You are on page 1of 6

Trade : Electrical Installation

Competitor Name :
Sub Criterion : Module B - Safety
Aspect Max
ID Mark
1 3 All Health and Safety requirements met at all times
1 mark deducted for each breach of Safety (Up to
maximum allocation)
PPE used as describe in the health and safety
regulation
No pieces of pipe and cable, lying down on the
floor. The competitor must keep these in a safe
area or in the bin box
3 Maximum Mark for Sub Criterion
J akarta,
Objective Marking Form
National Skills Competition
J akarta 2013
Competitor No :
Aspect of Criterion - Description
Requirement
or Nominal
Size
Result or
Actual Value
Mark
Awarded
Mark Awarded
Signatures confirming the accuracy of this result
B
EXPERT 1
EXPERT 2 EXPERT 3
Trade : Electrical Installation
Competitor Name :
Sub Criterion : Module B - Commisioning
Aspect Max
ID Mark
1 5 Comissioning OK
Test report OK, Safe to power up, Powered on
First attempt OK, No further attempt needed: 4
point
Second attempt OK, No further attempt
needed: 2 poin
More than two attempt needed: 1 poin
5 Maximum Mark for Sub Criterion
J akarta,
Signatures confirming the accuracy of this result
Objective Marking Form
National Skills Competition
J akarta 2013
Competitor No :
Aspect of Criterion - Description
Requirement
or Nominal
Size
Result or
Actual Value
Mark
Awarded
Mark Awarded
B
EXPERT 1
EXPERT 2 EXPERT 3
Trade : Electrical Installation
Competitor Name :
Sub Criterion : Module B - Function
Aspect Max
ID Mark
1 1 Motor rotates in one direction (when push S3)
0.5 Left contactor hold in circuit operates correctly
1
Motor rotates in the oposite direction (when push
S5)
0.5 Right contactor hold in circuit operates correctly
1
Interlock function correctly operates on control
station
0.5 Stop (when push S1)
0.5 Emergency Stop (when push S0)
1 Overload operates correctly
1 Indicators (0.5 each OK)
7 Maximum Mark for Sub Criterion
J akarta,
Objective Marking Form
National Skills Competition
J akarta 2013
Competitor No :
Aspect of Criterion - Description
Result or
Actual Value
Mark
Awarded
Mark Awarded
Requirement
or Nominal
Signatures confirming the accuracy of this result
B
EXPERT 1
EXPERT 2 EXPERT 3
Trade : Electrical Installation
Competitor Name :
Sub Criterion : Module B - Measurements
Aspect Max
ID Mark
1 0.5
Item 1: Equipment is level/plumb and
dimensionally correct to the datumline
The marking team must identify the items that are
to be inspected by lottery.
Ref TD: Measurements <=500mm +/- 2mm
Ref TD: Measurements >500mm +/- 3mm
0.5
Item 2: Equipment is level/plumb and
dimensionally correct to the reference line
0.5
Item 3: Equipment is level/plumb and
dimensionally correct to the reference line
0.5
Item 4: Equipment is level/plumb and
dimensionally correct to the reference line
1
Steel conduit level/plumb and dimensionally
correct with all bends
1
Steel tray level/plumb and dimensionally correct
with all bends correctly set with reference to the
datum line
1
PVC conduit level/plumb and dimensionally
correct with all bends correctly set with reference
to the datum line
5 Maximum Mark for Sub Criterion
J akarta,
Aspect of Criterion - Description
Requirement
or Nominal
Result or
Actual Value
Mark
Awarded
Objective Marking Form
National Skills Competition
J akarta 2013
Competitor No :
Mark Awarded
Signatures confirming the accuracy of this result
B
EXPERT 1
EXPERT 2 EXPERT 3
Trade : Electrical Installation
Competitor Name :
Sub Criterion : Module B - Installation of Equipment & Wire Ways
Aspect Max
ID Mark
1 3
All items of equipment and wire ways complete,
undamaged andsecurely fixed
Marks deducted for additional materials supplied
to the competitor due to their misuse or damage:
1 mark deducted for each meter of containment,
accessory or piece of equipment
1 mark deducted for each item not complete or
damaged or notsecurely fixed or for additional
materials supplied
1
Materials and equipment placed in the correct
location (lamps,pushbuttons and colors) according
tocompetition drawing
1
Materials, equipment, wire ways and accessories
assembled as per competition instructions and
manufactures instruction
5 Maximum Mark for Sub Criterion
J akarta,
Signatures confirming the accuracy of this result
Objective Marking Form
National Skills Competition
J akarta 2013
Competitor No :
Aspect of Criterion - Description
Requirement
or Nominal
Result or
Actual Value
Mark
Awarded
Mark Awarded
B
EXPERT 1 EXPERT 2 EXPERT 3
Trade : Electrical Installation
Competitor Name :
Sub Criterion : Module B - Wiring and Termination
Aspect Max
ID Mark
1 1
Item 1: Equipment or accessory terminals
correctly terminated at item 1
The marking team must identify the items that are
to be inspected by lottery.
Terminations must have no copper visible at the
termination when viewed at 90 degrees.
Terminations must have no plastic inside the
termination and be a good el ectri cal and
mechani cal j oi nt.
1
Item 2: Equipment or accessory terminals
correctly terminated at item 2
1
Item 3: Equipment or accessory terminals
correctly terminated at item 3
2
A1: Terminals correctly terminated at distribution
board
0 mistakes =3
1 mistakes =2
2 mistakes =1
3 mistakes
5 Maximum Mark for Sub Criterion
J akarta,
Mark Awarded
Signatures confirming the accuracy of this result
Objective Marking Form
National Skills Competition
J akarta 2013
Competitor No :
Aspect of Criterion - Description
Requirement
or Nominal
Result or
Actual Value
Mark
Awarded
B
EXPERT 1
EXPERT 2 EXPERT 3

You might also like