Attachment to Tender Schedule E

Schedule of Prices
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

RAAF BASE WILLIAMTOWN PAVEMENT WORKS

a Preliminary and General

1 Runway 12-30
2 Runway 12 RESA
3 Runway 12-30 ORP
4 Taxiway A
5 Taxiway B
6 Taxiway C
7 Taxiway D
8 Taxiway E
9 Taxiway H
10 Taxiway J
11 Taxiway M
12 Invert 3 to 5
13 Air Movements Apron
14 FACDU Apron
15 Main Apron
16 75 SQN Apron
17 AEW&C Apron
18 2 SQN Hangar Apron
19 South East (SAR) Helicopter Apron
20 FRA
21 Boeing Hangar Apron
22 ERU Apron
23 Aircraft Wash Apron
24 Compass Swing Platform
25 Access Road
26 Provisional Items

Base Subtotal

Individual pricing items shown on drawings

3540138 1
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST


General

The following abbreviations for units and works have been Note
used in this schedule:
mm = millimetre
m = linear metre
m2 = square metre
m3 = cubic metre
No. = number
kg = kilogram
t = tonne
hr = hour
LS = lump sum
PS = Provisional Sum
AC = Asphaltic Concrete
RBB = Rubberised Bituminous Bandage
PME = Polymer Modified Bitumen Emulsion
AGL = Aeronautical Ground Lighting

Tenderers are advised that this Schedule is to be read in Note


conjunction with the Drawings and Specification to which
they are hereby referred for full description of the items
measured herein.

Tenderers are referred to the General and Special Note


Conditions of Contract and the Preliminaries Section of the
Specification and are deemed to have allowed herein for
all items that may affect the works, such as night works.

The prices and rates entered in this Schedule are deemed Note
to have allowed for ALL costs involved in supply, placing
and /or fixing each item in its final position or form.
Unpriced items are deemed to be included elsewhere.

The Contract Administrator (CA) must be notified of any Note


discrepancies between this Schedule, the plans and the
Specification prior to any work being undertaken on the
items in question.

3540138 2
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

All items measured herein are measured net and no Note


allowance has been made for waste, overbreak,
compaction, rolling margins, tolerances and the like.
All costs associated with these items are deemed to be
included in the rates.

All rates entered herein shall be exclusive of GST Note

Quantities provided in this schedule are the Contract Note


Administrator's estimate of actual works as shown on the
Tender Drawings.
Notwithstanding, there is no guarantee as to the accuracy
of this information. No allowance has been made for
wastage, construction tolerances or temporary works
including ramping.

Asphalt tonnage has been based on an assumed density Note


of 2.4 tonne/m3.

3540138 3
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

a Preliminary

a1.1 Mobilise to the site, maintain and subsequently remove from site all Sum 1
necessary plant, equipment, gear, hoists, tools, cartage, transport, car
parking, temporary facilities and the like. Include for giving all trades
and subcontractors the free use of same as required.

a1.2 Ongoing overheads and other costs not included elsewhere in the Sum 1
schedule

a1.3 Quality Plan, Safety Plan, Environmental Management Plan and Sum 1
Program, Submission of Mix Design and materials test results

a1.4 Provision of "As-Constructed" drawings. Sum 1

a1.5 Provide any directional/ warning signs and barriers as required Sum 1
including markers and lights in accordance with CASA MoS139,
remove from site upon completion.

a1.6 Allow for full time site based suitable qualified and experienced Works Sum 1
Safety Officer (WSO) for the duration of the works, including
mobilisation, vehicles, accommodation, meals and other allowances.

3540138 4
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

1 Runway 12-30

1.1 Clean and fill pock marks (cavities) in the surface of the No 20 -
concrete at both runway ends with RBB or SRE(S)

1.2 Spalling on the concrete joints caused by SRE(S) de- 2 2.5 -


m
bonding from the joint surface to be cut back and
treated with SRE(S) - allow for over 20 individual spall
repairs.

1.3 Rout out, clean and reseal older brittle sections of joint m 2000 -
sealant with Thioflex 600;

1.4 Rout out, clean and seal mid slab transverse cracking m 20 -
with Thioflex 600

1.5 Transverse joint spall repair to the immediate east of 2 0.5 -


m
the interface with the asphalt on the Runway 30
Threshold using SRE(S).

1.6 Asphalt patch repair at both thresholds at the interface 2 360 -


m
between the concrete and asphalt. Mill out existing AC
pavement to a depth of 150mm (45m long x 4m wide),
apply tack coat and supply and compact AC Mix 14. Cut
grooves in asphalt 6x6x38mm centres)

1.7 Apply 50mm wide RBB to asphalt patches perimeter m 48 -


(Item 1.6)

1.8 Remove and reinstate both the black outline paint and 2 144 -
m
white markings at both Runway Thresholds;

1.9 Apply PME to localised coarse areas of asphalt, to the 2 300 -


m
east of the intersection with Taxiway C, 125m north
west of the Runway 30 arrestor assembly and to the
immediate west of the concrete asphalt interface at the
Runway 30 Threshold

1.10 Apply 50mm wide RBB to open longitudinal and m 2500 -


transverse construction joints (including concrete and
asphalt interfaces), parallel cracks, spalling secondary
AGL cable slots and mid paver run cracks along the
length of Runway 12-30

