Energoprojekt Hidroinzenjering Consulting Engineers Co. is an engineering company established in 1974 that is part of the larger Energoprojekt Group. It provides design, consulting, and engineering services for hydropower plants, irrigation projects, water and wastewater systems, and other infrastructure. The company has over 300 employees with expertise in various engineering disciplines and has completed numerous projects both domestically in Serbia and internationally. It prides itself on strategic planning, high quality work, reliability, and leaving a positive impression on partners and customers.
Energoprojekt Hidroinzenjering Consulting Engineers Co. is an engineering company established in 1974 that is part of the larger Energoprojekt Group. It provides design, consulting, and engineering services for hydropower plants, irrigation projects, water and wastewater systems, and other infrastructure. The company has over 300 employees with expertise in various engineering disciplines and has completed numerous projects both domestically in Serbia and internationally. It prides itself on strategic planning, high quality work, reliability, and leaving a positive impression on partners and customers.
Energoprojekt Hidroinzenjering Consulting Engineers Co. is an engineering company established in 1974 that is part of the larger Energoprojekt Group. It provides design, consulting, and engineering services for hydropower plants, irrigation projects, water and wastewater systems, and other infrastructure. The company has over 300 employees with expertise in various engineering disciplines and has completed numerous projects both domestically in Serbia and internationally. It prides itself on strategic planning, high quality work, reliability, and leaving a positive impression on partners and customers.
Irrigation and Drainage Water and Wastewater Environment Design, consulting and engineering 1 Company Profile General Information Energoprojekt Hidroinzenjering Consulting Engineers Co. is a company that belongs to Energoprojekt Group. The history of Energoprojekt Group - Holding Corporation p.l.c. dates back to the 20 th century, to the year 1951, when the company was founded for the designs and implementation of hydro and thermal power plants. Although established as a few-men consulting com- pany, Energoprojekt Group led through domestic and international market by highly professional management, after a tremendous growth over a fif- ty-year period has become one of the strongest, the most valuable and capable partner to the clients. Individual segments of Energoprojekt Group are organised as independent shareholder companies where the corporation acts as a holding company. Each company can either present itself as a separate entity or as a part of the corporation, depending on the particular market situation. Energoprojekt Group is the majority owner of 18 companies in the country and of 40 subsidiar- ies, branch offices and joint venture companies abroad. Energoprojekt Hidroinzenjering was established in 1974 as the first of 18 corporate members. Energoprojekt Hidroinzenjering capital amounts to around 3 mil EUR and it is divided into 681232 shares, where: 94.85 % of shares belong to Energoprojekt Holding as the majority owner 5.15 % of shares belong to individual share- holders Energoprojekt Hidroinzenjering was registered at the Business Register Agency in Belgrade (BD 8069/05) for the activities such as investigation works, studies, designing, supervision and con- sulting engineering services for hydropower, land reclamation, water supply, wastewater and water Name: ENERGOPROJEKT-Hidroinzenjering Consulting Engineers Co. Address: Bulevar Mihaila Pupina 12, 11070 Novi Beograd Serbia Telephone: +381 11 310 1150 +381 11 2142 108 Fax: +381 11 311 1979 E-mail: markdir@ephydro.com info@ephydro.com Web Site: www.energoprojekt.rs www.ephydro.com treatment and other activities related to the design- ing and construction of complex infrastructure systems. Providing a complete range of engineering skills in civil engineering, communication, energy and water treatment, company services cover full mul- tidisciplinary consulting, engineering, construction, financial arrangement, project management and procurement activities. Energoprojekt Hidroinzenjering has the advantage in the fact that all necessary engineering profes- sions indispensable for performing supervision of construction are represented among permanently employed staff. This has always resulted in suc- cessful solving of possible complex problems and meeting the deadlines for completion of services. It would be needless to emphasise that the financing funds of our previous Employers were never over- run and that works supervised by Energoprojekt Hidroinzenjering were carried out with the utmost quality. 2 Company Profile Energoprojekt Hidroinzenjering has accumulated knowledge needed to achieve full management and control of its projects. We keep improving the consulting and design services. In order to be adapted to the new market demand we plan to be active participants in the development activities with our high-quality feasibility studies and finan- cial engineering. Energoprojekt Hidroinzenjerings strategy is based on a good foresight into domestic and foreign market trends. Observing the market demands, Energoprojekt Hidroinzenjering has instituted an all-encompassing and multi-disciplinary approach to project realisation. Energoprojekt Hidroinzenjering develops primar- ily through strict contracts, sponsorship and other relations with development institutions facul- ties, institutes and specialised enterprises in the county and abroad. The development involves permanent identification, analyses, introduction and improvement of technology, new organisation forms and new concept of realisation of business transactions. The Scientific Research Development Centre, established within Energoprojekt Group, also organises and has a tutorship for specialist, master and doctors