You are on page 1of 27

Docket No.

272
The United Illuminating Company and the Connecticut Light & Power Company application for a Certificate of
Environmental Compatibility and Public Need for the construction of a 345kV electric transmission line and associated
facilities between the Scovill Rock Switching Station in the Town of Middletown and the Norwalk Substation in the City of
Norwalk, Connecticut.


C-1














APPENDIX C

SUBSTATION DRAWINGS
Docket No. 272
The United Illuminating Company and the Connecticut Light & Power Company application for a Certificate of
Environmental Compatibility and Public Need for the construction of a 345kV electric transmission line and associated
facilities between the Scovill Rock Switching Station in the Town of Middletown and the Norwalk Substation in the City of
Norwalk, Connecticut.


C-2
APPENDIX C
TABLE OF CONTENTS
SUBSTATION DRAWINGS

SINGER SUBSTATION

Drawing No. Drawing Title

25251-400 Singer Substation
Arrangement Plan

25251-401 Singer Substation
Sections 1 and 2

25251-402 Singer Substation
Section 3 - GIS Enclosure

25251-500 Singer Substation
Grading Plan

25251-501 Singer Substation
Foundation Plan

25251-502 Singer Substation
Foundation Details
GIS Enclosure

25251-503 Singer Substation
Foundation Details
Control Building

25251-504 Singer Substation
Foundation Details
345kV Shunt Reactor

25251-505 Singer Substation
Foundation Details
345/115kV Autotransformer

25251-506 Singer Substation
Foundation Details
Foundations 5,6,7, & 8






Docket No. 272
The United Illuminating Company and the Connecticut Light & Power Company application for a Certificate of
Environmental Compatibility and Public Need for the construction of a 345kV electric transmission line and associated
facilities between the Scovill Rock Switching Station in the Town of Middletown and the Norwalk Substation in the City of
Norwalk, Connecticut.


C-3
PEQUONNOCK SUBSTATION

Drawing No. Drawing Title

25247-001 Pequonnock Substation
Electrical Site Plan

25247-400 Pequonnock Substation
115kV Equipment Plan
Elev. 57-0 & Below

25247-400SH2 Pequonnock Substation
115kV Equipment Plan
Elev. 57-0 & Below
(Bay 50 Extension)

25247-401 Pequonnock Substation
Plan
Elev. 66-6

25247-401 (SH2) Pequonnock Substation
Plan
Elev. 66-6
(Bay 50 Extension)

25247-405 Pequonnock Substation
Sections A A & B B

25247-406 Pequonnock Substation
Sections C C & D D

25247-406SH2 Pequonnock Substation
Sections C C & D D (Cont)
(Bay 50 Extension)

25247-407 Pequonnock Substation
Section E E

25247-430 Pequonnock Substation
Section 6 6
(Bay 50 Extension)








Docket No. 272
The United Illuminating Company and the Connecticut Light & Power Company application for a Certificate of
Environmental Compatibility and Public Need for the construction of a 345kV electric transmission line and associated
facilities between the Scovill Rock Switching Station in the Town of Middletown and the Norwalk Substation in the City of
Norwalk, Connecticut.


C-4
BRIDGEPORT ENERGY SWITCHYARD

Drawing No. Drawing Title

25250-400 Bridgeport Energy Switching Station
Switchyard Bus & Equipment Plan

25250-401 Bridgeport Energy Switching Station
115kV Switchyard Sections

25250-401 SH2 Bridgeport Energy Switching Station
115kV Switchyard Sections