SUBJECT: 220 KV NEW SUB STATION CHISHTIAN AND VEHARI SUB STATION EXT.

PROJECT (PACKAGE-I)
To,
Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date
Excavation
1.0 12.0 12.0 25.0 10.0 0 21 21
Lean Concrete 1.0 12.0 12.0 25.0 10.0 0 18 18
Pad Concrete 1.0 12.0 12.0 25.0 10.0 0 6 6
Pedestal
1.0
Backfilling
Struc. Erection
Struc.insp.
Equip. Erec.
Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date
Excavation
27 27 40.0 140.0
Lean Concrete 0 18 18 40.0 134.0
Pad Concrete 31.0 92.0
Pedestal
11.0 31.0 27.0
Backfilling
Struc. Erection
Struc.insp.
Equip. Erec.
Remarks:
3. Excavation of Equipment foundations in progress.
132 kV Switch Yard
TYPE-iii (327.5 m)
Activities
Activities
C.V.T (26 Nos)
Current Trasnsformer
(39 Nos)
Asst.construction Manager
(Zia Shafqat Ali)
TYPE-ii (45 m)
Power Transformer
10/13 MVA (1 No)
High Level Gantry
(12 Nos)
Low Level Gantry
(12 Nos)
Marshaling Kiosik
(10+6=16 No)
1. Compaction of Base (water bound) for approach road in progress.
2. Concrete pouring of cable trench covers in progress.
Draw Pit
(4+3=7 Nos)
Bus/Line Isolator
(20+8=28 Sets)
Post Insulator
(9 Nos)
Circuit Breaker
(10 Sets)
Trenches (m)
TYPE-iv (378 m)
Surge Arrestor
(27 Nos)
Daily Progress Report
Contractor: NEIE 220/132 kV New Sub Station Chishtian
NEIE
Project Coordinator
Dated: 23/08/2013
To,
Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date
Excavation
2.0 10.0 5.0 4.0 6.0
Lean Concrete 2.0 10.0 5.0 4.0 2.0
Pad Concrete 2.0 10.0 5.0 4.0 1.0
Pedestal
2.0
Backfilling
Struc. Erection
Struc.insp.
Equip. Erec.
Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date
Excavation
9.0 6.0 15.0 70.0
Lean Concrete 9.0 6.0 15.0 60.0
Pad Concrete 8.0 6.0 15.0 57.0
Pedestal
29.0 57.0
Backfilling
Struc. Erection
Struc. Insp.
Equip. Erec.
Remarks:
6. Concrete pouring of Fire wall 4th lift (4 m) Completed.
220 kV Switch Yard
Activities
Isolator (16 sets) C.V.T (4 Nos)
Circuit Breaker
(6 Sets)
Trenches (m) Current Transformer
(18 Nos)
TYPE-iii (117 m) TYPE-ii (255 m)
Asst.Construction Manager
High Level
(Tower Gantry) (4 Nos)
TYPE-iv (230.5 m)
5. Concrete pouring of culvert slab for transformer way (3/3 Nos) Completed.
4. RCC Concrete of path way 4 Nos. Pannel (60 m Completed).
3. PCC (1:4:8) of path way 4 Nos. Pannel (60 m Completed).
2. RCC Topping of transformer way 10 Nos Pannel (175/250 m) completed.
1. PCC (1:4:8) of transformer way (200/250 m) Completed.
zia shafqat ali
NEIE
Project Coordinator
Daily Progress Report
Activities
Surge Arrestor
(12 Nos)
High Level
(Line Gantry) (5 Nos)
Auto Transformer
160 MVA (2 Nos)
Low Level
(Bus Gantry) (10 Nos)
C.C.V.T Line
(6 Nos)
SUBJECT: 220 KV NEW SUB STATION CHISHTIAN AND VEHARI SUB STATION EXT. PROJECT (PACKAGE-I)
Post Insulator
(20 Nos)
Dated: 23/08/2013
Contractor: NEIE 220/132 kV New Sub Station Chishtian
To,
Sr. No
1
2
3
4
5
6
7
8
8
NOTE:
(zia shafqat ali)
Concrete pad of Cable trench in 11 kV switch room
Sub Structure (Lean,Footing,Footing Beam, Brick Work, DPCs, Columns up to plinth
level,Plinth Beam & Backfilling under flooring)
Preparation for Flooring In progress
1. Fixing of fence frame & Cement plaster of switchyard fence wall column in progress.
Ground Floor Brick work of super structure In progress
Cutting, Bending & fixing reinforcement of roof slab & Beams Completed
Form work of cable trench walls in A/C , D/C room In progress
NEIE
Daily Progress Report
Control House Building
SUBJECT: 220 KV NEW GRID STATION CHISHTIAN AND VEHARI GRID STATION EXT. PROJECT (PACKAGE-I)
Dated:23/08/2013
Asst.Construction Manager
Project Coordinator
NEIE-AL-HUSSAIN
Contractor: NEIE
Completed
Concrete Pouring of 2nd Floor Roof Slab + Beams
Concrete Pouring of 1st Floor Roof Slab + Beams Completed
Completed
Status
Completed
Completed
Descripition of Activities
Form work of 2nd roof Beams & slab
To,
Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date
Excavation 2.0 4.0 2.0 6.0 6.0 6.0 6.0 9.0 9.0
Lean Concrete 2.0 4.0 2.0 6.0 6.0 6.0 6.0 9.0 9.0
Pad Concrete 2.0 4.0 2.0 6.0 6.0 9.0 9.0
Pedestal 2.0 2.0 3.0 4.0
Backfilling
Struc. Erection
Struc.insp.
Equip. Erec.
Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date
Excavation 18.0 18.0 9.0 9.0 12.0 12.0
Lean Concrete 16.0 16.0 9.0 9.0 12.0 12.0
Pad Concrete 16.0 16.0 9.0 9.0 12.0 12.0
Pedestal
Backfilling
Struc. Erection
Struc. Insp.
Equip. Erec.
Remarks:
Asst.Construction Manager
SUBJECT: 220 KV VEHARI SUB STATION EXT. PROJECT (PACKAGE-I)
Bus Gantry
(2 Nos)
Dated: 23/08/2013
Current Transformer
(12 Nos)
220 kV Switch Yard
Activities
Contractor: NEIE
Post Insulator
(10 Nos)
NEIE
Project Coordinator
NEIE-AL-HUSSAIN
(zia shafqat ali)
Surge Arrestor
(6 Nos)
Daily Progress Report
Line Gantry
(4 Nos)
Tower Gantry
(2 Nos)
C.C.V.T Line
(2 Nos)
1. Form work & Steel reinforcement of Circuit Breaker & Isolator in progress.
Trenches (m)
Activities
Isolator (24 Nos.) C.V.T (2 Nos)
Circuit Breaker
(9 Nos)