degree works of Energoprojekt Hidroinzenjering experts and plays an important role in all this. Energoprojekt Hidroinzenjering chooses carefully its personnel and watches their progress; it has clear proficiency plans for its employees, incentive schemes and flexibility in their shifting and transfer. Our prevalence does not lie only in the number of personnel and spheres of activity, but in the con- centration of top professionals as well. Company Strategy Energoprojekt Hidroinzenjering has earned the reputation of a company that has a good sense and capability for strategic planning. As a strong and highly professional system we have an exception- ally efficient and consistent approach and perfor- mance, both of the corporation as entirety and of its individual parts. Due to constant development of the internal organisation, we provide permanently adaptable and original approach to the most com- plicated problems. Energoprojekt Hidroinzenjering has its own data bases, and well developed applicable software for specific problems. The information system created upon the latest technical principles of information technology enables exceptional and inter-active planning and control processes. Planning is carried out according to the most up-to-date methods. We plan and organise qualified staff in an optimal way, thus performing even the most complicated tasks at a high quality level, on time, and within the planned financing. We plan in detail every single phase of the project. In order to achieve a more effective realisation, we apply different levels of standardisation of projects. We also make use of the international system of project coding. Energoprojekt Hidroinzenjering develops strategic marketing policies and devotes great attention to the investigation of the domestic and foreign mar- kets. With this aim Energoprojekt Hidroinzenjerings Marketing Department collects all relevant informa- tion about a market, about movements of capital, goods and services, solvency and ranking of local banks, local prices and availability of manpower, material and equipment, legal provisions in force, tax systems, etc. Out of a large number of acquired data and information, we successfully derive those that are to be taken into consideration and fol- lowed. Permanent presence of Energoprojekt Hidro- inzenjering in the world market is possible due to a large network of our Energoprojekt Group agencies and mixed companies. 3 Company Profile Company Style Competition in the world market in all fields of activity has imposed on our company quality and efficiency as a pre-condition for survival. Of course, Energoprojekt Hidroinzenjering works qualitatively, but our philosophy is not only to survive, but also to be successful. This does not mean permanent increase of profit at any cost, but it means that we should always give more and thus get priority. We do not only guarantee to observe the agreed dead- lines, the envisaged financial construction, security and quality, but we always take everything into consideration, including the matters that, according to contracts, we are not directly obliged to observe. Our style is to be reliable always to be trusted. According to the Engineering News Record, in the year 2010 Energoprojekt Group was ranked the 118 rd top international design firm. We pay attention to the environment and our style is co-operation with nature. We shall not only kindly and readily answer all your calls, and shall not only devote our time to you, but we shall constantly monitor all the phases of work, inform you in detail about the progress of the work, and suggest pos- sible improvements or savings. With us, everything functions in a professional way, but we also keep spreading the atmosphere of opti- mism. We always give more than correct relations and transmit warmth and openness. Our agencies, companies and building sites throughout the world transmit our style they are always in the focus of happenings and meetings, a centre of economic and social life in the countries where they are per- forming construction activities. Energoprojekt Hidroinzenjering leaves a strong impression because it always offers something new, different and individual. Partners and customers from all over the world know that it is always plea- sure to work with us, not only as with professionals, but also as with nice people. We enable a broad-scale demonstration of all cre- ative potentials. We train people for the future, for a world of high technology and knowledge. By way of training local manpower, we transmit our knowledge to the countries of Africa, Asia and Latin America. In those countries we have established mixed Energoprojekt companies, remaining among people of all races and stimulating the transfer of knowledge. In our search for knowledge, we stimulate visions. We develop the network of leading experts in various kinds of activities who turn every single idea into reality. We make efforts to implement ideas of the future today. 4 Company Profile Organisation and Structure Energoprojekt Hidroinzenjering has a permanent work force of 211 professional engineers and tech- nicians supported by commercial and contractual specialists, administrative staff and build-up date communication network, computing and CAD facil- ities. Some of the engineers have served on government advisory committees, research bodies, various pan- els and educational organisations. Civil engineers 51 Mechanical engineers 12 Electrical engineers 16 Geology/Geotechnical engineers 17 Surveying engineers 8 Agriculture engineers 4 Forestry engineers 3 Technology engineers 5 Architects 2 Economists (technical-economic analyses) 5 Technicians (Draftsmen / CAD operators) 66 Translators 5 Financial experts 4 Other skilled personnel 13 Shareholders Assembly, Board and Director, Bratislav Stisovic, M.Sc.C.E. manage Energoprojekt Hidroinzenjering Co. The activities of the Energoprojekt Hidroinzenjering Co. are implemented by 11 Specialized Engineering Departments. Each