1.11 Apply 50mm wide RBB to transverse joints are open up m 300 -
to 2mm wide with some minor spalling

1.13 Apply 50mm wide RBB to the perimeter of all asphalt m 250 -
patches (near the Runway 30 arrestor and west of the
Taxiway C intersection south of the centreline)

3540138 5
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

1.14 Apply PME to scuff marks from aircraft and vehicles 2 150 -
m
turning on the runway and from the arrestor assemblies

1.15 Treat edge drop off to surrounding grass strip. Remove 2 100 -
m
loose aggregates, supply and place seeded topsoil and
spray with bituminous emulsion along the edge of
Runway 12-30

Subtotal ** -

3540138 6
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

2 Runway 12 RESA

2.1 Remove weeds, treat with an approved pesticide and m 120 -


apply 50mm wide RBB to concrete joints on arrestor net
slab

2.2 Apply 50mm wide RBB to open cracks on blisters m 30 -

Subtotal ** -

3540138 7
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

3 Runway 12-30 ORP

3.1 Apply 50mm wide RBB to spalling joints along the m 150 -
interface with the southern ORP at the Runway 30
Threshold

3.2 Fill pitting concrete surface on the northern ORPs with No 1 -


SRE(S)

3.3 Apply 50mm wide RBB to interface between the asphalt m 150 -
and concrete on the northern shoulder

3.4 Cracked concrete surrounds for tie-down points in the m 5 -


northern ORP at the Runway 30 Threshold to be treated
with 50mm RBB

Subtotal ** -

3540138 8
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

4 Taxiway A

4.1 Rout out, clean and seal with Thioflex 600 a longitudinal m 30 -
crack (3mm wide) on Taxiway A1 south of interface with
the asphalt

4.2 Asphalt patch repair. Mill out existing AC pavement to a 2 60 -


m
depth of 50mm, apply tack coat and supply and
compact AC14 Mix. Apply 50mm RBB to patch
perimeter.

4.3 Asphalt patch (ramping) repair towards at concrete 2 45 -


m
asphalt interface at taxiway A1. Mill out existing AC
pavement to a depth of 75mm, apply tack coat and
supply and compact AC14 Mix. Apply 50mm RBB to
patch perimeter.

4.4 Asphalt patch repair on Taxiway A2 to area exhibiting 2 240 -


m
longitudinal cracking between recent patch repairs. Mill
out existing AC pavement to a depth of 140mm (8m x
30m long), apply tack coat and supply and compact
AC14 Mix. Apply 50mm RBB to patch perimeter.

4.5 Apply 50mm wide RBB to the perimeter of the patched m 76 -


areas from Item 4.4

4.6 AC14 Mix 10 140mm deep asphalt patch repair east of m2 240 -
the concrete pavement on Taxiway A1 to areas
exhibiting longitudinal cracking
-
4.7 Asphalt patch repair on Taxiway A2, between OLAs 5 2 50 -
m
and 6 to areas exhibiting shoving cracks in the aircraft
wheel paths (i 8m long x 3m wide) (ii 5m long x 3m
wide) (iii 5m long x 2m wide). Mill out existing AC
pavement to a depth of 140mm, apply tack coat and
supply and compact AC14 Mix.
-
4.8 Apply 50mm wide RBB to the perimeter of the patched m 130 -
areas from Item 4.6 and 4.7

4.9 Asphalt patch repair on Taxiway A3 to areas exhibiting 2 80 -


m
rutting. Mill out existing AC pavement to a depth of
100mm (20m long x 4m wide), apply tack coat and
supply and compact AC14 Mix.

4.10 Apply 50mm wide RBB to the perimeter of the patched m 48 -


area from Item 4.9

4.11 Apply PME to localised areas along centreline of 2 50 -


m
Taxiway A2 towards Taxiway C.

3540138 9
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

4.12 Apply 75mm wide RBB to open construction joints m 1000 -


(including patch repairs) and spalling secondary AGL
cable slots. Allow up to 500m length along Taxiways A1
and A2, 250m length along Taxiway A3 and A4 and a
250m length along Taxiway A5, priority to bandage seal
cracks within the central 10m width.

4.13 Pavement markings to be reapplied in faded and flaking 2 500 -


m
areas along Taxiway A - allow for up to 10% of existing
markings to be reapplied.

4.14 Apply 50mm wide RBB to transverse crack m 4 -


approximately 4m long west of OLA 2

4.15 Remove weeds, treat with an approved pesticide and m 20 -


apply 50mm wide RBB to open cracks on shoulders

4.16 Apply PME to localised sections of shoulder pavement 2 20 -


m
with very coarse surface texture. Carry out in
conjunction with 4.15

4.17 Apply 50mm wide RBB to open diagonal cracks towards m 100 -
the outer wheel paths near intersection with Taxiway D
and parallel cracking developing adjacent to longitudinal
joints

