11

75.87

66.45

47.69

47.69

40.84

18.91

10.00

Stabilising Moment

tm/m

386.68

312.04

292.24

266.53

240.97

181.08

125.94

125.94

86.31

37.82

20.00

Actuating Force

t/m

28.89

26.02

23.16

20.32

17.49

13.84

10.58

7.50

5.12

3.47

2.49

Actuating Moment

tm/m

141.56

114.37

89.97

68.45

49.79

34.19

22.31

13.66

7.92

4.26

2.41

Stabilising Load

t/m

117.26

109.21

101.85

93.46

85.06

75.65

70.65

55.03

48.18

19.60

10.00

Stabilising Moment

tm/m

420.71

341.48

321.67

296.04

270.41

210.51

210.51

145.18

105.55

39.20

20.00

Actuating Force

t/m

27.41

24.77

22.14

19.53

16.93

13.70

10.88

8.25

5.82

3.66

2.49

Actuating Moment

tm/m

139.07

113.16

89.90

69.29

51.30

36.09

24.13

14.95

8.39

4.29

2.41

Stabilising Load

t/m

128.07

120.02

112.66

104.11

95.87

86.45

67.69

67.69

60.84

38.91

30.00

Stabilising Moment

tm/m

436.68

352.04

332.24

306.53

280.97

221.08

165.94

165.94

126.31

77.82

60.00

Actuating Force

t/m

28.89

26.02

23.16

20.32

17.49

13.84

10.58

7.50

5.12

3.47

2.49

Actuating Moment

tm/m

141.56

114.37

89.97

68.45

49.79

34.19

22.31

13.66

7.92

4.26

2.41

Stabilising Load

t/m

137.26

129.21

121.85

113.46

105.06

95.65

90.65

75.03

68.18

39.60

30.00

Stabilising Moment

tm/m

470.71

381.48

361.67

336.04

310.41

250.51

250.51

185.18

145.55

79.20

60.00

Actuating Force

t/m

12.06

11.32

10.59

9.88

9.18

7.85

6.01

4.35

2.90

1.71

1.51

Actuating Moment

tm/m

68.52

57.01

46.25

36.24

26.95

18.54

11.94

7.15

4.01

2.34

1.92

Stabilising Load

t/m

118.07

110.02

102.66

94.11

85.87

76.45

62.69

62.69

55.84

38.91

30.00

Stabilising Moment

tm/m

381.68

302.04

282.24

256.53

230.97

198.58

143.44

143.44

126.31

77.82

60.00

Actuating Force

t/m

13.54

12.57

11.61

10.67

9.74

7.99

5.70

3.60

2.20

1.52

1.51

Actuating Moment

tm/m

71.01

58.22

46.32

35.40

25.44

16.64

10.12

5.86

3.53

2.31

1.92

Stabilising Load

t/m

127.26

119.21

111.85

103.46

95.06

85.65

85.65

70.03

63.18

39.60

30.00

Stabilising Moment

tm/m

415.71

331.48

311.67

286.04

260.41

228.01

228.01

162.68

145.55

79.20

60.00

Fishery Harbour at Barka

1.6

STABILITY CHECK

LOAD
COMB

59.00

Description

Toe

100.00

100.00

100.00

100.00

100.00

100.00

100.00

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8

100.00
B8 &
B9

B9 &
B10

B10 &
B11

BASE AREA

6.00

5.00

5.00

5.50

6.00

6.00

5.00

5.00

5.00

4.00

4.00

Zsea side

6.00

4.17

4.17

5.04

6.00

6.00

4.17

4.17

4.17

2.67

2.67

Zland side

6.00

4.17

4.17

5.04

6.00

6.00

4.17

4.17

4.17

2.67

2.67

HWL Actuating Load


Actuating Moment
Stabilising Load
Stabilising Moment

t/m

11.88

11.13

10.38

9.64

8.92

7.55

5.65

3.91

2.33

0.91

0.18

tm/m

66.56

55.06

44.30

34.29

25.01

16.62

10.03

5.26

2.15

0.54

0.26

t/m

98.07

90.02

82.66

74.11

65.87

56.45

42.69

42.69

35.84

18.91

10.00

tm/m

331.68

262.04

242.24

216.53

190.97

158.58

103.44

103.44

86.31

37.82

20.00

0.30

0.20

0.11

0.29

0.48

0.49

0.31

0.20

0.15

0.03

0.03

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Eccentricity (e) (m)


Against Sliding
Factor of
safety
Against Over Turning
Base
2
Sea Side (t/m )
Pressure
Land Side

Design Report-June 2012


Design of Quay Wall

(t/m2)

4.95

4.85

4.78

4.61

4.43

4.49

4.54

6.56

9.24

12.51

33.24

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

4.98

4.76

5.47

6.31

7.63

9.54

10.31

19.67

40.16

70.25

78.03

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

21.19

22.34

18.62

17.76

16.26

13.98

11.74

10.59

8.47

4.93

2.60

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

11.50

13.67

14.44

9.20

5.70

4.84

5.34

6.49

5.86

4.53

2.40

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
LWL Actuating Load

Toe
t/m

Actuating Moment
Stabilising Load
Stabilising Moment

10.43

9.48

7.69

5.34

3.15

B10 &
B11

1.62

0.72

0.18

69.06

56.27

44.38

33.46

23.51

14.72

8.21

3.97

1.67

0.51

0.26

107.26

99.21

91.85

83.46

75.06

65.65

65.65

50.03

43.18

19.60

10.00

tm/m

365.71

291.48

271.67

246.04

220.41

188.01

188.01

122.68

105.55

39.20

20.00

0.23

0.13

0.03

0.20

0.38

0.36

-0.24

0.13

0.09

0.03

0.03

Against Sliding

Against Over Turning

Design Report-June 2012


Design of Quay Wall

11.40

B9 &
B10

t/m

Factor of
safety

Land Side

12.38

B8 &
B9

tm/m

Eccentricity (e) (m)

Base
Sea Side
Pressure

13.37

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

4.81

4.81

4.83

4.80

4.75

5.13

7.38

9.52

15.95

16.29

33.24

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

5.30

5.18

6.12

7.35

9.38

12.78

22.90

30.89

63.16

76.48

78.03

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

22.06

22.92

18.93

18.53

17.23

14.88

9.36

11.54

9.61

5.09

2.60

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

13.69

16.77

17.81

11.82

7.80

7.00

16.89

8.48

7.66

4.71

2.40

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

(t/m )

(t/m )

Fishery Harbour at Barka

LOAD
COMB

Description

Toe

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8

B8 &
B9

B9 &
B10

B10 &
B11

BASE AREA

6.00

5.00

5.00

5.50

6.00

6.00

5.00

5.00

5.00

4.00

4.00

Zsea side

6.00

4.17

4.17

5.04

6.00

6.00

4.17

4.17

4.17

2.67

2.67

6.00

4.17

4.17

5.04

6.00

6.00

4.17

4.17

4.17

2.67

2.67

Zland side
HWL Actuating Load

t/m

Actuating Moment
Stabilising Load
Stabilising Moment

19.29

16.67

13.40

10.52

7.81

5.25

2.86

1.16

137.11

111.21

87.95

67.34

49.36

34.17

22.22

13.06

6.54

2.49

0.74

108.07

100.02

92.66

84.11

75.87

66.45

47.69

47.69

40.84

18.91

10.00

tm/m

386.68

312.04

292.24

266.53

240.97

181.08

125.94

125.94

86.31

37.82

0.69

0.49

0.30

0.38

0.47

0.79

0.33

0.13

0.55

0.13

0.07

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Against Sliding

Against Over Turning

Design Report-June 2012


Design of Quay Wall

21.93

t/m

Factor of
safety

Land Side

24.58

tm/m

Eccentricity (e) (m)

Base
Sea Side
Pressure

27.23

(t/m )
2

(t/m )

20.00

2.38

2.44

2.54

2.62

2.73

2.98

2.72

3.67

4.67

3.97

5.19

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.82

2.81

3.32

3.96

4.88

5.30

5.67

9.64

13.20

15.20

26.89

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

30.45

31.81

25.10

21.67

18.65

19.82

13.26

11.06

13.53

5.66

2.78

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

5.57

8.19

11.97

8.92

6.64

2.33

5.82

8.01

2.81

3.79

2.22

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

Toe

B10 &
B11

28.72

25.83

22.95

20.08

17.23

13.54

10.21

7.05

4.55

2.67

1.16

139.61

112.42

88.03

66.51

47.86

32.27

20.40

11.77

6.06

2.46

0.74

t/m

117.26

109.21

101.85

93.46

85.06

75.65

70.65

55.03

48.18

19.60

10.00

tm/m

420.71

341.48

321.67

296.04

270.41

210.51

210.51

145.18

105.55

39.20

20.00

0.60

0.40

0.21

0.29

0.38

0.64

-0.19

0.08

0.44

0.13

0.07

(m)

Against Over Turning

Design Report-June 2012


Design of Quay Wall

B9 &
B10

t/m

Against Sliding

Land Side

B8 &
B9

tm/m

Factor of
safety
Base
Sea Side
Pressure

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8

(t/m2)
2

(t/m )

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

2.45

2.54

2.66

2.79

2.96

3.35

4.15

4.68

6.35

4.40

5.19

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.01

3.04

3.65

4.45

5.65

6.52

10.32

12.33

17.42

15.92

26.89

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

31.32

32.39

25.40

22.44

19.62

20.72

10.89

12.01

14.67

5.82

2.78

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

7.76

11.29

15.34

11.54

8.74

4.49

17.37

10.00

4.61

3.98

2.22

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description

Toe

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8

B8 &
B9

B9 &
B10

B10 &
B11

BASE AREA

6.00

5.00

5.00

5.50

6.00

6.00

5.00

5.00

5.00

4.00

4.00

Zsea side

6.00

4.17

4.17

5.04

6.00

6.00

4.17

4.17

4.17

2.67

2.67

6.00

4.17

4.17

5.04

6.00

6.00

4.17

4.17

4.17

2.67

2.67

Zland side
HWL Actuating Load

t/m

Actuating Moment
Stabilising Load
Stabilising Moment

19.29

16.67

13.40

10.52

7.81

5.25

2.86

1.16

137.11

111.21

87.95

67.34

49.36

34.17

22.22

13.06

6.54

2.49

0.74

128.07

120.02

112.66

104.11

95.87

86.45

67.69

67.69

60.84

38.91

30.00

tm/m

436.68

352.04

332.24

306.53

280.97

221.08

165.94

165.94 126.31

77.82

0.66

0.49

0.33

0.45

0.58

0.84

0.38

0.24

0.06

Against Sliding

Against Over Turning

Design Report-June 2012


Design of Quay Wall

21.93

t/m

Factor of
safety

Land Side

24.58

tm/m

Eccentricity (e) (m)

Base
Sea Side
Pressure

27.23

(t/m )
2

(t/m )

0.53

60.00
0.02

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

2.82

2.93

3.08

3.24

3.45

3.87

3.86

5.20

6.95

8.17

15.58

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.18

3.17

3.78

4.55

5.69

6.47

7.47

12.71

19.32

31.27

80.67

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

35.45

38.21

31.50

28.28

25.31

26.48

19.66

17.46

19.93

10.66

7.78

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

7.24

9.79

13.57

9.58

6.64

2.33

7.42

9.61

4.41

8.79

7.22

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

Toe

B10 &
B11

28.72

25.83

22.95

20.08

17.23

13.54

10.21

7.05

4.55

2.67

1.16

139.61

112.42

88.03

66.51

47.86

32.27

20.40

11.77

6.06

2.46

0.74

t/m

137.26

129.21

121.85

113.46

105.06

95.65

90.65

75.03

68.18

39.60

30.00

tm/m

470.71

381.48

361.67

336.04

310.41

250.51

250.51

185.18

145.55

79.20

60.00

0.59

0.42

0.25

0.37

0.50

0.72

-0.04

0.19

0.45

0.06

0.02

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

(m)

2.87

3.00

3.19

3.39

3.66

4.24

5.32

6.38

8.99

8.89

15.58

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.37

3.39

4.11

5.05

6.49

7.76

12.28

15.73

24.02

32.16

80.67

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

(t/m )

36.32

38.79

31.80

29.05

26.28

27.39

17.29

18.41

21.07

10.82

7.78

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

(t/m2)

9.43

12.89

16.94

12.20

8.74

4.49

18.97

11.60

6.21

8.98

7.22

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Against Over Turning

Design Report-June 2012


Design of Quay Wall

B9 &
B10

t/m

Factor of
safety

Land Side

B8 &
B9

tm/m

Against Sliding

Base
Sea Side
Pressure

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8

Fishery Harbour at Barka

LOAD
COMB

Description

Toe

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8

B8 &
B9

B9 &
B10

B10 &
B11

BASE AREA

6.00

5.00

5.00

5.50

6.00

6.00

5.00

5.00

5.00

4.00

4.00

Zsea side

6.00

4.17

4.17

5.04

6.00

6.00

4.17

4.17

4.17

2.67

2.67

Zland side

6.00

4.17

4.17

5.04

6.00

6.00

4.17

4.17

4.17

2.67

2.67

HWL Actuating Load


Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

t/m

11.88

11.13

10.38

9.64

8.92

7.55

5.65

3.91

2.33

0.91

0.18

tm/m

66.56

55.06

44.30

34.29

25.01

16.62

10.03

5.26

2.15

0.54

0.26

t/m

118.07

110.02

102.66

94.11

85.87

76.45

62.69

62.69

55.84

38.91

30.00

tm/m

381.68

302.04

282.24

256.53

230.97

198.58

143.44

143.44 126.31

77.82

0.33

0.26

0.18

0.39

0.60

0.62

0.37

0.30

0.01

(m)

Against Sliding
Factor of
safety
Against Over Turning
Base
Sea Side
Pressure
Land Side

Design Report-June 2012


Design of Quay Wall

(t/m2)
2

(t/m )

0.28

60.00
0.01

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

5.96

5.93

5.93

5.86

5.78

6.08

6.66

9.63

14.40

25.73

99.72

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

5.73

5.49

6.37

7.48

9.23

11.95

14.30

27.27

58.77

144.54

234.09

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

26.19

28.74

25.02

24.37

22.92

20.64

18.14

16.99

14.87

9.93

7.60

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

13.16

15.27

16.04

9.86

5.70

4.84

6.94

8.09

7.46

9.53

7.40

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

Toe

B10 &
B11

13.37

12.38

11.40

10.43

9.48

7.69

5.34

3.15

1.62

0.72

0.18

69.06

56.27

44.38

33.46

23.51

14.72

8.21

3.97

1.67

0.51

0.26

t/m

127.26

119.21

111.85

103.46

95.06

85.65

85.65

70.03

63.18

39.60

30.00

tm/m

415.71

331.48

311.67

286.04

260.41

228.01

228.01

162.68

145.55

79.20

60.00

0.28

0.19

0.11

0.31

0.51

0.51

-0.07

0.23

0.22

0.01

0.01

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

5.71

5.78

5.89

5.95

6.02

6.69

9.63

13.33

23.34

32.91

99.72

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

6.02

5.89

7.02

8.55

11.08

15.49

27.77

40.97

87.10

154.52

234.09

(m)

Against Over Turning

Design Report-June 2012


Design of Quay Wall

B9 &
B10

t/m

Factor of
safety

Land Side

B8 &
B9

tm/m

Against Sliding

Base
Sea Side
Pressure

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8

(t/m2)
2

(t/m )

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

27.06

29.32

25.33

25.14

23.89

21.55

15.76

17.94

16.01

10.09

7.60

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

15.36

18.37

19.41

12.48

7.80

7.00

18.49

10.08

9.26

9.71

7.40

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description

Toe

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8

B8 &
B9

B9 &
B10

B10 &
B11

BASE AREA

6.00

5.00

5.00

5.50

6.00

6.00

5.00

5.00

5.00

4.00

4.00

Zsea side

6.00

4.17

4.17

5.04

6.00

6.00

4.17

4.17

4.17

2.67

2.67

6.00

4.17

4.17

5.04

6.00

6.00

4.17

4.17

4.17

2.67

2.67

Zland side
HWL Actuating Load

t/m

Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

9.88

9.18

7.85

6.01

4.35

2.90

1.71

1.51

68.52

57.01

46.25

36.24

26.95

18.54

11.94

7.15

4.01

2.34

1.92

98.07

90.02

82.66

74.11

65.87

56.45

42.69

42.69

35.84

18.91

10.00

tm/m

331.68

262.04

242.24

216.53

190.97

158.58

103.44

103.44

86.31

37.82

0.32

0.22

0.13

0.32

0.51

0.52

0.36

0.24

0.20

0.12

(m)

Against Over Turning

Design Report-June 2012


Design of Quay Wall

10.59

t/m

Against Sliding

Land Side

11.32

tm/m

Factor of
safety
Base
Sea Side
Pressure

12.06

(t/m )
2

(t/m )

20.00
0.19

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

4.88

4.77

4.68

4.50

4.30

4.31

4.26

5.89

7.42

6.65

3.96

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

4.84

4.60

5.24

5.98

7.09

8.55

8.66

14.47

21.54

16.17

10.40

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

21.52

22.81

19.09

18.14

16.58

14.30

12.19

11.04

8.92

5.60

3.22

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

11.17

13.20

13.97

8.81

5.38

4.52

4.88

6.03

5.42

3.85

1.78

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

Toe

B10 &
B11

12.57

11.61

10.67

9.74

7.99

5.70

3.60

2.20

1.52

1.51

tm/m

71.01

58.22

46.32

35.40

25.44

16.64

10.12

5.86

3.53

2.31

1.92

t/m

107.26

99.21

91.85

83.46

75.06

65.65

65.65

50.03

43.18

19.60

10.00

tm/m

365.71

291.48

271.67

246.04

220.41

188.01

188.01

122.68

105.55

39.20

20.00

0.25

0.15

0.05

0.23

0.40

0.39

-0.21

0.17

0.14

0.12

0.19

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

(m)

Against Over Turning

Design Report-June 2012


Design of Quay Wall

B9 &
B10

13.54

Factor of
safety

Land Side

B8 &
B9

t/m

Against Sliding

Base
Sea Side
Pressure

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8

(t/m )
2

(t/m )

4.75

4.74

4.75

4.69

4.62

4.93

6.91

8.35

11.80

7.73

3.96

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

5.15

5.01

5.86

6.95

8.66

11.30

18.58

20.94

29.92

16.95

10.40

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

22.39

23.39

19.39

18.92

17.55

15.20

9.82

11.99

10.06

5.77

3.22

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

13.36

16.30

17.34

11.43

7.47

6.68

16.44

8.02

7.21

4.03

1.78

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description

Toe

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8

B8 &
B9

B9 &
B10

B10 &
B11

BASE AREA

6.00

5.00

5.00

5.50

6.00

6.00

5.00

5.00

5.00

4.00

4.00

Zsea side

6.00

4.17

4.17

5.04

6.00

6.00

4.17

4.17

4.17

2.67

2.67

Zland side

6.00

4.17

4.17

5.04

6.00

6.00

4.17

4.17

4.17

2.67

2.67

HWL Actuating Load


Actuating Moment

t/m

27.41

24.77

22.14

19.53

16.93

13.70

10.88

8.25

5.82

3.66

2.49

tm/m

139.07

113.16

89.90

69.29

51.30

36.09

24.13

14.95

8.39

4.29

2.41

t/m

108.07

100.02

92.66

84.11

75.87

66.45

47.69

47.69

40.84

18.91

10.00

tm/m

386.68

312.04

292.24

266.53

240.97

181.08

125.94

125.94

86.31

37.82

20.00

0.71

0.51

0.32

0.41

0.50

0.82

0.37

0.17

0.59

0.23

Stabilising Load
Stabilising Moment

Eccentricity (e) (m)


Against Sliding
Factor of
safety
Against Over Turning
Base
Sea Side
Pressure
Land Side

Design Report-June 2012


Design of Quay Wall

0.24

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

2.37

2.42

2.51

2.58

2.69

2.91

2.63

3.47

4.21

3.10

2.41

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.78

2.76

3.25

3.85

4.70

5.02

5.22

8.42

10.28

8.82

8.30

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

(t/m2)

30.78

32.28

25.56

22.05

18.97

20.14

13.72

11.52

13.97

6.34

3.40

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

2
(t/m )

5.25

7.72

11.50

8.54

6.32

2.01

5.36

7.56

2.36

3.12

1.60

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
LWL Actuating Load

Toe
t/m

Actuating Moment
Stabilising Load
Stabilising Moment

20.32

17.49

13.84

10.58

7.50

B10 &
B11

5.12

3.47

2.49

141.56

114.37

89.97

68.45

49.79

34.19

22.31

13.66

7.92

4.26

2.41

117.26

109.21

101.85

93.46

85.06

75.65

70.65

55.03

48.18

19.60

10.00

tm/m

420.71

341.48

321.67

296.04

270.41

210.51

210.51

145.18

105.55

39.20

20.00

0.62

0.42

0.23

0.31

0.41

0.67

-0.16

0.11

0.47

0.22

0.24

Against Sliding

Against Over Turning

Design Report-June 2012


Design of Quay Wall

23.16

B9 &
B10

t/m

Factor of
safety

Land Side

26.02

B8 &
B9

tm/m

Eccentricity (e) (m)

Base
Sea Side
Pressure

28.89

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8

(t/m2)
2

(t/m )

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

2.43

2.52

2.64

2.76

2.92

3.28

4.01

4.40

5.65

3.39

2.41

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.97

2.99

3.58

4.32

5.43

6.16

9.44

10.63

13.33

9.20

8.30

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

31.65

32.86

25.87

22.83

19.94

21.04

11.35

12.46

15.11

6.50

3.40

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

7.44

10.82

14.87

11.16

8.41

4.17

16.91

9.55

4.16

3.30

1.60

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description

Toe

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8

B8 &
B9

B9 &
B10

B10 &
B11

BASE AREA

6.00

5.00

5.00

5.50

6.00

6.00

5.00

5.00

5.00

4.00

4.00

Zsea side

6.00

4.17

4.17

5.04

6.00

6.00

4.17

4.17

4.17

2.67

2.67

6.00

4.17

4.17

5.04

6.00

6.00

4.17

4.17

4.17

2.67

2.67

Zland side
HWL Actuating Load

t/m

Actuating Moment
Stabilising Load
Stabilising Moment

19.53

16.93

13.70

10.88

8.25

5.82

3.66

2.49

139.07

113.16

89.90

69.29

51.30

36.09

24.13

14.95

8.39

4.29

2.41

128.07

120.02

112.66

104.11

95.87

86.45

67.69

67.69

60.84

38.91

30.00

tm/m

436.68

352.04

332.24

306.53

280.97

221.08

165.94

165.94 126.31

77.82

0.68

0.51

0.35

0.47

0.60

0.86

0.41

0.27

0.11

Against Sliding

Against Over Turning

Design Report-June 2012


Design of Quay Wall

22.14

t/m

Factor of
safety

Land Side

24.77

tm/m

Eccentricity (e) (m)

Base
Sea Side
Pressure

27.41

(t/m )
2

(t/m )

0.56

60.00
0.08

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

2.80

2.91

3.05

3.20

3.40

3.79

3.73

4.92

6.27

6.38

7.23

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.14

3.11

3.70

4.42

5.48

6.13

6.88

11.10

15.05

18.15

24.89

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

35.78

38.68

31.96

28.66

25.64

26.80

20.12

17.92

20.37

11.34

8.40

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

6.91

9.32

13.10

9.20

6.32

2.01

6.96

9.16

3.96

8.12

6.60

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

Toe

B10 &
B11

28.89

26.02

23.16

20.32

17.49

13.84

10.58

7.50

5.12

3.47

2.49

141.56

114.37

89.97

68.45

49.79

34.19

22.31

13.66

7.92

4.26

2.41

t/m

137.26

129.21

121.85

113.46

105.06

95.65

90.65

75.03

68.18

39.60

30.00

tm/m

470.71

381.48

361.67

336.04

310.41

250.51

250.51

185.18

145.55

79.20

60.00

0.60

0.43

0.27

0.39

0.52

0.74

-0.02

0.21

0.48

0.11

0.08

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

(m)

