You are on page 1of 66

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.

doc


SOCIEDAD MINERA CERRO VERDE S.A.A.
CERRO VERDE PRODUCTION UNIT EXPANSION
PROJECT NO. A6CV

FABRICATION OF STRUCTURAL
AND MISCELLANEOUS STEEL,
PERUVIAN PACKAGE
SCOPE OF WORK

DOCUMENT NO. 240K-C2-SW-15-008
REV. C

08 MAY 2012



W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc


Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 1 of 12
This document has been revised as indicated below. Changes after Revision 0 are identified by vertical bars at
the right side of the page, with additions being underlined. Please replace all pages of this specification and
destroy the superseded copies.

Rev No. Originator Rev Date Revision Description
A -- -- Not Used
B -- -- Not Used
C Nick Tullan 8May12 Issued for Quotation



















New Issue Entire Document Re-issued

Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 2 of 12






This page is intentionally blank.

Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 3 of 12
TABLE OF CONTENTS

1. SCOPE OF WORK........................................................................................................................................ 5
2. DESCRIPTION OF WORK............................................................................................................................ 5
2.1 General.............................................................................................................................................5
2.2 Related Documents..........................................................................................................................5
3. DESCRIPTION OF WORK SPECIFIC....................................................................................................... 6
3.1 Scope of Facilities ............................................................................................................................6
3.2 Structural Steel Quantities................................................................................................................7
3.3 Scope of Services.............................................................................................................................7
3.4 Exclusions from Scope of Work........................................................................................................8
4. MATERIALS AND EQUIPMENT FURNISHED BY COMPANY AND CONTRACTOR.............................. 8
5. QUANTITIES ................................................................................................................................................. 8
5.1 Unit Rates.........................................................................................................................................8
5.2 Quantities..........................................................................................................................................9
5.3 Revisions, Additions and Deletions..................................................................................................9
5.4 Substitutions...................................................................................................................................10
6. SCHEDULE................................................................................................................................................. 10
6.1 Milestones.......................................................................................................................................10
6.2 Submittals for Bid...........................................................................................................................10
6.3 Available Production Capacity........................................................................................................11
7. ATTACHMENTS.......................................................................................................................................... 11


Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 4 of 12





This page is intentionally blank.

Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 5 of 12
1. SCOPE OF WORK
Except as otherwise expressly provided herein, Seller shall supply all adequate and competent labor,
supervision, administration, management, services, tools, equipment, warehousing, installed and
consumable materials, testing devices, and each and every item of expense necessary for performing
operations required to detail, supply, and fabricate, and all resource planning, receiving, handling, packing,
and loading, as well as testing, evaluation, and quality control for the prescribed portion of structural and
miscellaneous steel supply for the Sociedad Minera Cerro Verde, S.A.A. Cerro Verde Production Unit
Expansion herein called the Work.
2. DESCRIPTION OF WORK
2.1 General
A. Seller shall perform the Work in a timely and workmanlike manner to industry professional
standards in accordance with sound construction practices and local, state, and federal laws,
orders, codes, and regulations applicable to the Work.
B. All articles defining the Work to be performed by Seller are presented for the purpose of
clarifying the Work, but shall not constitute a complete list of the Work, nor limit the Work, nor
guarantee the Work.
C. The steelwork supply described herein as prescribed in Unit Rate Schedules. Bidders to provide
corresponding prices and unit rates.
D. Bidder shall indicate clearly any and all implications with respect to prices, delivery and unit rates
if PO packages or portions of a Package are removed or added to the total number of Packages
submitted in the bid.
E. Bidder shall indicate clearly any and all implications with respect to prices, delivery and unit rates
if there are schedule delays to any packages or portions of a Package in the bid.
F. See Attachment 5 for description and Steel Quantity Estimates.
G. Bidder shall verify capability to perform and assume responsibility for engineering design and
detailing of connections.
H. Bidder shall indicate method and software to be used for connection engineering design and
detailing. Names and capacities of detailing subcontractors shall be submitted, if the work is not
to be detailed in-house by the Bidder.
I. Sequencing of steelwork fabrication and delivery shall be coordinated with the Buyer. Steel shall
be delivered in erectable packages, from the ground up, including fall arrest devices, stairs,
platforms and handrails to facilitate construction progress.
2.2 Related Documents
A. Seller shall perform all Work in strict accordance with the following documents:
240K-C2-CS-15-012 Grouts
240K-C2-CS-15-021 Fabrication of Structural and Miscellaneous Steel
240K-C2-CS-15-022 Erection Of Structural Steel
240K-C2-CS-15-024 Metal Decking
240K-C2-DC-10-002 General Site Conditions Design Criteria
240K-C2-ES-55-002 Paint Specification
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 6 of 12
240K-C2-SD-15-021 Fabrication of Structural & Misc. Steel Supplier Drawing & Data
Commitment (SDDC) Form
B. Engineering Drawings
1. Refer to Attachment 1 for list of Reference Drawings.
2. Representative complexity drawings have been included to define complexity of steelwork
for typical buildings and structures. Actual engineering drawings may vary.
C. The Seller shall review all documents and ascertain that he fully understands the extent and
complexity of the scope of work of these packages.
3. DESCRIPTION OF WORK SPECIFIC
The Work described in Articles of this document shall include, but may not necessarily be limited to, the
following areas and activities:
3.1 Scope of Facilities
A. Area 3100 Primary Crushing and Coarse Ore Handling
1. Area 3110 Primary Crusher platform, stairs and equipment supports
2. Area 3120 Coarse Ore Handling
a. Coarse ore conveyor No. 1 C-3120-CV-012
b. Coarse ore conveyor No. 2 C-3120-CV-022
B. Area 3200 Secondary and Tertiary Crushing
1. Area 3210 Coarse Ore Reclaim
a. Coarse ore reclaim chamber equipment supports, platforms and stairs
b. Coarse ore reclaim conveyor No. 1 C-3210-CV-013
c. Coarse ore reclaim conveyor No. 2 C-3210-CV023
2. Area 3220 Secondary Crushing
a. Secondary crusher discharge conveyor No. 1 C-3220-CV-016
b. Secondary crusher discharge conveyor No. 2 C-3220-CV-026
3. Area 3230 Tertiary Crushing
a. HPGR discharge conveyor No.1 C-3230-CV-017
b. HPGR discharge conveyor No.2 C-3230-CV-027
c. HPGR product conveyor No. 1 C-3230-CV-018
d. HPGR product conveyor No. 2 C-3230-CV-028
4. Area 3240 Screening
a. Coarse ore oversize conveyor No. 1 C-3240-CV-015
b. Coarse ore oversize conveyor No. 2 C-3240-CV-025
c. Tertiary crusher bin feed conveyor No. 1 C-3240-CV-031
d. Tertiary crusher bin feed conveyor No. 2 C-3240-CV-041
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 7 of 12
C. Area 3300 Grinding
1. Area 3310 Ball Mill Feed
a. Ball mill screen oversize conveyor No. 1 C-3310-CV-019
b. Ball mill screen oversize conveyor No. 2 C-3310-CV-029
D. Area 3400 Copper Flotation
1. Area 3410 & 3440 Rougher Floatation and Cleaner Flotation
a. Overhead crane support structure
b. Pipe, cable and equipment supports
2. Area 3420 & 3430 Regrind and Cleaner Columns
a. Overhead crane support structure
Lateral moment frame structure longitudinally braced with interior columns supporting
floors and stair tower.
b. Cleaner column annex
c. Pipe, cable and equipment supports
E. Area 3500 Moly Plant
1. Equipment and pipe supports
2. Access floors, platforms and stairs
F. Area 3600 Concentrate Dewatering and Loadout
1. Enclosed Filter Press Building
2. Equipment, pipe and cable tray supports
3. Platforms and stairs
G. Area 3700 Tailing Thickening
1. Equipment, pipe and cable tray supports
2. Platforms and stairs
H. Area 3900 Process Utilities and Reagents
1. Equipment, pipe and cable tray supports
2. Platforms and stairs
I. Area 5000 Utilities & Ancillaries
3.2 Structural Steel Quantities
Refer to Attachment 5.
3.3 Scope of Services
A. Supply of all structural steel shapes, bars, plates, pins, connections etc. necessary to fabricate
the steelwork as described in the drawings and specifications
B. Preparation of all erection and shop detail drawings necessary for the fabrication of the
steelwork
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 8 of 12
C. Preparing, priming and painting of all steelwork as noted
D. Packaging and loading all steelwork and attachments
E. Supply the necessary touch-up primer and paint for site use
3.4 Exclusions from Scope of Work
The following works shall be excluded from the Contractors Scope of Work:
A. Off-loading of the steelwork at site
B. Erection of the steelwork at site
C. Touch-up painting of the erected steelwork
D. Steel embedded in concrete
4. MATERIALS AND EQUIPMENT FURNISHED BY COMPANY AND CONTRACTOR
Not Applicable.
5. QUANTITIES
5.1 Unit Rates
A. Prices shall be submitted on a unit rate basis as indicated on the attached Unit Rates Schedules
(Attachments 2 and 3).
B. Unit rates shall remain effective and unchanged for the duration of the overall work and are
independent of changes in the following:
1. Complexity
a. Actual types of structures and final choice of structural components may result in
variances from categories and representative building/structure types submitted with
the bid, but are adequate to establish fixed unit rate.
b. Distribution and available selection of weight ranges in unit rate categories are
adequate to account for variance in complexity and weight between sections of
varied unit weight within a category.
2. Quantities
a. Final quantities and distribution of quantities amongst categories and structures may
vary from those indicated in the unit rates list, milestones and other documents
issued to date.
b. Awarded and final quantities may increase or decrease by +/- 20 percent from the bid
quantities.
c. Portions of the work may, at the discretion of the Buyer, with prior written notice to
the Seller, be awarded to another supplier.
3. Schedule
Final milestone dates, IFC and RAS, for portions of the work may vary from those
indicated.
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 9 of 12
C. Unit rates shall identify for each category the following activities:
1. Connection allowance (unique to each category)
2. Detailing (including connection engineering design)
3. Supply
4. Fabrication
5. Surface preparation and painting
D. The bidder shall clearly indicate any and all implications with respect to unit rates and/or
schedule resulting from removal of detailing from the scope of work.
E. Submittals for Bid
1. Prices shall be submitted on a unit rate basis as indicated on the attached Unit Rates
Schedules (Attachments 2 and 3).
2. Unit rates shall be provided for each category, regardless of indicated quantity (even for
zero quantity).
3. The bidder shall submit unit rates in compliance with the categories indicated.
4. Quantities indicated include connection allowance, end plates, clip angles, gusset plates,
stiffeners, doublers, welds, and shop bolts etc. required for field and shop connections.
5. Bidder shall advise the Buyer prior to submittal of bid of variance from categories per the
Unit Rates Schedules.
6. Any variance from or additions to the standard Unit Rates List shall be submitted in the
same format as the attachments.
5.2 Quantities
A. Final quantities and distribution amongst categories and structures may vary from those
indicated.
B. Refer to Attachment 5 for estimated quantities.
5.3 Revisions, Additions and Deletions
A. Changes to structural and miscellaneous steel after initial issue of engineering drawings for
construction are likely.
B. Separate prices on a unit rate basis shall be provided in each category included in the Unit Rate
Schedules for material additions and deletions.
1. Material Additions
a. Members or sections added to engineering drawings (based on unit rate weight).
b. Additional materials for end plates, clip angles, gusset plates, stiffeners, doublers,
welds, shop bolts and field bolts shall not be considered as additions for the
purposes of calculating prices.
2. Material Deletions
Credit for members or sections deleted from engineering drawings (based on unit rate
weight).
3. The format for additions and deletions shall be the same as the Unit Rates Schedules.
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 10 of 12
C. An hourly rate for detailing of additions and deletions shall be submitted by the bidder.
5.4 Substitutions
Bid prices shall be prepared on the basis of materials identified by the project specifications.
A. Bidder shall provide statement of compliance with all material requirements.
B. Any deviation from specified materials, sections, products, practices or methods shall be clearly
stated and qualified in the bid.
6. SCHEDULE
6.1 Milestones
A. Refer to Attachment 4 for current schedule milestones.
B. Engineering drawings IFC dates are planned as issuance 16 weeks prior to RTS dates. Bidder to
confirm if the IFC dates can be delayed or advanced based on Fabrication and Delivery
capacities.
C. Confirm with Buyer the requirement of IFP (Mill Order).
D. Final milestone dates may vary from those indicated.
E. The bidder shall clearly indicate in the bid any and all implications with respect to unit rates
resulting from a change, either advancement or delay, in milestone dates.
6.2 Submittals for Bid
A. Schedule shall be submitted in bar chart form identifying milestones and durations including as a
minimum, but not necessarily limited to, the following:
1. PO award
2. Quantity take-offs
3. Mill order (bidder to identify if required)
4. Material supply
5. Connection design
6. Detailing
7. Review of shop drawings by Buyer (2 weeks)
8. Cutting
9. Fabrication
10. Painting
11. Pre-assembly
12. Preparation for shipping
13. Shipping
14. PO Closure
B. Schedule shall be reviewed and re-submitted in the same format prior to award.
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 11 of 12
6.3 Available Production Capacity
The bidder shall provide sufficient information to confirm ability and availability to perform the Work,
including but not limited to the following:
A. Shop capacity
B. Proven sustained (over a minimum 6 months) monthly shop production capacity
C. Production capacity available to the Buyer by month for the period from February 2013 to J une
2014
7. ATTACHMENTS
Attachment 1 Reference Drawing List
Attachment 2 Unit Pay Class Schedule
Attachment 3 Unit Rate Pay Class Schedule
Attachment 4 Steel Delivery Schedule
Attachment 5 Structural Steel Quantity Estimate



End of Scope of Work


Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 12 of 12





This page is intentionally blank.

Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 1



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 1 of 8
Attachment 1 Reference Drawing List


Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 1



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 2 of 8

This page is intentionally blank.

Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 1



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 3 of 8
REFERENCE DRAWING LIST

Drawing Number Title
240K-C2-0000-15S-101 R General Standards Structural Steel General Notes
240K-C2-0000-15S-102 R General Standards Structural Steel Details Sheet 1
240K-C2-0000-15S-103 R Standards Structural Steel Stair And Handrail Details
240K-C2-0000-15S-104 R General Standards Structural Steel Ladder Details
240K-C2-0000-15S-105 R Standards Structural Steel Grating And Floor Plate Details
C-3100-15S-111
Primary Crushing & C.O. Handling - Primary Crusher - Structural Steel -
Elevation Sh 1
C-3200-15S-111
Secondary & Tertiary Crushing - Coarse Ore Reclaim - Structural Steel -
CV0003 Elevations
C-3200-15S-112
Secondary & Tertiary Crushing - Coarse Ore Reclaim - Structural Steel -
CV0003 Tail End Arrangement Sh 1
C-3200-15S-113
Secondary & Tertiary Crushing - Coarse Ore Reclaim - Structural Steel -
CV0003 Tail End Arrangement Sh 2
C-3200-15S-114
Secondary & Tertiary Crushing - Coarse Ore Reclaim - Structural Steel -
CV0003 Head End Arrangement
C-3200-15S-115
Secondary & Tertiary Crushing - Coarse Ore Reclaim - Structural Steel -
CV0003 Misc Details Sh 1
C-3200-15S-116
Secondary & Tertiary Crushing - Coarse Ore Reclaim - Structural Steel -
CV0003 Head End Details
C-3200-15S-117
Secondary & Tertiary Crushing - Coarse Ore Reclaim - Structural Steel -
CV0003 Trolley Details
C-3200-15S-118
Secondary & Tertiary Crushing - Coarse Ore Reclaim - Structural Steel -
CV0003 Counterweight Details
C-3200-15S-201
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Base
Plate Plan
C-3200-15S-202
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Plan @
TOS EL 2704.494 & 2703.450
C-3200-15S-203
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Plan @
TOS EL 2709.100 & 2709.410
C-3200-15S-204
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Plan @
TOS EL 2711.900
C-3200-15S-205
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Plan @
TOS EL 2714.100
C-3200-15S-206
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Plan @
TOS EL 2718.300
C-3200-15S-207
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Plan @
TOS EL 2722.420
C-3200-15S-208
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Plan @
TO Rail 2724.500
C-3200-15S-209
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Plan @
TOS EL 2727.230
C-3200-15S-210
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Plan @
TOS EL 2733.500
C-3200-15S-211
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Truss
Plan @ TOS EL 2733.500
C-3200-15S-212
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel -
Elevation @ Truss 'A' & 'B'
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 1



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 4 of 8
Drawing Number Title
C-3200-15S-213
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Truss
'C', 'D', 'E' & Sway Frame 'F' & 'G'
C-3200-15S-214
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Feeder
Bin Spile Bar Pull Out Beams
C-3200-15S-216
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel -
Elevation @ Bayline 'A'
C-3200-15S-217
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel -
Elevation @ Bayline 'B'
C-3200-15S-218
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel -
Elevation @ Bayline 'C' & 'D'
C-3200-15S-219
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel -
Elevation @ Bayline '8'
C-3200-15S-220
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel -
Elevation @ Bayline '9'
C-3200-15S-221
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel -
Elevation @ Bayline '10'
C-3200-15S-222
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel -
Elevation @ Bayline '11'
C-3200-15S-223
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel -
Elevation @ Bayline '12'
C-3200-15S-224
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel -
Elevation @ Bayline '13'
C-3200-15S-225
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel -
Elevation @ Bayline '14'
C-3200-15S-226
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Coarse
Ore Screen Frame Plans
C-3200-15S-227
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Coarse
Ore Screen Frame Sections
C-3200-15S-228
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Bent
Elevations @ Bayline '17'
C-3200-15S-231
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Bin
Wall Arrangement
C-3200-15S-232
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Bin
Wall Arrangement
C-3200-15S-233
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Bin
Wall Arrangement
C-3200-15S-234
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Bin
Plan @ EL 2732.350
C-3200-15S-235
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Bin
Plan @ EL 2727.230 & 2724.980
C-3200-15S-241
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Stair
Tower 'A' - Plans
C-3200-15S-242
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Stair
Tower 'A' - Sections
C-3200-15S-244
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Stair
Tower 'B' - Plans
C-3200-15S-245
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Stair
Tower 'B' - Sections
C-3200-15S-246
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Misc
Details Sh 1
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 1



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 5 of 8
Drawing Number Title
C-3200-15S-247
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Misc
Details Sh 2
C-3200-15S-248
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Girt
Details
C-3200-15S-249
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Misc
Details Sh 3
C-3200-15S-251
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV004
- Elevations
C-3200-15S-252
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV004
Head End Arrangement
C-3200-15S-253
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Truss
CV-004-A/B Details
C-3200-15S-254
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Truss
CV-004-C/D Details
C-3200-15S-255
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV004
- Tail End Arrangement
C-3200-15S-256
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - Tail
End Details CONV CV-004
C-3200-15S-261
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel -
CV003/004/005 Transfer Plans Sh 1
C-3200-15S-262
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel -
CV003/004/005 Transfer Plans Sh 2
C-3200-15S-263
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel -
CV003/004/005 Transfer Elevations Sh 1
C-3200-15S-271
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel Plan &
Details - CV005 Arrangement
C-3200-15S-272
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV-005
Details
C-3200-15S-281
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV-007
Arrangement
C-3200-15S-282
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV-007
Details
C-3200-15S-287
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV-
006/007/008/011 Transfer Plans Sh 2
C-3200-15S-288
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV-
006/007/008/011 Transfer Elevations Sh 1
C-3200-15S-289
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV-
006/007/008/011 Transfer Elevations Sh 2
C-3200-15S-318
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - Crane Rail
Plan @ TOS EL 2720.604
C-3200-15S-322 Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - Roof Plan
C-3200-15S-331
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - Elevation
on Line 'E'
C-3200-15S-332
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - Elevation
on Line 'F'
C-3200-15S-335
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - Elevation
on Line 1,2,3,4,5 & 6
C-3200-15S-336
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - Elevation
on Line 7, 7.2, 7.3, & 8
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 1