4.18 Apply 50mm wide RBB to seal interface between m 30 -


Taxiway A and redundant pavement opposite Compass
Swing Platform

4.19 Apply 50mm wide RBB to (monitor) blisters along m 1250 -


southern shoulder pavement opposite Taxiway G for
surface cracking and heaving

4.20 Apply 50mm wide RBB to perimeter of trench m 50 -


reinstatement across taxiway curve leading on to the 30
Runway Threshold

4.21 Rout out, clean and seal fine mid bays cracking (less m 20 -
than 2mm wide) with Thioflex 600

4.22 Apply 50mm wide RBB to interface between the asphalt m 50 -


and concrete pavements along Taxiway A5 and weed
removal. (Review location)

Subtotal ** -

3540138 10
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

5 Taxiway B

5.1 Apply 50mm wide RBB to open longitudinal and m 150 -


transverse construction joints and spalling AGL cable
slots

5.2 Asphalt patch repair at invert 5 to area exhibiting rutting. m2 15 -


Mill out existing AC pavement to a depth of 100mm,
apply tack coat and supply and compact AC Mix 14.
Apply 50mm RBB to patch perimeter.

5.3 Apply 50mm wide RBB to patch perimeter of Item 5.2 m 16 -

Subtotal ** -

3540138 11
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

6 Taxiway C

6.1 Apply 50mm wide RBB to longitudinal joints m 150 -

6.2 Clean pavement edge. Saw cut back asphalt, excavate 2 40 -


m
and remove loose material. Supply and place seeded
topsoil and spray with bitumen emulsion to edge fillets
on Runway 12-30

Subtotal ** -

3540138 12
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

7 Taxiway D

7.1 Asphalt patch repair towards Taxiway E where there is 2 60 -


m
evidence of rutting in the wheel path . Mill out existing
AC pavement to a depth of 100mm, apply tack coat and
supply and compact AC Mix 14.

7.2 Apply 50mm wide RBB to perimeter of the patch Item m 64 -


7.1

7.3 Apply 50mm wide RBB to open longitudinal and m 250 -


transverse joints

7.4 Apply 75mm wide RBB to open spalling AGL cable slots m 50 -

7.5 Supply and place seeded topsoil and spray with 2 25 -


m
bituminous emulsion on the edges along Taxiway D

Subtotal ** -

3540138 13
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

8 Taxiway E

8.1 Asphalt patch repair on Taxiway E1 and E2 to areas of 2 50 -


m
rutting. Mill out existing AC pavement to a depth of
100mm, apply tack coat and supply and compact AC
Mix 14. Apply 50mm RBB to patch perimeter.

8.2 Apply 50mm RBB to open longitudinal and transverse m 200 -


joints and cracks on Taxiway E2

8.3 Apply 75mm wide RBB to open spalling AGL cable slots m 200 -
on Taxiway E2 (at Inverts 7 and 8)

8.4 Apply 50mm wide RBB along Taxiway E3 to perimeter m 200 -


of trench reinstatement and open construction joints

8.5 Cut back gate tubes near the dog leg in Taxiway E3 sum 1 -

Subtotal ** -

3540138 14
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

9 Taxiway H

9.1 Treat edge drop off at the intersection of Taxiway H. 2 150 -


m
Supply and place seeded topsoil and spray with
bituminous emulsion on the edges

Subtotal ** -

3540138 15
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

10 Taxiway J

10.1 Apply 50mm wide RBB to open transverse cracks m 100 -

-
-

Subtotal ** -

3540138 16
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

11 Taxiway M

-
-
-

Subtotal ** -

3540138 17
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

12 Inverts 3 to 5

12.1 Apply 50mm wide RBB to longitudinal cold joints m 150 -


towards edge of Taxiway B and to all concrete and
asphalt interfaces

12.2 Apply 50mm wide RBB to secondary AGL cable slots m 100 -

12.3 Apply 50mm wide RBB to cracking in wheel paths at m 50 -


Taxiway Inverts

-
-
-

Subtotal ** -

3540138 18
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

13 Air Movements Apron

13.1 Apply Fuel resistant membrane (FRM) to localised 2 100 -


m
areas where fuel damage has occurred

13.2 Apply 50mm wide RBB to open longitudinal joints m 10 -

-
-

Subtotal ** -

3540138 19
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

14 FACDU Apron

14.1 Rout out, clean and reseal existing failed crack repair to m 5 -
the immediate north of the FACDU Apron with Thioflex
600

14.2 Undertake SRE(S) repairs to failed concrete spall 2 0.2 -


m
repairs

Concrete Slab replacement works

14.3 Supply and place barriers at 1m intervals m 280 -

14.4 Saw cut along perimeter of works area. Min depth m 182 -
100mm

14.5 Break out and remove from site existing 100mm thick 2 1848 -
m
prestressed concrete slabs

14.6 Excavate existing basecourse and remove from site 3 462 -


m

14.7 Excavate to subgrade level and remove material from 3 462 -


m
site

14.8 Prepare and compact subgrade and proof roll 2 1848 -


m

14.9 Supply, place and compact basecourse 200mm depth. 2 1848 -


m
(Fine crushed rock material)

14.10 Construct joint type A m 30.4 -


-
14.11 Construct joint type C m 456 -

14.12 Construct joint type E m 91 -

14.13 Construct joint type L m 424.2 -

14.14 Construct joint type T m 60.6 -

14.15 Supply, place and compact 375mm thick airfield 3 750 -


m
pavement concrete

14.16 Saw cut along extents of new slot drain m 55 -

14.17 Excavate trench for new slot drain 650mm width x m 42 -


690mm deep

14.18 Prepare and compact trench base 650mm width m 42 -

14.19 Supply place and compact fine crushed rock. 100mm 2 43 -


m
depth

3540138 20
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

14.20 Supply and install 225 dia Elkinston/Gatic m 40 -


Ultraslot/Paveslot channel (F900 loading) and
associated concrete and rebar as per manufacturers

14.21 Supply and install Elkinston/Gatic Ultra heavy Duty No 1 -


(F900) outlet box and associated concrete and

14.22 Excavate 600mm wide trench. Supply and lay 300mm m 25 -


dia RCRRJ Class z pipe and backfill as detailed. Allow
for connection to existing manhole.

