The document outlines the standard operating procedure for coal drilling, including responsibilities of the client and contractor. It details the foreword, coordination responsibilities, flowcharts of the exploration process and drilling program, and procedural text in English and Indonesian. Key responsibilities include setting up the drill rig correctly, taking downhole surveys, marking and storing core properly, and providing daily shift reports. The client is responsible for approvals, drill site preparation, and checking surveys, core, and reports.
The document outlines the standard operating procedure for coal drilling, including responsibilities of the client and contractor. It details the foreword, coordination responsibilities, flowcharts of the exploration process and drilling program, and procedural text in English and Indonesian. Key responsibilities include setting up the drill rig correctly, taking downhole surveys, marking and storing core properly, and providing daily shift reports. The client is responsible for approvals, drill site preparation, and checking surveys, core, and reports.
The document outlines the standard operating procedure for coal drilling, including responsibilities of the client and contractor. It details the foreword, coordination responsibilities, flowcharts of the exploration process and drilling program, and procedural text in English and Indonesian. Key responsibilities include setting up the drill rig correctly, taking downhole surveys, marking and storing core properly, and providing daily shift reports. The client is responsible for approvals, drill site preparation, and checking surveys, core, and reports.
SUBJECT : COAL DRILLING CONTENTS 1. Foreword 2. Coordination Re!oni"i#itie $. F#ow%&art '. Pro%ed(ra# te)t *. A!!endi%e Revision Status I(e+ Re,. Date Re,iion De%ri!tion B- C&e%.ed C&e%.ed C&e%.ed A!!ro,ed Core Sample Procedure www.csaglobal.com Page 1 of 11 1. Foreword The first stage of a geological exploration program generally involves surface mapping to determine coal occurrence and outcrop sampling to get its preliminary sampling. However, to determine coal continuity and uality beyond the immediate surface of different techniue must be employed. This is where drilling ta!es place. The design of each drilling program is controlled by the level of existing !nowledge, density of existing drill holes, confidence of existing drill hole information, and any specific needs of the exploration programme. Prior to drilling commencement, each party have to !now their responsibilities. C#ient Re!oni"i#itie The exploration company is responsible for the following" #ll drill sites have the appropriate regulatory approvals$Tenement % forestry permit&if reuired' The drill site has been prepared and the sump excavated if reuired The hole collar has been pegged $preferably by a ualified surveyor', and the a(imuth for the hole is clearly mar!ed for the drillers to set up the rig. )ar! an off&set line within easily measured distance of where the wheels or s!ids of the rig will go, or put fore&sight and bac!& sight pegs on the line on which the rig will go. The rig will cause deflection of the compass so the a(imuth must be mar!ed before the rig arrives at the drill site. #dvising the driller in writing of declination, target (one and probable final depth. Chec!ing that down&hole surveys are reasonable. *here orientations should start and stop. *or! with driller to get acceptable orientation mar!s. Some experimentation may be reuired so start doing orientations above the +start, depth. Chec! core to ensure it is mar!ed properly. -et the driller to come to core shed and sort out any inconsistencies. # competent representative of the company should visit ach rig at least once a day. Chec! and sign shift reports regularly, and advice contractor promptly of any problems with recovery or depth measurements. Provision of a permanently fixed stable P.C pipe in which to chec! down&hole survey euipment. Contra%tor Re!oni"i#itie Set up rig on correct a(imuth and declination $/nstruments that use a spirit level should be chec!ed for accuracy' Ta!e down&hole survey measurements at the reuired depths Put orientation mar!s on core as reuired Retrieve the core from the barrel in such a way that the core is pushed out of the barrel using the minimum water pressure in a smooth and gradual manner so no core is unnecessarily damaged or bro!e and the integrity of the core is maintained. 0riller&induced core brea!s are mar!ed an +x, on both sides of the brea! )ar! core depths clearly and accurately. )ar! the top left of the tray +Start, and the bottom right +1nd,. *rite the depth of the bottom of each run on a core bloc! and place in the tray at the end of each run. )ar! the correct location for the mar!er bloc! by a cross on the bottom of compartment. 2ote any core loss on another bloc!. #ny cavities intersected should be mar!ed by a bloc! in the tray $it is helpful to have different coloured bloc!s for different purpose' #ll cavities wider than 34 cm and the depth of the cavity are clearly recorded n the drillers log and mar!ed on a bloc! in the core tray. 0iscrepancies with regard to cavities must be resolved as soon as possible 0rilling S5P www.csaglobal.com Page 2 of 11