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 6 of 8
Drawing Number Title
C-3200-15S-341
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - Girt
Elevations Sh 1
C-3200-15S-344
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - Girt
Elevations Sh 3
C-3200-15S-355
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - Bin Wall
Elevations
C-3200-15S-356
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - Bin
Elevations & Details Sh 1
C-3200-15S-357
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - Bin
Elevations & Details Sh 2
C-3200-15S-358
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - Bin
Elevations & Details Sh 3
C-3200-15S-359
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - Bin
Elevations & Details Sh 4
C-3200-15S-361
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - Truss
Details
C-3200-15S-362
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - Truss
Details
C-3200-15S-367
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - Sections &
Details Sh 3
C-3200-15S-391
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - CV010
Elevations
C-3200-15S-392
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - CV010 -
Tail End Arrangement
C-3200-15S-393
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - CV010 -
Take up Tower Sh 1
C-3200-15S-394
Primary Crushing & C.O. Handling - Coarse Ore Conveying - Structural Steel -
CV010 Take up Tower Sh 2
C-3200-15S-395
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - CV010 -
Take up Tower Sh 3
C-3200-15S-396
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - CV010 -
Head End Arrangement
C-3200-15S-397
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - CV010 -
Head End Details
C-3200-15S-398
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - CV010 -
''Truss - A''
C-3200-15S-399
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - CV010 -
''Truss - B''
C-3200-15S-400
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - CV010 -
''Truss - A'' Details
C-3200-15S-401
Secondary & Tertiary Crushing - Tertiary Crushing - Structural Steel - CV010 -
''Truss - B'' Details
C-3200-15S-402
Secondary & Tertiary Crushing - Coarse Ore Reclaim - Structural Steel - CV010
Counterweight Details
C-3200-15S-410
Secondary & Tertiary Crushing - Coarse Ore Reclaim - Structural Steel - CV014
Elevations
C-3200-15S-411
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV014
Tail End Arrangement
C-3200-15S-412
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV014
Tail End Arrangement Sh 2
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 1



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 7 of 8
Drawing Number Title
C-3200-15S-413
Secondary & Tertiary Crushing - Coarse Ore Reclaim - Structural Steel - CV014
- "Truss CV-014-A"
C-3200-15S-414
Secondary & Tertiary Crushing - Coarse Ore Reclaim - Structural Steel - CV014
- "Truss CV-014-B"
C-3200-15S-415
Secondary & Tertiary Crushing - Coarse Ore Reclaim - Structural Steel - CV014
- "Truss CV-014-C"
C-3200-15S-430
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV008
Elevations
C-3200-15S-431
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV008
Tail End Arrangement
C-3200-15S-432
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV008
Tail End Details
C-3200-15S-433
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV008
Take up Tower Sh 1
C-3200-15S-434
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV008
Take up Tower Sh 2
C-3200-15S-435
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV008
"Truss CV008-A"
C-3200-15S-436
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV008
"Truss CV008-B"
C-3200-15S-437
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV008
"Truss CV008-C"
C-3200-15S-438
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV008
"Truss CV008-D"
C-3200-15S-439
Secondary & Tertiary Crushing - Secondary Crushing - Structural Steel - CV008
Truss Sections & Details Sh 1
C-3300-15S-001 Grinding - General - Structural Steel - Base Plate Plan
C-3300-15S-002 Grinding - General - Structural Steel - Base Plate Details
C-3300-15S-011 Grinding - General - Structural Steel - Roof Framing Plan Sh 1
C-3300-15S-012 Grinding - General - Structural Steel - Roof Framing Plan Sh 2
C-3300-15S-014 Grinding - General - Structural Steel - Crane Girder Layout
C-3300-15S-022 Grinding - General - Structural Steel - Elevations on Gridline B
C-3300-15S-023 Grinding - General - Structural Steel - Elevations on Gridline C
C-3300-15S-024 Grinding - General - Structural Steel - Elevations on Gridline D
C-3300-15S-025 Grinding - General - Structural Steel - Elevations on Gridline E
C-3300-15S-026 Grinding - General - Structural Steel - Elevations on Gridline F
C-3300-15S-027 Grinding - General - Structural Steel - Elevations on Gridline G
C-3300-15S-028 Grinding - General - Structural Steel - Elevations on Gridline H
C-3300-15S-030 Grinding - General - Structural Steel - Elevations on Gridline K
C-3300-15S-031 Grinding - General - Structural Steel - Elevations on Gridline L
C-3300-15S-032 Grinding - General - Structural Steel - Elevations on Gridline 2
C-3300-15S-033 Grinding - General - Structural Steel - Elevations on Gridline 3
C-3300-15S-035 Grinding - General - Structural Steel - Elevations on Gridline 8
C-3300-15S-036 Grinding - General - Structural Steel - Elevations on Gridline 10
C-3300-15S-039 Grinding - General - Structural Steel - Miscellaneous Details Sh 2
C-3300-15S-041 Grinding - General - Structural Steel - Connections Details Sh 1
C-3300-15S-046 Grinding - General - Structural Steel - Column Splice Details
C-3300-15S-056 Grinding - General - Structural Steel - Crane Girder Details Sh 1
C-3300-15S-057 Grinding - General - Structural Steel - Girder Splice Details
C-3300-15S-059 Grinding - General - Structural Steel - Crane Rail, Stop, & Clip Details
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 1



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 8 of 8
Drawing Number Title
C-3500-15S-201 Moly Plant - Flotation - Structural Steel - Base Plate Plan
C-3500-15S-202 Moly Plant - Flotation - Structural Steel - Base Plates & Col. Splice Details
C-3500-15S-203 Moly Plant - Flotation - Structural Steel - Roof Steel Bottom Chord Plan
C-3500-15S-204 Moly Plant - Flotation - Structural Steel - Roof Steel Top Chord Plan
C-3500-15S-205 Moly Plant - Flotation - Structural Steel - Elevations @ Grid Line A
C-3500-15S-206 Moly Plant - Flotation - Structural Steel - Elevations @ Grid Line F
C-3600-15S-211 Concentrate Dewatering Building - Structural Steel - Filter Floor - Plan
C-3600-15S-212 Concentrate Dewatering Building - Structural Steel - Filter Floor - Details Sh 1
C-3600-15S-213 Concentrate Dewatering Building - Structural Steel - Filter Floor - Details Sh 2
C-3600-15S-214 Concentrate Dewatering Building - Structural Steel - Filter Floor - Details Sh 3
C-3600-15S-221
Concentrate Dewatering Building - Loadout Filter Building - Elevated Slab
Details

Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 2



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 1 of 16

Attachment 2 Unit Pay Class Schedule


Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 2



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 2 of 16





This page is intentionally blank.
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 2



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK
UNIT PAY CLASS SCHEDULE

This schedule of pay classes is valid ONLY for unit rate PO/Contracts
and for additions/deletions to scope of lump sum PO/Contracts


W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 3 of 16
Item Unit of
Measure
Pay Class Description

FABRICATION

The line items below are for Seller's provision of all fabricated material,
miscellaneous material, in accordance with the contract documents, project
specifications/standard drawings, and design drawings.
All unit prices are inclusive of costs for engineering, design, detailing, inspection,
material, labor, paint, inspecting, tagging, crating, handling, and loading.
Steel grade is either A992 or A36 per project specifications, unless noted
otherwise.
All steel is painted as per project specifications unless noted otherwise
Seller shall identify on the shop fabrication drawings the pay class of each
piece mark.




CLASS 1 LIGHT
Structural steel, shop fabricated from rolled section or equivalent weights 0 to
30 kg/m, including but not limited to items listed in the definition of Pay Class 4, as
well as brackets, access platforms, pipe and electrical cable supports, equipment
and conduit supports. This definition applies to line item 1.


1 Tonne CLASS 1 LIGHT STEEL

CLASS 2 MEDIUM
Structural steel, shop fabricated from rolled section or equivalent weights greater
than 31 kg/m, up to and including 60 kg/m, including but not limited to items listed
under the definition of Pay Class 4. This definition applies to line item 2.


2 Tonne CLASS 2 MEDIUM STEEL

CLASS 3 HEAVY
Structural steel, shop fabricated from rolled section or equivalent weights greater
than 61 kg/m, up to and including 90 kg/m, including but not limited to items listed
under the definition of Pay Class 4. This definition applies to line item 3.


3 Tonne CLASS 3 HEAVY





Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 2



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK
UNIT PAY CLASS SCHEDULE

This schedule of pay classes is valid ONLY for unit rate PO/Contracts
and for additions/deletions to scope of lump sum PO/Contracts


W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 4 of 16
Item Unit of
Measure
Pay Class Description
CLASS 4 X HEAVY
Structural steel, shop fabricated from rolled section or equivalent weights greater
than 91 kg/m, up to and including 180 kg/m, including but not limited to columns,
beams, frames, bracing with shop attached appurtenances, base plates, plates,
stiffeners, rolled shapes, and clips as per applicable ASTM, excluding Field Bolts.
Applies to line item 4.


4 Tonne CLASS 4 X HEAVY STEEL

CLASS 5 XX HEAVY
Structural steel, shop fabricated from rolled section or equivalent weights greater
than 181 kg/m, and up to 360 kg/m including but not limited to, columns, beams,
frames, bracing with shop attached appurtenances, base plates, plates, stiffeners,
rolled shapes, and clips as per applicable ASTM, excluding Field Bolts. Applies to
line item 5.


5 Tonne CLASS 5 XX HEAVY STEEL

CLASS 6 XXX HEAVY
Structural steel, shop fabricated from rolled section or equivalent weights greater
than 361 kg/m including but not limited to, columns, beams, frames, bracing,
framing, with shop attached appurtenances, base plates, plates, stiffeners, rolled
shapes, and clips as per and clips as per applicable ASTM, excluding Field Bolts.
Applies to line item 6.


6 Tonne CLASS 6 XXX HEAVY STEEL

CLASS 7 JUMBO SHAPE OVER 642 kg/m
Structural steel, shop fabricated from rolled jumbo sections or equivalent weights
greater than 642 kg/m, including but not limited to columns, beams, frames,
bracings with shop attached appurtenances, base plates, plates, stiffeners, rolled
shapes, clips as per applicable ASTM, excluding field bolts. Applies to line item 7.


7 Tonne CLASS 7 J UMBO SHAPES OVER 642 kg/m




Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 2



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK
UNIT PAY CLASS SCHEDULE

This schedule of pay classes is valid ONLY for unit rate PO/Contracts
and for additions/deletions to scope of lump sum PO/Contracts


W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 5 of 16
Item Unit of
Measure
Pay Class Description
CLASS E4 BUILT-UP SECTIONS
Shop fabricated from plates as per applicable ASTM, including but not limited to
shop attached stiffeners, clips, gussets, plates and rolled shapes. This definition
applies to line item E4.


E4 Tonne CLASS E4 BUILT-UP SECTIONS

CLASS 8 MONORAIL
Structural steel, shop fabricated from section including but not limited to beams, with
shop attached appurtenances, base plates, connection plates, stiffeners, rolled
shapes, and clips as per applicable ASTM, excluding field bolts. This definition
applies to line item 8.


8 Tonne CLASS 8 MONORAIL

CLASS 9 SHOP BUILT ROOF TRUSS
Structural steel, shop fabricated from rolled section including but not limited to items
listed in the definition of pay class 1 through 4. This definition applies to Line Item 9.


9 Tonne CLASS 9 SHOP BUILT ROOF TRUSS

CLASS 12 PLATEWORKS, BINS & HOPPERS
Structural Steel, shop fabricated from sections and plates including but not limited to
items listed in the definition of Pay Class A to E as well as plates, stiffeners,
hoppers, bin walls and bottoms, excluding columns, beams, and braces supporting
the bins which are included by Class A to E. This definition applies to item 12a- 12d.


12a Tonne CLASS 12 a PLATEWORKS, BINS & HOPPERS, 5/16INCH THICK , 7.9MM
12b Tonne CLASS 12 b PLATEWORKS, BINS & HOPPERS, 3/8INCH THICK , 9.5MM
12c Tonne CLASS 12 c PLATEWORKS, BINS & HOPPERS, 1/2INCH THICK , 12.7MM
12d Tonne CLASS 12 d PLATEWORKS, BINS & HOPPERS, 5/8INCH THICK , 15.9MM






Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 2



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK
UNIT PAY CLASS SCHEDULE

This schedule of pay classes is valid ONLY for unit rate PO/Contracts
and for additions/deletions to scope of lump sum PO/Contracts


W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 6 of 16
Item Unit of
Measure
Pay Class Description
CLASS 13, CRANE RAIL W/SPLICES
Crane rails, as per ASTM A1 or A759 as applicable, including joint bars and Bolts.
This definition applies to line item 13a-13g.


13a Tonne CLASS 13-a 40 lbs/yd RAIL
13b Tonne CLASS 13-b 60 lbs/yd RAIL
13c Tonne CLASS 13-c 80 lbs/yd RAIL
13d Tonne CLASS 13-d 104 lbs/yd RAIL
13e Tonne CLASS 13-e 135 lbs/yd RAIL
13f Tonne CLASS 13-f 171 lbs/yd RAIL
13g Tonne CLASS 13-g 175 lbs/yd RAIL

CLASS K1, COUNTER WT FRAME
Structural steel, shop fabricated from rolled section 0 kg/m up to and including 30
kg/m or equivalent weights in counter wt frames. This definition applies to line item
K1.


K1 Tonne CLASS K1, COUNTER WT FRAME

CLASS K2, COUNTER WT FRAME
Structural steel, shop fabricated from rolled section 31 kg/m up to and including 60
kg/m or equivalent weights in counter wt frames. This definition applies to line item
K2.


K2 Tonne CLASS K2, COUNTER WT FRAME

CLASS K3, COUNTER WT FRAME
Structural steel, shop fabricated from rolled section 61 kg/m up to and including 90
kg/m or equivalent weights in counter wt frames. This definition applies to line item
K3.


K3 Tonne CLASS K3, COUNTER WT FRAME




Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 2



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK
UNIT PAY CLASS SCHEDULE

This schedule of pay classes is valid ONLY for unit rate PO/Contracts
and for additions/deletions to scope of lump sum PO/Contracts


W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 7 of 16
Item Unit of
Measure
Pay Class Description
CLASS K4, COUNTER WT FRAME
ASTM A36 Plate Plain Material

K4 Tonne CLASS K4, COUNTER WT FRAME

CLASS H1 GIRTS LIGHT WEIGHT
Structural steel, shop fabricated from rolled section or equivalent weights greater
than 0 kg/m, up to and including 30 kg/m with shop attached appurtenances, base
plates, plates, stiffeners, rolled shapes and clips per applicable ASTM excluding
field bolt. This definition applies to line item H1.


H1 Tonne CLASS H1 GIRTS LIGHT WEIGHT

CLASS H2 GIRTS MEDIUM WEIGHT
Structural steel, shop fabricated from rolled section or equivalent weights greater
than 31 kg/m, up to and including 60 kg/m with shop attached appurtenances, base
plates, plates, stiffeners, rolled shapes and clips per applicable ASTM excluding
field bolt. This definition applies to line item H2.


H2 Tonne CLASS H2 GIRTS MEDIUM WEIGHT

CLASS H3 GIRTS HEAVY WEIGHT
Structural steel, shop fabricated from rolled section or equivalent weights greater
than 61 kg/m, up to and including 90 kg/m with shop attached appurtenances, base
plates, plates, stiffeners, rolled shapes and clips per applicable ASTM excluding
field bolt. This definition applies to line item H3.


H3 Tonne CLASS H3 GIRTS HEAVY WEIGHT

CLASS J1 PURLINS LIGHT WEIGHT
Structural steel, shop fabricated from rolled section or equivalent weights greater
than 0 kg/m, up to and including 30 kg/m with shop attached appurtenances, base
plates, plates, stiffeners, rolled shapes and clips per applicable ASTM excluding
field bolt. This definition applies to line item J 1.


J 1 Tonne CLASS J 1 PURLINS LIGHT WEIGHT

Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 2



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK
UNIT PAY CLASS SCHEDULE

This schedule of pay classes is valid ONLY for unit rate PO/Contracts
and for additions/deletions to scope of lump sum PO/Contracts


W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 8 of 16
Item Unit of
Measure
Pay Class Description
CLASS J2 PURLINS MEDIUM WEIGHT
Structural steel, shop fabricated from rolled section or equivalent weights greater
than 31 kg/m, up to and including 60 kg/m with shop attached appurtenances, base
plates, plates, stiffeners, rolled shapes and clips per applicable ASTM excluding
field bolt. This definition applies to line item J 2.


J 2 Tonne CLASS J 2 PURLINS MEDIUM WEIGHT

CLASS J3 PURLINS HEAVY WEIGHT
Structural steel, shop fabricated from rolled section or equivalent weights greater
than 61 kg/m, up to and including 90 kg/m with shop attached appurtenances, base
plates, plates, stiffeners, rolled shapes and clips per applicable ASTM excluding
field bolt. This definition applies to line item J 3


J 3 Tonne CLASS J 3 PURLINS HEAVY WEIGHT

14 CLASS 14 crane rail (Gantrex Weldable) clips crane tie down clamps and bolts,
nuts and washers. This definition applies to line items 14a-14g.


14a EA CLASS 14a WELDLOK 10
14b EA CLASS 14b WELDLOK 15
14c EA CLASS 14c WELDLOK 18
14d EA CLASS 14d WELDLOK 20
14e EA CLASS 14e WELDLOK 24
14f EA CLASS 14f WELDLOK 32
14g EA CLASS 14g WELDLOK 43

CLASS 15 STAIRS C/W 2 HANDRAILS
Structural steel, shop fabricated per standard drawing, stair treads to be shop
attached. This definition applies to line item 15.


15 Tonne CLASS 15 STAIRS C/W 2 HANDRAILS



Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 2



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK
UNIT PAY CLASS SCHEDULE

This schedule of pay classes is valid ONLY for unit rate PO/Contracts
and for additions/deletions to scope of lump sum PO/Contracts


W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 9 of 16
Item Unit of
Measure
Pay Class Description
CLASS 15 STAIR TREADS
Shop fabricated, and marked in accordance with project specifications. All welded
steel serrated grating 278 mm x 762 mm with 32 mm x 5 mm bearing bars, including
checkered nosing and side carrier plates with bolting holes, A307 bolts as required
with nuts and washers. Carrier plates to be in accordance with NAAM, (National
Association of Architectural Metals). Treads to be shop bolted to stair stringers. This
definition applies to line Item 15a, 15g.


15a EA CLASS 15a - STAIR TREADS

CLASS 16 FLOOR BAR GRATING
Welded , serrated steel bar grating to ASTM A569 with 32 mm x 5 mm bearing bars,
c/w banding at all openings. Grating to be connected to steel with removable saddle
clamps. Clamps to be included with 5% surplus. This definition refers to line items
16, 16g and 16gc.


