Accessories for the MV SWGRs to be provided by the contractor and some other points to be verified. If it is provided, it will trip the vcb automatically, which is not suitable for incomers or transformer breakers. But, this device can be provided, in case, if we are tripping the breaker by using an Emergency trip push button (during the failure of DC power supply-main and back-up, again it is very rare condition).
Original Description:
Original Title
MV SWGR Accessories and Some Important Points to Be Verified
Accessories for the MV SWGRs to be provided by the contractor and some other points to be verified. If it is provided, it will trip the vcb automatically, which is not suitable for incomers or transformer breakers. But, this device can be provided, in case, if we are tripping the breaker by using an Emergency trip push button (during the failure of DC power supply-main and back-up, again it is very rare condition).
Accessories for the MV SWGRs to be provided by the contractor and some other points to be verified. If it is provided, it will trip the vcb automatically, which is not suitable for incomers or transformer breakers. But, this device can be provided, in case, if we are tripping the breaker by using an Emergency trip push button (during the failure of DC power supply-main and back-up, again it is very rare condition).
Accessories for the MV SWGRs to be provided by the contractor & some other points to be verified:
1. Lifting truck for VCB 3 nos
2. Wall mounted tool rack - 3 nos 3. Spring charge handle for each swgr panel 4. VCB racking handle - for each swgr panel 5. E/S racking handle - for each swgr panel 6. Setting gauge - ? (I could not found this details in the MV SWGR /VCB manual. Should be asked with Tihama o&M.) 7. Test Plug 6 nos 8. Emergency trip handle for VCB - for each swgr panel ? 9. Emergency capacitor tripping device to be provided? But, this point should be clarified with Client (Tihama). Because, if it is provided, it will trip the VCB automatically, which is not suitable for incomers or transformer breakers. But, this device can be provided, in case, if we are tripping the breaker by using an Emergency trip push button (during the failure of DC power supply-main & back-up, again it is very rare condition.) (Note: we used this device (Condenser trip unit) in EMCC Incomer at PP11, which created trouble during the power failure. So, we bypassed this future in PP11).
10. Two dummy feeder for each bus 11. Busbar joints shall be enclosed by removable molded plastic covers. 12. One spare CB for each bus section. 13. Trip free operating mechanism for VCB (electrical & Mechanical) (as far as I checked the circuit of control scheme and vcb internal scheme, these provisions are already done)
14. Thermostat is required for Space heaters. May be a mistake in the P.O.
15. Interlock and safety features:
16. Special test equipment for maintenance test (PC) with the connecting leads and plugs (Communication cable).
17. One test plug for each assembly.
18. Supervision relay for 86
19. Kilk key for the each feeders 2/3 sets. 20. Isolation Test Switches not provided. But, it is not so important in this HHI SWGR.
21. Annunciator to be provided. But, this is not necessary. Because, all the status, alarm and trip signals will be indicated in the GE relay front side.
22. Not less than 10% spare terminals in each terminal block. 23. Mechanical protection for wirings in relays and meters (plastic cover) 24. Cross ferruling for the internal wire also. 25. Set of test plug for relay testing and Portable test equipment for meters? 26. A set of test jumper cables for testing secondary control contacts of VCB in withdrawn position. (i.e. a set of wires with approx.. 2-3 meters in length, which connects the jack of the withdrawn VCB at one end and to connect Fixed jack at VCB chamber in the swgr.)
27. One set of High voltage probe?
28. Provision for locking the calibration adjustments of the meters/instruments. (HHI will provide the meter, such a way that the calibration cannot be changed because of normal handling or vibration.
29. Supplier shall furnish the list of special tools and field test devices