14.23 Reinstate existing paint markings (150mm yellow m 150 -


centreline)

14.24 Allow for excavation and removal of unsuitable sand 3 100 -


m
and filling with suitable sand

14.25 Supply and place static earthing terminal No 3 -

14.26 Investigation and testing of contaminated areas LS 1 -

Subtotal ** -

3540138 21
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

15 Main Apron

15.1 Rout out, clean and seal cracks on the concrete m 150 -
pavements - numerous locations.

15.2 Undertake spall repairs on the concrete pavements 2 5 -


m
using SRE(S) - numerous locations.

15.3 Undertake spall repairs to the south of the 2OCU no 1 -


Hangar using a SRE(S) product. Infill pock mark
adjacent to EP 332 with SRE(S) - approx 100mm
diameter.

15.4 Undertake concrete repairs to the grated drains to the no 1 -


north and south west of 3SQN Hangar – (i) allow 3m
long by 260mm wide with Grade 40/10 concrete and (ii)
smaller spalls with SRE(S).

15.5 Apply 50mm wide RBB to open transverse cracks in m 100 -


2OCU asphalt shoulder

15.6 Apply SEST in 2OCU to asphalt shoulder in conjunction m2 1000 -


with item 15.5

15.7 Asphalt patch repairs to heavy block cracking in the 2 100 -


m
asphalt pavement north of Shelters A and B. Mill out
existing AC pavement to a depth of 100mm, apply tack
coat and supply and compact AC14 Mix. Apply 50mm
RBB to patch perimeter. (3m by 25m to the north of
Shelter A and 4m by 4m to the north of Shelter B)

15.8 Apply 50mm wide RBB to open joints and cracks on the m 200 -
perimeter of pits in the asphalt pavement north of
Shelters A and B

15.9 Remove weeds, treat with an approved pesticide and m 75 -


apply 50mm wide RBB to joint seal repairs on the
asphalt concrete interface to the south of Shelter A

Subtotal ** -

3540138 22
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

16 76 SQN Apron

16.1 Undertake SRE(S) concrete spall repairs to the 2 0.25 -


m
northern section of the apron - allow 2.5m long by
100mm wide.

16.2 Undertake SRE(S) concrete spall repairs to the large 2 0.35 -


m
slabs to the southern section of the apron - allow 3.5m
long by 100mm wide.

16.4 Asphalt patch repair to south shoulder. Mill out existing 2 10 -


m
AC pavement to a depth of 50mm, apply tack coat and
supply and compact AC14 Mix.

16.5 Apply 50mm wide RBB to perimeter of the patch Item m 14 -


16.4

16.6 Apply 50mm RBB treatment to open asphalt concrete m 300 -


joints

Subtotal ** -

3540138 23
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

17 AEW&C Apron

17.1 Apply 50mm wide RBB to open asphalt concrete m 450 -


pavement interfaces

17.2 Apply 50mm wide RBB to open asphalt pavement m 75 -


interface with Taxiway B

17.3 Apply 50mm wide RBB spalling AGL cable slots and m 100 -
longitudinal paver joints at the east entrance to AEW&C
Apron from Taxiway B

17.4 Survey and renew markings on the AEW&C Apron sum 1 -

Subtotal ** -

3540138 24
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

18 2 SQN Hangar Apron

18.1 Rout out, clean and seal spalling cracks with Thioflex m 15 -
600 joint sealant

Subtotal ** -

3540138 25
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

19 South East (SAR) Helicopter Apron

19.1 Rout out, clean and seal concrete joints to the east of m 500 -
the SAR/Flying Club Hangar with Thioflex 600 or similar
approved product

19.2 Localised SRE(S) joint spall repairs – allow 500mm by 2 0.05 -


m
100mm wide.

19.3 Repair cracked and spalled concrete to grated slot drain m2 3.75 -
by SAR/Flying Club Hangar with Grade 40/10 concrete
in 2010 – allow 15m length by 250mm wide by 200mm
deep

19.4 Clean and repaint pavement markings to the SAR m 60 -


helicopter parking location - allow 60m of yellow
markings 150mm wide.