Record the depth to water table and any parts of the hole where drilling fluid was lost Store core so it is secure and safe form contamination or interference until it is collected by company representative Provide sift reports $plods' to the client daily 0o completion wor! on the hole as reuired by the contract 2.1 Coordination Re!oni"i#itie ................. *ell site geologist will coordinate all coal handling and sampling. /n general, well site geologist is responsible for" Supervise drilling activity. 1nsure that all individuals and euipment meets company Safety Standards and that all wor! is completed in a safe manner. )aintain appropriate records. 0escribe down hole geology and structure from drill cuttings or drill core and geophysical logs. 0escribe detailed coal geology. Collect and log overburden samples and coal core $refer to +CSA Coa# Sa/!#in0 Pro%ed(re,'. 0escribe down hole geology and collect samples for geochemical analysis and or geotechnical studies. 0escribe groundwater conditions. Record any additional information that may be of geological importance and impact on subseuent mining. Consistent hole naming6numbers& use 7 digits i.e. hole 3 should be hole 443. Some example s of format suitable for CS#&managed drill holes refer to +CSA 1o#e Na/in0 Con,ention, please refers to a!!endi) 1 for the details'. Consistent recording of drill hole coordinates and how measured $prefer metric with datum and (one stated'. 8or reliable coal uality data core is necessary. Triple tube drilling should be used to enhance recovery. Hole si(es should be recorded. 1stimation of core recovery. 8or coal uality evaluation core recovery should be 23*4. /f geophysics is completed then an estimate of the location of any core loss should be possible. 0rilling S5P www.csaglobal.com Page $ of 11
$. F#ow%&art $.1. F#ow dia0ra/ to &ow !rin%i!a# a%ti,itie d(rin0 t&e e)!#oration !&ae o5 a %oa# /ine de,e#o!/ent !ro6e%t 0rilling S5P www.csaglobal.com Page ' of 11
1valuate Surface 1xploration Commence drilling open hole geophysical logging Surveying of all drill sites, sample sites, capping all boreholes 0rilling open holes, pilot part core holes, coal sampling Coal outcrops drilling 0etailed mapping in specified area, 8urther coal sampling Coal samples analysed at laboratories Coal 9uality report Proximate and ultimate analysis, other tests and washability tests 1stimation of insitu coal reserves Calculation of stripping ratio for opencast mine Coal reserves 1stimation to measured status: i.e. geological constraints -eological report /ncluding geophysics giving seam thic!ness and sedimentary history -eological report Coal geology Coal uality Coal reserves $.2. F#ow dia0ra/ to &ow dri##in0 !ro0ra/ 0rilling S5P www.csaglobal.com Page * of 11
'. Pro%ed(ra# te)t Dri## &o#e Co##ar No A%ti,it- Pro%ed(ra# Te)t En0#i& Ba&aa 1 0rill hole collar sta!e out The planned drill collars should be sta!ed out prior to drilling and clearly flagged. 0rill plan /0 and depth target should be noted on the mar!er flag. Posisi rencana titi! bor harus ditandai dengan ;elas di lapangan. 2omor /0 dan target !edalaman bor harus tetrtera dengan ;elas pada pita survey. 2 0rill collar re&survey #ll drill holes should be collar pic!ed up after completion. The collar re&survey are necessary in case the actual drill collar were moved in certain distance from its original plan. <e ensure that the collar pic! up should precisely above the completed drill hole location. 2ote the actual hole /0, actual hole depth, and collar coordinate on the survey flag. =actual hole /0 refer to +CS# Hole 2aming Convention, Seluruh lobang bor harus diambil !embali posisi collar&nya. Re&survey ini sangat penting terutama bila lo!asi lobang bor actual mengalami pergeseran dari lo!asi yang telah direncana!an semula. Harus diingat bahwa posisi collar yang diambil benar&benar berada di atas lobang bor. Catat /0 dan !edalaman lobang bor actual serta !oordinatnya pada pita survey. =/0 lobang bor actual mengacu pada +CS# Hole 2aming Convention, 0rilling S5P www.csaglobal.com Page 7 of 11 Dri## Pre!aration No A%ti,it- Pro%ed(ra# Te)t En0#i& Ba&aa 1 0rilling access preparation Create access to drilling location using do(er or initiated manually. 1nsure the road can be accessed by drill rig and other supporting euipment safely. <uat a!ses !e lo!asi pengeboran dengan mengguna!an do(er atau dirintis seara manual.
