CONCRETE POUR CARD CHECK LIST

Sl. No:
Date :
Project : Construction of PEB Sugar Godown at NSL Sugars Limited , Unit II,
Bhusanoor Village, Aland Tk,Gulbarga District, Karnataka.

Contractor : M/s NICE Constructions, Magdoom Pura,Aland,Gulbaraga Dist,
Karnataka
Drg.Grid No: Levels :

Sl.No. Item Yes No Remarks
01. Center Lines Checked
02. Levels Checked
03. Dimensions Checked
04.
Form work and staging checked for
accuracy, strength and finish

05.
Reinforcement Checked/Bar bending
Schedule enclosed

06. Cover to Reinforcement Checked
07. Column Reinforcement Laps ensured
08.
Electrical and miscellaneous work
Checked

09.
Verified test certificate for
Cement/Steel

10.
Adequacy of Materials/Equipment for
Pour Checked

11. Supervisory Staff Allocation made
12.
Temporary lighting and mechanic
presence

13. Finishing Masons available



CONCRETE POUR CARD CHECK LIST
Sl. No:
Date :

Max Aggregate Size /Slump: ------------mm-----------mm Start Time :

Concrete Grade/Quantity : M / Cum Completion Time:

Prepared by: Checked by: Approved by:

Contractor Site Incharge Factory Site Engineer Manager/Consultant
Name : Name: Name:

Sl.No. Item Yes No Remarks
After Concreting
14.
Soffit (S) and pour top (T) levels
Checked

15. Before and after form removal
16.
Construction Joint Location & Time
( if not as per Drawing)

17. Cement Consumption
18. No. of Cubes and identification mark
19. Test Cube results (7days/28days)
20. Concrete condition on form removal

STEEL REINFORCEMENT CHECK LIST
Sl. No:
Date :
FOR FOUNDATIONS/FOOTINGS/COLUMNS/BEAMS

Sl.No. Description Details/Spec.
As per drg
Actual Prepared
By
Contractor
Site
Incharge
Checked
By
Factory
Site
Engineer
Remarks

01. Length of Rod & Dia
02. Length of L
03. No. of Rods
04.
Direction of Bottom
& Top rods

05.
Column L provided
In Footing

06.
Cover & Cover
blocks

07. Binding Done
08. For beam, spacing
of stirrup may vary
in middle span &
end span. This is
specifically checked

09. Laps are avoided
beyond 50% at any
cross section

10. Rod position of
column after
concreting

11. Space bar for beams
12.
Cover for
Reinforcement for
bottom/sides