Subtotal ** -

3540138 26
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

20 FRA

20.1 SRE(S) spall repairs to concrete joints, allow up to 40m 2 2 -


m
x 0.05m wide

20.2 Rout out, clean and seal cracks in FRA area with m 25 -
Thioflex 600

20.3 Apply 50mm wide RBB to asphalt and concrete m 300 -


interface around perimeter of FRA

20.4 Asphalt repair on northern edge of FRA. Mill out existing m2 450 -
AC pavement to a depth of 40mm, apply tack coat and
supply and compact AC10 Mix. Apply 50mm RBB to
joint. (4.5m wide x 100m long)

Subtotal ** -

3540138 27
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

21 Boeing Hangar Apron

21.1 Rout out, clean and seal joints with Thioflex 600. m 500 -

21.2 Break and remove mound of concrete in south western sum 1 -


section of apron

21.3 Apply 50mm wide RBB to open longitudinal cracks, m 250 -


asphalt and concrete pavement interfaces and
perimeter of trench reinstatement

21.4 Apply SEST to asphalt shoulder pavement on western 2 75 -


m
side of Boeing Hangar Aprons

21.5 Cut back grass strip to north of intersection of Taxiways 2 50 -


m
D and E.

Subtotal ** -

3540138 28
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

22 ERU Apron

22.1 Remove weeds, treat with an approved pesticide and m 50 -


apply 50mm wide RBB to asphalt shoulder interface
with concrete slabs

Subtotal ** -

3540138 29
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

23 Aircraft Wash Apron

23.1 Supply and place seeded topsoil and spray with 2 25 -


m
bituminous emulsion on the edges on east taxiway

Subtotal ** -

3540138 30
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

24 Compass Swing Platform

24.1 Apply 50mm wide RBB to open longitudinal cracks m 100 -

Subtotal ** -

3540138 31
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

25 Access Road

25.1 Apply 50mm wide RBB to cracks m 50 -

Subtotal ** -

3540138 32
2009-10 National Airfields Project - Package 1
PROJECT: RAAF Base Williamtown Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

26 Provisional Items

26.1 Daily Rate for WSO (10 hour shift) Day Rate Only -
-
26.2 Reinstate runway edge markings on Runway 12-30 m 2500 -
(Provisional)

26.3 Rubber removal over the central 16m width of Runway 2 4000 -
m
12-30 (Provisional)

26.4 Pavement marking on the Air Movement Apron. 2 250 -


m
(Provisional)

26.6 FACDU Apron: Excavation (2m deep) and removal of 3 1520 -


m
contaminated material to a licensed landfill site
(Provisional).

26.7 FACDU Apron: Supply, placement and compaction of 3 1520 -


m
crushed rock (2m thick) (Provisional)

Subtotal Provisional Items ** -

3540138 33
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

RAAF BASE RICHMOND PAVEMENT WORKS

a Preliminary and General

1 Runway 10-28
2 Taxiway Z
b2 Taxiway A
3 Taxiway B
4 Taxiway C
5 Taxiway D
6 Taxiway E
7 Taxiway G
8 Taxiway H
9 Western ORP Apron
10 Eastern ORP
11 Eastern Tarmac
12 Western Tarmac
13 ERUF
14 Flying Club Taxiway and Apron
15 Fire Station Apron
16 OLA
17 Aircraft Wash
18 Provisional Items

Base Subtotal

Individual pricing items shown on drawings

3540138 34
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST


General

The following abbreviations for units and works have been Note
used in this schedule:
mm = millimetre
m = linear metre
m2 = square metre
m3 = cubic metre
No. = number
kg = kilogram
t = tonne
hr = hour
LS = lump sum
PS = Provisional Sum
AC = Asphaltic Concrete
RBB = Rubberised Bituminous Bandage
PME = Polymer Modified Bitumen Emulsion
AGL = Aeronautical Ground Lighting

Tenderers are advised that this Schedule is to be read in Note


conjunction with the Drawings and Specification to which
they are hereby referred for full description of the items
measured herein.

Tenderers are referred to the General and Special Note


Conditions of Contract and the Preliminaries Section of the
Specification and are deemed to have allowed herein for
all items that may affect the works, such as night works.

The prices and rates entered in this Schedule are deemed Note
to have allowed for ALL costs involved in supply, placing
and /or fixing each item in its final position or form.
Unpriced items are deemed to be included elsewhere.

The Contract Administrator (CA) must be notified of any Note


discrepancies between this Schedule, the plans and the
Specification prior to any work being undertaken on the
items in question.

3540138 35
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

All items measured herein are measured net and no Note


allowance has been made for waste, overbreak,
compaction, rolling margins, tolerances and the like.
All costs associated with these items are deemed to be
included in the rates.

All rates entered herein shall be exclusive of GST Note

Quantities provided in this schedule are the Contract Note


Administrator's estimate of actual works as shown on the
Tender Drawings.
Notwithstanding, there is no guarantee as to the accuracy
of this information. No allowance has been made for
wastage, construction tolerances or temporary works
including ramping.

Asphalt tonnage has been based on an assumed density Note


of 2.4 tonne/m3.

3540138 36
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

a Preliminary

a1.1 Mobilise to the site, maintain and subsequently remove from site all Sum 1
necessary plant, equipment, gear, hoists, tools, cartage, transport, car
parking, temporary facilities and the like. Include for giving all trades
and subcontractors the free use of same as required.

a1.2 Ongoing overheads and other costs not included elsewhere in the Sum 1
schedule

a1.3 Quality Plan, Safety Plan, Environmental Management Plan and Sum 1
Program, Submission of Mix Design and materials test results

a1.4 Provision of "As-Constructed" drawings. Sum 1

a1.5 Provide any directional/ warning signs and barriers as required Sum 1
including markers and lights in accordance with CASA MoS139,
remove from site upon completion.

a1.6 Allow for full time site based suitable qualified and experienced Works Sum 1
Safety Officer (WSO) for the duration of the works, including
mobilisation, vehicles, accommodation, meals and other allowances.