Department is responsible for commercial, technical and economic aspects of its activities. The departments are the following: Hydropower Systems, Hydraulic Structures and Economic Analysis Land Improvement and River Training Public Utilities and Sanitary Engineering Soil Mechanics, Soil Engineering, Foundation and Construction Management Structural Engineering and Rock Mechanics Road Engineering, Surveying Engineering and G.I.S. Water and Wastewater Treatment and Environmental Protection Hydrology, River Hydraulics, Erosion and Sedimentation Engineering Geology, Geophysics and Hydrology Electrical Equipment and Plants Mechanical Equipment and Plants Services: - Legal Service - Accounting Department - Marketing Department - Information Technology, Project Implementation Monitoring and Design Processing For any given assignment departments join together into an integrated project team under the guidance of Project Manager and supervision of Technical Manager responsible for project. Energoprojekt-Hidroinzenjering is determined to improve continually the quality of its products and services, to ensure that his traditional and new customers always rank it among top world organi- sations dealing with designing and consultancy services in the fields of energy, water and environ- ment. To this aim, Energoprojekt Hidroinzenjering continually improves its own Quality Management System. 5 Company Profile 6 Company Profile Summary of Company Activities Energoprojekt Hidroinzenjerings multidisciplinary teams work in close co-operation with public and private Clients and the funding agencies intending to identify the engineering and planning factors that determine the technical feasibility and eco- nomic viability of the projects and always fulfilling the needs and aspirations of the Client. Energoprojekt Hidroinzenjering Co. brings a disci- plined and controlled approach to: Data collection and interpretation Assessment of existing facilities and structures Feasibility studies for funding agencies Socio-economic studies and analyses Demand and revenue assessment Environmental audit and impact studies Our company applies these skills to the assessment of a wide range of projects in the environmental and energy sectors, including: Water resource and regional development Dams and hydroelectric power engineering Water & Wastewater treatment Land reclamation and irrigation Infrastructure and environmental engineering Hydropower Plants and electro-mechanical systems Energoprojekt Hidroinzenjering has extensive inter- national experience in designing and supervision of major civil, environmental and energy engineering projects. This ensures that all the disciplines within Energoprojekt Hidroinzenjering are based on thor- ough working knowledge of the international and national standards. Our companys experience covers all the significant forms of construction procurement: Conventional competitive bidding with Energoprojekt Hidroinzenjering acting as the Clients agent Project management Construction management Design and consulting Turn key projects Energoprojekt Hidroinzenjering offers a wide range of options to secure the construction, commission- ing and operation of the project in the manner that best supports the Clients financial plan and the funding agencys budget. The multidisciplinary teams provide a comprehen- sive design service in: Geotechnical and tunnelling engineering Foundation design Seismic engineering Surveying and mapping G.I.S. and remote sensing applications Dams and hydroelectric power engineering Irrigation and land reclamation Hydrology and flood control River hydraulics Electrical and mechanical plant design Control system Water treatment and effluent control Transportation and road engineering Solid waste control Complex structures Contract type definition and recommendation The multidisciplinary approach provides a single point of contact, which gives the Client assurance that all technical and economic aspects of the proj- ect will be studied, analysed and designed within a coherent and balanced work plan. As a part of the comprehensive service, Energoprojekt Hidroinzenjering offers a complete turn key pack- age to take responsibility for the design and con- sulting services for the electrical and mechanical equipment and control systems and, if required, extends this service to the operation of the system. 7 Company Profile Within the selected form of contract, our company can provide construction services including: Project planning Cost evaluation and budget control Contractor documentation and bills of quanti- ties Contractor prequalification and evaluation Bid analysis and evaluation Construction supervision Inspection and testing of plant and materials Quality assurance procedures Analysis and certification of payment Programme monitoring Commissioning and acceptance of the works Dispute resolution Maintenance and operation manuals Training of Client personnel Energoprojekt Hidroinzenjering places particular emphasis on the involvement of local contractors and the Clients organisation in the construction process by the implementation of on-site training programs during construction phase as well as dur- ing the commissioning, maintenance and opera- tional phases of the project. By working in close co-operation with the Client and local consultants, Energoprojekt Hidroinzenjering ensures thorough understanding of local condi- tions and cultures. This relationship provides a sound basis for training and technology transfer. Extensive use is made of mathematical model- ling in order to analyse the complex hydrologi- cal, dynamic and static problems associated with Hidroinzenjering, including validation using physi- cal, static and hydrological model tests. Designing is performed using advanced computer technology with proprietary software and in- house developed programs to meet the unique demands of the project. Organised in this manner, the Energoprojekt Hidroinzenjering can offer comprehensive design and engineering services in the above-mentioned fields starting from preliminary designs and feasibil- ity studies to final and detail designs, including inves- tigation works, project management and implemen- tation of large scale schemes. In close co-operation with the corporate members of ENERGOPROJEKT Group, Energoprojekt Hidroinzenjering renders complete services for turn key projects. 