CAPACITY BUILDING

Improving water operator finances through better


practices – experiences from East Africa
● The Fast Track Capacity Building programme
implemented by the National Water and Sewerage
Corporation (NWSC) in Uganda under UN-HABITAT’s
‘Water for African Cities’ programme demonstrates that
an integrated programme of training and capacity
building, combined with investments in physical
infrastructure, offers the best hope of improving
institutional capacities to reduce non-revenue water,
improve service delivery and increase the sustainability of
investments in the long-term. GRAHAM ALABASTER discusses
the programme’s success in five towns in Kenya
and Tanzania.

I t is only in recent years that


countries in sub-Saharan Africa
have started to emerge from the
focused resources on increasing service
coverage, with far less attention paid
towards the ensuring the sustainability
An official receives
water pipes for the
LVWSAN initiative in
institutional capacities to sustain the
services.An evaluation undertaken by
theWorld Bank’s Independent
highly centralised water sectors of these services or improving the Homa Bay, Kenya. Evaluation Group in 2009 concluded
supported by donor agencies, operation and maintenance (O&M) Credit: UN-HABITAT. that most municipal development
which have focused primarily on of existing assets.This results in the projects – including those with water
the main urban centres.This has situation shown in Figure 1, which supply components – paid little
left the infrastructure in many shows the difference between the attention to O&M, leading to negative
small towns neglected due to a theoretical values of access to improved project results and significantly
lack of investment in rehabilita- water facilities (measured as coverage increasing the risk to development
tion and a lack of technical and as reported by theWorld Health outcomes1. It is therefore clearly
managerial capacity within the Organisation (WHO) / UNICEF apparent that there is an imperative
organisations responsible for Joint Monitoring Program) and need to focus on the O&M require-
managing the assets.This has the actual access, taking into account ments of water and sanitation infra-
led to high rates of leakage and the inadequacies of supply based upon structure in order to improve service
revenue losses, which have data from five small towns in Kenya. delivery on a sustainable basis.
undermined the financial status of This situation invariably reduces
most small town operators. customer’s willingness to pay, which The UN-Habitat capacity building
At the same time, the Millennium has knock-on consequences on programme on utility management
Development Goals (MDGs) have utilities’ revenue and undermines A good example of an initiative that
has been designed to systematically
address the problems described above is
the UN-HABITAT’s Capacity
Building Programme on Utility
Management.The programme was
carried out between June 2007 and
August 2008 in the five towns of the
LakeVictoria RegionWater and
Sanitation (LVWATSAN) Initiative:
Muleba and Bukoba inTanzania and
Kisii, Gusii and Homa Bay in Kenya.
The overall objective was to
Figure 1: support the financial and operational
Access to water in sustainability of the capital investments
Kenyan towns provided under the LVWATSAN

WATER 21 • FEBRUARY 2011 33


CAPACITY BUILDING

Table 1: Technical and managerial aspects of the Performance


Improvement Programmes
Technical Managerial
• Water production and water quality • Customer care service
• Transmission and leakage control • Finance and accounts
• Billing and revenue collection • Human resource and administration