3540138 37
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

1 Runway 10-28

1.1 Apply 50mm wide RBB to open transverse and m 450


longitudinal joints and cracks on Runway 10-28. (150m
on Runway End 10, 150m on Runway End 28, 75m on
the Runway 10 RESA and 75m on the Runway 28
RESA). Open cracks on Runway 28 RESA to be filled
with sand prior to sealing.

1.2 Apply PME to localised areas of groove damage m2 25


Runway 10

1.3 Apply 50mm wide RBB to open joints either side of the m 225
interfaces of the concrete and asphalt at both
thresholds.

1.4 Undertake concrete joints spalls repairs (minimum m2 0.5


150mm wide) with SRE(S) at both thresholds – allow 1m
at Runway End 10 and 2m at Runway End 28.

1.5 Rout out, clean and seal repairs to concrete slabs at the m 10
Runway 28 Threshold

1.6 Apply 50mm wide RBB to open joints either side of the m 200
arrestor gear concrete slabs

1.7 Apply 75mm wide RBB to AGL slot at Taxiway D m 10

1.8 Treat edge drop offs on northern edge of Runway End m2 10


28 and on the northern edge of Runway 10 RESA.
Supply and place seeded topsoil and spray with bitumen
emulsion.

1.9 Remove concrete up stands and transformers to the sum 1


immediate west of the Runway 10 RESA

1.10 Asphalt patch repair on southern shoulder Runway End m2 80


10 to areas of >10mm rutting. Mill out existing AC
pavement to a depth of 25mm, apply tack coat and
supply and compact AC Mix 10.

1.11 Perimeter of patch repair in Item 1.12 to be sealed with m 84


RBB.

1.12 Spall repair along the centreline at the Runway 10 m2 0.15


Threshold (four bays west of the concrete and asphalt
interface). Treat with SRE(S) (spall repair 800mm long x
150mm wide)

1.13 Treat grass growth in coarse areas of AC on Runway m2 100


shoulders with an approved pesticide and apply PME.

Subtotal (1) **

3540138 38
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

2 Taxiway Z (1 to 4)

2.1 Undertake concrete spall repairs (minimum 75mm wide) m2 1


with SRE(S) along Taxiway Z (including the removal of
existing corner asphalt spall repairs)

2.2 Remove cork and reseal transverse joints with Thioflex m 150
600 on Taxiway Z1

2.3 Undertake concrete spall repairs (minimum 75mm wide) m2 0.15


with SRE(S) on Taxiway Z1

2.4 Remove weeds and treat with an approved pesticide. m 150


Apply 50mm wide RBB to open transverse joints at
interfaces of concrete and asphalt pavements along
Taxiway Z

2.5 Remove weeds and treat with an approved pesticide. m 150


Apply 50mm wide RBB to open cracks in taxiway
shoulders

2.6 Remove weeds and treat with an approved pesticide. m 3500


Apply 50mm wide RBB to open joints between taxiway
shoulder and concrete pavement.

2.7 Rout out, clean and seal concrete cracks to the m 6


concrete bar on the flexible section of Taxiway Z with
Thioflex 600 or similar approved product

Subtotal (2) **

3540138 39
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

b2 Taxiway A

b2.8 Remove weeds and treat with an approved pesticide to m 250


cracks on shoulder pavement. Apply 75mm wide RBB to
cracks

Subtotal (2) **

3540138 40
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

3 Taxiway B

3.1 Apply localised PME to central 8m width of taxiway m2 500

3.2 Remove weeds and treat with an approved pesticide. m 75


Apply 75mm wide RBB to open cracks and joints

Subtotal (3) **

3540138 41
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

4 Taxiway C

4.1 Apply PME to localised coarse areas m2 30

4.2 Apply 75mm wide RBB to open cracks and joints with m 125
75mm wide RBB

4.3 Apply 75mm wide RBB to AGL cable slots m 25

Subtotal (4) **

3540138 42
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

5 Taxiway D

5.1 Apply 75mm wide RBB to open longitudinal joints m 40

5.2 Apply 75mm wide RBB to AGL cable slot to TXE-D-12- m 20


31

Subtotal (5) **

3540138 43
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

6 Taxiway E

6.1 Paint taxiway edge markings (Base to confirm m 200


requirement in this location)

Subtotal (6) **

3540138 44
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

7 Taxiway G

7.1 Rout out clean and reseal joints with Thioflex 600 on m 500
southern extent of Taxiway G.

7.2 On or adjacent to the taxiway centreline, repair existing m2 0.25


failed repairs and new spalls and scaling with SRE(S) -
spall sizes (i) 500mm by 350mm (ii) 200mm by 250mm
and (iii) 300mm by 75mm.