8 Selected References Dams and Hydropower plants Energoprojekt-Hidroinzenjering has designed the majority of large dams and all hydropower plants in Serbia, Montenegro and Macedonia, as well as a large number of dams and hydropower plants throughout the world. Based on the designs prepared by Energoprojekt- Hidroinzenjering, 64 dams of various types and pur- poses and 54 hydropower plants have already been constructed or their construction is in progress. Some of those structures fall in the category of the largest structures in the world. Apart from design preparation, the majority of those structures, as well as some other projects awarded to Energoprojekt-Hidroinzenjering, involved investiga- tion works, preparation of tender documents, con- sulting services and technical assistance to the client, construction supervision Energoprojekt-Hidroinzenjering experts have also prepared numerous feasibility studies, preliminary solutions, preliminary and finals designs of dams and hydropower plants that are yet to be implemented. Energoprojekt-Hidroinzenjering was engaged on the projects of modernization and revitalisation of the existing hydropower plants. Energoprojekt-Hidroinzenjering possesses a several decade-long experience in designing and provision of consulting services related to small hydropower plants with the capacities less than 20 MW. Having in mind the growing interest of Private Developers in making investments in renewable ener- gy sources, Energoprojekt-Hidroinzenjering has also specialized in the provision of complete services in the implementation of this type of projects. Project Description Client Services provided Bekhme Hydropower Plant (Iraq) Rockfll dam on the Greater Zab river, height 230 m. Hydropower plant with installed capacity of 1590 MW (6 x 265 MW) State Commission for Reclamation and Irrigation Proj- ects, Irak Investigation works, Designs, Construction supervi- sion Piva Hydropower Plant (Montenegro) Concrete arch dam on the Piva river, height 220 m. Hydropower plant with installed capacity of 342 MW (3 x 114 MW) Electric Power In- dustry of Montene- gro, Niki Investigation works, Designs, Consulting services, Construction supervi- sion Djerdap I Hydropower Plant (Serbia/ Romania) Concrete gravity dam on the Danube river, height 61 m. Navigation lock (310 x 34 x 4.5 m). Hydropower plant with installed capacity of 2100 MW (12 x 175 MW) Djerdap Hydropow- er Plant, Kladovo Investigation works,Designs, Consulting services, Construction supervi- sion Bajina Basta Pumped Storage Plant (Serbia) Rockfll dam on the Beli Rzav river, height 131 m. Pumped storage power plant with installed capacity of 600 MW (2 x 300 MW) Electric Power Industry of Serbia, Belgrade Investigation works, Designs, Consulting services, Construction supervi- sion Bajina Basta Hydropower Plant (Serbia) Concrete hollow gravity dam on the Drina river, height 90 m. Hydropower plant with installed capacity of 380 MW (4 x 95 MW) Electric Power Industry of Serbia, Belgrade Investigation works, Designs, Consulting services, Construction supervi- sion Hydropower projects 9 Selected References Project Description Client Services provided Al Qadissiyah Hydropower Plant (Iraq) Concrete gravity dam on the Euphrates river, height 78 m. Hydropower plant with installed capacity of 660 MW (6 x 110 MW) Ministry of Irriga- tion, State Organisa- tion for Dams, Irak Designs, Consulting services, Construction super- vision Djerdap II Hydropower Plant (Serbia/ Romania) Concrete gravity dam on the Danube river, height 52 m. Hydropower plant with installed capacity of 540 MW (20 x 27 MW) Electric Power Industry of Serbia, Belgrade Investigation works, Designs, Consulting services, Supervision Perucica Hydropower Plant (Montenegro) Three rockfll dams (16, 28 and 30 m height). Hydropower plant with in- stalled capacity of 530 MW (5 x 40 + 2 x 65 MW) Electric Power In- dustry of Montene- gro, Niki Investigation works, Designs, Consulting services, Supervision Aslantash Hydropower Plant (Turkey) Rockfll dam on the Ceyhan river, height 95 m. Hydropower plant with installed capacity of 138 MW (3 x 46 MW) Ministry of Public Works, Ankara Designs, Construction super- vision Sjenica Hydropower Plant (Serbia) Rockfll dam on the Uvac river, height 110 m. Reser- voir storage capacity 213 million m3. Hydropower plant with installed capacity of 37 MW Lim Hydropower Plants, Nova Varos Investigation works, Designs, Consulting services, Construction super- vision Pirot Hydropower Plant (Serbia) Rockfll dam on the Visocica river, height 86 m. Reservoir storage capacity 170 million m3. Hydropower plant with installed capacity of 89 MW (2 x 44.5 MW) Electric Power Industry of Serbia, Belgrade Investigation works, Designs, Consulting services, Construction super- vision Kozjak Hydropower Plant (Macedonia) Rockfll dam on the Treska river, height 126 m. Hydropower plant with installed capacity of 80 MW (2 x 40 MW) Electric Power In- dustry of Macedo- nia, Skopje Revision of Design, Technical assistance, Experts Supervision Tekeze Hydropower Project (Ethiopia) Double curvature concrete arch dam, 185 m height. Underground powerhouse 4 x 75 MW units Ethiopian Electric Power Corporation Addis Ababa Construction Draw- ings, Technical assistance, Construction Super- vision (with Harza - USA) 10 Selected References Project Description Client Services provided King Talal Dam (Jordan) Rockfll dam on the Zorqa river, height 119 m Reservoir storage capacity 48 million m3 Jordan Valley Au- thority Investigation works, Designs, Construction super- vision Tikves Dam (Macedonia) Rockfll dam on the Crna Reka river, height 