You are on page 1of 4

1505

P.T.O.

21112
3 Hours / 100 Marks Seat No.


Instructions : (1) All Questions are compulsory.
(2) Answer each next main Question on a new page.
(3) Illustrate your answers with neat sketches wherever necessary.
(4) Figures to the right indicate full marks.
(5) Assume suitable data, if necessary.
(6) Use of Non-programmable Electronic Pocket Calculator is
permissible.

Marks
1. Attempt any FIVE : 20
(a) State any five special characteristics of a civil engineering works.
(b) State common causes of accidents on construction site.
(c) State different plan sanctioning authorities and its functions.
(d) State the objectives of management.
(e) Give two examples of formal and informal communication each.
(f) State any four causes of wastage of materials.
(g) Define method study and time study.

2. Attempt any FOUR : 16
(a) State four types of contracting firms in construction industry.
(b) State the procedure of converting agricultural land into non-agricultural
land.
(c) Explain the importance of information for management on the basis of
level of management.
(d) Prepare a checklist to ensure good quality concrete.
1505 [ 2 ]
(e) Describe the term resource allocation and resource levelling.
(f) A contractor employed 300 men for sixty weeks for construction work.
The working hours being 40 hours/week. Four disabling injuries
occurred during this period. What is the injury frequency rate ?

3. Attempt any FOUR : 16
(a) State functions of managements and its application to civil engineering
works.
(b) State four stages of planning by owner side and by contractor side each
of construction work.
(c) Explain Maslows need hierarchy and its use for management.
(d) State the circumstances under which excess payment is to be made to the
contractor.
(e) State and explain productivity.
(f) Write brief note on Equipment Use Record.

4. (a) Attempt any TWO : 08
(i) Explain Economic order quantity.
(ii) State eight qualities of leadership for site engineer.
(iii) State techniques to overcome barriers of effective communication.
(b) Attempt any TWO : 08
(i) Enlist the equipments used in concrete construction.
(ii) State the precautions you will take to ensure safety during
excavation in soft soil.
(iii) State the purpose of measurement book in PWD accounts.

5. (a) Attempt the following : 08
Define terms :
(i) Normal duration
(ii) Normal cost
(iii) Crashed duration
1505 [ 3 ]
P.T.O.
(iv) Crashed cost
(v) Direct cost
(vi) Indirect cost
(vii) Float
(viii) Dummy activity
(b) Attempt the following : 08
(i) Draw a network from the following data of civil engg work :
Activity A B C D E F G H I J K
Duration 04 12 10 08 06 08 10 10 10 10 06
Precedes None None None A A B C,D E F,G H,J J
Follows D,E F G G H I I J J K None
(ii) Mark critical path and calculate EST, LST, EFT, LFT and project
duration.
OR
(b) State the points to be considered while selecting equipments and state
four merits and demerits of owning the equipment.

6. Attempt any FOUR : 16
(a) State salient features of Gantt / Bar chart with two limitations.
(b) Explain PERT and state its two advantages over CPM.
(c) Draw organization chart of PWD.
(d) State the duties of storekeeper at site.
(e) Explain in brief Task Management.
(f) Explain in brief sampling technique for testing of material.
___________
1505 [ 4 ]

You might also like