Subtotal (7) **

3540138 45
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

8 Taxiway H

8.1 Rout out, clean and reseal joint with Thioflex 600 east of m 3
centreline

8.2 Repair existing failed repairs and new spalls with m2 0.5
SRE(S) on the east side of the taxiway centreline (spall
sizes (i) 2 No by 500mm by 75mm and (ii) 200mm by
500mm)

8.3 Apply SEST to shoulders m2 900

8.4 Apply 50mm wide RBB to open cracks and joints in the m 200
western shoulder

Subtotal (8) **

3540138 46
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

9 Western ORP Apron (OLA5)

9.1 Apply 50mm wide RBB treatment to open joint at m 40


interface with asphalt and concrete on Taxiway Z

Subtotal (9) **

3540138 47
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

10 Eastern ORP

10.1 Rout out, clean and seal joints with Thioflex 600 m 3500

10.2 Undertake concrete spall repairs with SRE(S) (minimum m2 0.25


75mm wide)

10.3 Apply SEST to the shoulder m2 400

10.4 Apply 50mm wide RBB to open cracks and joints in the m 200
shoulder

Subtotal (10) **

3540138 48
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

11 Eastern Tarmac

11.2 Undertake concrete spall repairs with SRE(S) (minimum m2 2


75mm wide) (various locations - to be agreed on site)

11.3 Asphalt patch repair between Hangar 1 and 2 to scaling m2 2


concrete surface. Mill out existing AC pavement to a
depth of 50mm, apply tack coat and supply and
compact AC Mix 10. Apply 50mm RBB to patch
perimeter. (4.0m long x 0.5m wide)

11.4 Grind down (maximum 20mm) faulting slabs to east of m2 125


Building 523 (review quantity)

11.5 Remove and replace asphalt repairs to faulting slabs on m2 15


Bay 19 - patch repair to be in an AC10 Mix with RBB
perimeter seal

11.6 Remove holding down bolts to the immediate south of sum 1


Building 321. Core out and backfill with grade 40/10
concrete. 55No 300mm diameter cores and 60No
100mm diameter cores.

11.7 Rout out, clean and reseal concrete joints in the area m 1200
previous occupied by the temporary hangar structure by
Building 321.

11.8 Apply SEST to the asphalt shoulder on the perimeter of m2 3000


Bay 1.

11.9 Apply 50mm wide RBB to open cracks and joints in the m 500
asphalt shoulder on the perimeter of Bay 1

11.10 Apply 50mm wide RBB to open joint between concrete m 400
and asphalt shoulder (including perimeter of Bay 19
concrete shoulder).

11.11 Apply PME to localised coarse open areas on the m2 250


shoulder.

11.12 Supply and place seeded topsoil and spray with m2 2000
bituminous emulsion to immediate south of Eastern
Tarmac

11.13 Clean and repaint red clearance line between Bays 22 m 250
and 23

3540138 49
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

11.14 Asphalt patch repair adjacent building 321 to spalling m2 4


concrete surface. Mill out existing AC pavement to a
depth of 50mm, remove geotextile fabric and glue down
any remaining sections, apply tack coat and supply and
compact AC Mix 10. Apply 50mm RBB to patch
perimeter. (4.0m long x 1.0m wide)

11.15 Concrete footing to be broken from surface and finished sum 1


surface to be repaired.

Subtotal (11) **

3540138 50
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

12 Western Tarmac

12.1 Undertake concrete spall repairs with SRE(S) (minimum m2 1


75mm wide) (various locations - to be agreed on site).

12.2 Rout out, clean and seal cracks with Thioflex 600 or m 5
similar approved product on Fire Station access track
opposite Hangar 3.

12.3 Rout out, clean and reseal concrete joints with Thioflex m 11500
600 or similar approved product to the eastern section
of the Western Tarmac.

12.4 Apply SEST to the asphalt shoulder on the western m2 2000


edge of the Western Tarmac

12.5 Apply 50mm wide RBB to open cracks and joints in the m 100
asphalt shoulder on the eastern edge of the Western
Tarmac

12.6 Apply 50mm wide RBB to open cracks and joints in the m 900
asphalt pavement to the west of Hangar 4

Subtotal (12) **

3540138 51
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

13 ERU Apron

13.1 Asphalt patch repair to rutted areas. Mill out existing AC m2 50


pavement to a depth of 80mm, apply tack coat and
supply and compact AC Mix 14. Apply 50mm RBB to
patch perimeter.

13.2 Apply 75mm wide RBB to open cracks m 50

13.3 Paint asphalt pavement with yellow chevron stripes sum 1


(400mm wide)

13.4 Supply and place seeded topsoil and spray with m2 30


bituminous emulsion to east of pavement

Subtotal (13) **

3540138 52
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

14 Flying Club Taxiway and Apron

No works proposed

Subtotal (14) **

3540138 53
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

15 Fire Station Apron

15.1 Rout out, clean and seal open and spalling crack m 25
(30mm wide) with 75mm wide RBB

Subtotal (15) **

3540138 54
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

16 OLA 1

16.1 Apply 50mm wide RBB to cracks m 40

Subtotal (16) **

3540138 55
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

17 Aircraft Wash

17.1 Isolated rubber inclusion in concrete surface to be no 1


removed, void cleaned, and filled with SRE(S) (allow
100mm x 30mm fill)

17.2 Perished rubber tube to east of wash bay to be no 1


removed.