114 m and crest length 338 m Reservoir storage capacity 475 million m3 Elektrostopanstvo Skopje, Water Management Enterprise Vardar, Skopje Investigation works, Designs, Construction super- vision Gazivode Dam (Serbia) Rockfll dam on the Ibar river, height 108 m and crest length 520 m Reservoir storage capacity 370 million m3 Ibar-Lepenac Enter- prise, Pristina Investigation works, Designs, Construction super- vision Poechos Dam (Peru) Rockfll dam on the Chira river, height 50 m and crest length 9 km Reservoir storage capacity 1 billion m3 Ministry of Agricul- ture, Government of Peru Investigation works, Designs, Construction super- vision Yermasoyia Dam (Cyprus) Rockfll dam with clay core, height 50 m and crest length 290 m Reservoir storage capacity 1.5 million m3 Department of Wa- ter Development, Cyprus Investigation works, Designs Barje Dam (Serbia) Rockfll dam on the Veter- nica river, height 75 m Reservoir storage capacity 41 million m3 Public Utility Enterprise for Water Supply Barje Investigation works, Designs, consulting services, Construction super- vision Mavrovo Dam (Macedonia) Rockfll dam on the Mav- rovska river, height 62 m Reservoir storage capacity 357 million m3 Elektrostopanstvo Skopje Investigation works, Designs, consulting services, Construction super- vision Batlava Dam (Serbia) Rockfll dam on the Batlava river, height 47 m Reservoir storage capacity 39 million m3 Industrial Integrated Works Kosovo, Obilic Investigation works, Designs, consulting services, Construction super- vision Dams used for water supply, irrigation and energy production 11 Selected References Water management systems Preparation of complex studies and designs in the field of water management and agriculture is among the main activities of Energoprojekt-Hidroinzenjering. So far Energoprojekt-Hidroinzenjering has prepared dozens of water resources management master plans, studies of water resource usage and development of catchment areas in the country and abroad, covering the area of around million square kilometers. Energoprojekt-Hidroinzenjering has also prepared irrigation and drainage designs for around 750 000 ha, including approximately 600 000 ha abroad. Apart from that, Energoprojekt-Hidroinzenjering has prepared numerous designs of drainage and flood control systems, development of riparian areas, train- ing and improvement of watercourses, erosion and sediment control. Country Project/Description Client Algeria Study of the Soummam river watershed development and improvement Watershed area around 1,000,000 ha Government of Algeria Pakistan Solution of the Gomal river watershed development and us- age of Gomal river waters Watershed area 30,000 km2 Directorate of Water and Energy Serbia Water Resources Management Master Plan for Serbia Long-term solution of usage and improvement of water resources in the territory of Serbia (95,000 km2) Ministry of Agricul- ture, Forestry and Water Management Serbia Water Resources Management Master Plan for the Lower Drina River Long-term plan of preservation and improvement of water regime in a part of the Drina river watershed (4,570 km2) Ministry of Agricul- ture, Forestry and Water Management Algeria General study of small and medium-size irrigation perim- eters. Northern Algeria region, area 230,000 km2 Ministry of Water Resources Libya Regional hydrogeological study of Ghadames-Djer Area covered by the study 100,000 km2 Government of Libya Libya Regional hydrogeological study of Wadi Sawfajjin Wadi Zamzam Al Jufrah Area covered by the study around 50,000 km2 Government of Libya Iraq Regional study of Western Desert water resources Hydrogeological and hydraulic analyses of desert area rec- lamation options Ministry of Waters Serbia Study of usage of the Velika Morava river hydropower po- tential. Watershed area 37,400 km2 Djerdap Hydropower Plant, Kladovo Zimbabwe Study of medium-height dams for water supply to local population and agricultural facilities in Machonaland West province (13,000 km2) Ministry of Agri- culture and Water Management Algeria Groundwater resources map of Northern Algeria (300,000 km2) The objective of the project was to quantify groundwater resources (by applying GIS technology) for the purpose of enabling successful planning of groundwater management. Ministry of Water Resources, National Agency for Hydraulic Resources (ANRH) Water resources management master plans and studies 12 Selected References Land reclamation - Irrigation and Drainage Project/Description Client Services provided Tikvesko Polje (Macedonia) Irrigation system, area 20,000 ha Water Management Enterprise Vardar, Skopje Investigation works, Studies, Designs Ibar-Lepenac (Serbia) Multi-purpose hydro-system of water supply to industrial facilities, residential areas and irriga- tion of around 73,000 ha of farmland Enterprise Ibar- Lepenac, Pristina Investigation works, Studies, Designs, Construction supervision North Nawin (Burma) Irrigation system in Prome district, area 40,000 ha Ministry of Agricul- ture Investigation works, Studies, Designs, Construction supervision Taflalet (Morocco) Irrigation system for around 30,000 ha Ministry of Agricul- ture Investigation works, Studies, designs, con- struction supervision Chira-Piura (Phase I) Peru Project of the Chira river water transfer into the Piura river by means of 54.5 km long derivation canal for the irrigation of the middle and lower Piura region. Drainage system with the area of around 32,000 ha Ministry of Agricul- ture, Government of Peru Investigation works, Studies, Designs Chira-Piura (Phase II) Peru Projects of amelioration structures for the pur- pose of increasing agricultural production on around 30,000 ha in the Piura river valley and system expansion by additional 5,600 ha Ministry of Agricul- ture, Government of Peru Investigation works, Designs Chira-Piura (Phase III) Peru Projects of amelioration structures for grav- ity irrigation of around 37,000 ha in the Chira river valley and system expansion by additional 5,000 ha