16 Sq. m CLASS 16 BAR GRATING 32 mm DEEP
16gc ea CLASS 16gc GRATING CLAMPS, HILTI DIX FASTENERS
16s Sq. m CLASS 16s Bar GRATING 32mm DEEP SERRATED
16ssc ea CLASS 16ssc GRATING CLAMPS, STAINLESS G-CLAMPS

CLASS 17a HEAVY DUTY 51 mm DEEP GRATING
Welded , serrated steel bar grating to ASTM A569 with 51 mm x 6 mm bearing bars,
c/w banding at all openings. Grating to be connected to steel with removable saddle
clamps. Clamps to be included with 5% surplus. This definition refers to line items
17.


17a Sq. m CLASS 17 HEAVY DUTY 51 mm DEEP GRATING
17b HEAVY DUTY 76 mm DEEP GRATING
76 mm x 6 mm Bearing Bars
17c HEAVY DUTY 101 mm DEEP GRATINGS
101 mm x 6 mm Bearing Bars

CLASS 18 ROOF DECKING GALVANIZED, 22 Ga, 38 mm DEEP

18 Sq. m CLASS 18 ROOF DECKING GALVANIZED, 22 Ga, 38 mm DEEP

Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 2



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK
UNIT PAY CLASS SCHEDULE

This schedule of pay classes is valid ONLY for unit rate PO/Contracts
and for additions/deletions to scope of lump sum PO/Contracts


W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 10 of 16
Item Unit of
Measure
Pay Class Description
CLASS 19 FLOOR DECKING GALVANIZED, 20 Ga, 38 mm DEEP
Steel deck plate to ASTM A653 Grade A. 38 mm deep with ribs at 150 mm C/C
and a minimum thickness of 0.9 mm. Minimum properties Ix=275000 mm4/m and
Sx=12000 mm3/m. This definition refers to line items 19.


19 Sq. m CLASS 19 FLOOR DECKING GALVANIZED , 20 Ga, 38 mm DEEP

CLASS 20 FLOOR DECKING GALVANIZED, 20 Ga, 76 mm DEEP
Steel deck plate to ASTM A653 Grade A. 76 mm deep with ribs at 200 mm C/C
and a minimum thickness of 0.9 mm. Minimum properties Ix=1060000 mm4/m and
Sx=28500 mm3/m. This definition refers to line items 20.


20a Sq. m CLASS 20a FLOOR DECKING GALVANIZED , 20 Ga, 76 mm DEEP
20b Sq. m CLASS 20b FLOOR DECKING GALVANIZED, 18 Ga 76 mm DEEP

CLASS 21 STEEL DECK PLATE
Shop fabricated, 12 gauge shop welded to trusses, line item 21.

21 Sq. m CLASS 21 STEEL DECK PLATE (SHOP WELD TO TRUSSES)

CLASS 22 CHECKER PLATE
ASTM A786 6 mm raise pattern, shop fabricated flat or bent, c/w banding at all
openings. To be field welded unless noted to supporting steel including but not
limited to opening closures, seals, lifting eyes, and handles, and removable covers
with appurtenances. Provide 14 mm diameter holes per sq. m. This definition
applies to line item 22.


22 Sq. m CLASS 22 CHECKER PLATE

CLASS 23 GRIP STRUT WALKWAY
762 mm wide 11 gauge. Shop fabricated preformed, hot dip galvanized, ASTM
A525, G-90, 762 mm wide, 11 gauge, as manufactured by Fisher & Ludlow (ISG
safety GRIP walkway. This definition refers to line item 23.


23 Lin. m CLASS 23 GRIP STRUT. WALKWAY

Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 2



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK
UNIT PAY CLASS SCHEDULE

This schedule of pay classes is valid ONLY for unit rate PO/Contracts
and for additions/deletions to scope of lump sum PO/Contracts


W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 11 of 16
Item Unit of
Measure
Pay Class Description
CLASS 25 HANDRAIL C/W KICKPLATE
Shop fabricated, with bar kickplate, 102 mm x 6 mm, 2 rail fabricated from
38 mm dia. STD ASTM A53 Type E or S smooth pipe, including but not limited to
horizontal bar rails, vertical posts and all related items, as per Fluor standard
drawing line item 25.


25 Tonne CLASS 25 HANDRAIL C/W KICK PLATE

CLASS 26 LADDERS WITHOUT CAGES
Shop fabricated, line item 26.

26 Tonne CLASS 26 LADDER WITHOUT CAGE

CLASS 27 LADDERS WITH CAGES
Shop fabricated, line item 27.

27 Tonne CLASS 27 LADDER WITH CAGE

CLASS 28 SAFETY GATES
Shop fabricated, self closing for front or side entry ladder, with supporting angle
posts attachments, and appurtenances, per standard drawing 240K-C2-0000-15S-
103. This definition applies to the item 28.


28 EA CLASS 28 SAFETY GATE

FIELD BOLTS, CLASSES 29a THROUGH 30d
29a
through
30d
Tonne Field bolts Classes 29a through 30d shall be provided as required as indicated in
the project specifications. These are not to be included with other classes of
structural steel. All bolts, nuts, and washers are to be packaged and tagged. Unit
prices for all bolts are per type, by weight, independent of size.


CLASS 29a BOLTS, NUTS, & WASHERS ASTM A307
Bolts, nuts and washers, unfinished, in accordance with ASTM A307, Class C,
complete, including standard washers. Each container is to be clearly marked
"ASTM A307" for identification.


29a Tonne CLASS 29a BOLTS, NUTS & WASHERS ASTM A307
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 2



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK
UNIT PAY CLASS SCHEDULE

This schedule of pay classes is valid ONLY for unit rate PO/Contracts
and for additions/deletions to scope of lump sum PO/Contracts


W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 12 of 16
Item Unit of
Measure
Pay Class Description

CLASS 29b >2 DIA A307 ANCHORS BOLTS
2 dia and greater A307 anchor bolts c/w 2 HEX nuts and one flat washer as per
Fluor Standard Drawing 240K-C2-0000-15R-102.


29b Tonne CLASS 29b >2 DIA A307 ANCHOR BOLTS

CLASS 29c SAG RODS
<19 mm>Rod c/w 2- HEX Nut and 2- Dia Flat Washers. This definition
applies to item 29c.


29c Tonne CLASS 29c SAG RODS GALVANIZED

CLASS 30a BOLTS, NUTS & WASHERS ASTM A325
Bolts, nuts and washers, high strength, carbon steel, in accordance with ASTM
A325 per project specification. Each container is to be clearly marked, "ASTM A325"
for identification.


30 Tonne CLASS 30a BOLTS, NUTS & WASHERS ASTM A325

CLASS 30b BOLTS NUTS AND WASHERS ASTM F1852
Bolts, nuts and washers unfinished in accordance with ASTM F1852 per project
specification. Each container is to be clearly marked ASTM F1852 for
identification.


30b Tonne CLASS 30b BOLTS NUTS AND WASHERS ASTM F1852

CLASS 30c BOLTS NUTS AND WASHERS ASTM A490
Bolts, nuts and washers, high strength, unfinished in accordance with ASTM A490
per project specification. Each container to be clearly marked ASTM A490 for
identification.


30c Tonne CLASS 30c BOLTS NUTS AND WASHERS ASTM A490

CLASS 30d BOLTS NUTS AND WASHERS ASTM F2280
Bolts, nuts, and washers, high strength, unfinished in accordance with ASTM F2280
per project specification. Each container is to be clearly marked ASTM F2280 for
identification.

Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 2



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK
UNIT PAY CLASS SCHEDULE

This schedule of pay classes is valid ONLY for unit rate PO/Contracts
and for additions/deletions to scope of lump sum PO/Contracts


W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 13 of 16
Item Unit of
Measure
Pay Class Description

30d Tonne CLASS 30d BOLTS NUTS AND WASHERS ASTM F2280

CLASS 31 STAINLESS STEEL BOLTS, NUTS AND WASHERS
Bolts, nuts and washers, unfinished, in accordance with ASTM 316 or 304 as
applicable, complete, including standard washers. Each container is to be clearly
marked "ASTM 316" or "ASTM 304" for identification.


31 Tonne CLASS 31 STAINLESS STEEL BOLTS AND WASHERS

CLASS 32 CONVEYOR SLIDING CONNECTION ASSEMBLY
Conveyor sliding connection assembly as per Fluor standard drawing. Provide price
per unit. This definition applies to item 32.


32 EA CLASS 32 CONVEYOR SLIDING CONNECTION ASSEMBLY

CLASS 33 CONVEYOR FIXED CONNECTION ASSEMBLY
Conveyor fixed connection assembly as per Fluor standard drawing. Provide price
per unit. This definition applies to Item 33.


33 EA CLASS 33 CONVEYOR FIXED CONNECTION ASSEMBLY

CLASS F1 LIGHT STEEL CONVEYOR TRUSSES
Structural steel, shop fabricated from rolled section or equivalent weights 0 to 30
kg/m, including but not limited to items listed in the definition of Pay Class 4, as well
as brackets, access platforms, pipe and electrical code cable supports, equipment
and conduit supports. This definition applies to line item F1.


F1 Tonne CLASS F1 LIGHT STEEL CONVEYOR TRUSSES

CLASS F2 MEDIUM STEEL CONVEYOR TRUSSES
Structural steel, shop fabricated from rolled section or equivalent weights greater
than 31 kg/m, up to and including 60 kg/m, including but not limited to items listed
under the definition of Pay Class. This definition applies to line item F2.


F2 Tonne CLASS F2 MEDIUM STEEL CONVEYOR TRUSSES

Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 2



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK
UNIT PAY CLASS SCHEDULE

This schedule of pay classes is valid ONLY for unit rate PO/Contracts
and for additions/deletions to scope of lump sum PO/Contracts


W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 14 of 16
Item Unit of
Measure
Pay Class Description
CLASS F3 HEAVY STEEL CONVEYOR TRUSSES
Structural steel, shop fabricated from rolled section or equivalent weights greater
than 61 kg/m, up to and including 90 kg/m, including but not limited to items listed
under the definition of Pay Class. This definition applies to line item F3.


F3 Tonne CLASS F3 HEAVY STEEL CONVEYOR TRUSSES

CLASS G1 LIGHT FEEL OVERLAND CONVEYOR TABLES AND SUPPORTS
Structural steel, shop fabricated from rolled section or equivalent weights 0 to 30
kg/m, including but not limited to items listed in the definition of Pay Class 4, as well
as brackets, access platforms, pipe and electrical cable supports, equipment and
conduit supports. This definition applies to line item G1.


G1 Tonne CLASS G1 LIGHT STEEL OVERLAND CONVEYOR TABLES AND SUPPORTS



GLASS G2 MEDIUM STEEL OVERLAND CONVEYOR TABLES AND SUPPORTS
Structural steel, shop fabricated from rolled section or equivalent weights greater
than 31 kg/m, up to and including 60 kg/m, including but not limited to items listed
under the definition of Pay Class. This definition applies to line item G2.


G2 Tonne CLASS G2 MEDIUM STEEL OVERLAND CONVEYOR TABLES AND SUPPORTS

CLASS 34- COMBINED SECTIONS
Not applicable.

34 Tonne CLASS 34 COMBINED SECTIONS

CLASS 37a and 37b SHIM PLATES
As per ASTM A36.

37a Tonne CLASS 37a - IDLER SHIM PLATES
37b Tonne CLASS 37b - COMMON SHIM PLATES


Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 2



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK
UNIT PAY CLASS SCHEDULE

This schedule of pay classes is valid ONLY for unit rate PO/Contracts
and for additions/deletions to scope of lump sum PO/Contracts


W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 15 of 16
Item Unit of
Measure
Pay Class Description
CLASS 38a PRIMER PAINT
For touch-up at the job site, in addition to that required by project specification
primer paint. This definition applies to line items 38a.


38 Liter CLASS 38a PRIMER PAINT

CLASS 38b TOP COAT PAINT
For touch-up at the job site, in addition to that required by project specification top
coat paint. This definition applies to line items 38b.


38 Liter CLASS 38b TOP COAT PAINT

CLASSES 39 THRU 42
SHOP TESTING, is defined as additional work performed as a result of Buyer's
engineering direction over and above applicable AWS and project specifications. All
charges must be properly supported. This definition applies to line items 39 to 42.


39 Lin. m MAGNETIC PARTICLE TESTING
40 Lin. m ULTRASONIC TESTING, (UT), GROOVE WELDS
41 Sq. m ULTRASONIC TESTING, (UT), SURFACE SCAN
42 EA RADIOGRAPHIC TESTING, PER FILM

Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 2



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK
UNIT PAY CLASS SCHEDULE

This schedule of pay classes is valid ONLY for unit rate PO/Contracts
and for additions/deletions to scope of lump sum PO/Contracts


W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 16 of 16
Item Unit of
Measure
Pay Class Description
CLASSES 43 THRU 46
SHOP REWORK - Labor for shop rework shall be at the unit rates listed in line items
43, 44 and shall apply to all contract steel pay classes. Material for shop rework
shall be chargeable at the unit prices in the respective pay classes for fabrication.
Invoices for shop rework shall be submitted separately by release and shall include
supporting documentation, to include reasons for rework, records of Buyer's
directives causing such rework, time cards, status of work at time of receipt of
change directive, and pertinent drawings.

SHOP REWORK is defined as additional work performed in the Seller's shop
required as a result of revisions at Buyer's direction, to completed or partially
completed work. Unit prices for shop rework include all overhead and supervision
required to revise completed or partially completed fabrication.


43 HR SHOP REWORK - FABRICATION
44 HR SHOP REWORK - PAINTING (INCLUDING SURFACE PREPARATION)
45 HR DETAILING AND ENGINEERING
46 HR SITE REPRESENTATIVE

CLASS 47 SHEAR STUDS FOR FIELD WELDING
47 EA CLASS 47 SHEAR STUDS FOR FIELD WELDING



Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 3



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 1 of 6
Attachment 3 - Unit Rate Pay Class Schedule
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 3



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 2 of 6




This page is intentionally blank.

Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 3



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 3 of 6
Unit Rate Pay Class Schedule
The following table outlines the unit rate pay classes used during the bid process as well as invoicing for the
structural steel contract. A complete detailed description and/or outline will also be included in all RFQs and
structural steel contracts.
Class Description Criteria Units
Structural Steel (Include Painting Where Required)
BEAMS
A1 Light weight 0 to 30 kg/m metric ton
A2 Medium Weight 31 to 60 kg/m metric ton
A3 Heavy Weight 61 to 90 kg/m metric ton
A4 X Heavy Weight 91 to 180 kg/m metric ton
A5 XX Heavy Weight 181 to 360 kg/m metric ton
A6 XXX Heavy Weight over 361 kg/m (except J umbos) metric ton
A7 J umbo Shape over 642 kg/m metric ton
COLUMNS
B1 Light weight 0 to 30 kg/m metric ton
B2 Medium Weight 31 to 60 kg/m metric ton
B3 Heavy Weight 61 to 90 kg/m metric ton
B4 X Heavy Weight 91 to 180 kg/m metric ton
B5 XX Heavy Weight 181 to 360 kg/m metric ton
B6 XXX Heavy Weight over 361 kg/m (except J umbos) metric ton
B7 J umbo Shape over 642 kg/m metric ton
VERTICAL BRACING
C1 Light weight 0 to 30 kg/m metric ton
C2 Medium Weight 31 to 60 kg/m metric ton
C3 Heavy Weight 61 to 90 kg/m metric ton
C4 X Heavy Weight 91 to 180 kg/m metric ton
C5 XX Heavy Weight over 181 kg/m metric ton
HORIZONTAL BRACING
D1 Light weight 0 to 30 kg/m metric ton
D2 Medium Weight 31 to 60 kg/m metric ton
D3 Heavy Weight 61 to 90 kg/m metric ton
D4 X Heavy Weight 91 to 180 kg/m metric ton
D5 XX Heavy Weight over 181 kg/m metric ton
3 PLATE BEAMS AND COLUMNS
E4 X Heavy Weight 91 to 180 kg/m metric ton
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 3



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 4 of 6
Class Description Criteria Units
E5 XX Heavy Weight 181 to 360 kg/m metric ton
E6 XXX Heavy Weight over 361 kg/m (except J umbos) metric ton
E7 J umbo Shape over 642 kg/m metric ton
CONVEYOR TRUSSES
F1 Light weight 0 to 30 kg/m metric ton
F2 Medium Weight 31 to 60 kg/m metric ton
F3 Heavy Weight over 90 kg/m metric ton
OVERLAND CONVEYOR TABLES & SUPPORTS
G1 Light weight 0 to 30 kg/m metric ton
G2 Medium Weight over 60 kg/m metric ton
GIRTS
H1 Light weight 0 to 30 kg/m metric ton
H2 Medium Weight 31 to 60 kg/m metric ton
H3 Heavy Weight 61 to 90 kg/m metric ton
PURLINS
J 1 Light weight 0 to 30 kg/m metric ton
J 2 Medium Weight 31 to 60 kg/m metric ton
J 3 Heavy Weight 61 to 90 kg/m metric ton
MISC. FRAMES <200KG & COUNTERWEIGHT FRAMES
K1 Light weight 0 to 30 kg/m metric ton
K2 Medium Weight 31 to 60 kg/m metric ton
K3 Heavy Weight 61 to 90 kg/m metric ton
K4 Counterweight Plates metric ton
8 Monorail beams metric ton
9 Shop Built Roof Trusses metric ton
12a Plateworks, Bins & Hoppers 7.9 mm (5/16 inch) metric ton
12b Plateworks, Bins & Hoppers 9.5 mm (3/8 inch) metric ton
12c Plateworks, Bins & Hoppers 12.7 mm (1/2 inch) metric ton
12d Plateworks, Bins & Hoppers 15.9 mm (5/8 inch) metric ton
13a Crane Rail w/splices (40#) metric ton
13b Crane Rail w/splices (60#) metric ton
13c Crane Rail w/splices (85#) metric ton
13d Crane Rail w/splices (104#) metric ton
13e Crane Rail w/splices (135#) metric ton
13f Crane Rail w/splices (171#) metric ton
13g Crane Rail w/splices (175#) metric ton
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 3



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 5 of 6
Class Description Criteria Units
14a Gantrex Weldable Rail Clips Weldlok 10 each
14b Gantrex Weldable Rail Clips Weldlok 15 each
14c Gantrex Weldable Rail Clips Weldlok 18 each
14d Gantrex Weldable Rail Clips Weldlok 20 each
14e Gantrex Weldable Rail Clips Weldlok 24 each
14f Gantrex Weldable Rail Clips Weldlok 32 each
14g Gantrex Weldable Rail Clips Weldlok 43 each
15 Stairs c/w 2 handrails metric ton
15a Stair Treads 32x5 bearing bars (1.25 inch
deep), price with one shop coat
primer only, shop bolted to
stringers
each
16 Floor Grating 32x5 bearing bars (1.25 inch
deep), price with one shop coat
primer only
m2
16s Floor Grating Serrated 32x5 bearing bars (1.25 inch
deep), price with one shop coat
primer only
m2
16gc Grating Clamps (Hilti DIX Fasteners) Not included in 16 or 16g above each
16ssc Grating Clamps (Stainless G-Clips) Not included in 16 or 16g above each
17a Heavy duty 2" deep grating (51mm deep) Price with one shop coat primer
only
m2
17b Heavy duty 3" deep grating (76mm deep) Price with one shop coat primer
only
m2
17c Heavy duty 4" deep grating (102mm deep) Price with one shop coat primer
only
m2
18 Roof Decking Galvanized 38 deep x 0.76 (22 ga 1.5 inch
deep)
m2
19 Roof/Floor Deck Galvanized 38 deep x 0.91 (20 ga 1.5 inch
deep)
m2
20a Roof/Floor Deck Galvanized 76 deep x 0.91 (20 ga 3 inch
deep)
m2
20b Roof/Floor Deck Galvanized 76 deep x 1.22 (18 ga 3 inch
deep)
m2
21 Deck Plate 2.67 mm (12 ga) m2
22 Checker Plate 6.4 mm (1/4 inch) m2
23 Grip Strut Walkway 762 wide x 127 deep x 3.13
galvanized (2.5 foot wide 11 ga)
lin m
25 Handrail c/w kickplate metric ton
26 Ladder without Cage metric ton
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 3