2.85

2.98

3.16

3.35

3.60

4.15

5.14

6.01

7.99

6.84

7.23

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.33

3.34

4.02

4.91

6.23

7.33

11.23

13.56

18.39

18.58

24.89

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

(t/m )

36.65

39.26

32.27

29.44

26.61

27.71

17.75

18.86

21.51

11.50

8.40

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

(t/m2)

9.11

12.42

16.47

11.82

8.41

4.17

18.51

11.15

5.76

8.30

6.60

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Against Over Turning

Design Report-June 2012


Design of Quay Wall

B9 &
B10

t/m

Factor of
safety

Land Side

B8 &
B9

tm/m

Against Sliding

Base
Sea Side
Pressure

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8

Fishery Harbour at Barka

LOAD
COMB

Description

Toe

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8

B8 &
B9

B9 &
B10

B10 &
B11

BASE AREA

6.00

5.00

5.00

5.50

6.00

6.00

5.00

5.00

5.00

4.00

4.00

Zsea side

6.00

4.17

4.17

5.04

6.00

6.00

4.17

4.17

4.17

2.67

2.67

Zland side

6.00

4.17

4.17

5.04

6.00

6.00

4.17

4.17

4.17

2.67

2.67

HWL Actuating Load

t/m

Actuating Moment
Stabilising Load
Stabilising Moment

9.88

9.18

7.85

6.01

4.35

2.90

1.71

1.51

68.52

57.01

46.25

36.24

26.95

18.54

11.94

7.15

4.01

2.34

1.92

118.07

110.02

102.66

94.11

85.87

76.45

62.69

62.69

55.84

38.91

30.00

tm/m

381.68

302.04

282.24

256.53

230.97

198.58

143.44

143.44 126.31

77.82

0.35

0.27

0.20

0.41

0.62

0.65

0.40

0.33

0.06

Against Sliding

Against Over Turning

Design Report-June 2012


Design of Quay Wall

10.59

t/m

Factor of
safety

Land Side

11.32

tm/m

Eccentricity (e) (m)

Base
Sea Side
Pressure

12.06

0.31

60.00
0.06

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

5.87

5.83

5.82

5.72

5.61

5.84

6.26

8.65

11.56

13.67

11.89

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

5.57

5.30

6.10

7.08

8.57

10.71

12.01

20.07

31.53

33.28

31.20

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

26.52

29.21

25.49

24.75

23.24

20.96

18.59

17.44

15.32

10.60

8.22

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

12.84

14.80

15.57

9.47

5.38

4.52

6.48

7.63

7.02

8.85

6.78

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

(t/m )

(t/m )

Fishery Harbour at Barka

LOAD
COMB

Description

Toe

LWL Actuating Load

t/m

Actuating Moment

9.74

7.99

5.70

3.60

2.20

1.52

1.51

71.01

58.22

46.32

35.40

25.44

16.64

10.12

5.86

3.53

2.31

1.92

119.21

111.85

103.46

95.06

85.65

85.65

70.03

63.18

39.60

30.00

tm/m

415.71

331.48

311.67

286.04

260.41

228.01

228.01

162.68

145.55

79.20

60.00

0.29

0.21

0.13

0.33

0.53

0.53

-0.04

0.26

0.25

0.06

0.06

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Factor of
safety
Against Over Turning

Design Report-June 2012


Design of Quay Wall

10.67

B10 &
B11

127.26

Against Sliding

Base
Pressure Land Side

11.61

B9 &
B10

t/m

Eccentricity (e) (m)

Sea Side

12.57

B8 &
B9

tm/m

Stabilising Load
Stabilising Moment

13.54

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8

(t/m )
2

(t/m )

5.64

5.69

5.78

5.82

5.85

6.43

9.01

11.68

17.27

15.61

11.89

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

5.85

5.69

6.73

8.08

10.24

13.70

22.53

27.76

41.25

34.25

31.20

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

27.39

29.79

25.79

25.53

24.22

21.87

16.22

18.39

16.46

10.77

8.22

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

15.03

17.90

18.94

12.09

7.47

6.68

18.04

9.62

8.81

9.03

6.78

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at barka

2.1

ACTUATING FORCES AND MOMENTS-SEISMIC CASE

2.1.1 BACKFILL EARTH -UPWARD SEISMIC


2.1.1.1Pressure - High Water Condition
Backfill Soil Data
Height
Block
Ref. Detail (m)

ka

Computation of Pressure (t/m2 per m run)

ka

(horz.) bulk sub

B11 1.00 1.000 36 0 36 90 0.285 0.230 1.85

p1

0.400 36 0 36 90 0.285 0.230 1.85

p2

p1 =

0.600 36 0 36 90 0.285 0.230 1.85 0.82

p4

1.00 1.000 36 0 36 90 0.285 0.230 1.85 0.82

p6

B8

1.00 1.000 36 0 36 90 0.285 0.230 1.85 0.82

p8

B7

1.00 1.000 36 0 36 90 0.285 0.230 1.85 0.82

p10

B6

1.00 1.000 36 0 36 90 0.285 0.230 1.85 0.82

p12

0.500 36 0 24 90 0.285 0.260 1.85 0.82

p14

B5

1.00

p9

p12 = p10 + p11 =

p5 =

1.417

0.230 x 0.82 x 0.6 =

0.852
1.040

p10 = p8 + p9 =

1.229

p13
p15

1.00 1.000 36 0 24 135 0.035 0.032 1.85 0.82

p18

p19 p18=p16+p17=

B3

1.00 1.000 36 0 24 135 0.035 0.032 1.85 0.82

B2

1.00 1.000 36 0 24 135 0.035 0.032 1.85 0.82 p22 p22=p20+p21 =

B1

1.00 1.000 36 0 24 135 0.035 0.032 1.85 0.82 p24 p24=p22+p23 = 0.328

p20

p21
0.30

0.25

p20=p18+p19=
p23
p25

0.28

0.26

p7 =

0.230 x 0.82 x 1 =

0.189

p9 =

0.230 x 0.82 x 1 =

0.189

p11 =

0.230 x 0.82 x 1 =

0.189

p13 =

0.230 x 0.82 x 1 =

0.189

p14= 0.260x{1.85x(1+0.4+0.6)+0.82x(1+1x 3) }=

p16= 0.032x{1.85x(1+0.4+0.6)+0.82x(1+1x 3+0.5)} =

B4

Design Report-June2012
Design of Quay Wall

0.60

p8 = p6 + p7 =

p11

0.170

0.230 x 1.85 x 0.4=

p6 = p4 + p5 =

p7

p17

p16

p3 =

p4 = p2 + p3 =

p5

B9

0.426

p2 = 0.426

p3

B10 1.00

0.500 36 0 24 135 0.035 0.032 1.85 0.82

0.230 x 1.85 x 1 =

0.236 p17=

p19= 0.032 x 0.82 x 1 =

0.03

p21= 0.032 x 0.82 x 1 =

0.03

p23= 0.032 x 0.82 x 1 =

0.03

p25= 0.032 x 0.82 x 1 =

0.03

1.81 p15= 0.260 x 0.82 x 0.5 =

0.032 x 0.82 x 0.5 =

0.01

0.11

Fishery Harbour at Barka

2.1.1.2 Forces & Moment - High Water Condition

Block
Ref
B11
B10

B9
B8
B7
B6

B5

B4
B3
B2
B1

Description
Pressure
Pressure
(t/m2 per Height
Ref.
m run)
p1
0.426
1.00
p2
0.426
0.40
p3
0.17
0.40
p4
0.60
0.60
p5
0.26
0.60
p6
0.85
1.00
p7
0.19
1.00
p8
1.04
1.00
p9
0.19
1.00
p10
1.23
1.00
p11
0.19
1.00
p12
1.42
1.00
p13
0.19
1.00
p14
1.81
0.50
p15
0.11
0.50
p16
0.24
0.50
p17
0.01
0.50
p18
0.25
1.00
p19
0.03
1.00
p20
0.28
1.00
p21
0.03
1.00
p22
0.30
1.00
p23
0.03
1.00
p24
0.33
1.00
p25
0.03
1.00
Total

Design Report-June 2012


Design of Quay Wall

Actuating Force (t per m run)


Force
(t per m
run)
0.21
0.17
0.03
0.36
0.08
0.85
0.09
1.04
0.09
1.23
0.09
1.42
0.09
0.91
0.03
0.12
0.00
0.25
0.01
0.28
0.01
0.30
0.01
0.33
0.01

Toe
0.21
0.17
0.03
0.36
0.08
0.85
0.09
1.04
0.09
1.23
0.09
1.42
0.09
0.91
0.03
0.12
0.00
0.25
0.01
0.28
0.01
0.30
0.01
0.33
0.01
8.0

Lever Arm (Distance of CG ) (m)

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 &


B2
B3
B4
B5
B6
B7
B8
B9
0.21
0.17
0.03
0.36
0.08
0.85
0.09
1.04
0.09
1.23
0.09
1.42
0.09
0.91
0.03
0.12
0.00
0.25
0.01
0.28
0.01
0.30
0.01

0.21
0.17
0.03
0.36
0.08
0.85
0.09
1.04
0.09
1.23
0.09
1.42
0.09
0.91
0.03
0.12
0.00
0.25
0.01
0.28
0.01

0.21
0.17
0.03
0.36
0.08
0.85
0.09
1.04
0.09
1.23
0.09
1.42
0.09
0.91
0.03
0.12
0.00
0.25
0.01

0.21
0.17
0.03
0.36
0.08
0.85
0.09
1.04
0.09
1.23
0.09
1.42
0.09
0.91
0.03
0.12
0.00

0.21
0.17
0.03
0.36
0.08
0.85
0.09
1.04
0.09
1.23
0.09
1.42
0.09

0.21
0.17
0.03
0.36
0.08
0.85
0.09
1.04
0.09
1.23
0.09

0.21
0.17
0.03
0.36
0.08
0.85
0.09
1.04
0.09

0.21
0.17
0.03
0.36
0.08
0.85
0.09

7.7

7.37 7.08 6.82 5.77 4.25 2.93 1.80

B10
B9 &
&
Toe
B10
B11
0.21 0.21 10.42
0.17
9.80
0.03
9.77
0.36
9.30
0.08
9.25
8.50
8.42
7.50
7.42
6.50
6.42
5.50
5.42
4.75
4.71
4.25
4.21
3.50
3.42
2.50
2.42
1.50
1.42
0.50
0.42
0.85 0.21

Moment about (t-m per m run)

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 &


B2
B3
B4
B5
B6
B7
B8
B9
9.42
8.80
8.77
8.30
8.25
7.50
7.42
6.50
6.42
5.50
5.42
4.50
4.42
3.75
3.71
3.25
3.21
2.50
2.42
1.50
1.42
0.50
0.42

8.42
7.80
7.77
7.30
7.25
6.50
6.42
5.50
5.42
4.50
4.42
3.50
3.42
2.75
2.71
2.25
2.21
1.50
1.42
0.50
0.42

7.42
6.80
6.77
6.30
6.25
5.50
5.42
4.50
4.42
3.50
3.42
2.50
2.42
1.75
1.71
1.25
1.21
0.50
0.42

6.42
5.80
5.77
5.30
5.25
4.50
4.42
3.50
3.42
2.50
2.42
1.50
1.42
0.75
0.71
0.25
0.21

5.42
4.80
4.77
4.30
4.25
3.50
3.42
2.50
2.42
1.50
1.42
0.50
0.42

4.42
3.80
3.77
3.30
3.25
2.50
2.42
1.50
1.42
0.50
0.42

3.42
2.80
2.77
2.30
2.25
1.50
1.42
0.50
0.42

2.42
1.80
1.77
1.30
1.25
0.50
0.42

B10
B9 &
&
Toe
B10
B11
1.42 0.42 2.22
0.80
1.67
0.77
0.33
0.30
3.33
0.25
0.71
7.24
0.79
7.80
0.70
7.99
0.61
7.80
0.51
4.31
0.13
0.50
0.01
0.87
0.04
0.69
0.03
0.45
0.02
0.16
0.01
48.9

B10
&
B11
0.30 0.09
0.14
0.03
0.11
0.02

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 &


B2
B3
B4
B5
B6
B7
B8
B9 B10
2.01
1.50
0.30
2.97
0.63
6.39
0.70
6.76
0.61
6.76
0.51
6.38
0.42
3.40
0.10
0.38
0.01
0.62
0.03
0.41
0.02
0.15
0.01

1.79
1.33
0.26
2.61
0.56
5.53
0.61
5.72
0.51
5.53
0.42
4.96
0.32
2.50
0.07
0.27
0.01
0.37
0.02
0.14
0.01

1.58
1.16
0.23
2.25
0.48
4.68
0.51
4.68
0.42
4.30
0.32
3.54
0.23
1.59
0.05
0.15
0.00
0.12
0.01

1.37
0.99
0.20
1.90
0.40
3.83
0.42
3.64
0.32
3.07
0.23
2.13
0.13
0.68
0.02
0.03
0.00

1.15
0.82
0.16
1.54
0.33
2.98
0.32
2.60
0.23
1.84
0.13
0.71
0.04

0.94
0.65
0.13
1.18
0.25
2.13
0.23
1.56
0.13
0.61
0.04

0.73
0.48
0.09
0.82
0.17
1.28
0.13
0.52
0.04

0.52
0.31
0.06
0.47
0.10
0.43
0.04

41.1 33.5 26.3 19.4 12.85 7.85 4.27 1.91 0.59

0.09

Fishery Harbour at Barka

2.1..1.3 Pressure - Low Water Condition


Backfill Soil Data
Block
Ref.

Height Detail
(m)

B11

1.00

1.00

36

36

90

B10

1.00

1.00

36

36

B9

1.00

1.00

36

0.200

36

0.800

B8

Computation of Pressure (t/m per m run)

ka(horz.)

bulk

sub

0.285

0.230

1.85

p1

90

0.285

0.230

1.85

p2

36

90

0.285

0.230

1.85

36

90

0.285

0.230

1.85

36

36

90

0.285

0.230

1.85

0.82

p8

p8 = p6 + p7 =

1.36

p10

p10 = p8 + p9 =

1.51

ka

p1=

0.230 x 1.85 x 1 =

1.00

1.000

36

36

90

0.285

0.230

1.85

0.82

B6

1.00

1.000

36

36

90

0.285

0.230

1.85

0.82

p4

p4 = p2 + p3 =

p5

p6

0.500

36

24

90

0.285

0.260

1.85

0.82

B5

1.00
0.500

36

24 135

0.035

0.032

1.85

0.82

p12

0.85

p5 = 0.230 x 1.85 x 1 =

0.43

1.28

p7 = 0.230 x 1.85 x 0.2 =

0.09

p9 = 0.230 x 0.82 x 0.8 =

0.15

p11 = 0.230 x 0.82 x 1 =

0.19

p13 = 0.230 x 0.82 x 1 =

0.189

p11

1.70

p13
p15

P17

p18

0.43

p9

p14

p14= 0.260x{1.85x(1+1+1+0.2)+0.82x(0.8+1x 2) }=

p16= 0.032x{1.85x(1+1+1+0.2)+0.82x(0.8+1x 2+0.5) }=

B4

1.00

1.000

36

24 135

0.035

0.032

1.85

0.82

B3

1.00

1.000

36

24 135

0.035

0.032

1.85

0.82

B2

1.00

1.000

36

24 135

0.035

0.032

1.85

0.82

p22 p22=p20+p21 = 0.34

B1

1.00

1.000

36

24 135

0.035

0.032

1.85

0.82

p24 p24=p22+p23 = 0.37

Design Report-June 2012


Design of Quay Wall

p6 = p4 + p5 =

p7

p12=p10+p11=

p16

p3 = 0.230 x 1.85 x 1 =

p2 = 0.426

p3

1.00

B7

0.426

p19

p20

p18=p16+p17=

0.289

p20=p18+p19=

p21
p23

p25

0.32

0.276

p17=

p19= 0.032 x 0.82 x 1 =

0.03

p21= 0.032 x 0.82 x 1 =

0.03

p23= 0.032 x 0.82 x 1 =

0.03

p25= 0.032 x 0.82 x 1 =

0.03

2.1 p15=

0.032 x 0.82 x 0.5 =

0.260 x 0.82 x 0.5 =


0.01

0.11

Fishery Harbour at Barka

2.1.1.4 Forces & Moment - Low Water Condition


Description
Pressure
Pressure
(t/m2 per
Block
Ref.
m run)
Ref
B11
p1
0.426
p2
0.426
B10
p3
0.43
p4
0.85
B9
p5
0.43
p6
1.28
p7
0.09
B8
p8
1.36
p9
0.15
p10
1.51
B7
p11
0.19
p12
1.70
B6
p13
0.19
p14
2.136
p15
0.11
B5
p16
0.276
p17
0.01
p18
0.29
B4
p19
0.03
p20
0.32
B3
p21
0.03
p22
0.34
B2
p23
0.03
p24
0.37
B1
p25
0.03
Total

Design Report-June 2012


Design of Quay Wall

Actuating Force(t per m run)


Force
Height (t per m
run)
1.00
1.00
1.00
1.00
1.00
0.20
0.20
0.80
0.80
1.00
1.00
1.00
1.00
0.50
0.50
0.50
0.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.21
0.43
0.213
0.85
0.21
0.26
0.01
1.09
0.06
1.51
0.09
1.70
0.094
1.0681
0.027
0.1380
0.00
0.29
0.01
0.315
0.01
0.342
0.01
0.37
0.03

Toe
0.21
0.43
0.213
0.85
0.21
0.26
0.01
1.09
0.06
1.51
0.09
1.70
0.094
1.068
0.027
0.138
0.00
0.29
0.01
0.315
0.01
0.342
0.01
0.37
0.03
9.32

Dist of CG from (m)

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 &


B2
B3
B4
B5
B6
B7
B8
B9 B10
0.21
0.43
0.213
0.85
0.21
0.26
0.01
1.09
0.06
1.51
0.09
1.70
0.094
1.068
0.027
0.138
0.00
0.29
0.01
0.32
0.01
0.34
0.01

0.21
0.43
0.213
0.85
0.21
0.26
0.01
1.09
0.06
1.51
0.09
1.70
0.094
1.068
0.027
0.138
0.003
0.289
0.013
0.315
0.013

0.21
0.43
0.213
0.85
0.21
0.26
0.01
1.09
0.06
1.51
0.09
1.70
0.09
1.07
0.03
0.14
0.00
0.29
0.01

0.21
0.43
0.213
0.85
0.21
0.26
0.01
1.09
0.06
1.51
0.09
1.70
0.09
1.07
0.03
0.14
0.00

0.21
0.43
0.213
0.85
0.21
0.26
0.01
1.09
0.06
1.51
0.09
1.70
0.09

0.21
0.43
0.213
0.85
0.21
0.26
0.01
1.09
0.06
1.51
0.09

0.21
0.43
0.213
0.852
0.213
0.255
0.009
1.090
0.060

0.21
0.43
0.21
0.85
0.21

0.21
0.43
0.21

8.95

8.60

8.27

7.97

6.73

4.94

3.33

1.92

0.85

B10
&
B11

Toe

0.21 10.42
9.50
9.42
8.50
8.42
7.90
7.88
7.40
7.34
6.50
6.42
5.50
5.42
4.75
4.71
4.25
4.21
3.50
3.42
2.50
2.42
1.50
1.42
0.50
0.42
0.21

Moment about (t-m per m run)

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 &


B2
B3
B4
B5
B6
B7
B8
B9 B10
9.42
8.50
8.42
7.50
7.42
6.90
6.88
6.40
6.34
5.50
5.42
4.50
4.42
3.75
3.71
3.25
3.21
2.50
2.42
1.50
1.42
0.50
0.42

8.42
7.50
7.42
6.50
6.42
5.90
5.88
5.40
5.34
4.50
4.42
3.50
3.42
2.75
2.71
2.25
2.21
1.50
1.42
0.50
0.42

7.42
6.50
6.42
5.50
5.42
4.90
4.88
4.40
4.34
3.50
3.42
2.50
2.42
1.75
1.71
1.25
1.21
0.50
0.42

6.42
5.50
5.42
4.50
4.42
3.90
3.88
3.40
3.34
2.50
2.42
1.50
1.42
0.75
0.71
0.25
0.21

5.42
4.50
4.42
3.50
3.42
2.90
2.88
2.40
2.34
1.50
1.42
0.50
0.42

4.42
3.50
3.42
2.50
2.42
1.90
1.88
1.40
1.34
0.50
0.42

3.42
2.50
2.42
1.50
1.42
0.90
0.88
0.40
0.34

2.42
1.50
1.42
0.50
0.42

1.42
0.50
0.42

B10
&
B11
0.42

Toe
2.22
4.05
2.00
7.24
1.79
2.02
0.07
8.06
0.44
9.83
0.61
9.36
0.51
5.07
0.13
0.587
0.01
1.01
0.04
0.79
0.03
0.51
0.02
0.18
0.01
56.60

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 &


B2
B3
B4
B5
B6
B7
B8
B9 B10
2.01
3.62
1.79
6.39
1.58
1.76
0.06
6.97
0.38
8.32
0.51
7.66
0.42
4.01
0.10
0.45
0.01
0.72
0.03
0.47
0.02
0.17
0.01

1.79
3.20
1.58
5.53
1.37
1.51
0.05
5.88
0.32
6.81
0.42
5.96
0.32
2.94
0.07
0.31
0.01
0.43
0.02
0.16
0.01

1.58
2.77
1.37
4.68
1.15
1.25
0.04
4.79
0.26
5.30
0.32
4.25
0.23
1.87
0.05
0.17
0.00
0.14
0.01

1.37
2.34
1.15
3.83
0.94
1.00
0.03
3.70
0.20
3.78
0.23
2.55
0.13
0.80
0.02
0.03
0.00

1.15
1.92
0.94
2.98
0.73
0.74
0.02
2.62
0.14
2.27
0.13
0.85
0.04

B10
&
B11

0.94
1.49
0.73
2.13
0.51
0.49
0.02
1.53
0.08
0.76
0.04

0.73
1.07
0.51
1.28
0.30
0.23
0.01
0.44
0.02

0.52
0.64
0.30
0.43
0.09

0.30 0.09
0.21
0.09

47.45 38.68 30.24 22.12 14.53 8.71

4.58

1.97

0.60

0.09

Fishery Harbour at Barka

2.1.2

Live Load Surcharge

2.1.2.1 Pressure
Backfill Soil Data
Block
Ref.

Height Detail
(m)

Computation of pressure (t/m2 per m run)

ka

ka (horz.)