Ministry of Agricul- ture, Government of Peru Investigation works, Designs Garabulli (Libya) Project of reclamation of 32,000 ha of desert area and construction and equipping of 1000 farms. Water used for irrigation is pumped from 123 wells. Ministry of Agricul- ture Investigation works, Studies, Designs, Construction supervision El Mullac (Egypt) Project of desert area development and irriga- tion covering the area of 15,000 ha Ministry of Agricul- ture Investigation works, Designs, Construction supervision Badra-Jassan (Iraq) System of desert area irrigation by using the Tigris river waters, desalination and drainage in the area of 22,300 ha Ministry of Agricul- ture Investigation works, Studies, Designs El Tarf (Algeria) Land reclamation and irrigation of 16,000 ha agricultural lands. Water transfer, food control and river training are the component parts of this project. Ministry of Water Resources Investigation works, Studies, Designs, Construction supervision 13 Selected References Potable water Energoprojekt-Hidroinzenjering has designed around 50 potable water treatment plants in addition to a large number of local waterworks, distribution net- works and complex water supply systems of regional and interregional importance. Apart from preparing project and tender documents for the majority of those structures, Energoprojekt- Hidroinzenjering experts have supplied designs and performed supervision over work execution or pro- vided complete turn-key engineering of the struc- tures. Regional water supply systems Project/Description Client Services provided Southern Conveyor Project (Cyprus) Regional hydro-system of water supply to the cities of Limassol, Larnaca, Nicosia and irrigation of 13,700 ha. Main structures: hydraulic tunnel (14.5 km), two arterial pipelines (110 km and 37 km), two WTPs (80000 m3/day and 90000 m3/day), pumping sta- tion (1000 l/s) Ministry of Agri- culture, Natural Resources and Environment Basic Design, Investigation works, Tender Documents, Final and Detail Design, Construction supervision Multi-purpose system Rovni (Serbia) Regional system of water supply to fve municipali- ties in Kolubara region (1985 l/s) and for technical water supply to Kolubara B thermal power plant (1560 l/s). The system consists of a dam (75 m), reservoir (52 mill. m3), water intake structure (2 m3/s), arterial pipelines (65.5 km), WTP (3 x 640 l/s), 3 pumping stations, 3 tanks Public Enterprise Kolubara Rovni Water Manage- ment System, Valjevo Basic and Preliminary Design, Investigaiton works, investment programme, Final Designs, Consulting services, Construction supervision Regional water supply system Ljuberadja (Serbia) Water supply to the city of Nis and surrounding settlements from distant karst sources. Capacity of the system is 1400 l/s and the main structures are: 10 intake structures, 3 pumping stations, 3 tanks, 5 intake break chambers, pipeline in the length of 70 km Naissus Water- works, Nis Basic Design, Detail Designs, Consulting Services, Construction supervision Regional water supply system Barje (Serbia) The system enables water supply to the towns of Leskovac, Vucje, Lebane and Grdelica. It consists of a dam (65 m), reservoir (41 mill. m3), water intake structure (840 l/s), arterial pipelines (30.4 km) WTP (840 l/s), 1 pumping station, 2 tanks (25000 m3 and 3000 m3, respectively) Public Utility En- terprise for Water Supply Barje, Leskovac Basic and Preliminary Design, Investigation works, Final and Detail Designs, Tender Documents, Construction supervision Regional water supply system of Istra (Croatia) The system ensures water supply to 4 municipalities in the Istra peninsula from Botonega reservoir. It consists of a water intake structure (2050 l/s), WTP (1955 l/s), 4 pumping stations, 4 intake break chambers, 7 tanks, arterial pipelines Istra Waterworks, Buzet Preliminary Design, Final and Detail Design Regional water supply system Batlava (Serbia) Designed for potable water supply to Pristina, Kosovo Polje, Obilic and Podujevo. System capacity 850 l/s. Pristina Water- works Preliminary Design, Investigation works, investment programme, Final Designs 14 Selected References Project/Description Client Services provided Water supply system Coastal region of Montene- gro (Montenegro) Regional water supply to local population and tourist facilities in 6 coastal municipalities System capacity is 1330 l/s and the main structures are: water intake structure in the Skadar Lake (1400 l/s), WTP (1330 l/s), 5 pumping stations, 4 tanks, 10 intake break chambers, 1 surge tank and arterial pipelines in the total length of 114.5 km Public Enterprise Coastal region of Montenegro, Budva Basic Design, Preliminary Design, Investigation works, Final Designs Regional multi-purpose system Selova (Serbia) Designed for water supply to the city of Nis and 5 municipalities in Toplica region. Main structures: dam (70 m), reservoir (46 mill. m3), water intake structure (3000 l/s), arterial pipelines (90.2 km), WTP (3 x 900 l/s), 1 pumping station (3 x 50 l/s), 6 intake break chambers Public Enterprise for Water Supply to Toplica and Nis Region Basic Design, Investigation works, Final Designs, Construction Supervi- sion Regional multi-purpose system Rzav (Serbia) The system enables potable water supply to the municipalities of Arilje, Pozega, Lucani, Cacak and Gornji Milanovac. Main structures of the system with the capacity 2300 l/s are: dam (68 m), reservoir (21 mill. m3), WTP (1200 l/s), 2 pumping stations, 6 tanks, 1 intake break cham- ber, arterial pipelines in the total length of 77.9 km Public Enterprise for Water Man- agement System Usage Rzav Preliminary De- sign, investigation works, investment programme, Final Designs 15 Selected References Potable water treatment plants Project/Description Client Services provided WTP Makis I Belgrade (Serbia) Plant capacity 7920 m3/h Public Enterprise Water Board Belgrade Feasibility Study, Final and Detail Design, Construction supervision WTP Makis II Belgrade (Serbia) Plant capacity 