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 6 of 6
Class Description Criteria Units
27 Ladder with Cage metric ton
28 Safety Gate each
29a Bolts, Nuts & washers ASTM A307 metric ton
29b Bolts, Nuts & washers(Anchor Bolt) ASTM A307 metric ton
29c Sag rods, galvanized, nuts & washers ASTM A307 metric ton
30a Bolts, Nuts & washers ASTM A325 metric ton
30b Bolts, Nuts & washers ASTM F1852 twist off metric ton
30c Bolts, Nuts & washers ASTM A490 metric ton
30d Bolts, Nuts & washers ASTM F2280 twist off metric ton
31 Stainless steel Bolts, Nuts & Washers metric ton
32 Conveyor Sliding Connection Assembly each
33 Conveyor Fixed Connection Assembly each
34 Fabreeka impact absorbing pads 100 x 100 x 50 (size to be
confirmed)
each
37a Idler Shim Plates metric ton
37b Common Shim Plates metric ton
38a Paint Primer Touch-up paint liter
38b Paint Touch-up Paint liter
39 Magnetic Particle Testing lin m
40 Ultrasonic Testing, UT, groove welds lin m
41 Ultrasonic Testing, UT, surface scan m2
42 Radiographic Testing, per film hour
43 Shop Rework - Fabrication hour
44 Shop Rework - Painting hour
45 Shop Rework - Detailing and Engineering hour
46 Site Representative day
47 Shear Studs for Field Weld each

Note: Connection material included in tonnages

Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 4



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 1 of 4
Attachment 4 Steel Delivery Schedule

Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 4



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 2 of 4





This page is intentionally blank.
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 4



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 3 of 4

Structural Steel Key Fabrication Dates and Estimated Quantities
WBS Description WBI IFP IFC RTS Tonnage
3110 Primary Crusher 1 131A01AAC2 16-Dec-13 13-J an-14 5-May-14 59.0
3110 Primary Crusher 2 131D01AAC2 15-Sep-13 13-Oct-13 2-Feb-14 59.0
3120 Coarse Ore Conveyor 012 Drives 131C12AAC2 28-Aug-13 25-Sep-13 15-J an-14 95.4
3120 Coarse Ore Conveyor 012 Trusses 131C12AAC4 28-Aug-13 25-Sep-13 15-J an-14 286.2
3120 Coarse Ore Conveyor 022 Drives 131C22AAC2 17-May-13 14-J un-13 4-Oct-13 95.4
3120 Coarse Ore Conveyor 022 Trusses 131C22AAC4 17-May-13 14-J un-13 4-Oct-13 286.2
3210 Coarse Ore Conveyor 013 Drives 132C13AAC2 30-J un-13 28-J ul-13 17-Nov-13 23.2
3210 Coarse Ore Conveyor 013 Trusses 132C13AAC4 30-J un-13 28-J ul-13 17-Nov-13 69.5
3210 Coarse Ore Conveyor 023 Drives 132C23AAC2 19-Mar-13 16-Apr-13 6-Aug-13 23.2
3210 Coarse Ore Conveyor 023 Trusses 132C23AAC4 19-Mar-13 16-Apr-13 6-Aug-13 69.5
3210 Coarse Ore Reclaim Tunnel 1 132U01AAC2 23-J an-14 20-Feb-14 12-J un-14 10.4
3210 Coarse Ore Reclaim Tunnel 2 132U02AAC2 9-J an-14 6-Feb-14 29-May-14 6.4
3220 Screening Conveyor 016 Drives 132C16AAC2 1-J an-13 29-J an-13 21-May-13 104.8
3220 Screening Conveyor 016 Trusses 132C16AAC4 1-J an-13 29-J an-13 21-May-13 314.3
3220 Screening Conveyor 026 Drives 132C26AAC2 1-J an-13 29-J an-13 21-May-13 104.8
3220 Screening Conveyor 026 Trusses 132C26AAC4 1-J an-13 29-J an-13 21-May-13 314.3
3230 Screening Conveyor 017 Drives 132C17AAC2 1-J an-13 29-J an-13 21-May-13 97.3
3230 Screening Conveyor 017 Trusses 132C17AAC4 1-J an-13 29-J an-13 21-May-13 291.8
3230 Screening Conveyor 018 Drives 132C18AAC2 1-J an-13 29-J an-13 21-May-13 311.8
3230 Screening Conveyor 027 Drives 132C27AAC2 1-J an-13 29-J an-13 21-May-13 97.3
3230 Screening Conveyor 027 Trusses 132C27AAC4 1-J an-13 29-J an-13 21-May-13 291.8
3230 Screening Conveyor 028 Drives 132C28AAC2 1-J an-13 29-J an-13 21-May-13 411.4
3230 Screening Conveyor 050-055 (HPGR Feed) 132C50AAC4 1-J an-13 29-J an-13 21-May-13 50.0
3240 Screening Conveyor 015 132C15AAC2 17-Dec-12 14-J an-13 6-May-13 121.2
3240 Screening Conveyor 025 Drives 132C25AAC2 17-Dec-12 14-J an-13 6-May-13 121.2
3240 Screening Conveyor 031 Drives 132C31AAC2 17-Dec-12 14-J an-13 6-May-13 401.7
3240 Screening Conveyor 041 Drives 132C41AAC2 20-J an-13 14-J an-13 6-May-13 401.7
3310 Fine Ore Bin Lower Platforms 133A01AAC2 20-J an-13 17-Feb-13 9-J un-13 166.9
3310 Fine Ore Bin Towers and Stairs 133A01AAC4 17-Feb-13 17-Mar-13 7-J ul-13 166.9
3310 Fine Ore Bin Tripper Platforms 133A01ACC2 17-Mar-13 14-Apr-13 4-Aug-13 667.7
3310 Grinding Conveyor 019 Drives 133C19AAC2 7-J ul-13 4-Aug-13 24-Nov-13 30.1
3310 Grinding Conveyor 019 Trusses 133C19AAC4 7-J ul-13 4-Aug-13 24-Nov-13 90.2
3310 Grinding Conveyor 029 Drives 133C29AAC2 18-Dec-13 15-J an-14 7-May-14 35.0
3310 Grinding Conveyor 029 Trusses 133C29AAC4 18-Dec-13 15-J an-14 7-May-14 104.9
3310 Grinding Conveyor 060-065 133C60BAC2 17-Feb-13 17-Mar-13 7-J ul-13 55.6
3310 Grinding Conveyor 066-071 133C66BAC2 17-Feb-13 17-Mar-13 7-J ul-13 55.6
3410 Flotation Base Plates 234A00AAC1 14-J un-13 12-J ul-13 1-Nov-13 14.0
3410 Flotation 234A00AAC2 14-J un-13 12-J ul-13 1-Nov-13 265.6
3410 Flotation Crane Trusses 234A00AAC4 12-J ul-13 9-Aug-13 29-Nov-13 265.6
3410 Flotation Sampling 234A03AAC2 9-Aug-13 6-Sep-13 27-Dec-13 76.9
3410 Flotation Cell Platforms 234A03EAC2 9-Aug-13 6-Sep-13 27-Dec-13 76.9
3410 Flotation Piperacks 234A06AAC3 9-Aug-13 6-Sep-13 27-Dec-13 69.1
3420 Regrind 234B02AAC1 18-Aug-13 15-Sep-13 5-J an-14 452.3
3420 Regrind Floors 234B02AAC2 1-Sep-13 29-Sep-13 19-J an-14 361.8
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 4



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C.doc Page 4 of 4
Structural Steel Key Fabrication Dates and Estimated Quantities
WBS Description WBI IFP IFC RTS Tonnage
3420 Regrind Piperacks 234B05AAC3 15-Sep-13 13-Oct-13 2-Feb-14 21.1
3430 Column Flotation 234B01AAC2 18-Aug-13 15-Sep-13 5-J an-14 90.5
3510 Moly Plant 235D00AAC1 7-Aug-13 4-Sep-13 25-Dec-13 584.1
3510 Moly Plant Platforms/Stairs 235D00AAC2 24-J ul-13 21-Aug-13 11-Dec-13 584.1
3510
Moly Plant / Concentrate Thickening /
Filtering Piperacks
235F00AAC3 10-J ul-13 7-Aug-13 27-Nov-13 54.7
3610 Concentrate Thickening Storage Platform 236D00AAC2 28-Oct-13 25-Nov-13 17-Mar-14 216.5
3620 Concentrate Filter Building 236E01AAC2 10-Sep-13 8-Oct-13 28-J an-14 367.2
3630 Concentrate Storage / Loadout 236E02AAC2 6-Feb-14 6-Mar-14 26-J un-14 32.8
3710 Tailing Thickening Recycle Water Chamber 237A05AAC2 25-Dec-13 22-J an-14 14-May-14 965.6
3710 Tailing Thickening Launder and Sampler 237A08AAC2 8-J an-14 5-Feb-14 28-May-14 184.0
3710 Tailing Thickening Piperack 237A09AAC2 29-J an-14 26-Feb-14 18-J un-14 40.4
3810 Tailing Handling System 338A00AAC2 21-Feb-13 21-Mar-13 11-J ul-13 122.6
3820 Tailing Cyclone Facility 338B00AAC2 5-Aug-13 2-Sep-13 23-Dec-13 153.7
3830 Tailing Distribution System 338D00AAC2 23-Oct-13 20-Nov-13 12-Mar-14 491.8
3840 Reclaim Water System 338E00AAC2 1-Nov-13 29-Nov-13 21-Mar-14 69.8
3850 Seepage Water System 338F00AAC2 5-J an-14 2-Feb-14 25-May-14 13.8
3910 Reagent System Tank Platforms 239B00AAC2 10-J un-13 8-J ul-13 28-Oct-13 3.0
3910 Reagent System Piperack 239B10AAC3 10-J un-13 8-J ul-13 28-Oct-13 3.0
3920 Lime System Platforms 239A00AAC2 11-Sep-13 9-Oct-13 29-J an-14 3.6
3920 Lime System Piperacks 239A03AAC3 11-Sep-13 9-Oct-13 29-J an-14 3.6
5100 Fresh Water System 551Z00AAC2 15-Nov-12 13-Dec-12 4-Apr-13 28.3
5220 Electrical 220kV Main Substation 352B00AAC1 1-Apr-13 29-Apr-13 19-Aug-13 28.7
5230 Electrical (Mat'l Handling) Substation 352E00AAC1 1-Apr-13 29-Apr-13 19-Aug-13 28.7
5720 Truck Shop 357Z00AAC1 8-Sep-13 6-Oct-13 26-J an-14 86.0
6220 Concentrator Site Roads 0.0
11,651.2







Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 5



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-STRUCTURAL\240K-C2-SW-15-008_PERUVIANFABRICATION\240K-C2-SW-15-008-C.DOC
Attachment 5 Structural Steel Quantity Estimate
Sociedad Minera Cerro Verde S.A.A. Document No. 240K-C2-SW-15-008
Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 5



FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL, PERUVIAN PACKAGE SCOPE OF WORK

W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-STRUCTURAL\240K-C2-SW-15-008_PERUVIANFABRICATION\240K-C2-SW-15-008-C.DOC





This page is intentionally blank.





Sociedad Minera Cerro Verde S.A.A.
Cerro Verde Production Unit Expansion
Project No. A6CV
240K-C2-SW-15-008
Revision A
Attachment 5
Pay
Class Description Units Total
1
3
1
A
0
1
A
A
C
2

P
r
i
m
a
r
y

C
r
u
s
h
e
r

1
1
3
1
C
1
2
A
A
C
2

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
1
2

D
r
i
v
e
s
1
3
1
C
1
2
A
A
C
4

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
1
2

T
r
u
s
s
e
s
1
3
1
C
2
2
A
A
C
2

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
2
2

D
r
i
v
e
s
1
3
1
C
2
2
A
A
C
4

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
2
2

T
r
u
s
s
e
s
1
3
1
D
0
1
A
A
C
2

P
r
i
m
a
r
y

C
r
u
s
h
e
r

2
1
3
2
C
1
3
A
A
C
2

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
1
3

D
r
i
v
e
s
1
3
2
C
1
3
A
A
C
4

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
1
3

T
r
u
s
s
e
s
1
3
2
C
1
5
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
5
1
3
2
C
1
6
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
6

D
r
i
v
e
s
1
3
2
C
1
6
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
6

T
r
u
s
s
e
s
1
3
2
C
1
7
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
7

D
r
i
v
e
s
1
3
2
C
1
7
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
7

T
r
u
s
s
e
s
1
3
2
C
1
8
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
8

D
r
i
v
e
s
1
3
2
C
2
3
A
A
C
2

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
2
3

D
r
i
v
e
s
1
3
2
C
2
3
A
A
C
4

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
2
3

T
r
u
s
s
e
s
1
3
2
C
2
5
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
5

D
r
i
v
e
s
1
3
2
C
2
6
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
6

D
r
i
v
e
s
BEAMS
A1 Structural Steel, Light <= 30 kg/m t 475.9
A1a Structural Steel, Light <= 30 kg/m, Unpainted t 172.7 6.6 2.8 2.8 6.6 4.2 5.5 5.5 6.0 13.9 4.2 5.5 5.5
A2 Structural Steel, Medium, 30 < kg/m <= 60 t 550.8
A2a Structural Steel, Medium, 30 < kg/m <= 60, Unpainted t 492.1 10.8 16.2 16.2 10.8 3.9 21.9 16.9 12.7 41.5 3.9 21.9 16.9
A3 Structural Steel, Heavy, 60 < kg/m <= 90 t 550.1
A3a Structural Steel, Heavy, 60 < kg/m <= 90, Unpainted t 127.1 6.1 10.8 10.8 6.1 1.4 0.6 0.6 23.7 1.4 0.6
A4 Structural Steel, X Heavy, 91 < kg/m <= 180 t 498.0
A4a Structural Steel, X Heavy, 91 < kg/m <= 180, Unpainted t 376.3 14.6 14.6 3.1 7.9 8.1 8.7 3.1 7.9
A5 Structural Steel, XX Heavy, 181 < kg/m <= 360 t 458.9 0.4 0.3 1.0 0.3 1.0 1.2 0.4 0.3
A5a Structural Steel, XX Heavy, 181 < kg/m <= 360, Unpainted t 584.7 21.1 15.5 46.6 16.8 50.3 59.6 21.1 15.5
A6 Structural Steel, XXX Heavy > 360 kg/m t 44.7
A6a Structural Steel, XXX Heavy > 360 kg/m, Unpainted t 113.6
A7 Structural Steel, Jumbo Shape, > 642 kg/m t
COLUMNS
B1 Structural Steel, Light <= 30 kg/m t 461.9
B1a Structural Steel, Light <= 30 kg/m, Unpainted t 167.7 6.4 2.8 2.8 6.4 4.1 5.3 5.3 5.8 13.5 4.1 5.3 5.3
B2 Structural Steel, Medium, 30 < kg/m <= 60 t 244.8
B2a Structural Steel, Medium, 30 < kg/m <= 60, Unpainted t 218.7 4.8 7.2 7.2 4.8 1.7 9.8 7.5 5.7 18.5 1.7 9.8 7.5
B3 Structural Steel, Heavy, 60 < kg/m <= 90 t 165.9
B3a Structural Steel, Heavy, 60 < kg/m <= 90, Unpainted t 38.3 1.8 3.3 3.3 1.8 0.4 0.2 0.2 7.2 0.4 0.2
B4 Structural Steel, X Heavy, 91 < kg/m <= 180 t 337.6
B4a Structural Steel, X Heavy, 91 < kg/m <= 180, Unpainted t 255.1 9.9 9.9 2.1 5.3 5.5 5.9 2.1 5.3
B5 Structural Steel, XX Heavy, 181 < kg/m <= 360 t 318.9 0.3 0.2 0.7 0.2 0.7 0.8 0.3 0.2
B5a Structural Steel, XX Heavy, 181 < kg/m <= 360, Unpainted t 406.3 14.7 10.8 32.4 11.7 35.0 41.4 14.7 10.8
B6 Structural Steel, XXX Heavy > 360 kg/m t 67.1
B6a Structural Steel, XXX Heavy > 360 kg/m, Unpainted t 170.4
B7 Structural Steel, Jumbo Shape, > 642 kg/m t
VERTICAL BRACING
C1 Structural Steel, Light <= 30 kg/m t 154.0
C1a Structural Steel, Light <= 30 kg/m, Unpainted t 55.9 2.1 0.9 0.9 2.1 1.4 1.8 1.8 1.9 4.5 1.4 1.8 1.8
C2 Structural Steel, Medium, 30 < kg/m <= 60 t 397.8
C2a Structural Steel, Medium, 30 < kg/m <= 60, Unpainted t 355.4 7.8 11.7 11.7 7.8 2.8 15.8 12.2 9.2 30.0 2.8 15.8 12.2
C3 Structural Steel, Heavy, 60 < kg/m <= 90 t 157.2
C3a Structural Steel, Heavy, 60 < kg/m <= 90, Unpainted t 36.3 1.7 3.1 3.1 1.7 0.4 0.2 0.2 6.8 0.4 0.2
C4 Structural Steel, X Heavy, 91 < kg/m <= 180 t 8.4
C4a Structural Steel, X Heavy, 91 < kg/m <= 180, Unpainted t 6.4 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1
C5 Structural Steel, XX Heavy, > 181 kg/m t 0.0
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C_Att 5.xls
Page 1 of 16
Sociedad Minera Cerro Verde S.A.A.
Cerro Verde Production Unit Expansion
Project No. A6CV
240K-C2-SW-15-008
Revision A
Attachment 5
Pay
Class Description Units Total
1
3
1
A
0
1
A
A
C
2

P
r
i
m
a
r
y

C
r
u
s
h
e
r

1
1
3
1
C
1
2
A
A
C
2

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
1
2

D
r
i
v
e
s
1
3
1
C
1
2
A
A
C
4

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
1
2

T
r
u
s
s
e
s
1
3
1
C
2
2
A
A
C
2

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
2
2

D
r
i
v
e
s
1
3
1
C
2
2
A
A
C
4

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
2
2

T
r
u
s
s
e
s
1
3
1
D
0
1
A
A
C
2

P
r
i
m
a
r
y

C
r
u
s
h
e
r

2
1
3
2
C
1
3
A
A
C
2

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
1
3

D
r
i
v
e
s
1
3
2
C
1
3
A
A
C
4

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
1
3

T
r
u
s
s
e
s
1
3
2
C
1
5
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
5
1
3
2
C
1
6
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
6

D
r
i
v
e
s
1
3
2
C
1
6
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
6

T
r
u
s
s
e
s
1
3
2
C
1
7
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
7