B11

1.00

1.00

36.00

0.00

36.00

90.00

0.285

0.230

1.25

plls1

plls1 = 0.230 x 1.25 =

0.29

B10

1.00

1.00

36.00

0.00

36.00

90.00

0.285

0.230

1.25

plls2

plls2 = 0.230 x 1.25 =

0.29

B9

1.00

1.00

36.00

0.00

36.00

90.00

0.285

0.230

1.25

plls3

plls3 = 0.230 x 1.25 =

0.29

B8

1.00

1.00

36.00

0.00

36.00

90.00

0.285

0.230

1.25

plls4

plls4 = 0.230 x 1.25 =

0.29

B7

1.00

1.00

36.00

0.00

36.00

90.00

0.285

0.230

1.25

plls5

plls5 = 0.230 x 1.25 =

0.29

B6

1.00

1.00

36.00

0.00

36.00

90.00

0.285

0.230

1.25

plls6

plls6 = 0.230 x 1.25 =

0.29

0.50

36.00

0.00

24.00

90.00

0.285

0.26

1.25

plls7

plls7 = 0.26 x 1.25 =

0.33

B5

1.00
0.50

36.00

0.00

24.00

135.00

0.035

0.03

1.25

plls8

plls8 = 0.03 x 1.25 =

0.04

B4

1.00

1.00

36.00

0.00

24.00

135.00

0.035

0.03

1.25

plls9

plls9 = 0.03 x 1.25 =

0.04

B3

1.00

1.00

36.00

0.00

24.00

135.00

0.035

0.03

1.25

plls10

plls10 = 0.03 x 1.25 =

0.04

B2

1.00

1.00

36.00

0.00

24.00

135.00

0.035

0.03

1.25

plls11

plls11 = 0.03 x 1.25 =

0.04

B1

1.00

1.00

36.00

0.00

24.00

135.00

0.035

0.03

1.25

plls12

plls12 = 0.03 x 1.25 =

0.04

Design Report-June 2012


Design of Quay Wall

Fishery Harbour at Barka

2.1.2.2 Live Load Surcharge Forces & Moment Description

Actuating Force(t per m run)

Dist of CG from (m)

Moment about (t-m per m run)

Pressure
Force
Force
(t/m2 per m Height (t per Toe
Ref.
m run)
run)

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 &


B2
B3
B4
B5
B6
B7
B8
B9 B10

B10
&
B11

B11

plls1

0.29

1.00

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29 10.50 9.50

8.50

7.50

6.50

5.50

4.50

3.50

2.50

1.50

B10

plls2

0.29

1.00

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

9.50

8.50

7.50

6.50

5.50

4.50

3.50

2.50

1.50

0.50

B9

plls3

0.29

1.00

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

8.50

7.50

6.50

5.50

4.50

3.50

2.50

1.50

0.50

B8

plls4

0.29

1.00

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

7.50

6.50

5.50

4.50

3.50

2.50

1.50

0.50

B7

plls5

0.29

1.00

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

6.50

5.50

4.50

3.50

2.50

1.50

0.50

B6

plls6

0.29

1.00

0.29

0.29

0.29

0.29

0.29

0.29

0.29

5.50

4.50

3.50

2.50

1.50

0.50

plls7

0.33

0.50

0.16

0.16

0.16

0.16

0.16

0.16

4.75

3.75

2.75

1.75

plls8

0.04

0.50

0.02

0.02

0.02

0.02

0.02

0.02

4.25

3.25

2.25

1.25

B4

plls9

0.04

1.00

0.04

0.04

0.04

0.04

0.04

3.50

2.50

1.50

0.50

B3

plls10

0.04

1.00

0.04

0.04

0.04

0.04

2.50

1.50

0.50

B2

plls11

0.04

1.00

0.04

0.04

0.04

1.50

0.50

B1

plls12

0.04

1.00

0.04

0.04

Block
Ref

Toe

B10
&
B11

Toe

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 &


B2
B3
B4
B5
B6
B7
B8
B9 B10

0.50

3.02

2.73

2.44

2.16

1.87

1.58

1.29

1.01

0.72

0.43 0.14

2.73

2.44

2.16

1.87

1.58

1.29

1.01

0.72

0.43

0.14

2.44

2.16

1.87

1.58

1.29

1.01

0.72

0.43

0.14

2.16

1.87

1.58

1.29

1.01

0.72

0.43

0.14

1.87

1.58

1.29

1.01

0.72

0.43

0.14

1.58

1.29

1.01

0.72

0.43

0.14

0.75

0.77

0.61

0.45

0.28

0.12

0.25

0.08

0.06

0.04

0.02 0.005

0.13

0.09

0.06

0.02

0.09

0.06

0.02

0.06

0.02

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 &


B2
B3
B4
B5
B6
B7
B8
B9 B10

B10
&
B11

B5

Total

Design Report-June2012
Design of Quay Wall

2.06

0.50
2.02

1.98

1.94

1.91

1.73

1.44

1.15

0.86

0.58

0.02
14.95 12.91 10.91 8.95

7.03

5.18

3.59

2.30

1.29

0.58 0.14

Fishery Harbour at Barka

2.1.3 HORZ SEISMIC FORCE-DUE TO SELF-WT


2.1.3.1Computation of Force - High Water Condition

Forces and Moments - High Water Condition

Block Dimensions

Block Ref

B11

WS
E10
B10
WS
LWL
E9
B10 WS1
HWL WS2
E10
E10(S)
B9
WS
LWL
E9
B9
WS1
HWL E9(S)
B8
WS1
LWL WS2
E8
E8(S)
B8
WS1
HWL
E8
B7
WS
E7(S)
B6
WS
E6(S)
WS
B5
RF1
RF2
WS
B4
RF1
RF2
WS
B3
RF1
RF2
WS
B2
RF1
RF2
WF1
B1
WF2
BP
Total Load &
Moment HWL
Total Load &
Moment LWL

Unit
Volum
Seismic
Weig Weight Horz
e
Force
Seism
ht
(t/m
Acro
ic
Along
Heigh
run)
ss
Coeff.
Wall
t
Wall
(m)

(m)

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

4.00
1.00
4.00
1.00
4.00
4.00
1.00
1.00
5.00
1.00
5.00
1.00
5.00
5.00
1.00
1.00
5.00
1.00
5.00
1.00
6.00
1.00
6.50
0.50
0.50
6.00
0.50
0.50
5.50
0.50
0.50
5.00
0.50
0.50
0.50
0.50
5.50

Design Report-June2012
Design of Quay Wall

(m) (cu.m)

(t/cu
m)

1.00
1.00
1.00
1.00
0.40
0.60
0.40
0.60
1.00
1.00
1.00
1.00
0.20
0.80
0.20
0.80
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.50
1.00
0.50
0.50
1.00
0.50
0.50
1.00
0.50
0.50
0.50
0.50
1.00

2.50
1.85
2.40
1.85
2.40
1.40
1.85
0.82
2.40
1.85
1.37
0.82
1.37
0.82
1.85
0.82
1.37
0.82
1.37
0.82
1.37
0.82
1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.37

4.00
1.00
4.00
1.00
1.60
2.40
0.40
0.60
5.00
1.00
5.00
1.00
1.00
4.00
0.20
0.80
5.00
1.00
5.00
1.00
6.00
1.00
6.50
0.25
0.13
6.00
0.25
0.13
5.50
0.25
0.13
2.50
0.25
0.25
0.25
0.25
5.50

(t/m run)
10.00
1.85
9.60
1.85
3.84
3.36
0.74
0.49
12.00
1.85
6.85
0.82
1.37
3.28
0.37
0.66
6.85
0.82
6.85
0.82
8.22
0.82
8.91
0.34
0.17
8.22
0.34
0.17
7.54
0.34
0.17
3.43
0.34
0.34
0.34
0.34
7.54

0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08

0.80
0.15
0.77
0.15
0.31
0.27
0.06
0.04
0.96
0.15
0.55
0.07
0.11
0.26
0.03
0.05
0.55
0.07
0.55
0.07
0.66
0.07
0.71
0.03
0.01
0.66
0.03
0.01
0.60
0.03
0.01
0.27
0.03
0.03
0.03
0.03
0.60

Seismic Force

Distance of CG From

B10
&
B11

Toe

(t/ m (t/ m (t/ m (t/ m (t/ m (t/ m (t/ m (t/ m (t/ m (t/ m (t/ m
run) run) run) run) run) run) run) run) run) run) run)

(m)

Toe

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 &


B2 B3 B4 B5 B6 B7 B8 B9 B10

0.80
0.15
0.77
0.15
0.31
0.27
0.06
0.04
0.96
0.15
0.55
0.07
0.11
0.26
0.03
0.05
0.55
0.07
0.55
0.07
0.66
0.07
0.71
0.03
0.01
0.66
0.03
0.01
0.60
0.03
0.01

0.80
0.15
0.77
0.15
0.31
0.27
0.06
0.04
0.96
0.15
0.55
0.07
0.11
0.26
0.03
0.05
0.55
0.07
0.55
0.07
0.66
0.07
0.71
0.03
0.01
0.66
0.03
0.01

0.80
0.15
0.77
0.15
0.31
0.27
0.06
0.04
0.96
0.15
0.55
0.07
0.11
0.26
0.03
0.05
0.55
0.07
0.55
0.07
0.66
0.07
0.71
0.03
0.01

0.80
0.15
0.77
0.15
0.31
0.27
0.06
0.04
0.96
0.15
0.55
0.07
0.11
0.26
0.03
0.05
0.55
0.07
0.55
0.07
0.66
0.07

0.80
0.15
0.77
0.15
0.31
0.27
0.06
0.04
0.96
0.15
0.55
0.07
0.11
0.26
0.03
0.05
0.55
0.07
0.55
0.07

0.80
0.15
0.77
0.15
0.31
0.27
0.06
0.04
0.96
0.15
0.55
0.07
0.11
0.26
0.03
0.05
0.55
0.07

0.80
0.15
0.77
0.15
0.31
0.27
0.06
0.04
0.96
0.15
0.55
0.07

Moment about

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 &


B2 B3 B4 B5 B6 B7 B8
B9 B10

B10
&
B11

Toe

B1 & B2 & B3 & B4 & B5 & B6 &


B2
B3
B4
B5
B6
B7

(m)

B7
B10
B8 & B9 &
&
&
B9 B10
B8
B11

(m)

(m)

(m)

(m)

(t/ m
run)

(t/ m
run)

(t/ m (t/ m (t/ m


run) run) run)

(t/ m
run)

(t/ m (t/ m (t/ m (t/ m (t/ m


run) run) run) run) run)

0.80 0.80 10.50 9.50 8.50 7.50 6.50 5.50 4.50


0.15 0.15 10.50 9.50 8.50 7.50 6.50 5.50 4.50
0.77
9.50 8.50 7.50 6.50 5.50 4.50 3.50
0.15
9.50 8.50 7.50 6.50 5.50 4.50 3.50
0.31
9.20 8.20 7.20 6.20 5.20 4.20 3.20
0.27
9.30 8.30 7.30 6.30 5.30 4.30 3.30
0.06
9.20 8.20 7.20 6.20 5.20 4.20 3.20
0.04
9.30 8.30 7.30 6.30 5.30 4.30 3.30
8.50 7.50 6.50 5.50 4.50 3.50 2.50
8.50 7.50 6.50 5.50 4.50 3.50 2.50
8.50 7.50 6.50 5.50 4.50 3.50 2.50
8.50 7.50 6.50 5.50 4.50 3.50 2.50
7.10 6.10 5.10 4.10 3.10 2.10 1.10
7.40 6.40 5.40 4.40 3.40 2.40 1.40
7.10 6.10 5.10 4.10 3.10 2.10 1.10
7.40 6.40 5.40 4.40 3.40 2.40 1.40
7.50 6.50 5.50 4.50 3.50 2.50 1.50
7.50 6.50 5.50 4.50 3.50 2.50 1.50
6.50 5.50 4.50 3.50 2.50 1.50 0.50
6.50 5.50 4.50 3.50 2.50 1.50 0.50
5.50 4.50 3.50 2.50 1.50 0.50
5.50 4.50 3.50 2.50 1.50 0.50
4.50 3.50 2.50 1.50 0.50
4.25 3.25 2.25 1.25 0.25
4.21 3.21 2.21 1.21 0.21
3.50 2.50 1.50 0.50
3.25 2.25 1.25 0.25
3.21 2.21 1.21 0.21
2.50 1.50 0.50
2.25 1.25 0.25
2.21 1.21 0.21
1.50 0.50
1.25 0.25
1.21 0.21
0.25
0.21
0.50

3.50
3.50
2.50
2.50
2.20
2.30
2.20
2.30
1.50
1.50
1.50
1.50
0.10
0.40
0.10
0.40
0.50
0.50

2.50
2.50
1.50
1.50
1.20
1.30
1.20
1.30
0.50
0.50
0.50
0.50

1.50 0.50 8.40


1.50 0.50 1.55
0.50
7.30
0.50
1.41
0.20
2.83
0.30
2.50
0.20
0.54
0.30
0.37
8.16
1.26
4.66
0.56
0.78
1.94
0.21
0.39
4.11
0.49
3.56
0.43
3.62
0.36
3.21
0.12
0.06
2.30
0.09
0.04
1.51
0.06
0.03
0.41
0.03
0.03
0.01
0.01
0.30

7.60
1.41
6.53
1.26
2.52
2.23
0.49
0.33
7.20
1.11
4.11
0.49
0.67
1.68
0.18
0.34
3.56
0.43
3.01
0.36
2.96
0.30
2.49
0.09
0.04
1.64
0.06
0.03
0.90
0.03
0.02
0.14
0.01
0.01

6.80
1.26
5.76
1.11
2.21
1.96
0.43
0.29
6.24
0.96
3.56
0.43
0.56
1.42
0.15
0.28
3.01
0.36
2.47
0.30
2.30
0.23
1.78
0.06
0.03
0.99
0.03
0.02
0.30
0.01
0.00

4.40
0.81
3.46
0.67
1.29
1.16
0.25
0.17
3.36
0.52
1.92
0.23
0.23
0.63
0.06
0.13
1.37
0.16
0.82
0.10
0.33
0.03

3.60
0.67
2.69
0.52
0.98
0.89
0.19
0.13
2.40
0.37
1.37
0.16
0.12
0.37
0.03
0.07
0.82
0.10
0.27
0.03

(m)

(m)

(m)

(m)

(m)

0.80
0.15
0.77
0.15
0.31
0.27
0.06
0.04
0.96
0.15
0.55
0.07
0.11
0.26
0.03
0.05
0.55
0.07
0.55
0.07
0.66
0.07
0.71
0.03
0.01
0.66
0.03
0.01
0.60
0.03
0.01
0.27
0.03
0.03
0.03
0.03
0.60

0.80
0.15
0.77
0.15
0.31
0.27
0.06
0.04
0.96
0.15
0.55
0.07
0.11
0.26
0.03
0.05
0.55
0.07
0.55
0.07
0.66
0.07
0.71
0.03
0.01
0.66
0.03
0.01
0.60
0.03
0.01
0.27
0.03
0.03

6.00
1.11
4.99
0.96
1.90
1.69
0.37
0.25
5.28
0.81
3.01
0.36
0.45
1.15
0.12
0.23
2.47
0.30
1.92
0.23
1.64
0.16
1.07
0.03
0.02
0.33
0.01
0.00

5.20
0.96
4.22
0.81
1.60
1.42
0.31
0.21
4.32
0.67
2.47
0.30
0.34
0.89
0.09
0.18
1.92
0.23
1.37
0.16
0.99
0.10
0.36
0.01
0.00

2.80
0.52
1.92
0.37
0.68
0.62
0.13
0.09
1.44
0.22
0.82
0.10
0.01
0.10
0.00
0.02
0.27
0.03

2.00
0.37
1.15
0.22
0.37
0.35
0.07
0.05
0.48
0.07
0.27
0.03

1.20 0.40
0.22 0.07
0.38
0.07
0.06
0.08
0.01
0.01

6.61

6.61 6.28 5.64 4.94 4.19 3.46 2.85 2.24 1.62 0.95

41.87 35.25 28.82 22.87 17.59 13.04 9.22 6.06 3.52 1.59 0.47

7.85

7.19 6.86 6.22 5.52 4.76 4.04 3.43 2.97 1.86 0.95

47.56 40.06 33.05 26.53 20.67 15.54 11.14 7.41 4.30 1.88 0.47

Fishery Harbour at Barka

2.2. LOAD & MOMENT DUE TO VERTICAL UPWARD SEISMIC

Block Ref

Seismic Load

Moment about

Distance of CG From

Block Dimensions
Seismi
Volum Unit
Alon
Weight Seis
Across
Weight
c Wt
e
g
Height
mic
Wall
Wall
Coefficie
(t/m
(t/m
nt
(m)
(m)
(m) (cu.m) (t/cum)
run)
run)

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

B8 &
B9

B9 & B10 &


Toe
B10 B11

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

-0.40

-0.40

-0.40 -0.40

-0.40

B10
&
B11

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

B8 &
B9

B9 &
B10

(m)

(m)

(m)

(m)

(m)

(m)

(m)

(m)

(m)

(m)

(t-m
(t-m
(t-m
(t-m
(t-m
(t-m
(t-m
(t-m
(t-m
(t-m
(t-m
(m) per m per m per m per m per m per m per m per m per m per m per m
run) run) run) run) run) run) run) run) run)
run)
run)

-0.40 -0.40 -0.40 -0.40 -0.40 -0.40 -0.40

2.50

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00 -1.00 -0.80 -0.80 -0.80 -0.80 -0.80 -0.80 -0.80 -0.80

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

B8 &
B9

B9 &
B10

B 11

WS

1.00

4.00

1.00

4.00

2.50

10.00 -0.04

B 10
LWL

WS

1.00

4.00

1.00

4.00

2.40

9.60

-0.04 -0.384

-0.384

-0.38 -0.38

-0.38

-0.38 -0.38 -0.38 -0.38 -0.38 -0.38

2.50

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

-0.96 -0.77 -0.77 -0.77 -0.77 -0.77 -0.77 -0.77 -0.77

-0.77

WS1

1.00

4.00

0.40

1.60

2.40

3.84

-0.04 -0.154

-0.154

-0.15 -0.15

-0.15

-0.15 -0.15 -0.15 -0.15 -0.15 -0.15

2.50

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

-0.38 -0.31 -0.31 -0.31 -0.31 -0.31 -0.31 -0.31 -0.31

-0.31

WS2

1.00

4.00

0.60

2.40

1.37

3.29

-0.04 -0.132

-0.132

-0.13 -0.13

-0.13

-0.13 -0.13 -0.13 -0.13 -0.13 -0.13

2.50

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

-0.33 -0.26 -0.26 -0.26 -0.26 -0.26 -0.26 -0.26 -0.26

-0.26

WS

1.00

5.00

1.00

5.00

2.40

12.00 -0.04

-0.48

-0.48

-0.48 -0.48

-0.48

-0.48 -0.48 -0.48 -0.48 -0.48

3.00

2.50

2.50

2.50

2.50

2.50

2.50

2.50

2.50

-1.44 -1.20 -1.20 -1.20 -1.20 -1.20 -1.20 -1.20 -1.20

E10-11

1.00

1.00

2.00

2.00

1.85

3.70

-0.04

-0.15

-0.15

-0.15 -0.15

-0.15

-0.15 -0.15 -0.15 -0.15 -0.15

5.00

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

-0.74 -0.67 -0.67 -0.67 -0.67 -0.67 -0.67 -0.67 -0.67

WS1

1.00

5.00

1.00

5.00

1.40

7.00

-0.04

-0.28

-0.28

-0.28 -0.28

-0.28

-0.28 -0.28 -0.28 -0.28 -0.28

3.00

2.50

2.50

2.50

2.50

2.50

2.50

2.50

2.50

-0.84 -0.70 -0.70 -0.70 -0.70 -0.70 -0.70 -0.70 -0.70

E10-11

1.00

1.00

1.40

1.40

1.85

2.59

-0.04

-0.10

-0.10

0.01

0.01

0.00

0.00

0.00

0.00

0.00

0.00

5.00

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

-0.52

0.05

0.05

0.00

0.00

0.00

0.00

0.00

0.00

E10-11(S) 1.00

1.00

0.60

0.60

0.82

0.49

-0.04 -0.0197

-0.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.00

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

-0.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

B10
HWL

B9
LWL

B9
HWL

B8

WS1

1.00

5.00

0.20

1.00

2.40

2.40

-0.04

-0.10

-0.10

-0.10 -0.10

-0.10

-0.10 -0.10 -0.10

0.01

3.00

2.50

2.50

2.50

2.50

2.50

2.50

2.50

-0.29 -0.24 -0.24 -0.24 -0.24 -0.24 -0.24

0.02

LWL

WS2

1.00

5.00

0.80

4.00

1.37

5.48

-0.04

-0.22

-0.22

-0.22 -0.22

-0.22

-0.22 -0.22 -0.22

0.05

3.00

2.50

2.50

2.50

2.50

2.50

2.50

2.50

-0.66 -0.55 -0.55 -0.55 -0.55 -0.55 -0.55

0.12

B8
HWL

WS

1.00

5.00

1.00

5.00

1.37

6.85

-0.04

-0.27

-0.27

-0.27 -0.27

-0.27

-0.27 -0.27 -0.27

0.08

3.00

2.50

2.50

2.50

2.50

2.50

2.50

2.50

-0.82 -0.69 -0.69 -0.69 -0.69 -0.69 -0.69

0.19

WS

1.00

5.00

1.00

5.00

1.37

6.85

-0.04

-0.27

-0.27

-0.27 -0.27

-0.27

-0.27 -0.27 -0.27

3.00

3.00

3.00

3.00

3.00

3.00

3.00

B7

B6
LWL

B6
HWL

-0.82 -0.82 -0.82 -0.82 -0.82 -0.82 -0.82

WS

1.00

6.00

1.00

6.00

1.37

8.22

-0.04 -0.329

-0.329

-0.33 -0.33

-0.33

-0.33 -0.33

3.50

3.00

3.00

3.00

3.00

3.00

-1.15 -0.99 -0.99 -0.99 -0.99 -0.99

E7-11

1.00

1.00

3.20

3.20

1.85

5.92

-0.04 -0.237

-0.237

-0.24 -0.24

-0.24

-0.24 -0.24

6.00

5.50

5.50

5.50

5.50

5.50

-1.42 -1.30 -1.30 -1.30 -1.30 -1.30


-0.35 -0.32 -0.32 -0.32 -0.32 -0.32

E7-11(S) 1.00

1.00

1.80

1.80

0.82

1.48

-0.04 -0.059

-0.059

-0.06 -0.06

-0.06

-0.06 -0.06

6.00

5.50

5.50

5.50

5.50

5.50

WS

1.00

6.00

1.00

6.00

1.37

8.22

-0.04 -0.329

-0.329

-0.33 -0.33

-0.33

-0.33 -0.33

3.50

3.00

3.00

3.00

3.00

3.00

-1.15 -0.99 -0.99 -0.99 -0.99 -0.99

E7-11

1.00

1.00

1.40

1.40

1.85

2.59

-0.04 -0.104

-0.104

-0.10 -0.10

-0.10

-0.10 -0.10

6.00

5.50

5.50

5.50

5.50

5.50

-0.62 -0.57 -0.57 -0.57 -0.57 -0.57

E7-11(S) 1.00

1.00

3.60

3.60

0.82

2.95

-0.04 -0.118

-0.118

-0.12 -0.12

-0.12

-0.12 -0.12

6.00

5.50

5.50

5.50

5.50

5.50

-0.71 -0.65 -0.65 -0.65 -0.65 -0.65

Design Report-June 2012


Design of Quay Wall

B10
&
B11

B1 &
B2

-0.80 -0.80

Fishery Harbour at Barka

Block Ref

B5

B4

B3

B2

B1

Block Dimensions
Volum Unit
Seismi
Alon
Weight Seis
Across
e
Weight
c Wt
g
Height
mic
Wall
Wall
Coefficie
(t/m
(t/m
nt
(m)
(m)
(m) (cu.m) (t/cum)
run)
run)

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

B8 &
B9

B9 & B10 &


Toe
B10 B11

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

(t/m
run)

Seismic Load

Distance of CG From

(t/m
run)

Moment about

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

B8 &
B9

B9 &
B10

(m)

(m)

(m)

(m)

(m)

(m)

(m)

(m)

(m)

(m)

