Table 2: Key outcomes of the capacity building in two of
the participating utilities
Performance indicator GWASCO BUWASA
Sept 2007 June 2008 Sept 2007 June 2008
(Before PIP) (Before PIP)
Water produced (m3/d) - 2778 - 5695
Unaccounted for water (NRW) 62% 41% 59% 51%
Revenue collection (USD) 12,773 21,133 24,923 48,369
O&M expenditures (USD per month) 27,917 22,423 31,032 50,869
Working ratio (expenditure / revenues) 2.2 1.06 1.25 1.05
Number of metered connections 696 1,676 2,720 5,220
Metering efficiency (%) 15% 29% 58% 90%
complaints and the actions taken. Figure 2: computerized generation of bills actually implementing changes in
The aim was to improve the Vicious cycle that can easily be referenced to the O&M practices.These changes need
handling of customer complaints of poor service customer data base and integrated to be enshrined in the organization’s
and provision of feed back to delivery with the block mapping. strategic and policy and business
the customers. exacerbated by GWASCO managed to reduce plans.As well as changes in operational
poor O&M NRW from 62% before the changes from a technical perspective,
Key achievements and outcomes programme to 41% in the period of there is a need for specific tools
As a result of the capacity building nine months after the introduction of that enable managers to make
activities described above, the utilities the PIP in September 2007.These decisions related to operation and
were observed to develop a stronger improvements were as a result of maintenance practices.
feeling of ownership and a better implementation of better monitoring Training programmes must be
understanding of the need to work as a combined with an improved response relevant and ‘hands on’ and should be
team to overcome key constraints to leaks and bursts. Examples of supported by assistance in systems
affecting the performance of the revenue collection improvements for development.The training provided by
organisation. Divisions between BUWASA are shown in Figure 2. NWSC has been immensely beneficial
management and staff were observed Improvements were noted in revenue to the utilities participating in the
to decrease with the staff showing collection in all the towns, although in programme. However, the quality of
greater support for management some cases the targets set for each the existing staff needs to be strength-
decisions.This has also led to internal quarter in the PIP were not achieved. ened further through tailor-made
staff reorganization, improved manage- training programmes.These may
ment structures and a marked Institutionalization of improved include asset management tools,
improvement in the ambience of both operational and management practices standard operating procedures and / or
the offices and installations, which has The reductions in NRW can be performance monitoring indicators.
improved their corporate image. attributed to both the infrastructure UN-HABITAT is aiming to collabo-
All the utilities have improved developments and hardware rate with IWA,WHO and the
their documentation and reporting components provided by UN- National Institute of Public Heath in
capabilities.With the monitoring HABITAT combined with the skills Japan under the umbrella of the
and evaluation reporting templates acquired by the staff acquired during Operation and Maintenance Network
developed during the execution of the the FastTrack Capacity Building (see box) to meet these capacity
programme, data and information is programme.The results that have been building needs. ●
captured on a regular basis.Through achieved demonstrate that an integrat-
the reporting templates, the utilities ed programme of training and capacity References
can now track their performance over building combined with investments in NWSC (2008) FastTrack Capacity Building
time and produce comprehensive physical infrastructure offers the best Programme For Utilities. Final Project Report
monthly and quarterly reports. hope of improving institutional (September 2008). LakeVictoriaWater and
Table 2 summarizes the key out- capacities in the long-term. Sanitation Initiative, NWSC External Services,
comes in two of the utilities: Gusii The key to achieving the institu- Uganda
Water and Sanitation Company Figure 3: tionalization of O&M practices is to
(GWASCO) in Kisii, Kenya and Revenue collection ensure that there is a demand within Note
BukobaWater and Sewerage Authority trends for BUWASA the organization from all levels in 1
World Bank (2009) Improving
(BUWASA) inTanzania. (July 2007 – staff from the director down to the Municipal Management for Cities to
Pilot areas were block mapped in June 2008) technicians, who are responsible for Succeed:An IEG Special Study.
each of the towns which has enabled Independent Evaluation Group,
the utilities to easily identify their Knowledge Programs and Evaluation
% of (potential) revenue collected