D
r
i
v
e
s
1
3
2
C
1
7
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
7

T
r
u
s
s
e
s
1
3
2
C
1
8
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
8

D
r
i
v
e
s
1
3
2
C
2
3
A
A
C
2

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
2
3

D
r
i
v
e
s
1
3
2
C
2
3
A
A
C
4

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
2
3

T
r
u
s
s
e
s
1
3
2
C
2
5
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
5

D
r
i
v
e
s
1
3
2
C
2
6
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
6

D
r
i
v
e
s
HORIZONTAL BRACING 0.0
D1 Structural Steel, Light <= 30 kg/m t 307.9
D1a Structural Steel, Light <= 30 kg/m, Unpainted t 111.8 4.3 1.8 1.8 4.3 2.7 3.5 3.5 3.9 9.0 2.7 3.5 3.5
D2 Structural Steel, Medium, 30 < kg/m <= 60 t 336.6
D2a Structural Steel, Medium, 30 < kg/m <= 60, Unpainted t 300.7 6.6 9.9 9.9 6.6 2.4 13.4 10.3 7.8 25.4 2.4 13.4 10.3
D3 Structural Steel, Heavy, 60 < kg/m <= 90 t
D4 Structural Steel, X Heavy, 91 < kg/m <= 180 t
D5 Structural Steel, XX Heavy, > 181 kg/m t
3 PLATE BEAMS AND COLUMNS
E4 Structural Steel, X Heavy, 91 < kg/m <= 180 t 0.0
E5 Structural Steel, XX Heavy, 181 < kg/m <= 360 t 0.0
E6 Structural Steel, XXX Heavy, > 361 kg/m (except Jumbos) t 0.0
E7 Structural Steel, Jumbo Shape, > 642 kg/m t 0.0
CONVEYOR TRUSSES,
F1 Structural Steel, Light weight, 0 to 30 kg/m t 380.7 25.0 25.0 36.9 48.2 52.9 36.9
F2 Structural Steel, Medium Weight, 31 to 60 kg/m t 1,003.1 135.3 135.3 32.7 140.9 106.2 32.7
F3 Structural Steel, Heavy Weight, over 90 kg/m t 475.8 125.8 125.8 42.8 43.8
OVERLAND CONVEYOR TABLES & SUPPORTS,
G1 Structural Steel, Light, <= 30 kg/m t 0.0
G2 Structural Steel, Medium Weight, over 60 kg/m t 0.0
GIRTS,
H1 Structural Steel, Light <= 30 kg/m t 0.0
H2 Structural Steel, Medium Weight, 31 to 60 kg/m t 0.0
H3 Structural Steel, Heavy Weight, 61 to 90 kg/m t 0.0
PURLINS,
J1 Structural Steel, Light <= 30 kg/m t 0.0
J2 Structural Steel, Medium Weight, 31 to 60 kg/m t 0.0
J3 Structural Steel, Heavy Weight, 61 to 90 kg/m t 0.0
MISC. FRAMES < 200KG & COUNTERWEIGHT FRAMES,
K1 Misc Steel, Light <= 30 kg/m t 249.9
K1a Misc Steel, Light <= 30 kg/m, Unpainted t 15.0 0.6 1.9 0.6 1.9 0.6
K2 Misc Steel, Medium, 30 < kg/m <= 60 t 0.0
K3 Misc Steel, Heavy, 60 < kg/m t 0.0
K4 Counterweight Plates t 0.0
Sub-Totals t 11,650.2 59.0 95.4 286.2 95.4 286.2 59.0 23.2 69.5 121.2 104.7 314.2 97.3 291.8 311.8 23.2 69.5 121.2 104.7
12a Plateworks, Bins & Hoppers, 7.9 mm (5/16 inch) t 0.0
12b Plateworks, Bins & Hoppers, 9.5 mm (3/8 inch) t 0.0
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C_Att 5.xls
Page 2 of 16
Sociedad Minera Cerro Verde S.A.A.
Cerro Verde Production Unit Expansion
Project No. A6CV
240K-C2-SW-15-008
Revision A
Attachment 5
Pay
Class Description Units Total
1
3
1
A
0
1
A
A
C
2

P
r
i
m
a
r
y

C
r
u
s
h
e
r

1
1
3
1
C
1
2
A
A
C
2

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
1
2

D
r
i
v
e
s
1
3
1
C
1
2
A
A
C
4

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
1
2

T
r
u
s
s
e
s
1
3
1
C
2
2
A
A
C
2

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
2
2

D
r
i
v
e
s
1
3
1
C
2
2
A
A
C
4

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
2
2

T
r
u
s
s
e
s
1
3
1
D
0
1
A
A
C
2

P
r
i
m
a
r
y

C
r
u
s
h
e
r

2
1
3
2
C
1
3
A
A
C
2

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
1
3

D
r
i
v
e
s
1
3
2
C
1
3
A
A
C
4

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
1
3

T
r
u
s
s
e
s
1
3
2
C
1
5
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
5
1
3
2
C
1
6
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
6

D
r
i
v
e
s
1
3
2
C
1
6
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
6

T
r
u
s
s
e
s
1
3
2
C
1
7
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
7

D
r
i
v
e
s
1
3
2
C
1
7
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
7

T
r
u
s
s
e
s
1
3
2
C
1
8
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
8

D
r
i
v
e
s
1
3
2
C
2
3
A
A
C
2

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
2
3

D
r
i
v
e
s
1
3
2
C
2
3
A
A
C
4

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
2
3

T
r
u
s
s
e
s
1
3
2
C
2
5
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
5

D
r
i
v
e
s
1
3
2
C
2
6
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
6

D
r
i
v
e
s
12c Plateworks, Bins & Hoppers, 12.7 mm (1/2 inch) t 0.0
12d Plateworks, Bins & Hoppers, 15.9 mm (5/8 inch) t 6.7
13a Crane Rail w/splices (40#) t 0.6
13b Crane Rail w/splices (60#) t 19.7
13c Crane Rail w/splices (85#) t 31.6
13d Crane Rail w/splices (104#) t 0.0
13e Crane Rail w/splices (135#) t 0.0
13f Crane Rail w/splices (171#) t 0.0
13g Crane Rail w/splices (175#) t 0.0
14a Gantrex Weldable Rail Clips, Weldlok 10 each 0.0
14b Gantrex Weldable Rail Clips, Weldlok 15 each 0.0
14c Gantrex Weldable Rail Clips, Weldlok 18 each 0.0
14d Gantrex Weldable Rail Clips, Weldlok 20 each 0.0
14e Gantrex Weldable Rail Clips, Weldlok 24 each 0.0
14f Gantrex Weldable Rail Clips, Weldlok 32 each 0.0
14g Gantrex Weldable Rail Clips, Weldlok 43 each 0.0
15 Stairs w/ Handrail & Kickplates t 238.6 6.3 0.7 2.0 0.7 2.0 6.3 0.3 1.0 3.2 2.1 6.4 2.1 6.4 10.7 0.3 1.0 3.2 2.1
15a
Stair Treads , 32x5 bearing bars (1.25 inch deep), price with
one shop coat primer only, shop bolted to stringers
each 0.0
16
Floor Grating, 32x5 bearing bars (1.25 inch deep), price with
one shop coat primer only
m2 15,657.0 171.2 56.8 170.3 56.8 170.3 171.2 60.0 180.0 254.5 64.5 193.5 97.0 291.0 644.0 60.0 180.0 254.5 64.5
16s
Floor Grating Serrated, 32x5 bearing bars (1.25 inch deep),
price with one shop coat primer only
m2 0.0
16gc
Grating Clamps (Hilti DIX Fasteners), Not included in 16
above
each 0.0
16ssc
Grating Clamps (Stainless G-Clips), Not included in 16
above
each 0.0
17a
Heavy duty 2" deep grating (51mm deep) , Price with one
shop coat primer only
m2 172.9
17b
Heavy duty 3" deep grating (76mm deep) , Price with one
shop coat primer only
m2 0.0
17c
Heavy duty 4" deep grating (102mm deep) , Price with one
shop coat primer only
m2 0.0
18
Roof Decking Galvanized , 38 deep x 0.76 (22 ga 1.5 inch
deep)
m2 3,609.4
19
Roof/Floor Deck Galvanized , 38 deep x 0.91 (20 ga 1.5 inch
deep)
m2 0.0
20a
Roof/Floor Deck Galvanized , 76 deep x 0.91 (20 ga 3 inch
deep)
m2 0.0
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C_Att 5.xls
Page 3 of 16
Sociedad Minera Cerro Verde S.A.A.
Cerro Verde Production Unit Expansion
Project No. A6CV
240K-C2-SW-15-008
Revision A
Attachment 5
Pay
Class Description Units Total
1
3
1
A
0
1
A
A
C
2

P
r
i
m
a
r
y

C
r
u
s
h
e
r

1
1
3
1
C
1
2
A
A
C
2

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
1
2

D
r
i
v
e
s
1
3
1
C
1
2
A
A
C
4

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
1
2

T
r
u
s
s
e
s
1
3
1
C
2
2
A
A
C
2

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
2
2

D
r
i
v
e
s
1
3
1
C
2
2
A
A
C
4

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
2
2

T
r
u
s
s
e
s
1
3
1
D
0
1
A
A
C
2

P
r
i
m
a
r
y

C
r
u
s
h
e
r

2
1
3
2
C
1
3
A
A
C
2

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
1
3

D
r
i
v
e
s
1
3
2
C
1
3
A
A
C
4

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
1
3

T
r
u
s
s
e
s
1
3
2
C
1
5
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
5
1
3
2
C
1
6
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
6

D
r
i
v
e
s
1
3
2
C
1
6
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
6

T
r
u
s
s
e
s
1
3
2
C
1
7
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
7

D
r
i
v
e
s
1
3
2
C
1
7
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
7

T
r
u
s
s
e
s
1
3
2
C
1
8
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
1
8

D
r
i
v
e
s
1
3
2
C
2
3
A
A
C
2

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
2
3

D
r
i
v
e
s
1
3
2
C
2
3
A
A
C
4

C
o
a
r
s
e

O
r
e

C
o
n
v
e
y
o
r

0
2
3

T
r
u
s
s
e
s
1
3
2
C
2
5
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
5

D
r
i
v
e
s
1
3
2
C
2
6
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
6

D
r
i
v
e
s
20b
Roof/Floor Deck Galvanized , 76 deep x 1.22 (18 ga 3 inch
deep)
m2 0.0
21 Deck Plate, Steel, 12 Ga m2 263.1 10.0 30.0 10.0 30.0 10.0
22 Checker Plate, 64 mm Thk, Panel Assemblies m2 3,681.3 50.0 150.0 50.0 150.0 50.0
23 Walkway, Gripstrut m 0.0
25 Handrail w/ Kickplate, Pipe t 298.9 2.5 2.2 6.5 2.2 6.5 2.5 0.9 2.6 5.7 1.7 5.2 2.4 7.3 13.0 0.9 2.6 5.7 1.7
27 Ladder w/ Cage t 7.9
28 Safety Gate each 0.0
29a Bolts, Nuts & washers, ASTM A307 t 0.0
29b Bolts, Nuts & washers(Anchor Bolt), ASTM A307 t 0.0
29c Sag rods, galvanized, nuts & washers, ASTM A307 t 0.0
30a Bolts, Nuts & washers, ASTM A325 t 0.0
30b Bolts, Nuts & washers, ASTM F1852 twist off t 0.0
30c Bolts, Nuts & washers, ASTM A490 t 0.0
30d Bolts, Nuts & washers, ASTM F2280 twist off t 0.0
31 Stainless steel Bolts, Nuts & Washers t 0.0
32 Conveyor Sliding Connection Assembly t 0.0
33 Conveyor Fixed Connection Assembly t 0.0
34
Fabreeka impact absorbing pads, 100 x 100 x 50 (size to be
confirmed)
each 0.0
37a Idler Shim Plates t 0.0
37b Common Shim Plates t 0.0
38a Paint, Primer Touch-up paint liter 0.0
38b Paint, Touch-up Paint liter 0.0
39 Magnetic Particle Testing lin m 0.0
40 Ultrasonic Testing, UT, groove welds lin m 0.0
41 Ultrasonic Testing, UT, surface scan m2 0.0
42 Radiographic Testing, per film hour 0.0
43 Shop Rework - Fabrication hour 0.0
44 Shop Rework - Painting hour 0.0
45 Shop Rework - Detailing and Engineering hour 0.0
46 Site Representative day 0.0
47 Shear Studs for Field Weld each 0.0
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C_Att 5.xls
Page 4 of 16
Sociedad Minera Cerro Verde S.A.A.
Cerro Verde Production Unit Expansion
Project No. A6CV
240K-C2-SW-15-008
Revision A
Attachment 5
Pay
Class Description Units
BEAMS
A1 Structural Steel, Light <= 30 kg/m t
A1a Structural Steel, Light <= 30 kg/m, Unpainted t
A2 Structural Steel, Medium, 30 < kg/m <= 60 t
A2a Structural Steel, Medium, 30 < kg/m <= 60, Unpainted t
A3 Structural Steel, Heavy, 60 < kg/m <= 90 t
A3a Structural Steel, Heavy, 60 < kg/m <= 90, Unpainted t
A4 Structural Steel, X Heavy, 91 < kg/m <= 180 t
A4a Structural Steel, X Heavy, 91 < kg/m <= 180, Unpainted t
A5 Structural Steel, XX Heavy, 181 < kg/m <= 360 t
A5a Structural Steel, XX Heavy, 181 < kg/m <= 360, Unpainted t
A6 Structural Steel, XXX Heavy > 360 kg/m t
A6a Structural Steel, XXX Heavy > 360 kg/m, Unpainted t
A7 Structural Steel, Jumbo Shape, > 642 kg/m t
COLUMNS
B1 Structural Steel, Light <= 30 kg/m t
B1a Structural Steel, Light <= 30 kg/m, Unpainted t
B2 Structural Steel, Medium, 30 < kg/m <= 60 t
B2a Structural Steel, Medium, 30 < kg/m <= 60, Unpainted t
B3 Structural Steel, Heavy, 60 < kg/m <= 90 t
B3a Structural Steel, Heavy, 60 < kg/m <= 90, Unpainted t
B4 Structural Steel, X Heavy, 91 < kg/m <= 180 t
B4a Structural Steel, X Heavy, 91 < kg/m <= 180, Unpainted t
B5 Structural Steel, XX Heavy, 181 < kg/m <= 360 t
B5a Structural Steel, XX Heavy, 181 < kg/m <= 360, Unpainted t
B6 Structural Steel, XXX Heavy > 360 kg/m t
B6a Structural Steel, XXX Heavy > 360 kg/m, Unpainted t
B7 Structural Steel, Jumbo Shape, > 642 kg/m t
VERTICAL BRACING
C1 Structural Steel, Light <= 30 kg/m t
C1a Structural Steel, Light <= 30 kg/m, Unpainted t
C2 Structural Steel, Medium, 30 < kg/m <= 60 t
C2a Structural Steel, Medium, 30 < kg/m <= 60, Unpainted t
C3 Structural Steel, Heavy, 60 < kg/m <= 90 t
C3a Structural Steel, Heavy, 60 < kg/m <= 90, Unpainted t
C4 Structural Steel, X Heavy, 91 < kg/m <= 180 t
C4a Structural Steel, X Heavy, 91 < kg/m <= 180, Unpainted t
C5 Structural Steel, XX Heavy, > 181 kg/m t
1
3
2
C
2
6
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
6

T
r
u
s
s
e
s
1
3
2
C
2
7
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
7

D
r
i
v
e
s
1
3
2
C
2
7
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
7

T
r
u
s
s
e
s
1
3
2
C
2
8
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
8

D
r
i
v
e
s
1
3
2
C
3
1
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
3
1

D
r
i
v
e
s
1
3
2
C
4
1
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
4
1

D
r
i
v
e
s
1
3
2
C
5
0
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
5
0
-
0
5
5
1
3
2
U
0
1
A
A
C
2

C
o
a
r
s
e

O
r
e

R
e
c
l
a
i
m

T
u
n
n
e
l

1
1
3
2
U
0
2
A
A
C
2

C
o
a
r
s
e

O
r
e

R
e
c
l
a
i
m

T
u
n
n
e
l

2
1
3
3
A
0
1
A
A
C
2

F
i
n
e

O
r
e

B
i
n

L
o
w
e
r

P
l
a
t
f
o
r
m
s
1
3
3
A
0
1
A
A
C
4

F
i
n
e

O
r
e

B
i
n

T
o
w
e
r
s

a
n
d

S
t
a
i
r
s
1
3
3
A
0
1
A
C
C
2

F
i
n
e

O
r
e

B
i
n

T
r
i
p
p
e
r

P
l
a
t
f
o
r
m
s
1
3
3
C
1
9
A
A
C
2

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
1
9

D
r
i
v
e
s
1
3
3
C
1
9
A
A
C
4

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
1
9

T
r
u
s
s
e
s
1
3
3
C
2
9
A
A
C
2

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
2
9

D
r
i
v
e
s
1
3
3
C
2
9
A
A
C
4

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
2
9

T
r
u
s
s
e
s
1
3
3
C
6
0
B
A
C
2

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
6
0
-
0
6
5
1
3
3
C
6
6
B
A
C
2

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
6
6
-
0
7
1
2
3
4
A
0
0
A
A
C
1