B10
&
B11

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

WS

1.00

6.50

1.00

6.50

1.37

8.91

-0.04

-0.36

-0.36

-0.36 -0.36

-0.36

-0.36

3.75

3.25

3.25

3.25

3.25

-1.34 -1.16 -1.16 -1.16 -1.16

1.00

0.50

0.50

0.25

1.37

0.34

-0.04

-0.01

-0.01

-0.01 -0.01

-0.01

-0.01

7.25

6.75

6.75

6.75

6.75

-0.10 -0.09 -0.09 -0.09 -0.09

RF2

1.00

0.50

0.50

0.25

1.37

0.34

-0.04

-0.01

-0.01

-0.01 -0.01

-0.01

-0.01

7.17

6.67

6.67

6.67

6.67

-0.10 -0.09 -0.09 -0.09 -0.09

WS

1.00

6.00

1.00

6.00

1.37

8.22

-0.04

-0.33

-0.33

-0.33 -0.33

-0.33

3.50

3.00

3.00

3.00

-1.15 -0.99 -0.99 -0.99

RF1

1.00

0.5

0.5

0.25

1.37

0.34

-0.04

-0.01

-0.01

-0.01 -0.01

-0.01

6.75

6.25

6.25

6.25

-0.09 -0.09 -0.09 -0.09

-0.01

5.67

-0.04 -0.04 -0.04 -0.04

RF2

1.00

0.5

0.5

0.13

1.37

0.17

-0.04

-0.01

-0.01

-0.01 -0.01

6.17

5.67

5.67

WS

1.00

5.50

1.00

5.50

1.37

7.54

-0.04

-0.30

-0.30

-0.30 -0.30

3.25

2.75

2.75

-0.98 -0.83 -0.83

RF1

1.00

0.50

0.50

0.25

1.37

0.34

-0.04

-0.01

-0.01

-0.01 -0.01

5.75

5.25

5.25

-0.08 -0.07 -0.07

RF2

1.00

0.50

0.50

0.13

1.37

0.17

-0.04

-0.01

-0.01

-0.01 -0.01

6.17

5.67

5.67

-0.04 -0.04 -0.04

WS

1.00

5.00

1.00

5.00

1.37

6.85

-0.04

-0.27

-0.27

-0.27

3.00

2.50

-0.82 -0.69

RF1

1.00

0.50

0.50

0.25

1.37

0.34

-0.04

-0.01

-0.01

-0.01

5.75

5.25

-0.08 -0.07

RF2

1.00

0.50

0.50

0.13

1.37

0.17

-0.04

-0.01

-0.01

-0.01

5.67

5.17

-0.04 -0.04

WF1

1.00

0.50

0.50

0.13

1.37

0.17

-0.04

-0.01

-0.01

0.33

WF2

1.00

0.50

0.50

0.25

1.37

0.34

-0.04

-0.01

-0.01

0.25

0.00

BP

1.00

5.50

1.00

5.50

1.37

7.54

-0.04

-0.30

-0.30

3.25

-0.98

Design Report-June 2012


Design of Quay Wall

B6 &
B7

B7 &
B8

B8 &
B9

B9 &
B10

B10
&
B11

(t-m
(t-m
(t-m
(t-m
(t-m
(t-m
(t-m
(t-m
(t-m
(t-m
(t-m
(m) per m per m per m per m per m per m per m per m per m per m per m
run) run) run) run) run) run) run) run) run)
run)
run)

RF1

Total Load &


Moment -LWL
Total Load &
Moment -HWL

B5 &
B6

0.00

-4.30

-3.98 -3.68

-3.36

-3.01 -2.63 -2.00 -1.35 -1.41 -0.78 -0.40

-14.68 -11.84 -11.05 -10.11 -9.00 -7.66 -5.04 -3.29 -3.43

-1.57

-0.80

-3.86

-3.40 -3.11

-2.80

-2.45 -2.06 -1.51 -0.89 -0.97 -0.69 -0.40

-13.14 -9.92 -9.12 -8.23 -7.12 -5.78 -3.58 -1.88 -2.07

-1.37

-0.80

Fishery Harbour at Barka

2.3 SUMMARY OF TOTAL LOAD AND MOMENT


2.3.1 ACTUATING FORCE AND MOMENT (IMPOSED LOADS ARE TAKEN AS 50% OF THE ORIGINAL)
FORCE
DUE TO

POSITION

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 & B6 B6 & B7

B7 &
B8

B8 &
B9

B9 &
B10

B10 &
B11

BACKFILL
(HIGH WATER CONDITION)

LOAD(t/m length)

8.03

7.69

7.37

7.08

6.82

5.77

4.25

2.93

1.80

0.85

0.21

MOMENT (t-m/m)

48.92

41.06

33.53

26.30

19.35

12.85

7.85

4.27

1.91

0.59

0.09

SEISMIC
(HIGH WATER CONDITION)

LOAD(t/m length)

6.61

6.61

6.28

5.64

4.94

4.19

3.46

2.85

2.24

1.62

0.95

MOMENT (t-m/m)

41.87

35.25

28.82

22.87

17.59

13.04

9.22

6.06

3.52

1.59

0.47

BACKFILL+SEISMIC
(HIGH WATER CONDITION)

LOAD(t/m length)

14.64

14.30

13.66

12.72

11.76

9.95

7.72

5.78

4.03

2.47

1.16

MOMENT (t-m/m)

90.79

76.32

62.35

49.18

36.95

25.90

17.07

10.33

5.43

2.18

0.56

BACKFILL
(LOW WATER CONDITION)

LOAD(t/m length)

9.32

8.95

8.60

8.27

7.97

6.73

4.94

3.33

1.92

0.85

0.21

MOMENT (t-m/m)

56.60

47.45

38.68

30.24

22.12

14.53

8.71

4.58

1.97

0.60

0.09

SEISMIC
(LOW WATER CONDITION)

LOAD(t/m length)

7.85

7.19

6.86

6.22

5.52

4.76

4.04

3.43

2.97

1.86

0.95

MOMENT (t-m/m)

47.56

40.06

33.05

26.53

20.67

15.54

11.14

7.41

4.30

1.88

0.47

BACKFILL+SEISMIC
(LOW WATER CONDITION)

LOAD(t/m length)

17.17

16.14

15.46

14.49

13.49

11.50

8.98

6.76

4.89

2.72

1.16

MOMENT (t-m/m)

104.17

87.52

71.73

56.77

42.80

30.08

19.85

11.99

6.27

2.48

0.56

LOAD(t/m length)

1.03

1.01

0.99

0.97

0.95

0.86

0.72

0.58

0.43

0.29

0.00

MOMENT (t-m/m)

7.48

6.46

5.46

4.48

3.51

2.59

1.80

1.15

0.65

0.29

0.07

LOAD(t/m length)

5.75

5.13

4.51

3.89

3.28

2.66

2.04

1.42

0.80

0.19

0.00

MOMENT (t-m/m)

26.73

21.30

16.48

12.27

8.69

5.72

3.37

1.64

0.53

0.04

0.00

LOAD(t/m length)

6.10

5.27

4.45

3.63

2.80

1.98

1.15

0.33

0.00

0.00

0.00

MOMENT (t-m/m)

22.58

16.90

12.04

8.00

4.78

2.40

0.83

0.09

0.00

0.00

0.00

LOAD(t/m length)

0.09

0.10

0.11

0.12

0.13

0.15

0.18

0.22

0.29

0.40

0.67

MOMENT (t-m/m)

0.98

0.98

0.97

0.97

0.97

0.96

0.95

0.94

0.93

0.90

0.83

LIVE LOAD SURCHARGE


Unbalanced Hydraustatic
Force
(High Water Condition)
Unbalanced Hydraustatic
Force
(Low Water Condition)
BOLLARD PULL

Design Report-June 2012


Design of Quay Wall

Fishery Harbour at Barka

2.3.2 STABILISING FORCE AND MOMENT (IMPOSED LOADS ARE TAKEN AS 50% OF THE ORIGINAL)
FORCE
DUE TO

SELF-WT+SEISMIC
(HIGH WATER CONDITION)

SELF-WT+SEISMIC
(LOW WATER CONDITION)

LIVE LOAD SURCHARGE


on Wall

LIVE LOAD SURCHARGE


on backfill

Design Report-June 2012


Design of Quay Wall

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B7 &
B8

B8 &
B9

LOAD(t/m)

94.21

86.62

79.55

71.32

63.43

54.39

41.18

41.80

34.88 18.22

9.60

MOMENT (t-m/m)

318.55 252.13 233.11 208.30 183.85 152.80

99.86

101.56 84.24 36.45

19.20

LOAD(t/m)

102.96

63.64

48.68

41.77 18.82

9.60

MOMENT (t-m/m)

351.04 279.63 260.62 235.93 211.41 180.36

182.97 119.38 102.12 37.63

19.20

LOAD(t/m)

10.00

10.00

10.00

10.00

10.00

10.00

10.00

10.00

10.00 10.00

10.00

MOMENT (t-m/m)

25.00

20.00

20.00

20.00

20.00

20.00

20.00

20.00

20.00 20.00

20.00

LOAD(t/m)

5.00

5.00

5.00

5.00

5.00

5.00

2.50

2.50

2.50

0.00

0.00

MOMENT (t-m/m)

27.50

25.00

25.00

25.00

25.00

11.25

11.25

11.25

0.00

0.00

0.00

POSITION

95.24

88.17

80.10

72.06

B5 & B6 B6 & B7

63.02

B9 &
B10

B10 &
B11

Fishery Harbour at Barka

2.4 LOAD COMBINATION


LOAD Case Ref.

1.0 WALL +

BACKFILL
HWL

LWL

Load Reference

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

B8 &
B9

B9 &
B10

B10
&
B11

Actuating Force

t/m

20.39

19.43

18.17

16.62

15.04

12.61

9.76

7.20

4.84

2.66

1.16

Actuating Moment

tm/m 117.52

97.61

78.83

61.45

45.63

31.62

20.44

11.97

5.96

2.22

0.56

Stabilising Load

t/m

86.62

79.55

71.32

63.43

54.39

41.18

41.80

34.88 18.22

9.60

94.21

Stabilising Moment tm/m 318.55 252.13 233.11 208.30 183.85 152.80

99.86 101.56

Actuating Force

10.13

t/m

23.27

21.42

19.91

18.11

16.29

13.47

7.09

Actuating Moment

tm/m 126.75 104.41

83.77

64.77

47.58

32.47

20.68

12.08

Stabilising Load

t/m

88.17

80.10

72.06

63.02

63.64

48.68

102.96

95.24

84.24 36.45 19.20


4.89

2.72

1.16

6.27

2.48

0.56

41.77 18.82

9.60

Stabilising Moment tm/m 351.04 279.63 260.62 235.93 211.41 180.36 182.97 119.38 102.12 37.63 19.20

2.0 1.0 +

Actuating Force
LL
Actuating Moment
Surcharge HWL
on Backfill
Stabilising Load

t/m

21.42

20.44

19.16

17.59

15.99

13.47

10.48

7.78

tm/m 125.00 104.07

84.29

65.93

49.15

34.21

22.24

13.12

t/m

84.55

76.32

68.43

59.39

43.68

44.30

99.21

91.62

Stabilising Moment tm/m 346.05 277.13 258.11 233.30 208.85 164.05 111.11 112.81

LWL

24.29

5.27

2.95

1.16

6.60

2.50

0.64

37.38 18.22

9.60

84.24 36.45 19.20

Actuating Force

t/m

22.43

20.90

19.08

17.24

14.34

10.85

7.66

5.32

3.00

1.16

Actuating Moment

tm/m 134.23 110.87

89.22

69.24

51.09

35.06

22.48

13.23

6.92

2.77

0.64

Stabilising Load

t/m

93.17

85.10

77.06

68.02

66.14

51.18

44.27 18.82

9.60

107.96 100.24

Stabilising Moment tm/m 378.54 304.63 285.62 260.93 236.41 191.61 194.22 130.63 102.12 37.63 19.20

3.0 1.0 +

Actuating Force
LL
Actuating Moment
Surcharge HWL
on Backfill
Stabilising Load
& Wall
Stabilising Moment
Actuating Force
LWL

t/m

21.42

20.44

19.16

17.59

15.99

13.47

10.48

7.78

5.27

2.95

1.16

tm/m 125.00 104.07

84.29

65.93

49.15

34.21

22.24

13.12

6.60

2.50

0.64

t/m

94.55

86.32

78.43

69.39

53.68

54.30

109.21 101.62

47.38 28.22 19.60

tm/m 371.05 297.13 278.11 253.30 228.85 184.05 131.11 132.81 104.24 56.45 39.20
t/m

24.29

22.43

20.90

19.08

Actuating Moment

tm/m 134.23 110.87

89.22

69.24

Stabilising Load

t/m

117.96 110.24 103.17

95.10

17.24

14.34

10.85

7.66

51.09

35.06

22.48

13.23

87.06

78.02

76.14

61.18

5.32

3.00

1.16

6.92

2.77

0.64

54.27 28.82 19.60

Stabilising Moment tm/m 403.54 324.63 305.62 280.93 256.41 211.61 214.22 150.63 122.12 57.63 39.20

Design Report-June 2012


Design of Quay Wall

Fishery Harbour at Barka

LOAD Case Ref.

Load Reference

1.0 + +
1.0
4.0 WALL

Actuating Force
LL
Actuating Moment
Surcharge HWL
on Wall
Stabilising Load
Only
Stabilising Moment

LWL

t/m

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

B8 &
B9

B9 &
B10

B10
&
B11

20.39

19.43

18.17

16.62

15.04

12.61

9.76

7.20

4.84

2.66

1.16

tm/m 117.52

97.61

78.83

61.45

45.63

31.62

20.44

11.97

5.96

2.22

0.56

109.21 101.62

94.55

86.32

78.43

69.39

53.68

54.30

t/m

47.38 28.22 19.60

tm/m 371.05 297.13 278.11 253.30 228.85 184.05 131.11 132.81 104.24 56.45 39.20

Actuating Force

t/m

23.27

21.42

19.91

18.11

16.29

13.47

10.13

7.09

4.89

2.72

1.16

Actuating Moment

tm/m 126.75 104.41

83.77

64.77

47.58

32.47

20.68

12.08

6.27

2.48

0.56

Stabilising Load

t/m

117.96 110.24 103.17

95.10

87.06

78.02

76.14

61.18

54.27 28.82 19.60

Stabilising Moment tm/m 403.54 324.63 305.62 280.93 256.41 211.61 214.22 150.63 122.12 57.63 39.20

5.0 1.0 +
Bollard
Pull

HWL

LWL

Actuating Force

t/m

20.48

19.53

18.27

16.73

15.17

12.76

9.94

7.43

5.12

3.06

1.83

Actuating Moment

tm/m 118.50

98.59

79.80

62.42

46.60

32.58

21.40

12.91

6.89

3.12

1.40

Stabilising Load

t/m

86.62

79.55

71.32

63.43

54.39

41.18

41.80

34.88 18.22

9.60

94.21

Stabilising Moment tm/m 318.55 252.13 233.11 208.30 183.85 152.80

99.86 101.56

Actuating Force

10.31

t/m

23.35

21.51

20.01

18.23

16.42

13.63

7.31

Actuating Moment

tm/m 127.73 105.39

84.74

65.74

48.55

33.44

21.63

13.02

Stabilising Load

t/m

88.17

80.10

72.06

63.02

63.64

48.68

102.96

95.24

84.24 36.45 19.20


5.17

3.12

1.83

7.20

3.38

1.40

41.77 18.82

9.60

Stabilising Moment tm/m 351.04 279.63 260.62 235.93 211.41 180.36 182.97 119.38 102.12 37.63 19.20

6.0 2.0 +
Bollard
Pull

HWL

Actuating Force

t/m

20.53

19.26

17.71

16.12

13.63

10.66

8.00

5.55

3.35

1.83

Actuating Moment

tm/m 125.98 105.05

21.50

85.26

66.90

50.11

35.17

23.19

14.06

7.53

3.40

1.47

Stabilising Load

t/m

84.55

76.32

68.43

59.39

43.68

44.30

37.38 18.22

9.60

99.21

91.62

Stabilising Moment tm/m 346.05 277.13 258.11 233.30 208.85 164.05 111.11 112.81

LWL

24.38

84.24 36.45 19.20

Actuating Force

t/m

22.52

21.00

19.20

17.37

14.49

11.03

7.88

5.60

3.40

1.83

Actuating Moment

tm/m 135.20 111.85

90.20

70.21

52.06

36.02

23.43

14.17

7.85

3.67

1.47

Stabilising Load

t/m

93.17

85.10

77.06

68.02

66.14

51.18

44.27 18.82

9.60

107.96 100.24

Stabilising Moment tm/m 378.54 304.63 285.62 260.93 236.41 191.61 194.22 130.63 102.12 37.63 19.20

Design Report-June 2012


Design of Quay Wall

Fishery Harbour at Barka

LOAD Case Ref.

3.0 + +
1.0
7.0 WALL
Bollard
Pull

HWL

Load Reference

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

21.50

B7 &
B8

B8 &
B9

B9 &
B10

B10
&
B11

Actuating Force

t/m

20.53

19.26

17.71

16.12

13.63

10.66

8.00

5.55

3.35

1.83

Actuating Moment

tm/m 125.98 105.05

85.26

66.90

50.11

35.17

23.19

14.06

7.53

3.40

1.47

Stabilising Load

t/m

94.55

86.32

78.43

69.39

53.68

54.30

109.21 101.62

47.38 28.22 19.60

Stabilising Moment tm/m 371.05 297.13 278.11 253.30 228.85 184.05 131.11 132.81 104.24 56.45 39.20

LWL

Actuating Force

t/m

24.38

22.52

21.00

19.20

17.37

14.49

11.03

7.88

5.60

3.40

1.83

Actuating Moment

tm/m 135.20 111.85

90.20

70.21

52.06

36.02

23.43

14.17

7.85

3.67

1.47

Stabilising Load

t/m

117.96 110.24 103.17

95.10

87.06

78.02

76.14

61.18

54.27 28.82 19.60

Stabilising Moment tm/m 403.54 324.63 305.62 280.93 256.41 211.61 214.22 150.63 122.12 57.63 39.20

8.0 4.0 +
Bollard
Pull

HWL

Actuating Force

t/m

20.48

19.53

18.27

16.73

15.17

12.76

9.94

7.43

5.12

3.06

1.83

Actuating Moment

tm/m 118.50

98.59

79.80

62.42

46.60

32.58

21.40

12.91

6.89

3.12

1.40

Stabilising Load

t/m

109.21 101.62

94.55

86.32

78.43

69.39

53.68

54.30

47.38 28.22 19.60

Stabilising Moment tm/m 371.05 297.13 278.11 253.30 228.85 184.05 131.11 132.81 104.24 56.45 39.20
Actuating Force
LWL

t/m

23.35

21.51

20.01

18.23

Actuating Moment

tm/m 127.73 105.39

84.74

65.74

Stabilising Load

t/m

117.96 110.24 103.17

95.10

16.42

13.63

10.31

7.31

48.55

33.44

21.63

13.02

87.06

78.02

76.14

61.18

5.17

3.12

1.83

7.20

3.38

1.40

54.27 28.82 19.60

Stabilising Moment tm/m 403.54 324.63 305.62 280.93 256.41 211.61 214.22 150.63 122.12 57.63 39.20

Design Report-June 2012


Design of Quay Wall

Fishery Harbour at Barka

2.5

STABILITY CHECK

LOAD
COMB

59.00

Description

Toe

BASE AREA
Zsea side
Zland side
HWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment

Eccentricity (e)

125.00

125.00

125.00

125.00

125.00

125.00

125.00

125.00

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8 B8 & B9

B9 &
B10

B10 &
B11
4.00
2.67

6.00
6.00

5.00
4.17

5.00
4.17

5.50
5.04

6.00
6.00

6.00
6.00

5.00
4.17

5.00
4.17

5.00
4.17

4.00
2.67

t/m

6.00
20.39

4.17
19.43

4.17
18.17

5.04
16.62

6.00
15.04

6.00
12.61

4.17
9.76

4.17
7.20

4.17
4.84

2.67
2.67
2.66 1.16

tm/m

117.52

97.61

78.83

61.45

45.63

31.62

20.44

11.97

5.96

2.22

0.56

t/m

94.21

86.62

79.55

71.32

63.43

54.39

41.18

41.80

34.88

18.22

9.60

tm/m

318.55

252.13

233.11

208.30

183.85

152.80

99.86

101.56

84.24

36.45 19.20

0.87

0.72

0.56

0.69

0.82

0.77

0.57

0.36

0.26

0.12

0.06

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.77

2.67

2.63

2.58

2.53

2.59

2.53

3.48

4.33

4.11

4.96

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.71

2.58

2.96

3.39

4.03

4.83

4.88

8.48

14.14

16.45

34.08

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

29.30

32.21

26.61

22.74

19.25

16.06

13.88

11.94

9.11

5.39

2.61

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

2.10

2.44

5.21

3.19

1.89

2.07

2.59

4.78

4.84

3.73

2.19

(m)

Against Sliding
Factor of
safety
Against Over Turning
Base
Sea Side
Pressure

Land Side

2
(t/m )

(t/m2)

safe

Design Report-June2012
Design of Quay Wall

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment

Eccentricity (e)

Toe

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8 B8 & B9

B9 &
B10

B10 &
B11

t/m

23.27

21.42

19.91

18.11

16.29

13.47

10.13

7.09

4.89

2.72

1.16

tm/m

126.75

104.41

83.8

64.77

47.58

32.47

20.68

12.08

6.27

2.48

0.56

t/m

102.96

95.24

88.17

80.10

72.06

63.02

63.64

48.68

41.77

18.82

9.60

tm/m

351.04

279.63

261.00

235.93

211.41

180.36

182.97

119.38

102.12

37.63

19.20

0.82

0.66

0.490

0.61

0.73

0.65

-0.05

0.30

0.21

0.13

0.06

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.66

2.67

2.66

2.65

2.65

2.81

3.77

4.12

5.13

4.16

4.96

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.77

2.68

3.12

3.64

4.44

5.55

8.85

9.88

16.29

15.14

34.08

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

31.26

34.14

28.00

24.30

20.73

17.37

11.97

13.19

10.41

5.64

2.61

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

3.06

3.96

7.27

4.82

3.29

3.64

13.49

6.28

6.30

3.77

2.19

(m)

Against Sliding
Factor of
safety
Against Over Turning
Base
Sea Side
Pressure

Land Side

(t/m2)

(t/m2)

safe

Design Report-June2012
Design of Quay Wall

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description

Toe

BASE AREA
Zsea side

Actuating Moment
Stabilising Load
Stabilising Moment

Eccentricity (e)

B9 &
B10

B10 &
B11
4.00
2.67

6.00
6.00

5.00
4.17

5.00
4.17

5.50
5.04

6.00
6.00

6.00
6.00

5.00
4.17

5.00
4.17

5.00
4.17

4.00
2.67

t/m

6.00
21.42

4.17
20.44

4.17
19.16

5.04
17.59

6.00
15.99

6.00
13.47

4.17
10.48

4.17
7.78

4.17
5.27

2.67
2.67
2.95 1.16

tm/m

125.00

104.07

84.29

65.93

49.15

34.21

22.24

13.12

6.60

2.50

0.64

t/m

99.21

91.62

84.55

76.32

68.43

59.39

43.68

44.30

37.38

18.22

9.60

tm/m

346.05

277.13

258.11

233.30

208.85

164.05

111.11

112.81

84.24

36.45 19.20

0.77

0.61

0.44

0.56

0.67

0.81

0.47

0.25

0.42

0.14

0.07

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.78

2.69

2.65

2.60

2.57

2.64

2.50

3.42

4.26

3.71

4.96

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.77

2.66

3.06

3.54

4.25

4.80

5.00

8.60

12.76

14.56

30.22

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

29.30

31.76

25.92

22.31

19.00

17.95

13.61

11.52

11.27

5.50

2.64

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

3.77

4.89

7.90

5.45

3.81

1.84

3.86

6.20

3.68

3.62

2.16

Zland side
HWL Actuating Load

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8 B8 & B9

(m)

Against Sliding
Factor of
safety
Against Over Turning
Base
Sea Side
Pressure

Land Side

2
(t/m )