Pasti!an ;alan tersebut dapat dilalui oleh rig dan peralatan pendu!ung lainnya dengan aman. 2 0ril pad preparation Create drill pad as flat as possible sufficient for rig, drill tools, and euipments. 1nsure the area is stable and safe. <uat landasan pengeboran sedater mung!in sehingga cu!up untu! posisi rig beserta peralatan dan perleng!apannya. Pasti!an lo!asi ini berada pada area yang stabil dan aman. $ 0rill sump preparation Create drill sump in appropriate capacity depend on rig si(e. <arricade drill sump to !eep drilling operational safe. <uat !olam sir!ulasi pemboran dengan u!uran laya! yang tergantung u!uran rig yang dipa!ai. <ari!ade !olam sir!ulasi pemboran agar !egiatan pengeboran tetap ber;alan aman. Core Sample Procedure www.csaglobal.com Page 8 of 11 ' Rig setting Place the rig at the specified location with correct a(imuth and declination. Store drilling tools and euipments in easily accessible place but does not interfere drilling activity. Run pre&start rig engine and other tools and euipments, ensure its wor! properly. Tempat!an rig pada lo!asi yang telah ditentu!an sesuai dengan a(imuth dan de!linasi yang direncana!an. Simpan peralatan dan perleng!apan pengeboran ditempat yang mudah di;ang!au namun tida! mengganggu !eleluasaan !egiatan pengeboran. >a!u!an +pre&start, mesin rig beserta peralatan dan perlenga!apan pengeboran, pasti!an semuanya dapat beroperasi dengan normal. Dri##in0 O!eration No A%ti,it- Pro%ed(ra# Te)t En0#i& Ba&aa 1. 0rilling Run drilling until the planned depth. 0riller should aware drilling depth for coring. 1nsure the drill bit suitable with drill method $open or cored' and ground condition. )easure and record drilling progress >a!u!an pengeboran sampai !edalaman yang direncana!an. 0riller harus waspada terhadap !edalaman drilling untu! dila!u!an pengeboran inti. Pasti!an bit yang diguna!an sesuai dengan metoda pengeboran $lobang terbu!a atau inti' dan !ondisi bawah permu!aan. ?!ur dan catat !ema;uan !edalaman pengeboran pada catatan pengeboran. Core Sample Procedure www.csaglobal.com Page 9 of 11 depth on the drilling notes. 2 >ogging and sampling Record drill cutting for every 3m depth of drilling progress. Record cored lithology and collect sample $refer to +CS# Coal Sampling Procedure,'. Catat cutting pengeboran setiap 3m !edalaman pengeboran. Catat dan ambil conto batuan inti $mengacu pada +CS# Sampling Procedure,'. $ -eophysical logging 1nsure the hole has reached the target depth and clearly flushed prior to geophysical logging. 1nsure logging probe and other logging tools are wor!ing properly. The most common and suggested tools are calliper, gamma ray, density, spontaneous potential, and resistivity log. >ower the probe through the hole with certain speed until reach the hole bottom. >ift the probe and activate logging tools to record. #d;ust lithology interval depth with the geophysical logging result. Pasti!an lobang bor telah mencapai !edalaman yang ditentu!an dan telah di& flushing, dengan bersih sebelum dila!u!an geophysical logging. Pasti!an logging probe dan peralatan lainnya dapat be!er;a dengan bai!. #lat yang paling umum dan disaran!an yaitu log !aliper, gamma ray, density, spontaneous potensial, dan resistivity. Turun!an probe !e dalam lobang bor dengan !ecepatan tertentu sampai dengan dasar lobang bor. #ng!at probe dan a!tif!an alat logging untu! mulai mere!am. >a!u!an penyesuaian !edalaman interval lithology dengan hasil geophysical logging. Core Sample Procedure www.csaglobal.com Page 3 of 11 Dri##in0 Co/!#etion No A%ti,it- Pro%ed(ra# Te)t En0#i& Ba&aa 1 Rig down Pull all rods and place bac! on the brac!et properly. Pull down the rig. Collect all tools and euipments and store in its proper place. @eluar!an seluruh pipa dari lobang bor dan simpan !embali pada tempatnya. Turun!an !embali rig. @umpul!an seluruh peralatan dan perleng!apan pengeboran dan tempat!an pada tempatnya. 2 0rill site Clean drill site before leaving. Cover drill sump Rapi!an lo!asi pengeboran sebelum ditinggal!an. Tutup !embali !olam sir!ulasi pengeboran. Core Sample Procedure www.csaglobal.com Page 1: of 11 A!!endi) 1.1 A!!endi) 1.$ A!!endi) 2.2 Core Sample Procedure www.csaglobal.com Page 11 of 11