F
l
o
t
a
t
i
o
n

B
a
s
e

P
l
a
t
e
s
3.1
6.0 16.9 19.7 19.7 2.0 5.8 5.8 23.1 2.3 2.6
1.2
12.7 59.5 65.5 65.5 1.6 3.8 2.3 11.5 11.5 46.0 8.4 9.8
1.0
0.6 23.7 6.7 6.7 4.4 3.8 3.8 15.3
0.0
8.1 12.4 17.0 17.0 4.9 41.5 41.5 165.9
1.0 0.3 1.0 1.6 1.4 1.4 0.1
46.6 16.8 50.3 79.5 69.4 69.4 6.1
0.1 0.3 0.3 1.3 0.1 0.1
4.8 16.3 16.3 65.3 5.4 5.4
3.0
5.8 16.4 19.1 19.1 1.9 5.6 5.6 22.4 2.2 2.5
0.5
5.7 26.5 29.1 29.1 0.7 1.7 1.0 5.1 5.1 20.5 3.7 4.4
0.3
0.2 7.1 2.0 2.0 1.3 1.2 1.2 4.6
0.0
5.5 8.4 11.5 11.5 3.3 28.1 28.1 112.5
0.7 0.2 0.7 1.1 1.0 1.0 0.1
32.4 11.7 35.0 55.2 48.2 48.2 4.3
0.1 0.5 0.5 2.0 0.2 0.2
7.2 24.5 24.5 97.9 8.2 8.2
1.0
1.9 5.5 6.4 6.4 0.6 1.9 1.9 7.5 0.7 0.8
0.9
9.2 43.0 47.3 47.3 1.2 2.7 1.7 8.3 8.3 33.2 6.0 7.1
0.3
0.2 6.8 1.9 1.9 1.3 1.1 1.1 4.4
0.0
0.1 0.2 0.3 0.3 0.1 0.7 0.7 2.8
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C_Att 5.xls
Page 5 of 16
Sociedad Minera Cerro Verde S.A.A.
Cerro Verde Production Unit Expansion
Project No. A6CV
240K-C2-SW-15-008
Revision A
Attachment 5
Pay
Class Description Units
HORIZONTAL BRACING
D1 Structural Steel, Light <= 30 kg/m t
D1a Structural Steel, Light <= 30 kg/m, Unpainted t
D2 Structural Steel, Medium, 30 < kg/m <= 60 t
D2a Structural Steel, Medium, 30 < kg/m <= 60, Unpainted t
D3 Structural Steel, Heavy, 60 < kg/m <= 90 t
D4 Structural Steel, X Heavy, 91 < kg/m <= 180 t
D5 Structural Steel, XX Heavy, > 181 kg/m t
3 PLATE BEAMS AND COLUMNS
E4 Structural Steel, X Heavy, 91 < kg/m <= 180 t
E5 Structural Steel, XX Heavy, 181 < kg/m <= 360 t
E6 Structural Steel, XXX Heavy, > 361 kg/m (except Jumbos) t
E7 Structural Steel, Jumbo Shape, > 642 kg/m t
CONVEYOR TRUSSES,
F1 Structural Steel, Light weight, 0 to 30 kg/m t
F2 Structural Steel, Medium Weight, 31 to 60 kg/m t
F3 Structural Steel, Heavy Weight, over 90 kg/m t
OVERLAND CONVEYOR TABLES & SUPPORTS,
G1 Structural Steel, Light, <= 30 kg/m t
G2 Structural Steel, Medium Weight, over 60 kg/m t
GIRTS,
H1 Structural Steel, Light <= 30 kg/m t
H2 Structural Steel, Medium Weight, 31 to 60 kg/m t
H3 Structural Steel, Heavy Weight, 61 to 90 kg/m t
PURLINS,
J1 Structural Steel, Light <= 30 kg/m t
J2 Structural Steel, Medium Weight, 31 to 60 kg/m t
J3 Structural Steel, Heavy Weight, 61 to 90 kg/m t
MISC. FRAMES < 200KG & COUNTERWEIGHT FRAMES,
K1 Misc Steel, Light <= 30 kg/m t
K1a Misc Steel, Light <= 30 kg/m, Unpainted t
K2 Misc Steel, Medium, 30 < kg/m <= 60 t
K3 Misc Steel, Heavy, 60 < kg/m t
K4 Counterweight Plates t
Sub-Totals t
12a Plateworks, Bins & Hoppers, 7.9 mm (5/16 inch) t
12b Plateworks, Bins & Hoppers, 9.5 mm (3/8 inch) t
1
3
2
C
2
6
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
6

T
r
u
s
s
e
s
1
3
2
C
2
7
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
7

D
r
i
v
e
s
1
3
2
C
2
7
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
7

T
r
u
s
s
e
s
1
3
2
C
2
8
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
8

D
r
i
v
e
s
1
3
2
C
3
1
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
3
1

D
r
i
v
e
s
1
3
2
C
4
1
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
4
1

D
r
i
v
e
s
1
3
2
C
5
0
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
5
0
-
0
5
5
1
3
2
U
0
1
A
A
C
2

C
o
a
r
s
e

O
r
e

R
e
c
l
a
i
m

T
u
n
n
e
l

1
1
3
2
U
0
2
A
A
C
2

C
o
a
r
s
e

O
r
e

R
e
c
l
a
i
m

T
u
n
n
e
l

2
1
3
3
A
0
1
A
A
C
2

F
i
n
e

O
r
e

B
i
n

L
o
w
e
r

P
l
a
t
f
o
r
m
s
1
3
3
A
0
1
A
A
C
4

F
i
n
e

O
r
e

B
i
n

T
o
w
e
r
s

a
n
d

S
t
a
i
r
s
1
3
3
A
0
1
A
C
C
2

F
i
n
e

O
r
e

B
i
n

T
r
i
p
p
e
r

P
l
a
t
f
o
r
m
s
1
3
3
C
1
9
A
A
C
2

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
1
9

D
r
i
v
e
s
1
3
3
C
1
9
A
A
C
4

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
1
9

T
r
u
s
s
e
s
1
3
3
C
2
9
A
A
C
2

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
2
9

D
r
i
v
e
s
1
3
3
C
2
9
A
A
C
4

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
2
9

T
r
u
s
s
e
s
1
3
3
C
6
0
B
A
C
2

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
6
0
-
0
6
5
1
3
3
C
6
6
B
A
C
2

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
6
6
-
0
7
1
2
3
4
A
0
0
A
A
C
1

F
l
o
t
a
t
i
o
n

B
a
s
e

P
l
a
t
e
s
2.0
3.9 11.0 12.8 12.8 1.3 3.7 3.7 14.9 1.5 1.7
0.7
7.8 36.4 40.0 40.0 1.0 2.3 1.4 7.0 7.0 28.1 5.1 6.0
48.2 52.9 20.4 23.0 5.7 5.7
140.9 106.2 69.8 81.9 10.7 10.7
42.8 43.8 25.5 25.5
1.9 0.6 1.9 2.5 2.5
314.2 97.3 291.8 411.4 401.7 401.7 48.4 10.4 6.4 166.9 166.9 667.7 30.1 90.2 35.0 104.9 55.6 55.6 14.0
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C_Att 5.xls
Page 6 of 16
Sociedad Minera Cerro Verde S.A.A.
Cerro Verde Production Unit Expansion
Project No. A6CV
240K-C2-SW-15-008
Revision A
Attachment 5
Pay
Class Description Units
12c Plateworks, Bins & Hoppers, 12.7 mm (1/2 inch) t
12d Plateworks, Bins & Hoppers, 15.9 mm (5/8 inch) t
13a Crane Rail w/splices (40#) t
13b Crane Rail w/splices (60#) t
13c Crane Rail w/splices (85#) t
13d Crane Rail w/splices (104#) t
13e Crane Rail w/splices (135#) t
13f Crane Rail w/splices (171#) t
13g Crane Rail w/splices (175#) t
14a Gantrex Weldable Rail Clips, Weldlok 10 each
14b Gantrex Weldable Rail Clips, Weldlok 15 each
14c Gantrex Weldable Rail Clips, Weldlok 18 each
14d Gantrex Weldable Rail Clips, Weldlok 20 each
14e Gantrex Weldable Rail Clips, Weldlok 24 each
14f Gantrex Weldable Rail Clips, Weldlok 32 each
14g Gantrex Weldable Rail Clips, Weldlok 43 each
15 Stairs w/ Handrail & Kickplates t
15a
Stair Treads , 32x5 bearing bars (1.25 inch deep), price with
one shop coat primer only, shop bolted to stringers
each
16
Floor Grating, 32x5 bearing bars (1.25 inch deep), price with
one shop coat primer only
m2
16s
Floor Grating Serrated, 32x5 bearing bars (1.25 inch deep),
price with one shop coat primer only
m2
16gc
Grating Clamps (Hilti DIX Fasteners), Not included in 16
above
each
16ssc
Grating Clamps (Stainless G-Clips), Not included in 16
above
each
17a
Heavy duty 2" deep grating (51mm deep) , Price with one
shop coat primer only
m2
17b
Heavy duty 3" deep grating (76mm deep) , Price with one
shop coat primer only
m2
17c
Heavy duty 4" deep grating (102mm deep) , Price with one
shop coat primer only
m2
18
Roof Decking Galvanized , 38 deep x 0.76 (22 ga 1.5 inch
deep)
m2
19
Roof/Floor Deck Galvanized , 38 deep x 0.91 (20 ga 1.5 inch
deep)
m2
20a
Roof/Floor Deck Galvanized , 76 deep x 0.91 (20 ga 3 inch
deep)
m2
1
3
2
C
2
6
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
6

T
r
u
s
s
e
s
1
3
2
C
2
7
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
7

D
r
i
v
e
s
1
3
2
C
2
7
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
7

T
r
u
s
s
e
s
1
3
2
C
2
8
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
8

D
r
i
v
e
s
1
3
2
C
3
1
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
3
1

D
r
i
v
e
s
1
3
2
C
4
1
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
4
1

D
r
i
v
e
s
1
3
2
C
5
0
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
5
0
-
0
5
5
1
3
2
U
0
1
A
A
C
2

C
o
a
r
s
e

O
r
e

R
e
c
l
a
i
m

T
u
n
n
e
l

1
1
3
2
U
0
2
A
A
C
2

C
o
a
r
s
e

O
r
e

R
e
c
l
a
i
m

T
u
n
n
e
l

2
1
3
3
A
0
1
A
A
C
2

F
i
n
e

O
r
e

B
i
n

L
o
w
e
r

P
l
a
t
f
o
r
m
s
1
3
3
A
0
1
A
A
C
4

F
i
n
e

O
r
e

B
i
n

T
o
w
e
r
s

a
n
d

S
t
a
i
r
s
1
3
3
A
0
1
A
C
C
2

F
i
n
e

O
r
e

B
i
n

T
r
i
p
p
e
r

P
l
a
t
f
o
r
m
s
1
3
3
C
1
9
A
A
C
2

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
1
9

D
r
i
v
e
s
1
3
3
C
1
9
A
A
C
4

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
1
9

T
r
u
s
s
e
s
1
3
3
C
2
9
A
A
C
2

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
2
9

D
r
i
v
e
s
1
3
3
C
2
9
A
A
C
4

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
2
9

T
r
u
s
s
e
s
1
3
3
C
6
0
B
A
C
2

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
6
0
-
0
6
5
1
3
3
C
6
6
B
A
C
2

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
6
6
-
0
7
1
2
3
4
A
0
0
A
A
C
1

F
l
o
t
a
t
i
o
n

B
a
s
e

P
l
a
t
e
s
6.7
0.1 0.1 0.4 0.0 0.0
0.6
6.4 2.1 6.4 10.7 8.6 8.6 0.6 0.6 6.8 6.8 27.3 0.4 1.3 0.4 1.2 2.3 2.3 1.0
193.5 97.0 291.0 743.0 473.0 473.0 20.7 1.6 1.6 125.0 125.0 499.8 145.0 435.0 146.0 438.0 41.7 41.7 51.2
8.4 410.4 410.4 1,641.6 136.8 136.8
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C_Att 5.xls
Page 7 of 16
Sociedad Minera Cerro Verde S.A.A.
Cerro Verde Production Unit Expansion
Project No. A6CV
240K-C2-SW-15-008
Revision A
Attachment 5
Pay
Class Description Units
20b
Roof/Floor Deck Galvanized , 76 deep x 1.22 (18 ga 3 inch
deep)
m2
21 Deck Plate, Steel, 12 Ga m2
22 Checker Plate, 64 mm Thk, Panel Assemblies m2
23 Walkway, Gripstrut m
25 Handrail w/ Kickplate, Pipe t
27 Ladder w/ Cage t
28 Safety Gate each
29a Bolts, Nuts & washers, ASTM A307 t
29b Bolts, Nuts & washers(Anchor Bolt), ASTM A307 t
29c Sag rods, galvanized, nuts & washers, ASTM A307 t
30a Bolts, Nuts & washers, ASTM A325 t
30b Bolts, Nuts & washers, ASTM F1852 twist off t
30c Bolts, Nuts & washers, ASTM A490 t
30d Bolts, Nuts & washers, ASTM F2280 twist off t
31 Stainless steel Bolts, Nuts & Washers t
32 Conveyor Sliding Connection Assembly t
33 Conveyor Fixed Connection Assembly t
34
Fabreeka impact absorbing pads, 100 x 100 x 50 (size to be
confirmed)
each
37a Idler Shim Plates t
37b Common Shim Plates t
38a Paint, Primer Touch-up paint liter
38b Paint, Touch-up Paint liter
39 Magnetic Particle Testing lin m
40 Ultrasonic Testing, UT, groove welds lin m
41 Ultrasonic Testing, UT, surface scan m2
42 Radiographic Testing, per film hour
43 Shop Rework - Fabrication hour
44 Shop Rework - Painting hour
45 Shop Rework - Detailing and Engineering hour
46 Site Representative day
47 Shear Studs for Field Weld each
1
3
2
C
2
6
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
6

T
r
u
s
s
e
s
1
3
2
C
2
7
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
7

D
r
i
v
e
s
1
3
2
C
2
7
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
7

T
r
u
s
s
e
s
1
3
2
C
2
8
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
2
8

D
r
i
v
e
s
1
3
2
C
3
1
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
3
1

D
r
i
v
e
s
1
3
2
C
4
1
A
A
C
2

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
4
1

D
r
i
v
e
s
1
3
2
C
5
0
A
A
C
4

S
c
r
e
e
n
i
n
g

C
o
n
v
e
y
o
r

0
5
0
-
0
5
5
1
3
2
U
0
1
A
A
C
2

C
o
a
r
s
e

O
r
e

R
e
c
l
a
i
m

T
u
n
n
e
l

1
1
3
2
U
0
2
A
A
C
2

C
o
a
r
s
e

O
r
e

R
e
c
l
a
i
m

T
u
n
n
e
l

2
1
3
3
A
0
1
A
A
C
2

F
i
n
e

O
r
e

B
i
n

L
o
w
e
r

P
l
a
t
f
o
r
m
s
1
3
3
A
0
1
A
A
C
4

F
i
n
e

O
r
e

B
i
n

T
o
w
e
r
s

a
n
d

S
t
a
i
r
s
1
3
3
A
0
1
A
C
C
2

F
i
n
e

O
r
e

B
i
n

T
r
i
p
p
e
r

P
l
a
t
f
o
r
m
s
1
3
3
C
1
9
A
A
C
2

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
1
9

D
r
i
v
e
s
1
3
3
C
1
9
A
A
C
4

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
1
9

T
r
u
s
s
e
s
1
3
3
C
2
9
A
A
C
2

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
2
9

D
r
i
v
e
s
1
3
3
C
2
9
A
A
C
4

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
2
9

T
r
u
s
s
e
s
1
3
3
C
6
0
B
A
C
2

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
6
0
-
0
6
5
1
3
3
C
6
6
B
A
C
2

G
r
i
n
d
i
n
g

C
o
n
v
e
y
o
r

0
6
6
-
0
7
1
2
3
4
A
0
0
A
A
C
1

F
l
o
t
a
t
i
o
n

B
a
s
e

P
l
a
t
e
s
30.0 10.0 30.0 40.0 40.0 23.1
150.0 50.0 150.0 200.0 200.0 8.2 348.0 348.0 1,392.0 116.0 116.0
5.2 2.4 7.3 15.2 11.8 11.8 0.2 0.2 3.7 3.7 14.7 2.8 8.5 3.3 9.9 1.2 1.2 0.6
0.3 0.3
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C_Att 5.xls
Page 8 of 16
Sociedad Minera Cerro Verde S.A.A.
Cerro Verde Production Unit Expansion
Project No. A6CV
240K-C2-SW-15-008
Revision A
Attachment 5
Pay
Class Description Units
BEAMS
A1 Structural Steel, Light <= 30 kg/m t
A1a Structural Steel, Light <= 30 kg/m, Unpainted t
A2 Structural Steel, Medium, 30 < kg/m <= 60 t
A2a Structural Steel, Medium, 30 < kg/m <= 60, Unpainted t
A3 Structural Steel, Heavy, 60 < kg/m <= 90 t
A3a Structural Steel, Heavy, 60 < kg/m <= 90, Unpainted t
A4 Structural Steel, X Heavy, 91 < kg/m <= 180 t
A4a Structural Steel, X Heavy, 91 < kg/m <= 180, Unpainted t
A5 Structural Steel, XX Heavy, 181 < kg/m <= 360 t
A5a Structural Steel, XX Heavy, 181 < kg/m <= 360, Unpainted t
A6 Structural Steel, XXX Heavy > 360 kg/m t
A6a Structural Steel, XXX Heavy > 360 kg/m, Unpainted t
A7 Structural Steel, Jumbo Shape, > 642 kg/m t
COLUMNS
B1 Structural Steel, Light <= 30 kg/m t
B1a Structural Steel, Light <= 30 kg/m, Unpainted t
B2 Structural Steel, Medium, 30 < kg/m <= 60 t
B2a Structural Steel, Medium, 30 < kg/m <= 60, Unpainted t
B3 Structural Steel, Heavy, 60 < kg/m <= 90 t
B3a Structural Steel, Heavy, 60 < kg/m <= 90, Unpainted t
B4 Structural Steel, X Heavy, 91 < kg/m <= 180 t
B4a Structural Steel, X Heavy, 91 < kg/m <= 180, Unpainted t
B5 Structural Steel, XX Heavy, 181 < kg/m <= 360 t
B5a Structural Steel, XX Heavy, 181 < kg/m <= 360, Unpainted t
B6 Structural Steel, XXX Heavy > 360 kg/m t
B6a Structural Steel, XXX Heavy > 360 kg/m, Unpainted t
B7 Structural Steel, Jumbo Shape, > 642 kg/m t
VERTICAL BRACING
C1 Structural Steel, Light <= 30 kg/m t
C1a Structural Steel, Light <= 30 kg/m, Unpainted t
C2 Structural Steel, Medium, 30 < kg/m <= 60 t
C2a Structural Steel, Medium, 30 < kg/m <= 60, Unpainted t
C3 Structural Steel, Heavy, 60 < kg/m <= 90 t
C3a Structural Steel, Heavy, 60 < kg/m <= 90, Unpainted t
C4 Structural Steel, X Heavy, 91 < kg/m <= 180 t
C4a Structural Steel, X Heavy, 91 < kg/m <= 180, Unpainted t
C5 Structural Steel, XX Heavy, > 181 kg/m t
2
3
4
A
0
0
A
A
C
2