(t/m2)

safe

Design Report-June2012
Design of Quay Wall

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment

Eccentricity (e)

Toe

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8 B8 & B9

B9 &
B10

B10 &
B11

t/m

24.29

22.43

20.90

19.08

17.24

14.34

10.85

7.66

5.32

3.00

1.16

tm/m

134.23

110.87

89.22

69.24

51.09

35.06

22.48

13.23

6.92

2.77

0.64

t/m

107.96

100.24

93.17

85.10

77.06

68.02

66.14

51.18

44.27

18.82

9.60

tm/m

378.54

304.63

285.62

260.93

236.41

191.61

194.22

130.63

102.12

37.63

19.20

0.74

0.57

0.39

0.50

0.60

0.70

-0.10

0.21

0.35

0.15

0.07

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.67

2.68

2.67

2.68

2.68

2.85

3.66

4.01

4.99

3.76

4.96

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.82

2.75

3.20

3.77

4.63

5.46

8.64

9.87

14.76

13.57

30.22

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

31.26

33.69

27.40

23.87

20.48

19.26

11.70

12.76

12.57

5.74

2.64

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

4.73

6.41

9.87

7.08

5.20

3.42

14.76

7.71

5.14

3.66

2.16

(m)

Against Sliding
Factor of
safety
Against Over Turning
Base
Sea Side
Pressure

Land Side

(t/m2)

(t/m2)

safe

Design Report-June2012
Design of Quay Wall

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description

Toe

BASE AREA
Zsea side
Zland side
HWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment

Eccentricity (e)

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8 B8 & B9

B9 &
B10

B10 &
B11
4.00
2.67

6.00
6.00

5.00
4.17

5.00
4.17

5.50
5.04

6.00
6.00

6.00
6.00

5.00
4.17

5.00
4.17

5.00
4.17

4.00
2.67

t/m

6.00
21.42

4.17
20.44

4.17
19.16

5.04
17.59

6.00
15.99

6.00
13.47

4.17
10.48

4.17
7.78

4.17
5.27

2.67
2.67
2.95 1.16

tm/m

125.00

104.07

84.29

65.93

49.15

34.21

22.24

13.12

6.60

t/m

109.21

101.62

94.55

86.32

78.43

69.39

53.68

54.30

47.38

28.22 19.60

tm/m

371.05

297.13

278.11

253.30

228.85

184.05

131.11

132.81

104.24

56.45 39.20

0.75

0.60

0.45

0.58

0.71

0.84

0.47

0.30

0.44

0.09

0.03

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.06

2.98

2.96

2.94

2.94

3.09

3.07

4.19

5.40

5.75

10.13

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.97

2.86

3.30

3.84

4.66

5.38

5.90

10.12

15.78

22.55

61.70

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

31.80

34.96

29.12

25.61

22.33

21.29

16.81

14.72

14.47

8.00

5.14

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

4.60

5.69

8.70

5.78

3.81

1.84

4.66

7.00

4.48

6.12

4.66

2.50

0.64

(m)

Against Sliding
Factor of
safety
Against Over Turning
Base
Sea Side
Pressure

Land Side

2
(t/m )

(t/m2)

safe

Design Report-June2012
Design of Quay Wall

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment

Eccentricity (e)

Toe

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8 B8 & B9

B9 &
B10

B10 &
B11

t/m

24.29

22.43

20.90

19.08

17.24

14.34

10.85

7.66

5.32

3.00

1.16

tm/m

134.23

110.87

89.22

69.24

51.09

35.06

22.48

13.23

6.92

2.77

0.64

t/m

117.96

110.24

103.17

95.10

87.06

78.02

76.14

61.18

54.27

28.82

19.60

tm/m

403.54

324.63

305.62

280.93

256.41

211.61

214.22

150.63

122.12

57.63

39.20

0.72

0.56

0.40

0.52

0.64

0.74

-0.02

0.25

0.38

0.10

0.03

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.91

2.95

2.96

2.99

3.03

3.27

4.21

4.79

6.12

5.76

10.13

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.01

2.93

3.43

4.06

5.02

6.04

9.53

11.39

17.66

20.79

61.70

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

33.76

36.89

30.60

27.17

23.82

22.59

14.90

15.96

15.77

8.24

5.14

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

5.56

7.21

10.67

7.41

5.20

3.42

15.56

8.51

5.94

6.16

4.66

(m)

Against Sliding
Factor of
safety
Against Over Turning
Base
Sea Side
Pressure

Land Side

(t/m2)

(t/m2)

safe

Design Report-June2012
Design of Quay Wall

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description

Toe

BASE AREA
Zsea side

Actuating Moment
Stabilising Load
Stabilising Moment

Eccentricity (e)

B9 &
B10

B10 &
B11
4.00
2.67

6.00
6.00

5.00
4.17

5.00
4.17

5.50
5.04

6.00
6.00

6.00
6.00

5.00
4.17

5.00
4.17

5.00
4.17

4.00
2.67

t/m

6.00
20.39

4.17
19.43

4.17
18.17

5.04
16.62

6.00
15.04

6.00
12.61

4.17
9.76

4.17
7.20

4.17
4.84

2.67
2.67
2.66 1.16

tm/m

117.52

97.61

78.83

61.45

45.63

31.62

20.44

11.97

5.96

t/m

109.21

101.62

94.55

86.32

78.43

69.39

53.68

54.30

47.38

28.22 19.60

tm/m

371.05

297.13

278.11

253.30

228.85

184.05

131.11

132.81

104.24

56.45 39.20

0.68

0.54

0.39

0.53

0.66

0.80

0.44

0.27

0.43

0.08

0.03

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.21

3.14

3.12

3.12

3.13

3.30

3.30

4.52

5.88

6.37

10.13

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.16

3.04

3.53

4.12

5.01

5.82

6.41

11.10

17.50

25.47

69.57

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

30.55

33.41

27.81

24.72

21.75

20.86

16.38

14.44

14.31

7.89

5.11

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

5.85

7.24

10.01

6.66

4.39

2.27

5.09

7.28

4.64

6.23

4.69

Zland side
HWL Actuating Load

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8 B8 & B9

2.22

0.56

(m)

Against Sliding
Factor of
safety
Against Over Turning
Base
Sea Side
Pressure

Land Side

2
(t/m )

(t/m2)

safe

Design Report-June2012
Design of Quay Wall

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment

Eccentricity (e)

Toe

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8 B8 & B9

B9 &
B10

B10 &
B11

t/m

23.27

21.42

19.91

18.11

16.29

13.47

10.13

7.09

4.89

2.72

1.16

tm/m

126.75

104.41

83.77

64.77

47.58

32.47

20.68

12.08

6.27

2.48

0.56

t/m

117.96

110.24

103.17

95.10

87.06

78.02

76.14

61.18

54.27

28.82

19.60

tm/m

403.54

324.63

305.62

280.93

256.41

211.61

214.22

150.63

122.12

57.63

39.20

0.65

0.50

0.35

0.48

0.60

0.70

-0.04

0.24

0.37

0.09

0.03

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.04

3.09

3.11

3.15

3.21

3.47

4.51

5.18

6.66

6.37

10.13

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.18

3.11

3.65

4.34

5.39

6.52

10.36

12.47

19.48

23.19

69.57

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

32.51

35.34

29.29

26.29

23.23

22.16

14.47

15.69

15.61

8.14

5.11

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

6.81

8.76

11.98

8.29

5.79

3.85

15.99

8.78

6.10

6.27

4.69

(m)

Against Sliding
Factor of
safety
Against Over Turning
Base
Sea Side
Pressure

Land Side

(t/m2)

(t/m2)

safe

Design Report-June2012
Design of Quay Wall

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description

Toe

BASE AREA
Zsea side

Actuating Moment
Stabilising Load
Stabilising Moment

Eccentricity (e)

B9 &
B10

B10 &
B11
4.00
2.67

6.00
6.00

5.00
4.17

5.00
4.17

5.50
5.04

6.00
6.00

6.00
6.00

5.00
4.17

5.00
4.17

5.00
4.17

4.00
2.67

t/m

6.00
20.48

4.17
19.53

4.17
18.27

5.04
16.73

6.00
15.17

6.00
12.76

4.17
9.94

4.17
7.43

4.17
5.12

2.67
2.67
3.06 1.83

tm/m

118.50

98.59

79.80

62.42

46.60

32.58

21.40

12.91

6.89

3.12

1.40

t/m

94.21

86.62

79.55

71.32

63.43

54.39

41.18

41.80

34.88

18.22

9.60

tm/m

318.55

252.13

233.11

208.30

183.85

152.80

99.86

101.56

84.24

36.45 19.20

0.88

0.73

0.57

0.70

0.84

0.79

0.59

0.38

0.28

0.17

0.15

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.76

2.66

2.61

2.56

2.51

2.56

2.49

3.38

4.08

3.57

3.15

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.69

2.56

2.92

3.34

3.95

4.69

4.67

7.86

12.23

11.70

13.75

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

29.47

32.44

26.84

22.93

19.41

16.22

14.11

12.17

9.34

5.72

2.92

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

1.94

2.20

4.97

3.00

1.73

1.91

2.36

4.55

4.62

3.39

1.88

Zland side
HWL Actuating Load

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8 B8 & B9

(m)

Against Sliding
Factor of
safety
Against Over Turning
Base
Sea Side
Pressure

Land Side

2
(t/m )

(t/m2)

safe

Design Report-June2012
Design of Quay Wall

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment

Eccentricity (e)

Toe

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8 B8 & B9

B9 &
B10

B10 &
B11

t/m

23.35

21.51

20.01

18.23

16.42

13.63

10.31

7.31

5.17

3.12

1.83

tm/m

127.73

105.39

84.74

65.74

48.55

33.44

21.63

13.02

7.20

3.38

1.40

t/m

102.96

95.24

88.00

80.10

72.06

63.02

63.64

48.68

41.77

18.82

9.60

tm/m

351.04

279.63

260.62

235.93

211.41

180.36

182.97

119.38

102.12

37.63

19.20

0.83

0.67

0.50

0.63

0.74

0.67

-0.03

0.31

0.23

0.18

0.15

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.65

2.66

2.64

2.64

2.63

2.77

3.70

4.00

4.84

3.62

3.15

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.75

2.65

3.08

3.59

4.35

5.39

8.46

9.17

14.19

11.12

13.75

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

31.42

34.37

28.19

24.50

20.89

17.53

12.20

13.41

10.63

5.97

2.92

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

2.90

3.72

7.01

4.63

3.13

3.48

13.26

6.06

6.07

3.43

1.88

(m)

Against Sliding
Factor of
safety
Against Over Turning
Base
Sea Side
Pressure

Land Side

(t/m2)

(t/m2)

safe

Design Report-June2012
Design of Quay Wall

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description

Toe

BASE AREA
Zsea side
Zland side
HWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment

Eccentricity (e)

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8 B8 & B9

B9 &
B10

B10 &
B11
4.00
2.67

6.00
6.00

5.00
4.17

5.00
4.17

5.50
5.04

6.00
6.00

6.00
6.00

5.00
4.17

5.00
4.17

5.00
4.17

4.00
2.67

t/m

6.00
21.50

4.17
20.53

4.17
19.26

5.04
17.71

6.00
16.12

6.00
13.63

4.17
10.66

4.17
8.00

4.17
5.55

2.67
2.67
3.35 1.83

tm/m

125.98

105.05

85.26

66.90

50.11

35.17

23.19

14.06

7.53

3.40

1.47

t/m

99.21

91.62

84.55

76.32

68.43

59.39

43.68

44.30

37.38

18.22

9.60

tm/m

346.05

277.13

258.11

233.30

208.85

164.05

111.11

112.81

84.24

36.45 19.20

0.78

0.62

0.46

0.57

0.68

0.83

0.49

0.27

0.45

0.19

0.15

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.77

2.68

2.63

2.59

2.55

2.62

2.46

3.32

4.04

3.27

3.15

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.75

2.64

3.03

3.49

4.17

4.66

4.79

8.02

11.18

10.71

13.07

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

29.46

31.99

26.15

22.50

19.16

18.11

13.84

11.74

11.49

5.83

2.95

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

3.61

4.65

7.66

5.25

3.65

1.68

3.63

5.98

3.46

3.28

1.85

(m)

Against Sliding
Factor of
safety
Against Over Turning
Base
Sea Side
Pressure

Land Side

2
(t/m )

(t/m2)

safe

Design Report-June2012
Design of Quay Wall

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment

Eccentricity (e)

Toe

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8 B8 & B9

B9 &
B10

B10 &
B11

t/m

24.38

22.52

21.00

19.20

17.37

14.49

11.03

7.88

5.60

3.40

1.83

tm/m

135.20

111.85

90.20

70.21

52.06

36.02

23.43

14.17

7.85

3.67

1.47

t/m

107.96

100.24

93.17

85.10

77.06

68.02

66.14

51.18

44.27

18.82

9.60

tm/m

378.54

304.63

285.62

260.93

236.41

191.61

194.22

130.63

102.12

37.63

19.20

0.75

0.58

0.40

0.51

0.61

0.71

-0.08

0.22

0.37

0.20

0.15

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.66

2.67

2.66

2.66

2.66

2.82

3.60

3.90

4.74

3.32

3.15

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.80

2.72

3.17

3.72

4.54

5.32

8.29

9.22

13.02

10.25

13.07

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

31.42

33.92

27.63

24.06

20.65

19.42

11.93

12.99

12.79

6.08

2.95

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

4.57

6.17

9.63

6.88

5.04

3.26

14.53

7.48

4.92

3.33

1.85

(m)

Against Sliding
Factor of
safety
Against Over Turning
Base
Sea Side
Pressure

Land Side

(t/m2)

(t/m2)

safe

Design Report-June2012
Design of Quay Wall

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description

Toe

BASE AREA
Zsea side

Actuating Moment
Stabilising Load
Stabilising Moment

Eccentricity (e)

B9 &
B10

B10 &
B11
4.00
2.67

6.00
6.00

5.00
4.17

5.00
4.17

5.50
5.04

6.00
6.00

6.00
6.00

5.00
4.17

5.00
4.17

5.00
4.17

4.00
2.67

t/m

6.00
21.50

4.17
20.53

4.17
19.26

5.04
17.71

6.00
16.12

6.00
13.63

4.17
10.66

4.17
8.00

4.17
5.55

2.67
2.67
3.35 1.83

tm/m

125.98

105.05

85.26

66.90

50.11

35.17

23.19

14.06

7.53

t/m

109.21

101.62

94.55

86.32

78.43

69.39

53.68

54.30

47.38

28.22 19.60

tm/m

371.05

297.13

278.11

253.30

228.85

184.05

131.11

132.81

104.24

56.45 39.20

0.76

0.61

0.46

0.59

0.72

0.85

0.49

0.31

0.46

0.12

0.07

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.05

2.97

2.94

2.92

2.92

3.06

3.02

4.07

5.12

5.06

6.43

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.95

2.83

3.26

3.79

4.57

5.23

5.65

9.44

13.84

16.58

26.69

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

31.96

35.19

29.35

25.80

22.49

21.45

17.04

14.94

14.69

8.33

5.45

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

4.44

5.45

8.46

5.58

3.65

1.68

4.43

6.78

4.26

5.78

4.35

Zland side
HWL Actuating Load

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8 B8 & B9

3.40

1.47

(m)

Against Sliding
Factor of
safety
Against Over Turning
Base
Sea Side
Pressure

Land Side

2
(t/m )

(t/m2)

safe

Design Report-June2012
Design of Quay Wall

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment

Eccentricity (e)

Toe

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8 B8 & B9

B9 &
B10

B10 &
B11

t/m

24.38

22.52

21.00

19.20

17.37

14.49

11.03

7.88

5.60

3.40

1.83

tm/m

135.20

111.85

90.20

70.21

52.06

36.02

23.43

14.17

7.85

3.67

1.47

t/m

117.96

110.24

103.17

95.10

87.06

78.02

76.14

61.18

54.27

28.82

19.60

tm/m

403.54

324.63

305.62

280.93

256.41

211.61

214.22

150.63

122.12

57.63

39.20

0.73

0.57

0.41

0.53

0.65

0.75

-0.01

0.27

0.39

0.13

0.07

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.90

2.94

2.95

2.97

3.01

3.23

4.14

4.66

5.81

5.08

6.43

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.98

2.90

3.39

4.00

4.93

5.87

9.14

10.63

15.57

15.69

26.69

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

33.92

37.12

30.83

27.37

23.98

22.75

15.13

16.19

15.99

8.58

5.45

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

5.40

6.97

10.43

7.21

5.04

3.26

15.33

8.28

5.72

5.83

4.35

(m)

Against Sliding
Factor of
safety
Against Over Turning
Base
Sea Side
Pressure

Land Side

(t/m2)

(t/m2)

safe

Design Report-June2012
Design of Quay Wall

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description

Toe

BASE AREA
Zsea side
Zland side
HWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment

Eccentricity (e)

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8 B8 & B9

B9 &
B10

B10 &
B11

6.00
6.00

5.00
4.17

5.00
4.17

5.50
5.04

6.00
6.00

6.00
6.00

5.00
4.17

5.00
4.17

5.00
4.17

4.00
2.67

4.00
2.67

6.00

4.17

4.17

5.04

6.00

6.00

4.17

4.17

4.17

2.67

2.67

t/m

20.48

19.53

18.27

16.73

15.17

12.76

9.94

7.43

5.12

3.06

1.83

tm/m

118.50

98.59

79.80

62.42

46.60

32.58

21.40

12.91

6.89

3.12

1.40

t/m

109.21

101.62

94.55

86.32

78.43

69.39

53.68

54.30

47.38

28.22 19.60

tm/m

371.05

297.13

278.11

253.30

228.85

184.05

131.11

132.81

104.24

56.45 39.20

0.69

0.55

0.40

0.54

0.68

0.82

0.46

0.29

0.45

0.11

0.07

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.20

3.12

3.10

3.09

3.10

3.26

3.24

4.39

5.55

5.53

6.43

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.13

3.01

3.48

4.06

4.91

5.65

6.13

10.28

15.14

18.11

28.06

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

30.72

33.64

28.04

24.92

21.91

21.02

16.61

14.67

14.54

8.22

5.42

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

5.69

7.00

9.77

6.47

4.23

2.11

4.86

7.05

4.42

5.89

4.38

(m)

Against Sliding
Factor of
safety
Against Over Turning
Base
Sea Side
Pressure

Land Side

(t/m2)

(t/m2)

safe

Design Report-June2012
Design of Quay Wall

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment

Eccentricity (e)

Toe

B1 & B2 B2 & B3 B3 & B4 B4 & B5 B5 & B6 B6 & B7 B7 & B8 B8 & B9

B9 &
B10

B10 &
B11

t/m

23.35

21.51

20.01

18.23

16.42

13.63

10.31

7.31

5.17

3.12

1.83

tm/m

127.73

105.39

84.74

65.74

48.55

33.44

21.63

13.02

7.20

3.38

1.40

t/m

117.96

110.24

103.17

95.10

87.06

78.02

76.14

61.18

54.27

28.82

19.60

tm/m

403.54

324.63

305.62

280.93

256.41

211.61

214.22

150.63

122.12

57.63

39.20

0.66

0.51

0.36

0.49

0.61

0.72

-0.03

0.25

0.38

0.12

0.07

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.03

3.07

3.09

3.13

3.18

3.44

4.43

5.02

6.29

5.55

6.43

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.16

3.08

3.61

4.27

5.28

6.33

9.90

11.57

16.96

17.03

28.06

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

32.67

35.57

29.52

26.48

23.39

22.32

14.70

15.91

15.83

8.47

5.42

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

6.65

8.52

11.74

8.10

5.63

3.69

15.76

8.56

5.87

5.93

4.38

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

(m)

Against Sliding
Factor of
safety
Against Over Turning
Base
Sea Side
Pressure

Land Side

Design Report-June2012
Design of Quay Wall

(t/m2)

(t/m2)

Fishery Harbour at Barka

3.1

ACTUATING FORCES AND MOMENTS-SEISMIC CASE

3.1.1

BACKFILL EARTH -DOWNWARD SEISMIC

3.1.1.1 Pressure - High Water Condition


Backfill Soil Data
Block
Height
Ref. Detail (m)

Computation of Pressure (t/m per m run)

ka
(horz.)

bulk

sub

B11 1.00 1.000 36 0 36 90 0.304 0.246

1.85

p1

0.400 36 0 36 90 0.304 0.246

1.85

p2

0.600 36 0 36 90 0.304 0.246

1.85

0.82

B9

1.00 0.400 36 0 36 90 0.304 0.246

1.85

0.82

p6

B8

1.00 1.000 36 0 36 90 0.304 0.246

1.85

0.82

p8

B7

1.00 1.000 36 0 36 90 0.304 0.246

1.85

0.82

p10

B6

1.00 1.000 36 0 36 90 0.304 0.246

1.85

0.82

p12

0.500 36 0 24 90 0.304 0.277

1.85

0.82

p14

B5

1.00
0.500 36 0 24 135 0.035 0.032

1.85

0.82

B4

1.00 1.000 36 0 24 135 0.035 0.032

1.85

0.82

B3

1.00 1.000 36 0 24 135 0.035 0.032

1.85

0.82

B2

1.00 1.000 36 0 24 135 0.035 0.032

1.85

0.82

p22 p24=p22+p23 =

B1

1.00 1.000 36 0 24 135 0.035 0.032

1.85

0.82

p24 p22=p20+p21 =

ka

p1 =

p4

p3 =

p5 =

p9

0.246 x 0.82 x 0.4 =

0.081

p9 =

0.246 x 0.82 x 1 =

0.202

p11 =

0.246 x 0.82 x 1 =

0.202

p13 =

0.246 x 0.82 x 1 =

0.202

p14= 0.277x{1.85x(1+0.4+0.6)+0.82x(0.4+1x 3) }=

1.80

p10 = p8 + p9 =

1.394

1.193

p13
p15

p16= 0.032x{1.85x(1+0.4+0.6)+0.82x(0.4+1x 3+0.5)} =


p19 p18=p16+p17=

p18
p20

p21
0.29
0.313

0.23

p20=p18+p19=
p23
p25

0.26

0.27

p7 =

0.991

p8 = p6 + p7 =

p11
p12 = p10 + p11 =

0.246 x 0.82 x 0.6 =

0.910

p6 = p4 + p5 =

p7

0.182

0.246 x 1.85 x 0.4=


0.64

p4 = p2 + p3 =

p5

p17

p16

0.455

p2 = 0.455

p3

B10 1.00

Design Report-June2012
Design of Quay Wall

0.246 x 1.85 x 1 =

0.221

p17=

p19= 0.032 x 0.82 x 1 =

0.03

p21= 0.032 x 0.82 x 1 =

0.03

p23= 0.032 x 0.82 x 1 =

0.03

p25= 0.032 x 0.82 x 1 =

0.03

0.032 x 0.82 x 0.5 =

p15=

0.277 x 0.82 x 0.5 =


0.01

0.114

Fishery Harbour at Barka

3.1.1.2 Forces & Moment - High Water Condition

Block
Ref
B11
B10

B9
B8
B7
B6

B5

B4
B3
B2
B1

Description
Pressure
Pressure
2
(t/m per Height
Ref.
m run)
p1
0.455
1.00
p2
0.455
0.40
p3
0.18
0.40
p4
0.64
0.60
p5
0.27
0.60
p6
0.91
1.00
p7
0.08
1.00
p8
0.99
1.00
p9
0.20
1.00
p10
1.19
1.00
p11
0.20
1.00
p12
1.39
1.00
p13
0.20
1.00
p14
1.80
0.50
p15
0.11
0.50
p16
0.22
0.50
p17
0.01
0.50
p18
0.23
1.00
p19
0.03
1.00
p20
0.26
1.00
p21
0.03
1.00
p22
0.29
1.00
p23
0.03
1.00
p24
0.31
1.00
p25
0.03
1.00
Total

