You are on page 1of 3

Working months/Years : 14.02.

2011 to till on date


Company name : R.L. Institute of Nautical Sciences, Madurai
Position : Faculty in Mechanical Engineering.
Responsibilities : Working as a Faculty in Mechanical Engineering. Taking regular classes to B.S.(Marine
Engineering) & Nautical Sciences. I am taking various subjects in Mechanical Engineering, like Refrigeration and
air conditioning, Hydraulics, Thermodynamics, Boilers and Steam turbines, Pumps and Pumping system. I am
actively involved in Syllabus review committee and other Academic activities as and when assigned by our
Principal Sir.
Developed Preventive Maintenance Schedule for all the critical equipments in our college campus. The schedule
comprises of detail PM task list with the manpower and materials required to execute the PM jobs. I am using MS
Project software for developing PM program for the critical equipments at our college campus.
Salary : Rs.40,000 per month.

Working months/Years : 26.02.2006, to 31.01.2011
Company name : Ras Gas Company Limited, Qatar
Position : Integrated Activities Asset Planning Engineer. Act as Head of Asset Planning as and
when required.
Responsibilities :
1) Actively involved in developing the Asset calendars for Offshore RGA Asset and LNG Train 3, 4, 5 & AGI
Asset. Prepare bar chart schedules for all the Facilities Engineering Projects (FE) for Offshore and Train 3 ,
4, 5 & AGI.
2) Prepare detailed bar chart for major shutdown in RGA Offshore Train-1 & 2 and other related Well Heads.
Close co-ordination and follow up to prepare S-Curve for progress monitoring.
3) Preparation of ALBP (Asset Level Business Plan) and 5 years Long Term Plan.
4) Preparation of WP&B (Work Program and Budget) for Offshore Asset and Train 3, 4, 5 & AGI Asset.
5) Preparation of Gate-1 for all the Planned shutdowns of Offshore and Train 3, 4, 5 & AGI Asset.
6) Shutdown Support for Offshore and Train 3, 4, 5 & AGI Asset: Participation in SD Gate 2, 3, 4 stages.
Preparation of PSSR for Gate 5 document preparation for Shutdowns
7) FDA interface & reporting: Liaise between Shutdown group, FDA team and Asset teams
8) Providing Planning support in emergency situations.
9) Involved in MEG Taskforce (Completed during 2007-2008).
10) Providing necessary Planning support to Barzan Asset support.
11) Prepare statistical analytical reports as required for Engineering KPIs
12) Involve in finalizing ATOMS (Asset Team Opportunity Management System). Convert the ATOMS into
project activities, to prepare WP&B schedules.
13) Provide planning support to OED (Operation Expansion Department) on commissioning activities and the
overall planning & coordination of the new facilities startup activities.

Working months/Years : 12.07.2000 to 12.02.2006
Company name : Zakum Development Company, (ZADCO), Abudhabi.
Position : Integrated Activities Planning Engineer
Responsibilities :
1) Involved in Setting up Commercial Strategies.Involved in Maintenance management task Force.
Implementation of MAXIMO, CMMS (Computerized Maintenance Management Systems). Involved
in Stock value optimisation program. Prepare PM programs, schedule and implement.
2) Prepare detailed bar chart for major maintenance jobs and major shutdowns using Primavera P3e.
3) Prepare annual budget for the department, prepare budget forecast and budget control.
4) Train the incoming UAE Nationals :-on the job & class room training.

Working months/Years : 09.05.1998 to 04.07.2000
Company name : Qatar Liquefied Gas Company Ltd, Qatar.
Position : Planning & Costing Engineer
Responsibilities :
1) Participate in preparation of Shutdown Master Plan schedules. Planning using Primavera-P3 ,
scheduling and progress monitoring. Working in CMMS system SAP R/3.
2) Develop internal procedures for planning & scheduling in-house engineering works.
3) Measure the progress of projects and report the variances.
4) Review tender schedules and provide technical input in tender evaluation.
5) Prepare Project master schedules using Primavera -P3 (for Windows) software, for Facilities
Modifications to support internal project justification and Contract tender invitation.
6) Prepare the Division monthly and yearly plans and works schedules and maintains updates.
7) Prepare cost estimates for Facilities Modifications.

Working months/Years : 06.02.1992 to 20.02.1998
Company name : Abu Dhabi National Oil Company, Ruwais Refinery, Abudhabi.
Position : Maintenance Planner
Responsibilities : Worked in TEROMAN CMMS system. Maintains cost control on all expenditures
related to contract services. Planning, preparation and scheduling of specific modular or major turnarounds
maintenance activities. Developed PM Programs, plan & schedule and revise the frequency & activities for various
types of Stationary and Rotating Equipment. Participates in preparation of annual budget submissions for the
maintenance function. Train the incoming UAE Nationals - on the job & class room training.

Working months/Years : 04.03.1989 to 02.08.1990
Company name : Kuwait Oil Company, Kuwait.
Position : Maintenance Planning Engineer.
Responsibilities : Worked in the Computerised Maintenance Management Services of KOC, Kuwait.
Developed PM Programs for various type of Stationary and Rotating Equipment, Associated with oil field Gas
gathering centers and booster stations. Prepared major overhauling procedures of various types of Gas Turbines and
different types of Gas Engines.
Working months/Years : 12.03.1986 to 02.08.1990
Company name : Kuwait National Petroleum Company, Mina-al Ahmadi, Kuwait.
Position : Plant Maintenance Engineer.
Responsibilities :
a. Running Maintenance and Shutdown Maintenance of 3X560 MMSCFD Natural Gas Plant.
b. Running maintenance and shutdown maintenance of high pressure boilers of 900 PSI & 820
Deg. F. at 6 X 180 Tons/Hr. Capacity make of Lentzes Ferdinand - West Germany &
Mitsubishi, Japan.
c. Running maintenance and shutdown maintenance of Multistage Flash Evaporators (19
Stages) for water desalination plants of 4 X 1,000,000 Gallons/day of Sumitomo Heavy
Industries, Japan.
Working months/Years : 20.08.1984 to 11.03.1986
Company name : Bharat Petroleum Corporation Ltd. (Refinery), Bombay.
Position : Mechanical Officer
Responsibilities : Condition Monitoring of Refinery Process Equipment.Trouble shooting and overhauling
of various types of Rotating Equipment in the Refinery
Working months/Years : August 1981 to July 1983
Company name : Southern petrochemicals industries corporation Ltd., Tuticorin, Tamilnadu.
Position : Maintenance Engineer
Responsibilities : Mechanical maintenance of Ammonia, Urea, Sulfuric Acid, Phosphoric Acid and
Diammonium Phosphate Plants.