F
l
o
t
a
t
i
o
n
2
3
4
A
0
0
A
A
C
4

F
l
o
t
a
t
i
o
n

C
r
a
n
e

T
r
u
s
s
e
s
2
3
4
A
0
3
A
A
C
2

F
l
o
t
a
t
i
o
n

S
a
m
p
l
i
n
g
2
3
4
A
0
3
E
A
C
2

F
l
o
t
a
t
i
o
n

C
e
l
l

P
l
a
t
f
o
r
m
s
2
3
4
A
0
6
A
A
C
3

F
l
o
t
a
t
i
o
n

P
i
p
e
r
a
c
k
s
2
3
4
B
0
1
A
A
C
2

C
o
l
u
m
n

F
l
o
t
a
t
i
o
n
2
3
4
B
0
2
A
A
C
1

R
e
g
r
i
n
d
2
3
4
B
0
2
A
A
C
2

R
e
g
r
i
n
d

F
l
o
o
r
s
2
3
4
B
0
5
A
A
C
3

R
e
g
r
i
n
d

P
i
p
e
r
a
c
k
s
2
3
5
D
0
0
A
A
C
1

M
o
l
y

P
l
a
n
t

B
u
i
l
d
i
n
g
2
3
5
D
0
0
A
A
C
2

M
o
l
y

P
l
a
n
t

B
u
i
l
d
i
n
g

P
l
a
t
f
o
r
m
s
/
S
t
a
i
r
s
2
3
5
F
0
0
A
A
C
3

M
o
l
y

P
l
a
n
t

/

C
o
n
c
e
n
t
r
a
t
e

T
h
i
c
k
e
n
i
n
g

/

F
i
l
t
e
r
i
n
g

P
i
p
e
r
2
3
6
D
0
0
A
A
C
2

C
o
n
c
e
n
t
r
a
t
e

T
h
i
c
k
e
n
i
n
g

S
t
o
r
a
g
e

P
l
a
t
f
o
r
m
2
3
6
E
0
1
A
A
C
2

C
o
n
c
e
n
t
r
a
t
e

F
i
l
t
e
r

B
u
i
l
d
i
n
g
2
3
6
E
0
2
A
A
C
2

C
o
n
c
e
n
t
r
a
t
e

S
t
o
r
a
g
e

/

L
o
a
d
o
u
t
2
3
9
A
0
0
A
A
C
2

L
i
m
e

S
y
s
t
e
m

P
l
a
t
f
o
r
m
s
2
3
9
A
0
3
A
A
C
3

L
i
m
e

S
y
s
t
e
m

P
i
p
e
r
a
c
k
s
2
3
9
B
0
0
A
A
C
2

R
e
a
g
e
n
t

S
y
s
t
e
m

T
a
n
k

P
l
a
t
f
o
r
m
s
2
3
9
B
1
0
A
A
C
3

R
e
a
g
e
n
t

S
y
s
t
e
m

P
i
p
e
r
a
c
k
58.9 58.9 17.0 17.0 5.4 4.5 22.6 18.1 3.1 58.9 58.9 4.1 20.4 1.4 4.9 0.3 0.3 0.5 0.5
22.5 22.5 6.5 6.5 19.1 6.6 33.2 26.6 4.3 70.6 70.6 15.3 23.9 41.8 5.2 0.9 0.9 0.6 0.6
18.2 18.2 5.3 5.3 17.9 89.4 71.5 88.4 88.4 56.7 36.8 2.5
0.5 0.5 0.2 0.2 6.8 33.9 27.1 37.7 37.7 111.2
11.1 55.5 44.4
57.1 57.1 16.5 16.5 5.3 4.4 22.0 17.6 3.0 57.2 57.2 4.0 19.8 1.4 4.8 0.3 0.3 0.5 0.5
10.0 10.0 2.9 2.9 8.5 3.0 14.8 11.8 1.9 31.4 31.4 6.8 10.6 18.6 2.3 0.4 0.4 0.3 0.3
5.5 5.5 1.6 1.6 5.4 27.0 21.6 26.7 26.7 17.1 11.1 0.8
0.4 0.4 0.1 0.1 4.6 23.0 18.4 25.6 25.6 75.4
7.7 38.5 30.8
19.0 19.0 5.5 5.5 1.8 1.5 7.3 5.9 1.0 19.1 19.1 1.3 6.6 0.5 1.6 0.1 0.1 0.2 0.2
16.3 16.3 4.7 4.7 13.8 4.8 24.0 19.2 3.1 51.0 51.0 11.1 17.3 30.2 3.8 0.7 0.7 0.4 0.4
5.2 5.2 1.5 1.5 5.1 25.5 20.4 25.2 25.2 16.2 10.5 0.7
0.0 0.0 0.0 0.0 0.1 0.6 0.5 0.6 0.6 1.9
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C_Att 5.xls
Page 9 of 16
Sociedad Minera Cerro Verde S.A.A.
Cerro Verde Production Unit Expansion
Project No. A6CV
240K-C2-SW-15-008
Revision A
Attachment 5
Pay
Class Description Units
HORIZONTAL BRACING
D1 Structural Steel, Light <= 30 kg/m t
D1a Structural Steel, Light <= 30 kg/m, Unpainted t
D2 Structural Steel, Medium, 30 < kg/m <= 60 t
D2a Structural Steel, Medium, 30 < kg/m <= 60, Unpainted t
D3 Structural Steel, Heavy, 60 < kg/m <= 90 t
D4 Structural Steel, X Heavy, 91 < kg/m <= 180 t
D5 Structural Steel, XX Heavy, > 181 kg/m t
3 PLATE BEAMS AND COLUMNS
E4 Structural Steel, X Heavy, 91 < kg/m <= 180 t
E5 Structural Steel, XX Heavy, 181 < kg/m <= 360 t
E6 Structural Steel, XXX Heavy, > 361 kg/m (except Jumbos) t
E7 Structural Steel, Jumbo Shape, > 642 kg/m t
CONVEYOR TRUSSES,
F1 Structural Steel, Light weight, 0 to 30 kg/m t
F2 Structural Steel, Medium Weight, 31 to 60 kg/m t
F3 Structural Steel, Heavy Weight, over 90 kg/m t
OVERLAND CONVEYOR TABLES & SUPPORTS,
G1 Structural Steel, Light, <= 30 kg/m t
G2 Structural Steel, Medium Weight, over 60 kg/m t
GIRTS,
H1 Structural Steel, Light <= 30 kg/m t
H2 Structural Steel, Medium Weight, 31 to 60 kg/m t
H3 Structural Steel, Heavy Weight, 61 to 90 kg/m t
PURLINS,
J1 Structural Steel, Light <= 30 kg/m t
J2 Structural Steel, Medium Weight, 31 to 60 kg/m t
J3 Structural Steel, Heavy Weight, 61 to 90 kg/m t
MISC. FRAMES < 200KG & COUNTERWEIGHT FRAMES,
K1 Misc Steel, Light <= 30 kg/m t
K1a Misc Steel, Light <= 30 kg/m, Unpainted t
K2 Misc Steel, Medium, 30 < kg/m <= 60 t
K3 Misc Steel, Heavy, 60 < kg/m t
K4 Counterweight Plates t
Sub-Totals t
12a Plateworks, Bins & Hoppers, 7.9 mm (5/16 inch) t
12b Plateworks, Bins & Hoppers, 9.5 mm (3/8 inch) t
2
3
4
A
0
0
A
A
C
2

F
l
o
t
a
t
i
o
n
2
3
4
A
0
0
A
A
C
4

F
l
o
t
a
t
i
o
n

C
r
a
n
e

T
r
u
s
s
e
s
2
3
4
A
0
3
A
A
C
2

F
l
o
t
a
t
i
o
n

S
a
m
p
l
i
n
g
2
3
4
A
0
3
E
A
C
2

F
l
o
t
a
t
i
o
n

C
e
l
l

P
l
a
t
f
o
r
m
s
2
3
4
A
0
6
A
A
C
3

F
l
o
t
a
t
i
o
n

P
i
p
e
r
a
c
k
s
2
3
4
B
0
1
A
A
C
2

C
o
l
u
m
n

F
l
o
t
a
t
i
o
n
2
3
4
B
0
2
A
A
C
1

R
e
g
r
i
n
d
2
3
4
B
0
2
A
A
C
2

R
e
g
r
i
n
d

F
l
o
o
r
s
2
3
4
B
0
5
A
A
C
3

R
e
g
r
i
n
d

P
i
p
e
r
a
c
k
s
2
3
5
D
0
0
A
A
C
1

M
o
l
y

P
l
a
n
t

B
u
i
l
d
i
n
g
2
3
5
D
0
0
A
A
C
2

M
o
l
y

P
l
a
n
t

B
u
i
l
d
i
n
g

P
l
a
t
f
o
r
m
s
/
S
t
a
i
r
s
2
3
5
F
0
0
A
A
C
3

M
o
l
y

P
l
a
n
t

/

C
o
n
c
e
n
t
r
a
t
e

T
h
i
c
k
e
n
i
n
g

/

F
i
l
t
e
r
i
n
g

P
i
p
e
r
2
3
6
D
0
0
A
A
C
2

C
o
n
c
e
n
t
r
a
t
e

T
h
i
c
k
e
n
i
n
g

S
t
o
r
a
g
e

P
l
a
t
f
o
r
m
2
3
6
E
0
1
A
A
C
2

C
o
n
c
e
n
t
r
a
t
e

F
i
l
t
e
r

B
u
i
l
d
i
n
g
2
3
6
E
0
2
A
A
C
2

C
o
n
c
e
n
t
r
a
t
e

S
t
o
r
a
g
e

/

L
o
a
d
o
u
t
2
3
9
A
0
0
A
A
C
2

L
i
m
e

S
y
s
t
e
m

P
l
a
t
f
o
r
m
s
2
3
9
A
0
3
A
A
C
3

L
i
m
e

S
y
s
t
e
m

P
i
p
e
r
a
c
k
s
2
3
9
B
0
0
A
A
C
2

R
e
a
g
e
n
t

S
y
s
t
e
m

T
a
n
k

P
l
a
t
f
o
r
m
s
2
3
9
B
1
0
A
A
C
3

R
e
a
g
e
n
t

S
y
s
t
e
m

P
i
p
e
r
a
c
k
38.1 38.1 11.0 11.0 3.5 2.9 14.6 11.7 2.0 38.1 38.1 2.7 13.2 0.9 3.2 0.2 0.2 0.3 0.3
13.8 13.8 4.0 4.0 11.7 4.1 20.3 16.2 2.6 43.1 43.1 9.4 14.6 25.5 3.2 0.6 0.6 0.3 0.3
10.5 10.5
265.6 265.6 76.9 76.9 69.1 90.5 452.3 361.8 21.1 584.1 584.1 54.7 216.5 367.2 32.8 3.6 3.6 3.0 3.0
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C_Att 5.xls
Page 10 of 16
Sociedad Minera Cerro Verde S.A.A.
Cerro Verde Production Unit Expansion
Project No. A6CV
240K-C2-SW-15-008
Revision A
Attachment 5
Pay
Class Description Units
12c Plateworks, Bins & Hoppers, 12.7 mm (1/2 inch) t
12d Plateworks, Bins & Hoppers, 15.9 mm (5/8 inch) t
13a Crane Rail w/splices (40#) t
13b Crane Rail w/splices (60#) t
13c Crane Rail w/splices (85#) t
13d Crane Rail w/splices (104#) t
13e Crane Rail w/splices (135#) t
13f Crane Rail w/splices (171#) t
13g Crane Rail w/splices (175#) t
14a Gantrex Weldable Rail Clips, Weldlok 10 each
14b Gantrex Weldable Rail Clips, Weldlok 15 each
14c Gantrex Weldable Rail Clips, Weldlok 18 each
14d Gantrex Weldable Rail Clips, Weldlok 20 each
14e Gantrex Weldable Rail Clips, Weldlok 24 each
14f Gantrex Weldable Rail Clips, Weldlok 32 each
14g Gantrex Weldable Rail Clips, Weldlok 43 each
15 Stairs w/ Handrail & Kickplates t
15a
Stair Treads , 32x5 bearing bars (1.25 inch deep), price with
one shop coat primer only, shop bolted to stringers
each
16
Floor Grating, 32x5 bearing bars (1.25 inch deep), price with
one shop coat primer only
m2
16s
Floor Grating Serrated, 32x5 bearing bars (1.25 inch deep),
price with one shop coat primer only
m2
16gc
Grating Clamps (Hilti DIX Fasteners), Not included in 16
above
each
16ssc
Grating Clamps (Stainless G-Clips), Not included in 16
above
each
17a
Heavy duty 2" deep grating (51mm deep) , Price with one
shop coat primer only
m2
17b
Heavy duty 3" deep grating (76mm deep) , Price with one
shop coat primer only
m2
17c
Heavy duty 4" deep grating (102mm deep) , Price with one
shop coat primer only
m2
18
Roof Decking Galvanized , 38 deep x 0.76 (22 ga 1.5 inch
deep)
m2
19
Roof/Floor Deck Galvanized , 38 deep x 0.91 (20 ga 1.5 inch
deep)
m2
20a
Roof/Floor Deck Galvanized , 76 deep x 0.91 (20 ga 3 inch
deep)
m2
2
3
4
A
0
0
A
A
C
2

F
l
o
t
a
t
i
o
n
2
3
4
A
0
0
A
A
C
4

F
l
o
t
a
t
i
o
n

C
r
a
n
e

T
r
u
s
s
e
s
2
3
4
A
0
3
A
A
C
2

F
l
o
t
a
t
i
o
n

S
a
m
p
l
i
n
g
2
3
4
A
0
3
E
A
C
2

F
l
o
t
a
t
i
o
n

C
e
l
l

P
l
a
t
f
o
r
m
s
2
3
4
A
0
6
A
A
C
3

F
l
o
t
a
t
i
o
n

P
i
p
e
r
a
c
k
s
2
3
4
B
0
1
A
A
C
2

C
o
l
u
m
n

F
l
o
t
a
t
i
o
n
2
3
4
B
0
2
A
A
C
1

R
e
g
r
i
n
d
2
3
4
B
0
2
A
A
C
2

R
e
g
r
i
n
d

F
l
o
o
r
s
2
3
4
B
0
5
A
A
C
3

R
e
g
r
i
n
d

P
i
p
e
r
a
c
k
s
2
3
5
D
0
0
A
A
C
1

M
o
l
y

P
l
a
n
t

B
u
i
l
d
i
n
g
2
3
5
D
0
0
A
A
C
2

M
o
l
y

P
l
a
n
t

B
u
i
l
d
i
n
g

P
l
a
t
f
o
r
m
s
/
S
t
a
i
r
s
2
3
5
F
0
0
A
A
C
3

M
o
l
y

P
l
a
n
t

/

C
o
n
c
e
n
t
r
a
t
e

T
h
i
c
k
e
n
i
n
g

/

F
i
l
t
e
r
i
n
g

P
i
p
e
r
2
3
6
D
0
0
A
A
C
2

C
o
n
c
e
n
t
r
a
t
e

T
h
i
c
k
e
n
i
n
g

S
t
o
r
a
g
e

P
l
a
t
f
o
r
m
2
3
6
E
0
1
A
A
C
2

C
o
n
c
e
n
t
r
a
t
e

F
i
l
t
e
r

B
u
i
l
d
i
n
g
2
3
6
E
0
2
A
A
C
2

C
o
n
c
e
n
t
r
a
t
e

S
t
o
r
a
g
e

/

L
o
a
d
o
u
t
2
3
9
A
0
0
A
A
C
2

L
i
m
e

S
y
s
t
e
m

P
l
a
t
f
o
r
m
s
2
3
9
A
0
3
A
A
C
3

L
i
m
e

S
y
s
t
e
m

P
i
p
e
r
a
c
k
s
2
3
9
B
0
0
A
A
C
2

R
e
a
g
e
n
t

S
y
s
t
e
m

T
a
n
k

P
l
a
t
f
o
r
m
s
2
3
9
B
1
0
A
A
C
3

R
e
a
g
e
n
t

S
y
s
t
e
m

P
i
p
e
r
a
c
k
0.5 2.7 2.1
11.7 11.7 3.4 3.4
18.1 18.1 5.2 5.2 0.3 1.7 1.3 4.0 4.0 6.4 1.9 1.8
973.2 973.2 281.7 281.7 208.5 1,042.5 834.0 362.8 362.8 150.0 18.0 167.0
865.0
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C_Att 5.xls
Page 11 of 16
Sociedad Minera Cerro Verde S.A.A.
Cerro Verde Production Unit Expansion
Project No. A6CV
240K-C2-SW-15-008
Revision A
Attachment 5
Pay
Class Description Units
20b
Roof/Floor Deck Galvanized , 76 deep x 1.22 (18 ga 3 inch
deep)
m2
21 Deck Plate, Steel, 12 Ga m2
22 Checker Plate, 64 mm Thk, Panel Assemblies m2
23 Walkway, Gripstrut m
25 Handrail w/ Kickplate, Pipe t
27 Ladder w/ Cage t
28 Safety Gate each
29a Bolts, Nuts & washers, ASTM A307 t
29b Bolts, Nuts & washers(Anchor Bolt), ASTM A307 t
29c Sag rods, galvanized, nuts & washers, ASTM A307 t
30a Bolts, Nuts & washers, ASTM A325 t
30b Bolts, Nuts & washers, ASTM F1852 twist off t
30c Bolts, Nuts & washers, ASTM A490 t
30d Bolts, Nuts & washers, ASTM F2280 twist off t
31 Stainless steel Bolts, Nuts & Washers t
32 Conveyor Sliding Connection Assembly t
33 Conveyor Fixed Connection Assembly t
34
Fabreeka impact absorbing pads, 100 x 100 x 50 (size to be
confirmed)
each
37a Idler Shim Plates t
37b Common Shim Plates t
38a Paint, Primer Touch-up paint liter
38b Paint, Touch-up Paint liter
39 Magnetic Particle Testing lin m
40 Ultrasonic Testing, UT, groove welds lin m
41 Ultrasonic Testing, UT, surface scan m2
42 Radiographic Testing, per film hour
43 Shop Rework - Fabrication hour
44 Shop Rework - Painting hour
45 Shop Rework - Detailing and Engineering hour
46 Site Representative day
47 Shear Studs for Field Weld each
2
3
4
A
0
0
A
A
C
2

F
l
o
t
a
t
i
o
n
2
3
4
A
0
0
A
A
C
4

F
l
o
t
a
t
i
o
n

C
r
a
n
e

T
r
u
s
s
e
s
2
3
4
A
0
3
A
A
C
2

F
l
o
t
a
t
i
o
n

S
a
m
p
l
i
n
g
2
3
4
A
0
3
E
A
C
2

F
l
o
t
a
t
i
o
n

C
e
l
l

P
l
a
t
f
o
r
m
s
2
3
4
A
0
6
A
A
C
3

F
l
o
t
a
t
i
o
n

P
i
p
e
r
a
c
k
s
2
3
4
B
0
1
A
A
C
2

C
o
l
u
m
n

F
l
o
t
a
t
i
o
n
2
3
4
B
0
2
A
A
C
1

R
e
g
r
i
n
d
2
3
4
B
0
2
A
A
C
2

R
e
g
r
i
n
d

F
l
o
o
r
s
2
3
4
B
0
5
A
A
C
3

R
e
g
r
i
n
d

P
i
p
e
r
a
c
k
s
2
3
5
D
0
0
A
A
C
1

M
o
l
y

P
l
a
n
t

B
u
i
l
d
i
n
g
2
3
5
D
0
0
A
A
C
2

M
o
l
y

P
l
a
n
t

B
u
i
l
d
i
n
g

P
l
a
t
f
o
r
m
s
/
S
t
a
i
r
s
2
3
5
F
0
0
A
A
C
3

M
o
l
y

P
l
a
n
t

/

C
o
n
c
e
n
t
r
a
t
e

T
h
i
c
k
e
n
i
n
g

/

F
i
l
t
e
r
i
n
g

P
i
p
e
r
2
3
6
D
0
0
A
A
C
2

C
o
n
c
e
n
t
r
a
t
e

T
h
i
c
k
e
n
i
n
g

S
t
o
r
a
g
e

P
l
a
t
f
o
r
m
2
3
6
E
0
1
A
A
C
2

C
o
n
c
e
n
t
r
a
t
e

F
i
l
t
e
r

B
u
i
l
d
i
n
g
2
3
6
E
0
2
A
A
C
2

C
o
n
c
e
n
t
r
a
t
e

S
t
o
r
a
g
e

/

L
o
a
d
o
u
t
2
3
9
A
0
0
A
A
C
2

L
i
m
e

S
y
s
t
e
m

P
l
a
t
f
o
r
m
s
2
3
9
A
0
3
A
A
C
3

L
i
m
e

S
y
s
t
e
m

P
i
p
e
r
a
c
k
s
2
3
9
B
0
0
A
A
C
2

R
e
a
g
e
n
t

S
y
s
t
e
m

T
a
n
k

P
l
a
t
f
o
r
m
s
2
3
9
B
1
0
A
A
C
3

R
e
a
g
e
n
t

S
y
s
t
e
m

P
i
p
e
r
a
c
k
10.9 10.9 3.2 3.2 1.4 7.2 5.8 3.1 3.1 2.6 0.4 3.5
0.1 0.7 0.6
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C_Att 5.xls
Page 12 of 16
Sociedad Minera Cerro Verde S.A.A.
Cerro Verde Production Unit Expansion
Project No. A6CV
240K-C2-SW-15-008
Revision A
Attachment 5
Pay
Class Description Units
BEAMS
A1 Structural Steel, Light <= 30 kg/m t
A1a Structural Steel, Light <= 30 kg/m, Unpainted t
A2 Structural Steel, Medium, 30 < kg/m <= 60 t
A2a Structural Steel, Medium, 30 < kg/m <= 60, Unpainted t
A3 Structural Steel, Heavy, 60 < kg/m <= 90 t
A3a Structural Steel, Heavy, 60 < kg/m <= 90, Unpainted t
A4 Structural Steel, X Heavy, 91 < kg/m <= 180 t
A4a Structural Steel, X Heavy, 91 < kg/m <= 180, Unpainted t
A5 Structural Steel, XX Heavy, 181 < kg/m <= 360 t
A5a Structural Steel, XX Heavy, 181 < kg/m <= 360, Unpainted t
A6 Structural Steel, XXX Heavy > 360 kg/m t
A6a Structural Steel, XXX Heavy > 360 kg/m, Unpainted t
A7 Structural Steel, Jumbo Shape, > 642 kg/m t
COLUMNS
B1 Structural Steel, Light <= 30 kg/m t
B1a Structural Steel, Light <= 30 kg/m, Unpainted t
B2 Structural Steel, Medium, 30 < kg/m <= 60 t
B2a Structural Steel, Medium, 30 < kg/m <= 60, Unpainted t
B3 Structural Steel, Heavy, 60 < kg/m <= 90 t
B3a Structural Steel, Heavy, 60 < kg/m <= 90, Unpainted t
B4 Structural Steel, X Heavy, 91 < kg/m <= 180 t
B4a Structural Steel, X Heavy, 91 < kg/m <= 180, Unpainted t
B5 Structural Steel, XX Heavy, 181 < kg/m <= 360 t
B5a Structural Steel, XX Heavy, 181 < kg/m <= 360, Unpainted t
B6 Structural Steel, XXX Heavy > 360 kg/m t
B6a Structural Steel, XXX Heavy > 360 kg/m, Unpainted t
B7 Structural Steel, Jumbo Shape, > 642 kg/m t
VERTICAL BRACING
C1 Structural Steel, Light <= 30 kg/m t
C1a Structural Steel, Light <= 30 kg/m, Unpainted t
C2 Structural Steel, Medium, 30 < kg/m <= 60 t
C2a Structural Steel, Medium, 30 < kg/m <= 60, Unpainted t
C3 Structural Steel, Heavy, 60 < kg/m <= 90 t
C3a Structural Steel, Heavy, 60 < kg/m <= 90, Unpainted t
C4 Structural Steel, X Heavy, 91 < kg/m <= 180 t
C4a Structural Steel, X Heavy, 91 < kg/m <= 180, Unpainted t
C5 Structural Steel, XX Heavy, > 181 kg/m t
3
3
7
A
0
5
A
A
C
2