Design Report-June 2012


Design of Quay Wall

Actuating Force (t per m run)


Force
(t per m
run)
0.23
0.18
0.04
0.38
0.08
0.91
0.04
0.99
0.10
1.19
0.10
1.39
0.10
0.90
0.03
0.11
0.00
0.23
0.01
0.26
0.01
0.29
0.01
0.31
0.01

Toe
0.23
0.18
0.04
0.38
0.08
0.91
0.04
0.99
0.10
1.19
0.10
1.39
0.10
0.899
0.028
0.11
0.00
0.23
0.01
0.26
0.013
0.286
0.013
0.313
0.013
7.93

Lever Arm (Distance of CG ) (m)

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 &


B2
B3
B4
B5
B6
B7
B8
B9
0.23
0.18
0.04
0.38
0.08
0.91
0.04
0.99
0.10
1.19
0.10
1.39
0.10
0.899
0.028
0.11
0.00
0.23
0.01
0.26
0.013
0.286
0.013

0.23
0.18
0.04
0.38
0.08
0.91
0.04
0.99
0.10
1.19
0.10
1.39
0.10
0.899
0.028
0.110
0.003
0.234
0.013
0.260
0.013

0.23
0.18
0.04
0.38
0.08
0.91
0.04
0.99
0.10
1.19
0.10
1.39
0.10
0.899
0.028
0.110
0.003
0.234
0.013

0.23
0.18
0.04
0.38
0.08
0.91
0.04
0.99
0.10
1.19
0.10
1.39
0.10
0.90
0.03
0.11
0.00

0.23
0.18
0.04
0.38
0.08
0.91
0.04
0.99
0.10
1.19
0.10
1.39
0.10

0.23
0.18
0.04
0.38
0.08
0.91
0.04
0.99
0.10
1.19
0.10

0.23
0.18
0.04
0.38
0.08
0.91
0.04
0.99
0.10

0.23
0.18
0.04
0.38
0.08
0.91
0.04

7.60 7.30 7.03 6.78 5.74 4.25 2.95 1.86

B10
B9 &
&
Toe
B10
B11
0.23 0.23 10.42
0.18
9.80
0.04
9.77
0.38
9.30
0.08
9.25
8.50
8.42
7.50
7.42
6.50
6.42
5.50
5.42
4.75
4.71
4.25
4.21
3.50
3.42
2.50
2.42
1.50
1.42
0.50
0.42
0.91 0.23

Moment about (t-m per m run)

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 &


B2
B3
B4
B5
B6
B7
B8
B9
9.42
8.80
8.77
8.30
8.25
7.50
7.42
6.50
6.42
5.50
5.42
4.50
4.42
3.75
3.71
3.25
3.21
2.50
2.42
1.50
1.42
0.50
0.42

8.42
7.80
7.77
7.30
7.25
6.50
6.42
5.50
5.42
4.50
4.42
3.50
3.42
2.75
2.71
2.25
2.21
1.50
1.42
0.50
0.42

7.42
6.80
6.77
6.30
6.25
5.50
5.42
4.50
4.42
3.50
3.42
2.50
2.42
1.75
1.71
1.25
1.21
0.50
0.42

6.42
5.80
5.77
5.30
5.25
4.50
4.42
3.50
3.42
2.50
2.42
1.50
1.42
0.75
0.71
0.25
0.21

5.42
4.80
4.77
4.30
4.25
3.50
3.42
2.50
2.42
1.50
1.42
0.50
0.42

4.42
3.80
3.77
3.30
3.25
2.50
2.42
1.50
1.42
0.50
0.42

3.42
2.80
2.77
2.30
2.25
1.50
1.42
0.50
0.42

2.42
1.80
1.77
1.30
1.25
0.50
0.42

B10
B9 &
&
Toe
B10
B11
1.42 0.42 2.37
0.80
1.78
0.77
0.36
0.30
3.55
0.25
0.76
7.74
0.34
7.43
0.75
7.75
0.65
7.67
0.55
4.27
0.13
0.469
0.014
0.82
0.04
0.65
0.03
0.430
0.02
0.16
0.01
48.73

B10
&
B11
0.32 0.10
0.15
0.03
0.11
0.02

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 &


B2
B3
B4
B5
B6
B7
B8
B9 B10
2.14
1.60
0.32
3.17
0.68
6.83
0.30
6.44
0.65
6.56
0.55
6.27
0.45
3.37
0.11
0.36
0.01
0.58
0.03
0.39
0.02
0.14
0.01

1.92
1.42
0.28
2.79
0.59
5.92
0.26
5.45
0.55
5.37
0.45
4.88
0.34
2.47
0.08
0.25
0.01
0.35
0.02
0.13
0.01

1.69
1.24
0.25
2.41
0.51
5.01
0.22
4.46
0.45
4.17
0.34
3.49
0.24
1.57
0.05
0.14
0.00
0.12
0.01

1.46
1.06
0.21
2.03
0.43
4.10
0.18
3.47
0.34
2.98
0.24
2.09
0.14
0.67
0.02
0.03
0.00

1.23
0.87
0.17
1.64
0.35
3.19
0.14
2.48
0.24
1.79
0.14
0.70
0.04

1.01
0.69
0.14
1.26
0.27
2.28
0.10
1.49
0.14
0.60
0.04

0.78
0.51
0.10
0.88
0.18
1.37
0.06
0.50
0.04

0.55
0.33
0.06
0.50
0.10
0.46
0.02

40.97 33.52 26.35 19.45 12.99 8.00 4.41 2.01 0.63

0.10

Fishery Harbour at Barka

3.1..1.3 Pressure - Low Water Condition


Bloc
Height
k
Detail (m)
Ref.

Backfill Soil Data


ka

ka(horz
bulk
.)

Computation of Pressure (t/m2 per m run)

sub

B11 1.00 1.00 36 0 36 90 0.304 0.246

1.85

p1

B10 1.00 1.00 36 0 36 90 0.304 0.246

1.85

p2

B9 1.00 1.00 36 0 36 90 0.304 0.246

1.85

0.200 36 0 36 90 0.304 0.246

1.85 0.82

0.800 36 0 36 90 0.304 0.246

1.85 0.82

p1=

0.246 x 1.85 x 1 =

p4 = p2 + p3 =

p5

p6

p6 = p4 + p5 =

p7

B8 1.00
p8 = p6 + p7 =

1.46

p10 = p8 + p9 =

1.62

B7 1.00 1.000 36 0 36 90 0.304 0.246

1.85 0.82 p10

B6 1.00 1.000 36 0 36 90 0.304 0.246

1.85 0.82

0.500 36 0 24 90 0.304 0.277

1.85 0.82

0.500 36 0 24 135 0.035 0.032

1.85 0.82

B4 1.00 1.000 36 0 24 135 0.035 0.032

1.85 0.82

B3 1.00 1.000 36 0 24 135 0.035 0.032

1.85 0.82

B2 1.00 1.000 36 0 24 135 0.035 0.032

1.85 0.82 p22 p24=p22+p23 =

B1 1.00 1.000 36 0 24 135 0.035 0.032

1.85 0.82 p24 p22=p20+p21 = 0.368

p12=p10+p11=

p12

p3 = 0.246 x 1.85 x 1 =

0.46

0.91

p5 = 0.246 x 1.85 x 1 =

0.46

1.37

p7 = 0.246 x 1.85 x 0.2 =

0.09

p9 = 0.246 x 0.82 x 0.8 =

0.16

p11 = 0.246 x 0.82 x 1 =

0.20

p13 = 0.246 x 0.82 x 1 =

0.202

p2 = 0.455

p3
p4

p8

0.455

p9
p11

1.82

p13

p14

p15

p14= 0.277x{1.85x(1+1+1+0.2)+0.82x(0.8+1x 2) }= 2.3 p15=

B5 1.00

Design Report-June 2012


Design of Quay Wall

p16= 0.032x{1.85x(1+1+1+0.2)+0.82x(0.8+1x 2+0.5) }=

P17

p16
p18

p19

p20

p18=p16+p17=

p20=p18+p19=

p21
0.34

0.289

p23
p25

0.32

0.276

p17=

p19= 0.032 x 0.82 x 1 =

0.03

p21= 0.032 x 0.82 x 1 =

0.03

p23= 0.032 x 0.82 x 1 =

0.03

p25= 0.032 x 0.82 x 1 =

0.03

0.032 x 0.82 x 0.5 =

0.277 x 0.82 x 0.5 =


0.01

0.11

Fishery Harbour at Barka

3.1.1.4 Forces & Moment - Low Water Condition


Description

Block
Ref
B11
B10
B9

B8

B7
B6

B5

B4
B3
B2
B1

Pressure
Pressure
(t/m2 per
Ref.
m run)
p1
p2
p3
p4
p5
p6
p7
p8
p9
p10
p11
p12
p13
p14
p15
p16
p17
p18
p19
p20
p21
p22
p23
p24
p25

Design Report-June2012
Design of Quay Wall

0.455
0.455
0.46
0.91
0.46
1.37
0.09
1.46
0.16
1.62
0.20
1.82
0.20
2.28
0.11
0.28
0.01
0.29
0.03
0.32
0.03
0.34
0.03
0.37
0.03
Total

Actuating Force(t per m run)


Height

Force
(t per m
run)

1.00
1.00
1.00
1.00
1.00
0.20
0.20
0.80
0.80
1.00
1.00
1.00
1.00
0.50
0.50
0.50
0.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.23
0.46
0.23
0.91
0.23
0.27
0.01
1.16
0.06
1.62
0.10
1.82
0.10
1.14
0.03
0.14
0.00
0.29
0.01
0.32
0.01
0.34
0.01
0.37
0.03

Toe
0.23
0.46
0.228
0.91
0.23
0.27
0.01
1.16
0.06
1.62
0.10
1.82
0.101
1.138
0.028
0.138
0.00
0.29
0.01
0.315
0.01
0.342
0.01
0.37
0.03
9.89

Dist of CG from (m)

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 &


B2
B3
B4
B5
B6
B7
B8
B9 B10
0.23
0.46
0.228
0.91
0.23
0.27
0.01
1.16
0.06
1.62
0.10
1.82
0.101
1.138
0.028
0.138
0.00
0.29
0.01
0.32
0.01
0.34
0.01

0.23
0.46
0.228
0.91
0.23
0.27
0.01
1.16
0.06
1.62
0.10
1.82
0.101
1.138
0.028
0.138
0.003
0.289
0.013
0.315
0.013

0.23
0.46
0.228
0.91
0.23
0.27
0.01
1.16
0.06
1.62
0.10
1.82
0.10
1.14
0.03
0.14
0.00
0.29
0.01

0.23
0.46
0.228
0.91
0.23
0.27
0.01
1.16
0.06
1.62
0.10
1.82
0.10
1.14
0.03
0.14
0.00

0.23
0.46
0.228
0.91
0.23
0.27
0.01
1.16
0.06
1.62
0.10
1.82
0.10

0.23
0.46
0.228
0.91
0.23
0.27
0.01
1.16
0.06
1.62
0.10

0.23
0.46
0.228
0.910
0.228
0.273
0.009
1.165
0.065

0.23
0.46
0.23
0.91
0.23

0.23
0.46
0.23

9.49

9.14

8.81

8.51

7.20

5.28

3.56

2.05

0.91

B10
&
B11

Toe

0.23 10.42
9.500
9.42
8.50
8.42
7.90
7.88
7.40
7.34
6.50
6.42
5.50
5.42
4.75
4.71
4.25
4.21
3.50
3.42
2.50
2.42
1.50
1.42
0.50
0.42
0.23

Moment about (t-m per m run)

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 &


B2
B3
B4
B5
B6
B7
B8
B9 B10
9.42
8.50
8.42
7.50
7.42
6.90
6.88
6.40
6.34
5.50
5.42
4.50
4.42
3.75
3.71
3.25
3.21
2.50
2.42
1.50
1.42
0.50
0.42

8.42
7.50
7.42
6.50
6.42
5.90
5.88
5.40
5.34
4.50
4.42
3.50
3.42
2.75
2.71
2.25
2.21
1.50
1.42
0.50
0.42

7.42
6.50
6.42
5.50
5.42
4.90
4.88
4.40
4.34
3.50
3.42
2.50
2.42
1.75
1.71
1.25
1.21
0.50
0.42

6.42
5.50
5.42
4.50
4.42
3.90
3.88
3.40
3.34
2.50
2.42
1.50
1.42
0.75
0.71
0.25
0.21

5.42
4.50
4.42
3.50
3.42
2.90
2.88
2.40
2.34
1.50
1.42
0.50
0.42

4.42
3.50
3.42
2.50
2.42
1.90
1.88
1.40
1.34
0.50
0.42

3.42
2.50
2.42
1.50
1.42
0.90
0.88
0.40
0.34

2.42
1.50
1.42
0.50
0.42

1.42
0.50
0.42

B10
&
B11
0.42

Toe
2.37
4.32
2.14
7.74
1.92
2.16
0.07
8.62
0.47
10.51
0.65
10.01
0.55
5.41
0.13
0.587
0.01
1.01
0.04
0.79
0.03
0.51
0.02
0.18
0.01
60.07

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 &


B2
B3
B4
B5
B6
B7
B8
B9 B10
2.14
3.87
1.92
6.83
1.69
1.88
0.06
7.46
0.41
8.90
0.55
8.19
0.45
4.27
0.11
0.45
0.01
0.72
0.03
0.47
0.02
0.17
0.01

1.92
3.41
1.69
5.92
1.46
1.61
0.05
6.29
0.34
7.28
0.45
6.37
0.34
3.13
0.08
0.31
0.01
0.43
0.02
0.16
0.01

1.69
2.96
1.46
5.01
1.23
1.34
0.04
5.13
0.28
5.66
0.34
4.55
0.24
1.99
0.05
0.17
0.00
0.14
0.01

1.46
2.50
1.23
4.10
1.01
1.06
0.04
3.96
0.22
4.04
0.24
2.73
0.14
0.85
0.02
0.03
0.00

1.23
2.05
1.01
3.19
0.78
0.79
0.03
2.80
0.15
2.43
0.14
0.91
0.04

B10
&
B11

1.01
1.59
0.78
2.28
0.55
0.52
0.02
1.63
0.09
0.81
0.04

0.78
1.14
0.55
1.37
0.32
0.25
0.01
0.47
0.02

0.55
0.68
0.32
0.46
0.10

0.32 0.10
0.23
0.10

50.58 41.27 32.30 23.64 15.54 9.31

4.90

2.11

0.65 0.10

Fishery Harbour at Barka

3.1.2

Live Load Surcharge

3.1.2.1 Pressure
Backfill Soil Data
Block
Ref.

Height Detail
(m)

ka

ka (horz.)

Computation of pressure (t/m2 per m run)

B11

1.00

1.00

36.00

0.00

36.00

90.00

0.304

0.246

1.25

plls1

plls1 = 0.246 x 1.25 =

0.31

B10

1.00

1.00

36.00

0.00

36.00

90.00

0.304

0.246

1.25

plls2

plls2 = 0.246 x 1.25 =

0.31

B9

1.00

1.00

36.00

0.00

36.00

90.00

0.304

0.246

1.25

plls3

plls3 = 0.246 x 1.25 =

0.31

B8

1.00

1.00

36.00

0.00

36.00

90.00

0.304

0.246

1.25

plls4

plls4 = 0.246 x 1.25 =

0.31

B7

1.00

1.00

36.00

0.00

36.00

90.00

0.304

0.246

1.25

plls5

plls5 = 0.246 x 1.25 =

0.31

B6

1.00

1.00

36.00

0.00

36.00

90.00

0.304

0.246

1.25

plls6

plls6 = 0.246 x 1.25 =

0.31

0.50

36.00

0.00

24.00

90.00

0.304

0.28

1.25

plls7

plls7 = 0.28 x 1.25 =

0.35

B5

1.00
0.50

36.00

0.00

24.00

135.00

0.035

0.03

1.25

plls8

plls8 = 0.03 x 1.25 =

0.04

B4

1.00

1.00

36.00

0.00

24.00

135.00

0.035

0.03

1.25

plls9

plls9 = 0.03 x 1.25 =

0.04

B3

1.00

1.00

36.00

0.00

24.00

135.00

0.035

0.03

1.25

plls10

plls10 = 0.03 x 1.25 =

0.04

B2

1.00

1.00

36.00

0.00

24.00

135.00

0.035

0.03

1.25

plls11

plls11 = 0.03 x 1.25 =

0.04

1.00

1.00

36.00

0.00

24.00

135.00

0.035

0.03

1.25

plls12

plls12 = 0.03 x 1.25 =

0.04

B1

Design Report-June2012
Design of Quay Wall

Fishery Harbour at Barka

3.1.2.2 Live Load Surcharge Forces & Moment Actuating Force(t per m run)

Description

Dist of CG from (m)

Moment about (t-m per m run)

Forc
Pressure
e
B10
B8 B9 B10
Force
Heigh
B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 &
B1 & B2 & B3 & B4 & B5 & B6 & B7 &
(t per Toe
&
&
& Toe
&
Toe
(t/m2 per
t
B2 B3 B4 B5 B6 B7 B8
B2
B3
B4
B5
B6
B7
B8
B9 B10
Ref.
m
B9 B10 B11
B11
m
run)
Block
run)
Ref

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 &


B2
B3 B4 B5 B6 B7 B8 B9 B10

B10
&
B11

B11

plls1

0.31

1.00 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 10.50 9.50 8.50 7.50 6.50 5.50 4.50 3.50 2.50 1.50 0.50 3.23

2.92

2.61 2.31 2.00 1.69 1.38 1.08 0.77 0.46 0.15

B10

plls2

0.31

1.00 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31

9.50 8.50 7.50 6.50 5.50 4.50 3.50 2.50 1.50 0.50

2.92

2.61

2.31 2.00 1.69 1.38 1.08 0.77 0.46 0.15

B9

plls3

0.31

1.00 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31

8.50 7.50 6.50 5.50 4.50 3.50 2.50 1.50 0.50

2.61

2.31

2.00 1.69 1.38 1.08 0.77 0.46 0.15

B8

plls4

0.31

1.00 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31

7.50 6.50 5.50 4.50 3.50 2.50 1.50 0.50

2.31

2.00

1.69 1.38 1.08 0.77 0.46 0.15

B7

plls5

0.31

1.00 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31

6.50 5.50 4.50 3.50 2.50 1.50 0.50

2.00

1.69

1.38 1.08 0.77 0.46 0.15

B6

plls6

0.31

1.00 0.31 0.31 0.31 0.31 0.31 0.31 0.31

5.50 4.50 3.50 2.50 1.50 0.50

1.69

1.38

1.08 0.77 0.46 0.15

plls7

0.35

0.50 0.18 0.18 0.18 0.18 0.18 0.18

4.75 3.75 2.75 1.75 0.75

0.83

0.66

0.48 0.31 0.13

plls8

0.04

0.50 0.02 0.02 0.02 0.02 0.02 0.02

4.25 3.25 2.25 1.25 0.25

0.08

0.06

0.04 0.02 0.00

B4

plls9

0.04

1.00 0.04 0.04 0.04 0.04 0.04

3.50 2.50 1.50 0.50

0.13

0.09

0.06 0.02

B3

plls10

0.04

1.00 0.04 0.04 0.04 0.04

2.50 1.50 0.50

0.09

0.06

0.02

0.02

B5

B2

plls11

0.04

1.00 0.04 0.04 0.04

1.50 0.50

0.06

B1

plls12

0.04

1.00 0.04 0.04

0.50

0.02

Total

Design Report-June 2012


Design of Quay Wall

2.19 2.15 2.11 2.08 2.04 1.85 1.54 1.23 0.92 0.62 0.31

15.97 13.80 11.67 9.57 7.52 5.54 3.84 2.46 1.38 0.62 0.15

Fishery Harbour at Barka

3.2.1

LOAD & MOMENT DUE TO VERTICAL UPWARD SEISMIC

Unit
Seismi Seismi
Volume Weig Weight
c Co- c Wt
B1 &
ht
Toe
efficien
B2
t
(t/cu (t/m
(t/m
(t/m
(m) (cu.m)
(t/m run)
m)
run)
run)
run)

B2 &
B4 &
B3 & B4
B3
B5
(t/m
(t/m
(t/m
run)
run)
run)

Seismic Load
B5 &
B6
(t/m
run)

B6 & B7 & B8 & B9 & B10 &


Toe
B7
B8
B9
B10 B11
(t/m (t/m (t/m (t/m (t/m
(m)
run) run) run) run) run)

B1 &
B2
(m)

(m)

(m)

(m)

(m)

(m)

(m)

(m)

(m)

2.50

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

Block Dimensions
Block Ref

Along Acros
Height
Wall s Wall

Distance of CG From
B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

Moment about
B7 & B8 & B9 &
B8
B9
B10

B10
&

Toe

B1 & B2 & B3 & B4 & B5 & B6 & B7 & B8 & B9 & B10 &
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
(t-m (t-m (t-m (t-m (t-m (t-m (t-m (t-m (t-m
(t-m
(t-m
(m)
per m per m per m per m per m per m per m per m per m per m per m

2.00

(m)

(m)

B 11

WS

1.00

4.00

1.00

4.00

2.50

10.00

0.04

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

1.00

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

B 10
LWL

WS

1.00

4.00

1.00

4.00

2.40

9.60

0.04

0.384

0.384

0.38

0.38

0.38

0.38

0.38

0.38

0.38

0.38

0.38

2.50

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

0.96

0.77

0.77

0.77

0.77

0.77

0.77

0.77

0.77

0.77

WS1

1.00

4.00

0.40

1.60

2.40

3.84

0.04

0.154

0.154

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

2.50

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

0.38

0.31

0.31

0.31

0.31

0.31

0.31

0.31

0.31

0.31

WS2

1.00

4.00

0.60

2.40

1.37

3.29

0.04

0.132

0.132

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

2.50

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

0.33

0.26

0.26

0.26

0.26

0.26

0.26

0.26

0.26

0.26

WS

1.00

5.00

1.00

5.00

2.40

12.00

0.04

0.48

0.48

0.48

0.48

0.48

0.48

0.48

0.48

0.48

0.48

3.00

2.50

2.50

2.50

2.50

2.50

2.50

2.50

2.50

1.44

1.20

1.20

1.20

1.20

1.20

1.20

1.20

1.20

E10-11

1.00

1.00

2.00

2.00

1.85

3.70

0.04

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

5.00

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

0.74

0.67

0.67

0.67

0.67

0.67

0.67

0.67

0.67

WS1

1.00

5.00

1.00

5.00

1.40

7.00

0.04

0.28

0.28

0.28

0.28

0.28

0.28

0.28

0.28

0.28

0.28

3.00

2.50

2.50

2.50

2.50

2.50

2.50

2.50

2.50

0.84

0.70

0.70

0.70

0.70

0.70

0.70

0.70

0.70

E10-11

1.00

1.00

1.40

1.40

1.85

2.59

0.04

0.10

0.10

0.10

0.10

0.10

0.10

0.10

0.10

0.10

0.10

5.00

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

0.52

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

1.00 1.00

0.60

0.60

0.82

0.49

0.04

0.020

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

5.00

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

0.10

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

B10
HWL

B9
LWL

B9
HWL

E10-11(S)
B8
LWL
B8
HWL
B7

B6
LWL

B6
HWL

B5

B4

B3

B2

B1

0.40

WS1

1.00

5.00

0.20

1.00

2.40

2.40

0.04

0.10

0.10

0.10

0.10

0.10

0.10

0.10

0.10

0.01

3.00

2.50

2.50

2.50

2.50

2.50

2.50

2.50

0.29

0.24

0.24

0.24

0.24

0.24

0.24

0.02

WS2

1.00

5.00

0.80

4.00

1.37

5.48

0.04

0.22

0.22

0.22

0.22

0.22

0.22

0.22

0.22

0.05

3.00

2.50

2.50

2.50

2.50

2.50

2.50

2.50

0.66

0.55

0.55

0.55

0.55

0.55

0.55

0.12

0.08

2.50

0.19

WS

1.00

5.00

1.00

5.00

1.37

6.85

0.04

0.27

0.27

0.27

0.27

0.27

0.27

0.27

0.27

WS

1.00

5.00

1.00

5.00

1.37

6.85

0.04

0.27

0.27

0.27

0.27

0.27

0.27

0.27

0.27

3.00

2.50

2.50

2.50

2.50

2.50

2.50

3.00

3.00

3.00

3.00

3.00

3.00

3.00

0.82

0.69

0.69

0.69

0.69

0.69

0.69

0.82

0.82

0.82

0.82

0.82

0.82

0.82

WS

1.00

6.00

1.00

6.00

1.37

8.22

0.04

0.329

0.329

0.33

0.33

0.33

0.33

0.33

3.50

3.00

3.00

3.00

3.00

3.00

1.15

0.99

0.99

0.99

0.99

0.99

E7-11

1.00

1.00

3.20

3.20

1.85

5.92

0.04

0.237

0.237

0.24

0.24

0.24

0.24

0.24

6.00

5.50

5.50

5.50

5.50

5.50

1.42

1.30

1.30

1.30

1.30

1.30

E7-11(S)