Initiative.The main objectives were to consultation with operators and


develop more effective operational customers.These PIPs focused
systems for water demand manage- on improving the operational
ment to reduce NRW, carry our water performance, covering technical and
audits and improve cost recovery managerial aspects of operation and
systems, and expand the revenue base maintenance in six operational areas
by establishing effective billing, (seeTable 1).
accounting and revenue collection Concept papers on utility
systems.An additional objective linked management defining the priority
to the above was to establish good lines areas for improvement and draft
of communication and improve implementation plan were prepared
relations between customers and for each of the five towns. Key
the utilities. performance indicators were selected
The NationalWater and Sewerage and targets set based on historical
Corporation (NWSC) in Uganda was performance and upon the provision
selected as the company with the of funding within the annual budgets. Children queue at the main focus of the initiative was on
relevant experience, competence and In each of the utilities,‘change water kiosk in capacity building.
suitable expertise within the region to agents’ from the utilities’ management Muleba, Tanzania. The NWSC External Services Unit
support these utilities through its teams, water board and local govern- Copyright: UN- adopted a combination of methods and
External Services Unit. NWSC ment were identified to act as HABITAT. techniques for capacity building,
successes in this area are exemplary. champions to promote the turnaround which aimed at ensuring active
The Managing Director recently of performance.To increase the participation from as many staff at all
received an award at the IWAWorld commitment of the management levels as possible. Comprehensive
Water Congress in Montreal for and staff, the PIPs were signed by situational analyses and training needs
leading a remarkable turnaround at representatives from each party and assessments were carried out and
NWSC over the last 12 years, during witnessed by the Board Chairperson. stakeholder consultations identified
which time the utility was transformed These plans were shared with the key thematic areas which were used as
from a fiscally and operationally clerk of works in each of the towns as the basis for preparation of a capacity
dysfunctional organisation to a well as the governmental advisors in building programme and training plan
financially sustainable and efficient Kenya andTanzania. for each utility.
service provider. Management and staff analyzed their
The capacity building process performance in each of the technical
Performance improvement Although there was a need for and managerial areas in the PIP
programmes expenditure for immediate rehabilita- through identification of their
With support of NWSC’s External tion of the system and procurement of respective strengths and weaknesses.
Services Unit, each utility prepared a supplies and equipment (e.g. water These self-assessments were used
performance improvement quality testing kits, bulk meters, to formulate strategies to address
programme (PIP) based upon a computers, software) to support identified bottlenecks and improve
technical assessment of assets and improved operation and maintenance, performance.Vocational training for
staff from each utility was then carried
out by NWSC.There were four key
The Operation and Maintenance Network: supporting focal areas of activity:
• Water demand management: water
sustainable water and sanitation services audits, leak detection surveys, and
identification of illegal connections
The Operation and Maintenance Network (OMN) aims to enhance the effectiveness and
to reduce non-revenue water (NRW).
sustainability of capital investments in water infrastructure and ensure improved service
• Block mapping: Practical demon-
delivery, with benefits for both consumers and the environment. The OMN plays a leading
strations were also held on how to
strategic role in promoting effective operation and maintenance, providing practical and
use the equipment for surveying and
authoritative advice to water and sanitation system managers and operators in low and
carrying out the block mapping
middle-income countries. It is coordinated by the National Institute of Public Health in
exercise to provide baseline infor-
Japan and supported by IWA and WHO.
mation with regard to the customers.
The network offers:
• Billing software development:A
• Access to practical guidance material via the online OM toolbox
more robust computer database
• Technical assistance from experts on O&M issues
system was developed for the
• The chance to share knowledge, case studies and develop new guidance materials
utilities, which was synchronized
• Access to regional events and workshops linked to wider capacity building activities
with block maps to allow for easy
inclusion of new customers.
Any persons or organisations interested in receiving support or contributing to the
• Commercial and customer care: a
network’s activities can join by registering at www.operationandmaintenance.net. For
logging system was introduced to
further details, contact Kirsten de Vette: Kirsten.deVette@iwahq.org.
the utilities for capturing customer

00
34 WATER
WATER 2121• •FEBRUARY
MONTH 20XX
2011
Table 2: Key outcomes of the capacity building in two of
the participating utilities
Performance indicator GWASCO BUWASA
Sept 2007 June 2008 Sept 2007 June 2008
(Before PIP) (Before PIP)
Water produced (m3/d) - 2778 - 5695
Unaccounted for water (NRW) 62% 41% 59% 51%
Revenue collection (USD) 12,773 21,133 24,923 48,369
O&M expenditures (USD per month) 27,917 22,423 31,032 50,869
Working ratio (expenditure / revenues) 2.2 1.06 1.25 1.05
Number of metered connections 696 1,676 2,720 5,220
Metering efficiency (%) 15% 29% 58% 90%