7920 m3/h Directorate of Building Land and Construction of Belgrade Feasibility Study, Preliminary Design, Tender Documents WTP Jezero Belgrade (Serbia) Plant capacity 3600 m3/h Public Enterprise Water Board Belgrade Turn-key project WTP Bezanija Belgrade (Serbia) Plant capacity 14400 m3/h Public Enterprise Water Board Belgrade Final Design, Detailed Design, Consulting services WTP Tersephanou (Cyprus) Plant capacity 3750 m3/h Ministry of Agriculture, Natu- ral Resources and Environ- ment Feasibility Study, Tender Documents, Final Design, Construction supervision WTP Limassol (Cyprus) Plant capacity 3500 m3/h Ministry of Agriculture, Natu- ral Resources and Environ- ment Feasibility Study, Tender Documents, Final Design, Construction supervision WTP Gradole (Croatia) Plant capacity 3500 m3/h Istra Waterworks Buzet Turn-key project WTP Butoniga (Croatia) Plant capacity 7200 m3/h Istra Waterworks Buzet Preliminary Design, Final Design WTP Gorina Leskovac (Serbia) Plant capacity 3024 m3/h Public Utility Enterprise for Water Supply Barje, Lesko- vac Turn-key project WTP Yaroslavle (Russia) Plant capacity 4320 m3/h Yaroslav water canal Turn-key project WTP Pecina Valjevo (Serbia) Plant capacity 2400 m3/h Public Enterprise Kolubara- Rovni Water Management System, Valjevo Turn-key project WTP Trnovce Velika Plana (Serbia) Plant capacity 2250 m3/h Public Enterprise Morava Velika Plana Preliminary Design, Final Design WTP Beljina Cacak (Serbia) Plant capacity 900 m3/h Cacak Waterworks Turn-key project 16 Selected References Wastewater In addition to resolving water supply and potable water treatment problems, Energoprojekt-Hidroinzenjering successfully deals with the problems of used water and stormwater collection and disposal, as well as with treatment of urban and industrial wastewaters. Based on the designs prepared by Energoprojekt- Hidroinzenjering, dozens of such structures (around 30 wastewater treatment plants alone) have been constructed or their construction is in progress. Apart from the preparation of investment-technical documents, Energoprojekt-Hidroinzenjering has pro- vided special engineering-consulting services and the majority of the wastewater treatment plants were built as turn-key projects. Systmes for collection and disposal of used waters and stormwater Project/Description Client Services provided System of collection, channeling and treatment of used waters for the city of Nicosia (Cyprus) 40 km of arterial sewers, 720 km of sewerage network, 8 pumping stations, 2 wastewater treatment plants, Sewerage Board of Nicosia Basic Design, Preliminary Design, Final Design, Tender Documents, Consulting Services Construction supervision (together with SOGREAH consl . France) Used water collection and disposal system for the town of Sremska Mitrovica (Serbia) Main sewer, sewage pumping stations, 59 km of sewerage network Directorate of Construc- tion Sremska Mitrovica Basic Design, Final Designs System of collection and disposal of stormwater and wastewaters for the town of Sabac and its suburban settlements (Serbia) Foul water sewerage system (38 km) stormwater sewerage system (195 km) Public Utility En- terprise Water- works Sabac Basic Design, Preliminary Design, Final Designs System of collection and disposal of stormwater and wastewaters for the town of Novi Knezevac (Serbia) Foul water sewerage system (40 km) stormwater sewerage system (40 km) Public Enterprise for Building Land Development Novi Knezevac Basic Design, Final Designs Kovin Sewerage System (Serbia) Sewers, pumping stations, wastewater pressure pipeline, sewerage network (22 km) Public Utility Enterprise Water Board Kovin Preliminary Design, Final Designs System of collection and disposal of wastewa- ters and stormwater for a part of Pozarevac (Serbia) Sewerage network (7 km) with 3 pumping sta- tions (260 l/s), stormwater sewerage system (8 km) with 2 pumping stations (3000 l/s) Building Land Directorate Pozarevac Preliminary Design, Final Designs System of collection and disposal of storm- water and wastewaters for the town of Cacak (Serbia) Sewerage network (45 km) with 4 pumping stations (50-700 l/s), stormwater sewerage system (52 km) Public Enterprise Gradac Cacak Basic Design, Preliminary Design, Final Designs 17 Selected References Project/Description Client Services provided Stormwater collection and disposal system in E-75 highway stretch through Belgrade (Serbia) Open drainage canal in the length of 12 km (maximum discharge 3.5 m3/s) and two sumps with the capacity of 28000 m3, respectively Directorate of Building Land and Construction of Belgrade Preliminary Design, Final Design Ha Potami Water Utilities (Cyprus) System of collection, channeling and treatment of used waters from tourist area. Total sewer- age network length 19 km, 8 relay pumping stations Aristo Develop- ers Ltd. Feasibility Study, Final Design Sewerage system of New Belgrade (Serbia) Total sewerage network length around 400 km, pumping station with the capacity of 3500 l/s. Sewerage Board Belgrade Final Design 18 Selected References Wastewater treatment plants Project/Description Client Services provided WWTP Kragujevac (Serbia) Plant capacity 1500 l/s (250000 PE) Municipality of Kragujevac Turn-key project WWTP Sabac (Serbia) Plant capacity 1500 l/s (193000 PE) Public Utility Enterprise Wa- terworks, Sabac Preliminary Design, Feasibility Study, Final and Detail Design WWTP Sremska Mitrovica (Serbia) Plant capacity 800 l/s (168000 PE) Directorate of Construction, Sremska Mitrovica Preliminary Design, Final and Detail Design WWTP Nis (Serbia) Plant capacity 1750 l/s (668000 PE) Public Utility Enterprise for Construction of the Town of Nis Preliminary Design, Feasibility Study, Final Design WWTP Vathia Gonia (Cyprus) Plant capacity 750 l/s (180000 PE) Sewerage Board of Nicosia Preliminary Design, Final Design, Tender Documents (together with SOGREAH consl . France) WWTP Gornji Milanovac (Serbia) Plant capacity 500 l/s (100000 PE) Public Utility Enterprise 17th October Gornji