1.00

1.00

1.80

1.80

0.82

1.48

0.04

0.059

0.059

0.06

0.06

0.06

0.06

0.06

6.00

5.50

5.50

5.50

5.50

5.50

0.35

0.32

0.32

0.32

0.32

0.32

WS

1.00

6.00

1.00

6.00

1.37

8.22

0.04

0.329

0.329

0.33

0.33

0.33

0.33

0.33

3.50

3.00

3.00

3.00

3.00

3.00

1.15

0.99

0.99

0.99

0.99

0.99

E7-11

1.00

1.00

1.40

1.40

1.85

2.59

0.04

0.104

0.104

0.10

0.10

0.10

0.10

0.10

6.00

5.50

5.50

5.50

5.50

5.50

0.62

0.57

0.57

0.57

0.57

0.57

E7-11(S)

1.00

1.00

3.60

3.60

0.82

2.95

0.04

0.118

0.118

0.12

0.12

0.12

0.12

0.12

6.00

5.50

5.50

5.50

5.50

5.50

0.71

0.65

0.65

0.65

0.65

0.65

WS

1.00

6.50

1.00

6.50

1.37

8.91

0.04

0.36

0.36

0.36

0.36

0.36

0.36

3.75

3.25

3.25

3.25

3.25

1.34

1.16

1.16

1.16

1.16

RF1

1.00

0.50

0.50

0.25

1.37

0.34

0.04

0.01

0.01

0.01

0.01

0.01

0.01

7.25

6.75

6.75

6.75

6.75

0.10

0.09

0.09

0.09

0.09

RF2

1.00

0.50

0.50

0.25

1.37

0.34

0.04

0.01

0.01

0.01

0.01

0.01

0.01

7.17

6.67

6.67

6.67

6.67

0.10

0.09

0.09

0.09

0.09

WS

1.00

6.00

1.00

6.00

1.37

8.22

0.04

0.33

0.33

0.33

0.33

0.33

3.50

3.00

3.00

3.00

1.15

0.99

0.99

0.99

RF1

1.00

0.5

0.5

0.25

1.37

0.34

0.04

0.01

0.01

0.01

0.01

0.01

6.75

6.25

6.25

6.25

0.09

0.09

0.09

0.09

RF2

1.00

0.5

0.5

0.13

1.37

0.17

0.04

0.01

0.01

0.01

0.01

0.01

6.17

5.67

5.67

5.67

0.04

0.04

0.04

0.04

WS

1.00

5.50

1.00

5.50

1.37

7.54

0.04

0.30

0.30

0.30

0.30

3.25

2.75

2.75

0.98

0.83

0.83

RF1

1.00

0.50

0.50

0.25

1.37

0.34

0.04

0.01

0.01

0.01

0.01

5.75

5.25

5.25

0.08

0.07

0.07

RF2

1.00

0.50

0.50

0.13

1.37

0.17

0.04

0.01

0.01

0.01

0.01

6.17

5.67

5.67

0.04

0.04

0.04

WS

1.00

5.00

1.00

5.00

1.37

6.85

0.04

0.27

0.27

0.27

3.00

2.50

0.82

0.69

RF1

1.00

0.50

0.50

0.25

1.37

0.34

0.04

0.01

0.01

0.01

5.75

5.25

0.08

0.07

RF2

1.00

0.50

0.50

0.13

1.37

0.17

0.04

0.01

0.01

0.01

5.67

5.17

0.04

0.04

WF1

1.00

0.50

0.50

0.13

1.37

0.17

0.04

0.01

0.01

0.33

0.00
0.00

WF2

1.00

0.50

0.50

0.25

1.37

0.34

0.04

0.01

0.01

0.25

BP

1.00

5.50

1.00

5.50

1.37

7.54

0.04

0.30

0.30

3.25

Total Load &


Moment -LWL
Total Load &
Moment -HWL

Design Report-June2012
Design of Quay wall

0.80

0.98

4.30

3.98

3.68

3.36

3.01

2.63

2.00

1.47

1.41

0.78

0.40

14.68 11.84 11.05 10.11 9.00

7.66

5.04

3.58

3.43

1.57

0.80

3.86

3.54

3.24

2.92

2.57

2.19

1.64

1.16

1.09

0.69

0.40

13.14 10.52 9.73

6.34

4.13

2.81

2.63

1.37

0.80

8.79

7.68

Fishery Harbour at Barka

3.3 SUMMARY TOTAL LOAD AND MOMENT - DOWNWARD SEISMIC


3.3.1 ACTUATING FORCE AND MOMENT (IMPOSED LOADS ARE TAKEN AS 50% OF THE ORIGINAL)
FORCE DUE TO

POSITION

Toe

B1 & B2 B2 & B3

B3 &
B4

B4 &
B5

B5 & B6

B6 &
B8 &
B7 & B8
B7
B9

B9 &
B10

B10 &
B11

BACKFILL
(HIGH WATER CONDITION)

LOAD(t/m)

7.93

7.60

7.30

7.03

6.78

5.74

4.25

2.95

1.86

0.91

0.23

MOMENT (t-m/m)

48.73

40.97

33.52

26.35

19.45

12.99

8.00

4.41

2.01

0.63

0.10

SEISMIC
(HIGH WATER CONDITION)

LOAD(t/m)

6.61

6.61

6.28

5.64

4.94

4.19

3.46

2.85

2.24

1.62

0.95

MOMENT (t-m/m)

41.87

35.25

28.82

22.87

17.59

13.04

9.22

6.06

3.52

1.59

0.47

BACKFILL+SEISMIC
(HIGH WATER CONDITION)

LOAD(t/m)

14.54

14.21

13.58

12.67

11.72

9.93

7.71

5.80

4.10

2.53

1.18

MOMENT (t-m/m)

90.60

76.22

62.34

49.23

37.04

26.03

17.22

10.47

5.53

2.22

0.57

BACKFILL
(LOW WATER CONDITION)

LOAD(t/m)

9.89

9.49

9.14

8.81

8.51

7.20

5.28

3.56

2.05

0.91

0.23

MOMENT (t-m/m)

60.07

50.58

41.27

32.30

23.64

15.54

9.31

4.90

2.11

0.65

0.10

SEISMIC
(LOW WATER CONDITION)

LOAD(t/m)

7.85

7.19

6.86

6.22

5.52

4.76

4.04

3.43

2.97

1.86

0.95

MOMENT (t-m/m)

47.56

40.06

33.05

26.53

20.67

15.54

11.14

7.41

4.30

1.88

0.47

BACKFILL+SEISMIC
(LOW WATER CONDITION)

LOAD(t/m)

17.73

16.68

16.00

15.02

14.02

11.96

9.32

6.99

5.02

2.77

1.18

MOMENT (t-m/m)

107.64

90.65

74.32

58.83

44.32

31.08

20.45

12.31

6.40

2.53

0.57

LOAD(t/m)

1.09

1.08

1.06

1.04

1.02

0.92

0.77

0.62

0.46

0.31

0.15

MOMENT (t-m/m)

7.99

6.90

5.83

4.79

3.76

2.77

1.92

1.23

0.69

0.31

0.08

Unbalanced Hydraustatic Force LOAD(t/m)


(High Water Condition)
MOMENT (t-m/m)

5.75

5.13

4.51

3.89

3.28

2.66

2.04

1.42

0.80

0.19

0.00

26.73

21.30

16.48

12.27

8.69

5.72

3.37

1.64

0.53

0.04

0.00

6.10

5.27

4.45

3.63

2.80

1.98

1.15

0.33

0.00

0.00

0.00

22.58

16.90

12.04

8.00

4.78

2.40

0.83

0.09

0.00

0.00

0.00

LOAD(t/m)

0.09

0.10

0.11

0.12

0.13

0.15

0.18

0.22

0.29

0.40

0.67

MOMENT (t-m/m)

0.98

0.98

0.97

0.97

0.97

0.96

0.95

0.94

0.93

0.90

0.83

LIVE LOAD SURCHARGE

Unbalanced Hydraustatic Force LOAD(t/m)


(Low Water Condition)
MOMENT (t-m/m)
BOLLARD PULL

Design Report-June 2012


Design of Quay Wall

Fishery Harbour at Barka

3.3.2 STABILISING FORCE AND MOMENT (IMPOSED LOADS ARE TAKEN AS 50% OF ORIGINAL)
FORCE DUE TO

SELF-WT+SEISMIC
(HIGH WATER CONDITION)

SELF-WT+SEISMIC
(LOW WATER CONDITION)

LIVE LOAD SURCHARGE


on Wall

LIVE LOAD SURCHARGE


on backfill

Design Report-June 2012


Design of Quay Wall

POSITION

Toe

B1 & B2 B2 & B3

B3 &
B4

B4 &
B5

B5 & B6

77.03

68.44

58.64

B8 &
B6 &
B7 & B8
B9
B7

B9 &
B10

B10 &
B11

44.33

LOAD(t/m)

101.93

93.56

85.90

43.86

36.93

19.60

10.40

MOMENT (t-m/m)

344.82

272.57

251.97 225.32 198.65 164.92 107.57 106.25

88.94

39.19

20.80

LOAD(t/m)

111.56

103.19

95.53

44.59

20.38

10.40

MOMENT (t-m/m)

380.39

303.32

282.72 256.15 229.41 195.67 193.06 126.25 108.98 40.77

20.80

LOAD(t/m)

10.00

10.00

10.00

10.00

10.00

10.00

10.00

10.00

10.00

10.00

10.00

MOMENT (t-m/m)

25.00

20.00

20.00

20.00

20.00

20.00

20.00

20.00

20.00

20.00

20.00

LOAD(t/m)

5.00

5.00

5.00

5.00

5.00

5.00

2.50

2.50

2.50

0.00

0.00

MOMENT (t-m/m)

27.50

25.00

25.00

25.00

25.00

11.25

11.25

11.25

0.00

0.00

0.00

86.81

78.07

68.27

67.65

51.50

Fishery Harbour at Barka

3.4

LOAD COMBINATION-DOWNWARD SEISMIC


LOAD Case Ref.

1.0

Load Reference

WALL +
BACKFILL
HWL

LWL

2.0

1.0 +
LL
Surcharge
on Backfill

HWL

LWL

3.0

1.0 +
LL
Surcharge
on Backfill
& Wall

HWL

LWL

Design Report-June 2012


Design of Quay Wall

Toe

B1 & B2 & B3 & B4 & B5 & B6 & B7 &


B9 & B10 &
B8 & B9
B2
B3
B4
B5
B6
B7
B8
B10 B11

Actuating Force

t/m

20.29 19.34 18.10 16.56 15.00 12.58 9.75

7.22

4.90

2.72

1.18

Actuating Moment

tm/m

117.33 97.52 78.82 61.50 45.73 31.75 20.59 12.12

6.06

2.26

0.57

Stabilising Load

t/m

101.93 93.56 85.90 77.03 68.44 58.64 44.33 43.86 36.93 19.60 10.40

Stabilising Moment

tm/m

344.8 272.6 252.0 225.3 198.7 164.9 107.6 106.3 88.94 39.19 20.8

Actuating Force

t/m

23.8

20.4

18.6

16.8

13.9

10.5

7.3

5.02

2.77

1.2

Actuating Moment

tm/m

130.2 107.5 86.4

66.8

49.1

33.5

21.3

12.4

6.40

2.53

0.6

Stabilising Load

t/m

111.6 103.2 95.5

86.8

78.1

68.3

67.6

51.5

44.59 20.38 10.4

Stabilising Moment

tm/m

380.4 303.3 282.7 256.1 229.4 195.7 193.1 126.3 108.98 40.77 20.8

Actuating Force

t/m

21.4

19.2

17.6

16.0

13.5

10.5

7.8

5.36

3.03

1.3

Actuating Moment

tm/m

125.3 104.4 84.7

66.3

49.5

34.5

22.5

13.3

6.75

2.56

0.6

Stabilising Load

t/m

101.9

77.0

68.4

58.6

44.3

43.9

36.93 19.60 10.4

Stabilising Moment

tm/m

344.8 272.6 252.0 225.3 198.7 164.9 107.6 106.3 88.94 39.19 20.8

Actuating Force

t/m

24.9

21.5

19.7

17.8

14.9

11.2

7.9

5.48

3.08

1.3

Actuating Moment

tm/m

138.2 114.4 92.2

71.6

52.9

36.2

23.2

13.6

7.10

2.83

0.6

86.8

78.1

68.3

67.6

51.5

44.59 20.38 10.4

22.0

20.4

93.6

23.0

85.9

Stabilising Load

t/m

111.6 103.2 95.5

Stabilising Moment

tm/m

380.4 303.3 282.7 256.1 229.4 195.7 193.1 126.3 108.98 40.77 20.8

Actuating Force

t/m

21.4

19.2

17.6

16.0

13.5

10.5

7.8

5.36

3.03

1.3

Actuating Moment

tm/m

125.3 104.4 84.7

66.3

49.5

34.5

22.5

13.3

6.75

2.56

0.6

83.4

73.6

56.8

56.4

49.43 29.60 20.4

20.4

Stabilising Load

t/m

116.9 108.6 100.9 92.0

Stabilising Moment

tm/m

397.3 317.6 297.0 270.3 243.7 196.2 138.8 137.5 108.94 59.19 40.8

Actuating Force

t/m

24.9

23.0

21.5

19.7

17.8

71.6

14.9

11.2

7.9

5.48

3.08

1.3

2.83

0.6

Actuating Moment

tm/m

138.2 114.4 92.2

52.9

36.2

23.2

13.6

7.10

Stabilising Load

t/m

126.6 118.2 110.5 101.8 93.1

83.3

80.1

64.0

57.09 30.38 20.4

Stabilising Moment

tm/m

432.9 348.3 327.7 301.1 274.4 226.9 224.3 157.5 128.98 60.77 40.8

Fishery Harbour at Barka

LOAD Case Ref.

1.0
4.0

WALL
1.0 + +
LL
Surcharge
on Wall
Only

Load Reference

HWL

LWL

5.0

1.0 +
Bollard Pull
HWL

LWL

6.0

2.0 +
Bollard Pull
HWL

LWL

Design Report-June 2012


Design of Quay Wall

Toe

B1 & B2 & B3 & B4 & B5 & B6 & B7 &


B9 & B10 &
B8 & B9
B10 B11
B2
B3
B4
B5
B6
B7
B8

Actuating Force

t/m

20.3

19.3

18.1

16.6

15.0

12.6

9.7

7.2

4.90

2.72

1.2

Actuating Moment

tm/m

117.3

97.5

78.8

61.5

45.7

31.8

20.6

12.1

6.06

2.26

0.6

Stabilising Load

t/m

111.9 103.6 95.9

87.0

78.4

68.6

54.3

53.9

46.93 29.60 20.4

Stabilising Moment

tm/m

369.8 292.6 272.0 245.3 218.7 184.9 127.6 126.3 108.94 59.19 40.8

Actuating Force

t/m

23.8

20.4

18.6

16.8

13.9

10.5

7.3

5.02

2.77

1.2

Actuating Moment

tm/m

130.2 107.5 86.4

66.8

49.1

33.5

21.3

12.4

6.40

2.53

0.6

Stabilising Load

t/m

121.6 113.2 105.5 96.8

88.1

78.3

77.6

61.5

54.59 30.38 20.4

Stabilising Moment

tm/m

405.4 323.3 302.7 276.1 249.4 215.7 213.1 146.3 128.98 60.77 40.8

Actuating Force

t/m

20.4

19.4

18.2

16.7

15.1

12.7

9.9

7.4

5.19

3.12

1.8

Actuating Moment

tm/m

118.3

98.5

79.8

62.5

46.7

32.7

21.5

13.1

6.99

3.16

1.4

Stabilising Load

t/m

101.9

93.6

85.9

77.0

68.4

58.6

44.3

43.9

36.93 19.60 10.4

Stabilising Moment

tm/m

344.8 272.6 252.0 225.3 198.7 164.9 107.6 106.3 88.94 39.19 20.8

Actuating Force

t/m

23.9

20.6

18.8

17.0

14.1

10.7

7.5

5.31

3.17

1.8

Actuating Moment

tm/m

131.2 108.5 87.3

67.8

50.1

34.4

22.2

13.3

7.33

3.43

1.4

Stabilising Load

t/m

111.6 103.2 95.5

86.8

78.1

68.3

67.6

51.5

44.59 20.38 10.4

Stabilising Moment

tm/m

380.4 303.3 282.7 256.1 229.4 195.7 193.1 126.3 108.98 40.77 20.8

Actuating Force

t/m

21.5

19.3

17.7

16.1

13.7

10.7

8.1

5.65

3.43

2.0

Actuating Moment

tm/m

126.3 105.4 85.6

67.3

50.5

35.5

23.5

14.3

7.68

3.46

1.5

77.0

68.4

58.6

44.3

43.9

36.93 19.60 10.4

22.0

22.0

20.5

Stabilising Load

t/m

101.9

Stabilising Moment

tm/m

344.8 272.6 252.0 225.3 198.7 164.9 107.6 106.3 88.94 39.19 20.8

93.6

Actuating Force

t/m

25.0

21.6

19.8

18.0

15.0

11.4

8.2

5.77

3.48

2.0

Actuating Moment

tm/m

139.2 115.4 93.2

72.6

53.8

37.2

24.2

14.6

8.03

3.73

1.5

86.8

78.1

68.3

67.6

51.5

44.59 20.38 10.4

23.1

85.9

Stabilising Load

t/m

111.6 103.2 95.5

Stabilising Moment

tm/m

380.4 303.3 282.7 256.1 229.4 195.7 193.1 126.3 108.98 40.77 20.8

Fishery Harbour at Barka

LOAD Case Ref.

1.0
7.0

Load Reference

WALL
3.0 + +
Bollard Pull
HWL

LWL

8.0

4.0 +
Bollard Pull
HWL

LWL

Design Report-June 2012


Design of Quay Wall

Toe

B1 & B2 & B3 & B4 & B5 & B6 & B7 &


B9 & B10 &
B8 & B9
B10 B11
B2
B3
B4
B5
B6
B7
B8
20.5

Actuating Force

t/m

21.5

19.3

17.7

16.1

13.7

10.7

8.1

5.65

3.43

2.0

Actuating Moment

tm/m

126.3 105.4 85.6

67.3

50.5

35.5

23.5

14.3

7.68

3.46

1.5

Stabilising Load

t/m

116.9 108.6 100.9 92.0

83.4

73.6

56.8

56.4

49.43 29.60 20.4

Stabilising Moment

tm/m

397.3 317.6 297.0 270.3 243.7 196.2 138.8 137.5 108.94 59.19 40.8

Actuating Force

t/m

25.0

21.6

19.8

18.0

15.0

11.4

8.2

5.77

3.48

2.0

Actuating Moment

tm/m

139.2 115.4 93.2

72.6

53.8

37.2

24.2

14.6

8.03

3.73

1.5

Stabilising Load

t/m

126.6 118.2 110.5 101.8 93.1

83.3

80.1

64.0

57.09 30.38 20.4

Stabilising Moment

tm/m

432.9 348.3 327.7 301.1 274.4 226.9 224.3 157.5 128.98 60.77 40.8

Actuating Force

t/m

20.4

19.4

18.2

16.7

15.1

12.7

9.9

7.4

5.19

3.12

1.8

Actuating Moment

tm/m

118.3

98.5

79.8

62.5

46.7

32.7

21.5

13.1

6.99

3.16

1.4

Stabilising Load

t/m

111.9 103.6 95.9

87.0

78.4

68.6

54.3

53.9

46.93 29.60 20.4

Stabilising Moment

tm/m

369.8 292.6 272.0 245.3 218.7 184.9 127.6 126.3 108.94 59.19 40.8

Actuating Force

t/m

23.9

20.6

18.8

17.0

14.1

10.7

7.5

5.31

3.17

1.8

Actuating Moment

tm/m

131.2 108.5 87.3

67.8

50.1

34.4

22.2

13.3

7.33

3.43

1.4

Stabilising Load

t/m

121.6 113.2 105.5 96.8

88.1

78.3

77.6

61.5

54.59 30.38 20.4

Stabilising Moment

tm/m

405.4 323.3 302.7 276.1 249.4 215.7 213.1 146.3 128.98 60.77 40.80

23.1

22.0

Fishery Harbour at Barka

3.5

STABILITY CHECK

LOAD
COMB

6.00
6.00

B1 &
B2
5.00
4.17

B2 &
B3
5.50
5.04

B3 &
B4
5.50
5.04

B4 &
B5
6.00
6.00

B5 &
B6
6.00
6.00

B6 &
B7
5.00
4.17

B7 &
B8
5.00
4.17

B8 &
B9
5.00
4.17

B9 &
B10
4.00
2.67

B10 &
B11
4.00
2.67

t/m

6.00
20.29

4.17
19.34

5.04
18.10

5.04
16.56

6.00
15.00

6.00
12.58

4.17
9.75

4.17
7.22

4.17
4.90

2.67
2.72

2.67
1.18

tm/m

117.33

97.52

78.82

61.50

45.73

31.75

20.59

12.12

6.06

2.26

0.57

t/m

101.93

93.56

85.90

77.03

68.44

58.64

44.33

43.86

36.93

19.60

10.40

344.82 272.57 251.97 225.32 198.65 164.92 107.57 106.25 88.94

39.19

20.80

Description

Toe

BASE AREA
Zsea side
Zland side
HWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

tm/m
(m)

Factor of
Against Sliding
safety
Against
Over
Turning
Base
Sea Side
Pressure

Land Side

Design Report-June 2012


Design of Quay Wall

(t/m2)

(t/m2)

0.77

0.63

0.73

0.62

0.77

0.73

0.54

0.35

0.26

0.12

0.05

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.01

2.90

2.85

2.79

2.74

2.80

2.73

3.64

4.52

4.33

5.31

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.94

2.79

3.20

3.66

4.34

5.19

5.22

8.77

14.67

17.37

36.52

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

30.04

32.83

28.13

23.53

20.14

16.90

14.59

12.49

9.65

5.75

2.81

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

3.94

4.59

3.11

4.48

2.67

2.65

3.14

5.05

5.12

4.05

2.39

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

B8 &
B9

B9 &
B10

B10 &
B11

23.83

21.95

20.44

18.65

16.82

13.94

10.47

7.32

5.02

2.77

1.18

tm/m

130.22 107.54 86.36

66.82

49.10

33.48

21.28

12.39

6.40

2.53

0.57

t/m

111.56 103.19 95.53

86.81

78.07

68.27

67.65

51.50

44.59

20.38

10.40

380.39 303.32 282.72 256.15 229.41 195.67 193.06 126.25 108.98 40.77

20.80

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

t/m

tm/m
(m)