T
a
i
l
i
n
g

T
h
i
c
k
e
n
i
n
g

R
e
c
y
c
l
e

W
a
t
e
r

C
h
a
m
b
e
r
3
3
7
A
0
8
A
A
C
2

T
a
i
l
i
n
g

T
h
i
c
k
e
n
i
n
g

L
a
u
n
d
e
r

a
n
d

S
a
m
p
l
e
r
3
3
7
A
0
9
A
A
C
2

T
a
i
l
i
n
g

T
h
i
c
k
e
n
i
n
g

P
i
p
e
r
a
c
k
3
3
8
A
0
0
A
A
C
2

T
a
i
l
i
n
g

H
a
n
d
l
i
n
g

S
y
s
t
e
m
3
3
8
B
0
0
A
A
C
2

T
a
i
l
i
n
g

C
y
c
l
o
n
e

F
a
c
i
l
i
t
y
3
3
8
D
0
0
A
A
C
2

T
a
i
l
i
n
g

D
i
s
t
r
i
b
u
t
i
o
n

S
y
s
t
e
m
3
3
8
E
0
0
A
A
C
2

R
e
c
l
a
i
m

W
a
t
e
r

S
y
s
t
e
m
3
3
8
F
0
0
A
A
C
2

S
e
e
p
a
g
e

W
a
t
e
r

S
y
s
t
e
m
3
5
2
B
0
0
A
A
C
1

E
l
e
c
t
r
i
c
a
l

2
2
0
k
V

M
a
i
n

S
u
b
s
t
a
t
i
o
n
3
5
2
E
0
0
A
A
C
1

E
l
e
c
t
r
i
c
a
l

H
a
r
m
o
n
i
c

F
i
l
t
e
r
s
3
5
7
Z
0
0
A
A
C
1

T
r
u
c
k

S
h
o
p
5
5
1
Z
0
0
A
A
C
2

F
r
e
s
h

W
a
t
e
r

S
y
s
t
e
m
3.1 35.0 3.9 17.8 29.2 1.6 1.5 8.0 8.0 2.8 6.0
51.9 29.3 10.4 26.8 35.9 3.1 1.5 1.5 1.5 5.5 3.8
34.0 2.2 0.6 0.6 13.0
102.5 126.1 13.4
318.4 10.9 6.7
39.6 2.8
3.0 33.9 3.8 17.3 28.4 1.5 1.5 7.8 7.8 2.8 5.8
23.1 13.0 4.6 11.9 16.0 1.4 0.7 0.7 0.7 2.4 1.7
10.3 0.7 0.2 0.2 3.9
69.5 85.5 9.1
221.3 7.6 4.7
59.3 4.2
1.0 11.3 1.3 5.8 9.5 0.5 0.5 2.6 2.6 0.9 1.9
37.5 21.1 7.5 19.4 25.9 2.2 1.1 1.1 1.1 3.9 2.8
9.7 0.6 0.2 0.2 3.7
1.7 2.1 0.2
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C_Att 5.xls
Page 13 of 16
Sociedad Minera Cerro Verde S.A.A.
Cerro Verde Production Unit Expansion
Project No. A6CV
240K-C2-SW-15-008
Revision A
Attachment 5
Pay
Class Description Units
HORIZONTAL BRACING
D1 Structural Steel, Light <= 30 kg/m t
D1a Structural Steel, Light <= 30 kg/m, Unpainted t
D2 Structural Steel, Medium, 30 < kg/m <= 60 t
D2a Structural Steel, Medium, 30 < kg/m <= 60, Unpainted t
D3 Structural Steel, Heavy, 60 < kg/m <= 90 t
D4 Structural Steel, X Heavy, 91 < kg/m <= 180 t
D5 Structural Steel, XX Heavy, > 181 kg/m t
3 PLATE BEAMS AND COLUMNS
E4 Structural Steel, X Heavy, 91 < kg/m <= 180 t
E5 Structural Steel, XX Heavy, 181 < kg/m <= 360 t
E6 Structural Steel, XXX Heavy, > 361 kg/m (except Jumbos) t
E7 Structural Steel, Jumbo Shape, > 642 kg/m t
CONVEYOR TRUSSES,
F1 Structural Steel, Light weight, 0 to 30 kg/m t
F2 Structural Steel, Medium Weight, 31 to 60 kg/m t
F3 Structural Steel, Heavy Weight, over 90 kg/m t
OVERLAND CONVEYOR TABLES & SUPPORTS,
G1 Structural Steel, Light, <= 30 kg/m t
G2 Structural Steel, Medium Weight, over 60 kg/m t
GIRTS,
H1 Structural Steel, Light <= 30 kg/m t
H2 Structural Steel, Medium Weight, 31 to 60 kg/m t
H3 Structural Steel, Heavy Weight, 61 to 90 kg/m t
PURLINS,
J1 Structural Steel, Light <= 30 kg/m t
J2 Structural Steel, Medium Weight, 31 to 60 kg/m t
J3 Structural Steel, Heavy Weight, 61 to 90 kg/m t
MISC. FRAMES < 200KG & COUNTERWEIGHT FRAMES,
K1 Misc Steel, Light <= 30 kg/m t
K1a Misc Steel, Light <= 30 kg/m, Unpainted t
K2 Misc Steel, Medium, 30 < kg/m <= 60 t
K3 Misc Steel, Heavy, 60 < kg/m t
K4 Counterweight Plates t
Sub-Totals t
12a Plateworks, Bins & Hoppers, 7.9 mm (5/16 inch) t
12b Plateworks, Bins & Hoppers, 9.5 mm (3/8 inch) t
3
3
7
A
0
5
A
A
C
2

T
a
i
l
i
n
g

T
h
i
c
k
e
n
i
n
g

R
e
c
y
c
l
e

W
a
t
e
r

C
h
a
m
b
e
r
3
3
7
A
0
8
A
A
C
2

T
a
i
l
i
n
g

T
h
i
c
k
e
n
i
n
g

L
a
u
n
d
e
r

a
n
d

S
a
m
p
l
e
r
3
3
7
A
0
9
A
A
C
2

T
a
i
l
i
n
g

T
h
i
c
k
e
n
i
n
g

P
i
p
e
r
a
c
k
3
3
8
A
0
0
A
A
C
2

T
a
i
l
i
n
g

H
a
n
d
l
i
n
g

S
y
s
t
e
m
3
3
8
B
0
0
A
A
C
2

T
a
i
l
i
n
g

C
y
c
l
o
n
e

F
a
c
i
l
i
t
y
3
3
8
D
0
0
A
A
C
2

T
a
i
l
i
n
g

D
i
s
t
r
i
b
u
t
i
o
n

S
y
s
t
e
m
3
3
8
E
0
0
A
A
C
2

R
e
c
l
a
i
m

W
a
t
e
r

S
y
s
t
e
m
3
3
8
F
0
0
A
A
C
2

S
e
e
p
a
g
e

W
a
t
e
r

S
y
s
t
e
m
3
5
2
B
0
0
A
A
C
1

E
l
e
c
t
r
i
c
a
l

2
2
0
k
V

M
a
i
n

S
u
b
s
t
a
t
i
o
n
3
5
2
E
0
0
A
A
C
1

E
l
e
c
t
r
i
c
a
l

H
a
r
m
o
n
i
c

F
i
l
t
e
r
s
3
5
7
Z
0
0
A
A
C
1

T
r
u
c
k

S
h
o
p
5
5
1
Z
0
0
A
A
C
2

F
r
e
s
h

W
a
t
e
r

S
y
s
t
e
m
2.0 22.6 2.5 11.5 18.9 1.0 1.0 5.2 5.2 1.8 3.9
31.7 17.9 6.4 16.4 21.9 1.9 0.9 0.9 0.9 3.3 2.3
0.0 122.6 8.3 38.3 56.6 1.8 1.3
965.6 184.1 40.4 122.6 153.6 491.8 69.7 13.8 28.7 28.7 86.5 28.3
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C_Att 5.xls
Page 14 of 16
Sociedad Minera Cerro Verde S.A.A.
Cerro Verde Production Unit Expansion
Project No. A6CV
240K-C2-SW-15-008
Revision A
Attachment 5
Pay
Class Description Units
12c Plateworks, Bins & Hoppers, 12.7 mm (1/2 inch) t
12d Plateworks, Bins & Hoppers, 15.9 mm (5/8 inch) t
13a Crane Rail w/splices (40#) t
13b Crane Rail w/splices (60#) t
13c Crane Rail w/splices (85#) t
13d Crane Rail w/splices (104#) t
13e Crane Rail w/splices (135#) t
13f Crane Rail w/splices (171#) t
13g Crane Rail w/splices (175#) t
14a Gantrex Weldable Rail Clips, Weldlok 10 each
14b Gantrex Weldable Rail Clips, Weldlok 15 each
14c Gantrex Weldable Rail Clips, Weldlok 18 each
14d Gantrex Weldable Rail Clips, Weldlok 20 each
14e Gantrex Weldable Rail Clips, Weldlok 24 each
14f Gantrex Weldable Rail Clips, Weldlok 32 each
14g Gantrex Weldable Rail Clips, Weldlok 43 each
15 Stairs w/ Handrail & Kickplates t
15a
Stair Treads , 32x5 bearing bars (1.25 inch deep), price with
one shop coat primer only, shop bolted to stringers
each
16
Floor Grating, 32x5 bearing bars (1.25 inch deep), price with
one shop coat primer only
m2
16s
Floor Grating Serrated, 32x5 bearing bars (1.25 inch deep),
price with one shop coat primer only
m2
16gc
Grating Clamps (Hilti DIX Fasteners), Not included in 16
above
each
16ssc
Grating Clamps (Stainless G-Clips), Not included in 16
above
each
17a
Heavy duty 2" deep grating (51mm deep) , Price with one
shop coat primer only
m2
17b
Heavy duty 3" deep grating (76mm deep) , Price with one
shop coat primer only
m2
17c
Heavy duty 4" deep grating (102mm deep) , Price with one
shop coat primer only
m2
18
Roof Decking Galvanized , 38 deep x 0.76 (22 ga 1.5 inch
deep)
m2
19
Roof/Floor Deck Galvanized , 38 deep x 0.91 (20 ga 1.5 inch
deep)
m2
20a
Roof/Floor Deck Galvanized , 76 deep x 0.91 (20 ga 3 inch
deep)
m2
3
3
7
A
0
5
A
A
C
2

T
a
i
l
i
n
g

T
h
i
c
k
e
n
i
n
g

R
e
c
y
c
l
e

W
a
t
e
r

C
h
a
m
b
e
r
3
3
7
A
0
8
A
A
C
2

T
a
i
l
i
n
g

T
h
i
c
k
e
n
i
n
g

L
a
u
n
d
e
r

a
n
d

S
a
m
p
l
e
r
3
3
7
A
0
9
A
A
C
2

T
a
i
l
i
n
g

T
h
i
c
k
e
n
i
n
g

P
i
p
e
r
a
c
k
3
3
8
A
0
0
A
A
C
2

T
a
i
l
i
n
g

H
a
n
d
l
i
n
g

S
y
s
t
e
m
3
3
8
B
0
0
A
A
C
2

T
a
i
l
i
n
g

C
y
c
l
o
n
e

F
a
c
i
l
i
t
y
3
3
8
D
0
0
A
A
C
2

T
a
i
l
i
n
g

D
i
s
t
r
i
b
u
t
i
o
n

S
y
s
t
e
m
3
3
8
E
0
0
A
A
C
2

R
e
c
l
a
i
m

W
a
t
e
r

S
y
s
t
e
m
3
3
8
F
0
0
A
A
C
2

S
e
e
p
a
g
e

W
a
t
e
r

S
y
s
t
e
m
3
5
2
B
0
0
A
A
C
1

E
l
e
c
t
r
i
c
a
l

2
2
0
k
V

M
a
i
n

S
u
b
s
t
a
t
i
o
n
3
5
2
E
0
0
A
A
C
1

E
l
e
c
t
r
i
c
a
l

H
a
r
m
o
n
i
c

F
i
l
t
e
r
s
3
5
7
Z
0
0
A
A
C
1

T
r
u
c
k

S
h
o
p
5
5
1
Z
0
0
A
A
C
2

F
r
e
s
h

W
a
t
e
r

S
y
s
t
e
m
14.4
0.7
5.0 7.5 2.6 3.6 0.4 0.4 0.2
1,532.5 553.6 84.0 136.0 90.0 57.5 57.5 8.1
86.5 86.5
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C_Att 5.xls
Page 15 of 16
Sociedad Minera Cerro Verde S.A.A.
Cerro Verde Production Unit Expansion
Project No. A6CV
240K-C2-SW-15-008
Revision A
Attachment 5
Pay
Class Description Units
20b
Roof/Floor Deck Galvanized , 76 deep x 1.22 (18 ga 3 inch
deep)
m2
21 Deck Plate, Steel, 12 Ga m2
22 Checker Plate, 64 mm Thk, Panel Assemblies m2
23 Walkway, Gripstrut m
25 Handrail w/ Kickplate, Pipe t
27 Ladder w/ Cage t
28 Safety Gate each
29a Bolts, Nuts & washers, ASTM A307 t
29b Bolts, Nuts & washers(Anchor Bolt), ASTM A307 t
29c Sag rods, galvanized, nuts & washers, ASTM A307 t
30a Bolts, Nuts & washers, ASTM A325 t
30b Bolts, Nuts & washers, ASTM F1852 twist off t
30c Bolts, Nuts & washers, ASTM A490 t
30d Bolts, Nuts & washers, ASTM F2280 twist off t
31 Stainless steel Bolts, Nuts & Washers t
32 Conveyor Sliding Connection Assembly t
33 Conveyor Fixed Connection Assembly t
34
Fabreeka impact absorbing pads, 100 x 100 x 50 (size to be
confirmed)
each
37a Idler Shim Plates t
37b Common Shim Plates t
38a Paint, Primer Touch-up paint liter
38b Paint, Touch-up Paint liter
39 Magnetic Particle Testing lin m
40 Ultrasonic Testing, UT, groove welds lin m
41 Ultrasonic Testing, UT, surface scan m2
42 Radiographic Testing, per film hour
43 Shop Rework - Fabrication hour
44 Shop Rework - Painting hour
45 Shop Rework - Detailing and Engineering hour
46 Site Representative day
47 Shear Studs for Field Weld each
3
3
7
A
0
5
A
A
C
2

T
a
i
l
i
n
g

T
h
i
c
k
e
n
i
n
g

R
e
c
y
c
l
e

W
a
t
e
r

C
h
a
m
b
e
r
3
3
7
A
0
8
A
A
C
2

T
a
i
l
i
n
g

T
h
i
c
k
e
n
i
n
g

L
a
u
n
d
e
r

a
n
d

S
a
m
p
l
e
r
3
3
7
A
0
9
A
A
C
2

T
a
i
l
i
n
g

T
h
i
c
k
e
n
i
n
g

P
i
p
e
r
a
c
k
3
3
8
A
0
0
A
A
C
2

T
a
i
l
i
n
g

H
a
n
d
l
i
n
g

S
y
s
t
e
m
3
3
8
B
0
0
A
A
C
2

T
a
i
l
i
n
g

C
y
c
l
o
n
e

F
a
c
i
l
i
t
y
3
3
8
D
0
0
A
A
C
2

T
a
i
l
i
n
g

D
i
s
t
r
i
b
u
t
i
o
n

S
y
s
t
e
m
3
3
8
E
0
0
A
A
C
2

R
e
c
l
a
i
m

W
a
t
e
r

S
y
s
t
e
m
3
3
8
F
0
0
A
A
C
2

S
e
e
p
a
g
e

W
a
t
e
r

S
y
s
t
e
m
3
5
2
B
0
0
A
A
C
1

E
l
e
c
t
r
i
c
a
l

2
2
0
k
V

M
a
i
n

S
u
b
s
t
a
t
i
o
n
3
5
2
E
0
0
A
A
C
1

E
l
e
c
t
r
i
c
a
l

H
a
r
m
o
n
i
c

F
i
l
t
e
r
s
3
5
7
Z
0
0
A
A
C
1

T
r
u
c
k

S
h
o
p
5
5
1
Z
0
0
A
A
C
2

F
r
e
s
h

W
a
t
e
r

S
y
s
t
e
m
76.6 76.6
14.9 1.2 47.1 2.2 1.2 1.0 0.3
1.7 0.5 3.6 0.1
W:\103_PROJ_ADMIN\109_ENG DOCS\109.2R_SW\15-Structural\240K-C2-SW-15-008_PeruvianFabrication\240K-C2-SW-15-008-C_Att 5.xls
Page 16 of 16

You might also like