complaints and the actions taken. Figure 2: computerized generation of bills actually implementing changes in
The aim was to improve the Vicious cycle that can easily be referenced to the O&M practices.These changes need
handling of customer complaints of poor service customer data base and integrated to be enshrined in the organization’s
and provision of feed back to delivery with the block mapping. strategic and policy and business
the customers. exacerbated by GWASCO managed to reduce plans.As well as changes in operational
poor O&M NRW from 62% before the changes from a technical perspective,
Key achievements and outcomes programme to 41% in the period of there is a need for specific tools
As a result of the capacity building nine months after the introduction of that enable managers to make
activities described above, the utilities the PIP in September 2007.These decisions related to operation and
were observed to develop a stronger improvements were as a result of maintenance practices.
feeling of ownership and a better implementation of better monitoring Training programmes must be
understanding of the need to work as a combined with an improved response relevant and ‘hands on’ and should be
team to overcome key constraints to leaks and bursts. Examples of supported by assistance in systems
affecting the performance of the revenue collection improvements for development.The training provided by
organisation. Divisions between BUWASA are shown in Figure 2. NWSC has been immensely beneficial
management and staff were observed Improvements were noted in revenue to the utilities participating in the
to decrease with the staff showing collection in all the towns, although in programme. However, the quality of
greater support for management some cases the targets set for each the existing staff needs to be strength-
decisions.This has also led to internal quarter in the PIP were not achieved. ened further through tailor-made
staff reorganization, improved manage- training programmes.These may
ment structures and a marked Institutionalization of improved include asset management tools,
improvement in the ambience of both operational and management practices standard operating procedures and / or
the offices and installations, which has The reductions in NRW can be performance monitoring indicators.
improved their corporate image. attributed to both the infrastructure UN-HABITAT is aiming to collabo-
All the utilities have improved developments and hardware rate with IWA,WHO and the
their documentation and reporting components provided by UN- National Institute of Public Heath in
capabilities.With the monitoring HABITAT combined with the skills Japan under the umbrella of the
and evaluation reporting templates acquired by the staff acquired during Operation and Maintenance Network
developed during the execution of the the FastTrack Capacity Building (see box) to meet these capacity
programme, data and information is programme.The results that have been building needs. ●
captured on a regular basis.Through achieved demonstrate that an integrat-
the reporting templates, the utilities ed programme of training and capacity References
can now track their performance over building combined with investments in NWSC (2008) FastTrack Capacity Building
time and produce comprehensive physical infrastructure offers the best Programme For Utilities. Final Project Report
monthly and quarterly reports. hope of improving institutional (September 2008). LakeVictoriaWater and
Table 2 summarizes the key out- capacities in the long-term. Sanitation Initiative, NWSC External Services,
comes in two of the utilities: Gusii The key to achieving the institu- Uganda
Water and Sanitation Company Figure 3: tionalization of O&M practices is to
(GWASCO) in Kisii, Kenya and Revenue collection ensure that there is a demand within Note
BukobaWater and Sewerage Authority trends for BUWASA the organization from all levels in 1
World Bank (2009) Improving
(BUWASA) inTanzania. (July 2007 – staff from the director down to the Municipal Management for Cities to
Pilot areas were block mapped in June 2008) technicians, who are responsible for Succeed:An IEG Special Study.
each of the towns which has enabled Independent Evaluation Group,
the utilities to easily identify their Knowledge Programs and Evaluation
% of (potential) revenue collected

customers in these zones and to Capacity Development (IEGKE),


increase the efficiency of metering. For Washington DC.
example, BUWASA increased meter-
ing efficiency from an average of 58% About the author
before the PIP to 95% in the period Graham Alabaster is Chief of Section I of
of nine months after the introduction the Water Sanitation and Infrastructure
of the PIP in September 2007.The Branch in the Human Settlements
new computer billing system has now Financing Division of the United Nations
been installed in all the towns and Human Settlements Programme UN-
customized to suit each utility’s Habitat, Nairobi, Kenya.
circumstances.This has enabled Email: Graham.Alabaster@unhabitat.org

WATER 21 • FEBRUARY 2011 35