Milanovac Turn-key project WWTP Loznica (Serbia) Plant capacity 475 l/s (2 x 40000 PE) Public Utility Enterprise Wa- terworks, Loznica Feasibility Study, Final Design WWTP Jagodina (Serbia) Plant capacity 450 l/s (90000 PE) Water Management Fund Jagodina Turn-key project WWTP Obrenovac (Serbia) Plant capacity 500 l/s (50000 PE) Social Fund for Building Land Obrenovac Turn-key project WWTP Lazarevac (Serbia) Plant capacity 420 l/s (40000 PE) Social Fund for Building Land Lazarevac Preliminary Design, Feasibility Study WWTP Kovin (Serbia) Plant capacity 230 l/s (20000 PE) Public Utility Enterprise Wa- ter Board Kovin Turn-key project WWTP Apatin and Industrial pre- treatment Plant capacity 93 l/s (165000 PE) + 63 l/s (Industrial efuents) Municipality of Apatin Feasibility Study, Final Design WWTP Novi Knezevac (Serbia) Plant capacity120 l/s (20000 PE) Public Enterprise for Build- ing Land Development, Novi Knezevac Basic Design, Final Design 19 Selected References Environment Energoprojekt-Hidroinzenjering has always considered environment protection to be a key criterion in the plan- ning and designing of structures within its scope of activi- ties and made solving of environmental problems one of its vital business and development interests. Such an approach resulted in numerous environmental impact studies and detailed analyses of infrastructure, hydro- power and water management structures and systems. Apart from that, a series of complete designs have been prepared for the purpose of resolving the problems related to solid household and industrial waste deposi- tion, sanitary protection of water sources, reservoirs and watercourses, soil pollution, expansion of open pit coalmines etc. Environmental impact assessment studies and designs Project/Description Client Services provided Study of the Impact of Existing Ashfills on Geo-Environment and Water and Proposal of Remediation Measures (Serbia) Electricity Authority of Serbia Study Impact of the Project of of Gornji Horizonti Waters Transfer in the Republic of Srpska on Surface and Groundwater Regime (Bosnia and Herzegovina) Electricity Author- ity of Republic of Srpska Study Master Plan and Feasibility Study for Inland Waterway Transport in Serbia Environmental Impact Assessment European Agency for Reconstruction Study Study of the Impact of the Project of the Upper Zeta River Water Transfer into Krupac and Slano Reservoirs on Poklonci Source (Montenegro) Electricity Authority of Montenegro Study Dump of contaminated material originating from Pancevo electrolyze factory (Serbia) Project of removal of materials contaminated with mercury (1500 m3) and restoration of the original state of the area DP HIP Petrohemija Pancevo Final Design Detailed Analysis of Environmental Impact of Regional Sanitary Waste Dumps of Kotor , Bar and Bijelo Polje (Montenegro) Government of Montenegro - Direc- tion of public works, Podgorica Study Sanitary protection of the zone of sources used for water supply to Velika Plana (Serbia) Public Enterprise Morava Velika Plana Final Design Sanitary protection of Barje reservoir (41 mil. m3) on the Veternica river (Serbia) Public Utility Enterprise for Water Supply Barje Final Design Sanitary Protection of the Uvac lake catchment area (Serbia) Municipality of Nova Varos Final Design Buk Bijela and Srbinje hydropower system Detailed analysis of environmental impact of the structures and works (Bosnia and Herze- govina)) Electricity Author- ity of Republic of Srpska Study 20 Selected References Project/Description Client Services provided HPP Krupa and HPP Banja Luka on Vrbas river, Environmental Impact Assesment study with the feasibility study of variant solutions for pro- tection of fsh life (Bosnia and Herzegovina) Electricity Author- ity of Republic of Srpska Study Water Management and Hydropower System Rzav - Detailed Analysis of Environmental Im- pact of the Dam and Reservoir (Serbia) Public Enterprise for Water Management System Usage Rzav Study Expansion of Pljevlja open pit mine and diver- sion of the Cehotina river (Montenegro) Pljevlja Mine Final Design Protection of water quality in the Zapadna Morava watershed against pollution concentra- tion and dispersion (Serbia) Water Management Enterprise of the Re- public of Serbia Study WTP Garilis detailed analysis of environmental impact of the structures and works (Cyprus) W. B. Lemesos Cy- prus Study Detailed analysis of environmental impact resulting from re-usage of treated water after its undergoing tertiary treatment in WWTP Paphos (Cyprus) Water Development Department Cyprus Study Detail Analysis of environmental Impact of the Wastewater treatment plant in Sabac (Serbia) Public Utility Enter- prise Waterworks, Sabac Study Deposition of solid waste in Montenegrin coastal region (Montenegro) Government of Mon- tenegro Study Solid household waste dump for Sijarinska Banja (Serbia) Public Enterprise Directorate of Con- struction Sijarin- ska Banja Final Design Transfer of the Toplodolska river into Zavoj reservoir (Serbia) Sanitary protection and detailed environmen- tal impact assessment study Electric Power In- dustry of Serbia Final Design Sanitary dump of sold household waste for the town of Irig and its surroundings (Serbia) Dump area 13 ha, capacity 10000 PE Municipality of Irig Feasibility Study, Final Design Sanitary Solid Waste Disposal of Pancevo (Serbia) Dump area 34 ha, capacity 145000 PE Public Enterprise Directorate of Construction and Development of Pancevo Final Design, Detailled Design Technical assistance Supervision and Project Implementation Sanitary-technical sold waste dump for the town of Mladenovac (Serbia) Dump area 34 ha Public Enterprise Directorate of Con- struction - Mlad- enovac Final Design, Detail Design ENERGOPROJEKT-Hidroinzenjering Consulting Engineers Serbia 11070 Belgrade Bulevar Mihaila Pupina 12 Phone: (+381) (11) 310-1150; (+381) (11) 2142-108 Fax: (+381) (11) 311-1979 E-mail: markdir@ephydro.com; info@ephydro.com Web: www.energoprojekt.rs; www.ephydro.com