Factor of
Against Sliding
safety
Against
Over
Turning
Base
Sea Side
Pressure

Land Side

Design Report-June 2012


Design of Quay Wall

(t/m2)

(t/m2)

0.76

0.60

0.69

0.57

0.69

0.62

0.04

0.29

0.20

0.12

0.05

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.81

2.82

2.80

2.79

2.78

2.94

3.88

4.22

5.33

4.41

5.31

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.92

2.82

3.27

3.83

4.67

5.85

9.07

10.19

17.02

16.14

36.52

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

32.68

35.56

30.53

25.59

22.00

18.48

14.17

13.87

11.05

6.04

2.81

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

4.51

5.71

4.21

5.98

4.03

4.28

12.89

6.73

6.78

4.15

2.39

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
BASE AREA
Zsea side
Zland side
HWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment

Eccentricity (e)

6.00
6.00

B1 &
B2
5.00
4.17

B2 &
B3
5.50
5.04

B3 &
B4
5.50
5.04

B4 &
B5
6.00
6.00

B5 &
B6
6.00
6.00

B6 &
B7
5.00
4.17

B7 &
B8
5.00
4.17

B8 &
B9
5.00
4.17

B9 &
B10
4.00
2.67

B10 &
B11
4.00
2.67

6.00
21.38

4.17
20.42

5.04
19.15

5.04
17.60

6.00
16.02

6.00
13.51

4.17
10.52

4.17
7.84

4.17
5.36

2.67
3.03

2.67
1.33

125.32 104.42 84.65

66.29

49.49

34.52

22.52

13.35

6.75

2.56

0.65

101.93

77.03

68.44

58.64

44.33

43.86

36.93

19.60

10.40

344.82 272.57 251.97 225.32 198.65 164.92 107.57 106.25 88.94

39.19

20.80

Toe

t/m
tm/m
t/m
tm/m

93.56

85.90

0.85

0.70

0.80

0.69

0.82

0.78

0.58

0.38

0.27

0.13

0.06

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.86

2.75

2.69

2.63

2.56

2.60

2.53

3.36

4.13

3.89

4.69

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.75

2.61

2.98

3.40

4.01

4.78

4.78

7.96

13.17

15.28

32.18

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

31.37

34.49

29.28

24.48

20.77

17.36

15.05

12.79

9.82

5.86

2.84

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

2.61

2.93

1.95

3.53

2.05

2.19

2.68

4.76

4.95

3.94

2.36

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

(m)

Against Sliding
Factor of
safety
Against Over
Turning
Sea Side
Base
Pressure

Land Side

Design Report-June 2012


Design of Quay Wall

(t/m2)

(t/m2)

Fishery Harbour at Barka

LOAD
COMB

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

B8 &
B9

B9 &
B10

B10 &
B11

24.92

23.03

21.50

19.69

17.84

14.86

11.24

7.93

5.48

3.08

1.33

tm/m

138.21 114.44 92.19

71.61

52.86

36.24

23.20

13.62

7.10

2.83

0.65

t/m

111.56 103.19 95.53

86.81

78.07

68.27

67.65

51.50

44.59

20.38

10.40

380.39 303.32 282.72 256.15 229.41 195.67 193.06 126.25 108.98 40.77

20.80

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

t/m

tm/m
(m)

Factor of
Against Sliding
safety
Against
Over
Turning
Base
Sea Side
Pressure

Land Side

Design Report-June 2012


Design of Quay Wall

(t/m2)

(t/m2)

0.83

0.67

0.756

0.62

0.74

0.66

0.01

0.31

0.22

0.14

0.06

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.69

2.69

2.67

2.65

2.63

2.76

3.61

3.90

4.88

3.97

4.69

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.75

2.65

3.07

3.58

4.34

5.40

8.32

9.27

15.36

14.39

32.18

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

34.01

37.22

31.69

26.54

22.62

18.94

13.71

14.17

11.22

6.16

2.84

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

3.18

4.06

3.05

5.03

3.40

3.81

13.35

6.43

6.62

4.03

2.36

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
BASE AREA
Zsea side
Zland side
HWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

t/m
tm/m
t/m
tm/m
(m)

Factor of
Against Sliding
safety
Against
Over
Turning
Base
Sea Side
Pressure

Land Side

Design Report-June 2012


Design of Quay Wall

6.00
6.00

B1 &
B2
5.00
4.17

B2 &
B3
5.50
5.04

B3 &
B4
5.50
5.04

B4 &
B5
6.00
6.00

B5 &
B6
6.00
6.00

B6 &
B7
5.00
4.17

B7 &
B8
5.00
4.17

B8 &
B9
5.00
4.17

B9 &
B10
4.00
2.67

B10 &
B11
4.00
2.67

6.00
21.38

4.17
20.42

5.04
19.15

5.04
17.60

6.00
16.02

6.00
13.51

4.17
10.52

4.17
7.84

4.17
5.36

2.67
3.03

2.67
1.33

125.32 104.42 84.65

66.29

49.49

34.52

22.52

13.35

6.75

2.56

0.65

116.93 108.56 100.90 92.03

83.44

73.64

56.83

56.36

49.43

29.60

20.40

397.32 317.57 296.97 270.32 243.65 196.17 138.82 137.50 108.94 59.19

40.80

Toe

(t/m2)

(t/m2)

0.67

0.54

0.65

0.53

0.67

0.80

0.45

0.30

0.43

0.09

0.03

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.28

3.19

3.16

3.14

3.13

3.27

3.24

4.31

5.53

5.87

9.21

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.17

3.04

3.51

4.08

4.92

5.68

6.17

10.30

16.13

23.08

63.12

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

32.62

35.69

31.27

26.46

23.27

22.15

17.55

15.29

15.02

8.36

5.34

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

6.36

7.73

5.42

7.00

4.55

2.39

5.18

7.26

4.75

6.44

4.86

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

t/m
tm/m
t/m
tm/m
(m)

Factor of
Against Sliding
safety
Against
Over
Turning
Base
Sea Side
Pressure

Land Side

Design Report-June 2012


Design of Quay Wall

(t/m2)

(t/m2)

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

B8 &
B9

B9 &
B10

B10 &
B11

24.92

23.03

21.50

19.69

17.84

14.86

11.24

7.93

5.48

3.08

1.33

138.21 114.44 92.19

71.61

52.86

36.24

23.20

13.62

7.10

2.83

0.65

126.56 118.19 110.53 101.81 93.07

83.27

80.15

64.00

57.09

30.38

20.40

432.89 348.32 327.72 301.15 274.41 226.92 224.31 157.50 128.98 60.77

40.80

0.67

0.52

0.62

0.50

0.62

0.71

0.01

0.25

0.37

0.09

0.03

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.05

3.08

3.08

3.10

3.13

3.36

4.28

4.84

6.25

5.92

9.21

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.13

3.04

3.55

4.21

5.19

6.26

9.67

11.56

18.18

21.45

63.12

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

35.26

38.42

33.67

28.52

25.12

23.73

16.21

16.67

16.42

8.66

5.34

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

6.93

8.86

6.52

8.50

5.90

4.02

15.85

8.93

6.42

6.53

4.86

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

6.00
6.00

B1 &
B2
5.00
4.17

B2 &
B3
5.50
5.04

B3 &
B4
5.50
5.04

B4 &
B5
6.00
6.00

B5 &
B6
6.00
6.00

B6 &
B7
5.00
4.17

B7 &
B8
5.00
4.17

B8 &
B9
5.00
4.17

B9 &
B10
4.00
2.67

B10 &
B11
4.00
2.67

t/m

6.00
20.29

4.17
19.34

5.04
18.10

5.04
16.56

6.00
15.00

6.00
12.58

4.17
9.75

4.17
7.22

4.17
4.90

2.67
2.72

2.67
1.18

tm/m

117.33

97.52

78.82

61.50

45.73

31.75

20.59

12.12

6.06

2.26

0.57

111.93 103.56 95.90

87.03

78.44

68.64

54.33

53.86

46.93

29.60

20.40

369.82 292.57 271.97 245.32 218.65 184.92 127.57 126.25 108.94 59.19

40.80

Description

Toe

BASE AREA
Zsea side
Zland side
HWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

t/m
tm/m
(m)

Factor of
Against Sliding
safety
Against
Over
Turning
Base
Sea Side
Pressure

Land Side

Design Report-June 2012


Design of Quay Wall

(t/m2)

(t/m2)

0.74

0.62

0.74

0.64

0.80

0.77

0.53

0.38

0.31

0.08

0.03

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.31

3.21

3.18

3.15

3.14

3.27

3.34

4.47

5.75

6.53

10.41

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.15

3.00

3.45

3.99

4.78

5.82

6.19

10.42

17.97

26.23

71.64

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

32.54

36.03

31.43

26.84

23.48

20.23

17.79

15.69

12.85

8.25

5.31

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

4.77

5.39

3.44

4.81

2.67

2.65

3.94

5.85

5.92

6.55

4.89

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

t/m
tm/m
t/m
tm/m
(m)

Factor of
Against Sliding
safety
Against
Over
Turning
Base
Sea Side
Pressure

Land Side

Design Report-June 2012


Design of Quay Wall

(t/m2)

(t/m2)

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

B8 &
B9

B9 &
B10

B10 &
B11

23.83

21.95

20.44

18.65

16.82

13.94

10.47

7.32

5.02

2.77

1.18

130.22 107.54 86.36

66.82

49.10

33.48

21.28

12.39

6.40

2.53

0.57

121.56 113.19 105.53 96.81

88.07

78.27

77.65

61.50

54.59

30.38

20.40

405.39 323.32 302.72 276.15 249.41 215.67 213.06 146.25 128.98 60.77

40.80

0.74

0.59

0.70

0.59

0.73

0.67

0.03

0.32

0.25

0.08

0.03

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.06

3.09

3.10

3.11

3.14

3.37

4.45

5.04

6.53

6.57

10.41

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.11

3.01

3.51

4.13

5.08

6.44

10.01

11.80

20.14

24.06

71.64

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

35.18

38.76

33.83

28.89

25.33

21.82

16.09

17.07

14.25

8.54

5.31

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

5.34

6.51

4.54

6.31

4.03

4.28

14.97

7.53

7.58

6.65

4.89

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

6.00
6.00

B1 &
B2
5.00
4.17

B2 &
B3
5.50
5.04

B3 &
B4
5.50
5.04

B4 &
B5
6.00
6.00

B5 &
B6
6.00
6.00

B6 &
B7
5.00
4.17

B7 &
B8
5.00
4.17

B8 &
B9
5.00
4.17

B9 &
B10
4.00
2.67

B10 &
B11
4.00
2.67

t/m

6.00
20.37

4.17
19.44

5.04
18.20

5.04
16.68

6.00
15.13

6.00
12.74

4.17
9.93

4.17
7.45

4.17
5.19

2.67
3.12

2.67
1.84

tm/m

118.31

98.50

79.79

62.47

46.70

32.71

21.55

13.06

6.99

3.16

1.40

t/m

101.93

93.56

85.90

77.03

68.44

58.64

44.33

43.86

36.93

19.60

10.40

344.82 272.57 251.97 225.32 198.65 164.92 107.57 106.25 88.94

39.19

20.80

Description

Toe

BASE AREA
Zsea side
Zland side
HWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

tm/m
(m)

Factor of
Against Sliding
safety
Against
Over
Turning
Base
Sea Side
Pressure

Land Side

Design Report-June 2012


Design of Quay Wall

(t/m2)

(t/m2)

0.78

0.64

0.75

0.64

0.78

0.75

0.56

0.38

0.28

0.16

0.13

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.00

2.89

2.83

2.77

2.71

2.76

2.68

3.53

4.27

3.77

3.39

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.91

2.77

3.16

3.61

4.25

5.04

4.99

8.14

12.72

12.41

14.83

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

30.20

33.07

28.32

23.72

20.30

17.06

14.82

12.72

9.88

6.08

3.13

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

3.78

4.35

2.92

4.29

2.51

2.49

2.91

4.82

4.90

3.72

2.07

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

B8 &
B9

B9 &
B10

B10 &
B11

23.92

22.05

20.55

18.77

16.96

14.09

10.65

7.54

5.31

3.17

1.84

tm/m

131.20 108.52 87.33

67.80

50.07

34.44

22.23

13.34

7.33

3.43

1.40

t/m

111.56 103.19 95.53

86.81

78.07

68.27

67.65

51.50

44.59

20.38

10.40

380.39 303.32 282.72 256.15 229.41 195.67 193.06 126.25 108.98 40.77

20.80

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

t/m

tm/m
(m)

Factor of
Against Sliding
safety
Against
Over
Turning
Base
Sea Side
Pressure

Land Side

Design Report-June 2012


Design of Quay Wall

(t/m2)

(t/m2)

0.77

0.61

0.70

0.58

0.70

0.64

0.03

0.31

0.22

0.17

0.13

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.80

2.81

2.79

2.78

2.76

2.91

3.81

4.10

5.04

3.85

3.39

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.90

2.80

3.24

3.78

4.58

5.68

8.68

9.47

14.86

11.90

14.83

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

32.84

35.80

30.72

25.78

22.16

18.64

13.94

14.10

11.28

6.38

3.13

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

4.35

5.48

4.02

5.79

3.87

4.11

13.12

6.50

6.56

3.81

2.07

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
BASE AREA
Zsea side
Zland side
HWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

t/m
tm/m
t/m
tm/m
(m)

Factor of
Against Sliding
safety
Against
Over
Turning
Base
Sea Side
Pressure

Land Side

Design Report-June 2012


Design of Quay Wall

6.00
6.00

B1 &
B2
5.00
4.17

B2 &
B3
5.50
5.04

B3 &
B4
5.50
5.04

B4 &
B5
6.00
6.00

B5 &
B6
6.00
6.00

B6 &
B7
5.00
4.17

B7 &
B8
5.00
4.17

B8 &
B9
5.00
4.17

B9 &
B10
4.00
2.67

B10 &
B11
4.00
2.67

6.00
21.47

4.17
20.51

5.04
19.26

5.04
17.72

6.00
16.15

6.00
13.66

4.17
10.70

4.17
8.06

4.17
5.65

2.67
3.43

2.67
2.00

126.30 105.40 85.62

67.26

50.46

35.48

23.47

14.29

7.68

3.46

1.48

101.93

77.03

68.44

58.64

44.33

43.86

36.93

19.60

10.40

344.82 272.57 251.97 225.32 198.65 164.92 107.57 106.25 88.94

39.19

20.80

Toe

(t/m2)

(t/m2)

93.56

85.90

0.86

0.71

0.81

0.70

0.83

0.79

0.60

0.40

0.30

0.18

0.14

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.85

2.74

2.68

2.61

2.54

2.58

2.49

3.26

3.92

3.43

3.13

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.73

2.59

2.94

3.35

3.94

4.65

4.58

7.44

11.58

11.31

14.06

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

31.53

34.72

29.48

24.67

20.93

17.52

15.28

13.01

10.04

6.20

3.15

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

2.45

2.70

1.76

3.34

1.88

2.03

2.45

4.53

4.73

3.60

2.05

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

B8 &
B9

B9 &
B10

B10 &
B11

25.01

23.12

21.61

19.80

17.98

15.01

11.42

8.15

5.77

3.48

2.00

tm/m

139.18 115.42 93.17

72.58

53.83

37.20

24.16

14.57

8.03

3.73

1.48

t/m

111.56 103.19 95.53

86.81

78.07

68.27

67.65

51.50

44.59

20.38

10.40

380.39 303.32 282.72 256.15 229.41 195.67 193.06 126.25 108.98 40.77

20.80

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

t/m

tm/m
(m)

Factor of
Against Sliding
safety
Against
Over
Turning
Base
Sea Side
Pressure

Land Side

Design Report-June 2012


Design of Quay Wall

(t/m2)

(t/m2)

0.84

0.68

0.77

0.64

0.75

0.68

0.00

0.33

0.24

0.18

0.14

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.68

2.68

2.65

2.63

2.61

2.73

3.55

3.79

4.64

3.51

3.13

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

2.73

2.63

3.03

3.53

4.26

5.26

7.99

8.67

13.58

10.92

14.06

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

34.17

37.45

31.88

26.73

22.79

19.10

13.58

14.40

11.44

6.50

3.15

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

3.02

3.82

2.86

4.84

3.24

3.65

13.48

6.20

6.39

3.70

2.05

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
BASE AREA
Zsea side
Zland side
HWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

t/m
tm/m
t/m
tm/m
(m)

Factor of
Against Sliding
safety
Against
Over
Turning
Base
Sea Side
Pressure

Land Side

Design Report-June 2012


Design of Quay Wall

6.00
6.00

B1 &
B2
5.00
4.17

B2 &
B3
5.50
5.04

B3 &
B4
5.50
5.04

B4 &
B5
6.00
6.00

B5 &
B6
6.00
6.00

B6 &
B7
5.00
4.17

B7 &
B8
5.00
4.17

B8 &
B9
5.00
4.17

B9 &
B10
4.00
2.67

B10 &
B11
4.00
2.67

6.00
21.47

4.17
20.51

5.04
19.26

5.04
17.72

6.00
16.15

6.00
13.66

4.17
10.70

4.17
8.06

4.17
5.65

2.67
3.43

2.67
2.00

126.30 105.40 85.62

67.26

50.46

35.48

23.47

14.29

7.68

3.46

1.48

116.93 108.56 100.90 92.03

83.44

73.64

56.83

56.36

49.43

29.60

20.40

397.32 317.57 296.97 270.32 243.65 196.17 138.82 137.50 108.94 59.19

40.80

Toe

(t/m2)

(t/m2)

0.68

0.55

0.66

0.54

0.68

0.82

0.47

0.31

0.45

0.12

0.07

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.27

3.18

3.14

3.12

3.10

3.23

3.19

4.19

5.25

5.18

6.13

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.15

3.01

3.47

4.02

4.83

5.53

5.91

9.62

14.18

17.09

27.57

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

32.78

35.92

31.46

26.66

23.43

22.31

17.78

15.51

15.24

8.70

5.65

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

6.20

7.50

5.23

6.81

4.38

2.23

4.95

7.03

4.53

6.10

4.55

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

t/m
tm/m
t/m
tm/m
(m)

Factor of
Against Sliding
safety
Against
Over
Turning
Base
Sea Side
Pressure

Land Side

Design Report-June 2012


Design of Quay Wall

(t/m2)

(t/m2)

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

B8 &
B9

B9 &
B10

B10 &
B11

25.01

23.12

21.61

19.80

17.98

15.01

11.42

8.15

5.77

3.48

2.00

139.18 115.42 93.17

72.58

53.83

37.20

24.16

14.57

8.03

3.73

1.48

126.56 118.19 110.53 101.81 93.07

83.27

80.15

64.00

57.09

30.38

20.40

432.89 348.32 327.72 301.15 274.41 226.92 224.31 157.50 128.98 60.77

40.80

0.68

0.53

0.63

0.51

0.63

0.72

0.00

0.27

0.38

0.12

0.07

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.04

3.07

3.07

3.08

3.11

3.33

4.21

4.71

5.94

5.24

6.13

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.11

3.02

3.52

4.15

5.10

6.10

9.29

10.81

16.07

16.28

27.57

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

35.42

38.65

33.86

28.71

25.29

23.90

16.08

16.90

16.64

9.00

5.65

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

6.77

8.62

6.33

8.31

5.74

3.86

15.98

8.70

6.19

6.20

4.55

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

6.00
6.00

B1 &
B2
5.00
4.17

B2 &
B3
5.50
5.04

B3 &
B4
5.50
5.04

B4 &
B5
6.00
6.00

B5 &
B6
6.00
6.00

B6 &
B7
5.00
4.17

B7 &
B8
5.00
4.17

B8 &
B9
5.00
4.17

B9 &
B10
4.00
2.67

B10 &
B11
4.00
2.67

t/m

6.00
20.37

4.17
19.44

5.04
18.20

5.04
16.68

6.00
15.13

6.00
12.74

4.17
9.93

4.17
7.45

4.17
5.19

2.67
3.12

2.67
1.84

tm/m

118.31

98.50

79.79

62.47

46.70

32.71

21.55

13.06

6.99

3.16

1.40

111.93 103.56 95.90

87.03

78.44

68.64

54.33

53.86

46.93

29.60

20.40

369.82 292.57 271.97 245.32 218.65 184.92 127.57 126.25 108.94 59.19

40.80

Description

Toe

BASE AREA
Zsea side
Zland side
HWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

t/m
tm/m
(m)

Factor of
Against Sliding
safety
Against
Over
Turning
Base
Sea Side
Pressure

Land Side

Design Report-June 2012


Design of Quay Wall

(t/m2)

(t/m2)

0.75

0.63

0.75

0.65

0.81

0.78

0.55

0.40

0.33

0.11

0.07

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.30

3.20

3.16

3.13

3.11

3.23

3.28

4.34

5.43

5.70

6.64

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.13

2.97

3.41

3.93

4.68

5.65

5.92

9.67

15.58

18.75

29.08

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

32.70

36.27

31.63

27.03

23.64

20.39

18.02

15.92

13.08

8.58

5.63

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

4.61

5.15

3.25

4.62

2.51

2.49

3.71

5.62

5.70

6.22

4.57

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

LOAD
COMB

Description
LWL Actuating Load
Actuating Moment
Stabilising Load
Stabilising Moment
Eccentricity (e)

t/m
tm/m
t/m
tm/m
(m)

Factor of
Against Sliding
safety
Against
Over
Turning
Base
Sea Side
Pressure

Land Side

Design Report-June 2012


Design of Quay Wall

(t/m2)

(t/m2)

Toe

B1 &
B2

B2 &
B3

B3 &
B4

B4 &
B5

B5 &
B6

B6 &
B7

B7 &
B8

B8 &
B9

B9 &
B10

B10 &
B11

23.92

22.05

20.55

18.77

16.96

14.09

10.65

7.54

5.31

3.17

1.84

131.20 108.52 87.33

67.80

50.07

34.44

22.23

13.34

7.33

3.43

1.40

121.56 113.19 105.53 96.81

88.07

78.27

77.65

61.50

54.59

30.38

20.40

405.39 323.32 302.72 276.15 249.41 215.67 213.06 146.25 128.98 60.77

40.80

0.74

0.60

0.71

0.60

0.74

0.68

0.04

0.34

0.27

0.11

0.07

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.05

3.08

3.08

3.10

3.12

3.33

4.37

4.90

6.17

5.74

6.64

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

3.09

2.98

3.47

4.07

4.98

6.26

9.58

10.96

17.59

17.74

29.08

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

35.34

39.00

34.03

29.08

25.49

21.98

16.32

17.30

14.48

8.88

5.63

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

5.18

6.28

4.35

6.12

3.87

4.11

14.74

7.30

7.36

6.31

4.57

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

safe

Fishery Harbour at Barka

4.0 CHECK IN PASSIVE PRESSURE


Here we have to check wheather the passive earth pressure can resist the berthing force.
We consider upto bottom of block B7.
Here passive pressure coeff for certain property of soil is calculated below-

36

36

90

kp
(horz.)

kp

28.411 22.985

Now for high water case pressure is calculated belowB11


B10
B9

1.000

1.000

0.400

0.400

0.600

0.600

1.00

1.000

B8

1.00

1.000

B7

1.00

1.000

p1=p2=

59.531

p1

p2
p3

Total passive earth force=


378.117 t
Consider half of passive force acts =
189.0585 t
Total berthing force=
43.10 t<<
189.0585 t
Hence berthing force is mobilised by passive earth force.

Design Report-June 2012


Design of Quay Wall

t/m2

p3= 67.85172 t/m2