17.3 Remove weeds from Interface between concrete m 200


pavement and asphalt shoulders treat with an approved
pesticide and apply 50mm wide RBB

17.4 Apply 50mm wide RBB to open cracks and sections of m 50


block cracking on the asphalt shoulders

17.5 Apply PME to block cracked areas of asphalt on m2 25


completion of RBB application in Item 17.4

17.6 Remove corroded steel light fitting ring from concrete sum 1
surface and treat surrounding concrete with SRE(S).

17.7 Undertake concrete spall repairs with SRE(S) (minimum m2 1


75mm wide) (various locations – to be agreed on site)

Subtotal (17) **

3540138 56
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: RAAF Base Richmond Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

18 Provisional Items

18.1 Daily Rate for WSO (10 hour shift) Day Rate Only

18.2 Rout out, clean and reseal concrete joints with Thioflex m 11500
600 or similar approved product to the western section
of the Western Tarmac

18.3 Runway 10-28 Rubber Removal, priority to central 16m m2 5000


width (Provisional)

18.4 Remarking Runway 10-28. Allow for the renewal of m2 500


lengths of the centreline masked by rubber Allow for
the renewal of the 28 numerals.

Subtotal Provisional Items **

3540138 57
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

HMAS ALBATROSS PAVEMENT WORKS

a Preliminary and General

1 Runway 03-21
2 Runway 08-26
3 Taxiway A
4 Taxiway B
5 Taxiway C
6 Taxiway D
7 Taxiway E
8 Taxiway F
9 Taxiway H
10 Flight Line Apron
11 Main Apron – Concrete Apron North West of
12 Main Apron – Asphalt Pavement between Hangars
B and C
13 Main Apron – Segmental Concrete Block between
Hangars C and D
14 Main Apron – Flexible Pavement between Hangars
C, D, E and F
15 Fire Station
16 OLA off Taxiway H
17 Civil Apron
18 VMMA Apron
19 Aircraft Wash Apron
20 Provisional Items

Base Subtotal

Individual pricing items shown on drawings

3540138 58
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST


General

The following abbreviations for units and works have been Note
used in this schedule:
mm = millimetre
m = linear metre
m2 = square metre
m3 = cubic metre
No. = number
kg = kilogram
t = tonne
hr = hour
LS = lump sum
PS = Provisional Sum
AC = Asphaltic Concrete
RBB = Rubberised Bituminous Bandage
PME = Polymer Modified Bitumen Emulsion
AGL = Aeronautical Ground Lighting

Tenderers are advised that this Schedule is to be read in Note


conjunction with the Drawings and Specification to which
they are hereby referred for full description of the items
measured herein.

Tenderers are referred to the General and Special Note


Conditions of Contract and the Preliminaries Section of the
Specification and are deemed to have allowed herein for
all items that may affect the works, such as night works.

The prices and rates entered in this Schedule are deemed Note
to have allowed for ALL costs involved in supply, placing
and /or fixing each item in its final position or form.
Unpriced items are deemed to be included elsewhere.

The Contract Administrator (CA) must be notified of any Note


discrepancies between this Schedule, the plans and the
Specification prior to any work being undertaken on the
items in question.

3540138 59
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

All items measured herein are measured net and no Note


allowance has been made for waste, overbreak,
compaction, rolling margins, tolerances and the like.
All costs associated with these items are deemed to be
included in the rates.

All rates entered herein shall be exclusive of GST Note

Quantities provided in this schedule are the Contract Note


Administrator's estimate of actual works as shown on the
Tender Drawings.
Notwithstanding, there is no guarantee as to the accuracy
of this information. No allowance has been made for
wastage, construction tolerances or temporary works
including ramping.

Asphalt tonnage has been based on an assumed density Note


of 2.4 tonne/m3.

3540138 60
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

a Preliminary

a1.1 Mobilise to the site, maintain and subsequently remove from site Sum 1
all necessary plant, equipment, gear, hoists, tools, cartage,
transport, car parking, temporary facilities and the like. Include
for giving all trades and subcontractors the free use of same as
required.

a1.2 Ongoing overheads and other costs not included elsewhere in Sum 1
the schedule

a1.3 Quality Plan, Safety Plan, Environmental Management Plan and Sum 1
Program, Submission of Mix Design and materials test results

a1.4 Provision of "As-Constructed" drawings. Sum 1

a1.5 Provide any directional/ warning signs and barriers as required Sum 1
including markers and lights in accordance with CASA MoS139,
remove from site upon completion.

a1.6 Allow for full time site based suitable qualified and experienced Sum 1
Works Safety Officer (WSO) for the duration of the works,
including mobilisation, vehicles, accommodation, meals and other
allowances.

3540138 61
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

1 Runway 03-21

1.1 Clean out large weathered inclusions and fill with no 20


hot rubberised bitumen (50mm dia, 50mm deep)

1.2 Core out dust balls and reinstate with hot AC14 Mix no 10
(150mm dia, 100mm deep)

1.3 Apply 50mm wide RBB to cracking on Runway 21 m 10


Threshold

1.4 Apply PME and 50mm wide RBB to scuffed area on m2 25


Runway 21 Threshold.

1.5 Remove reinstated cores and fill with AC14 Mix 14 no 20


(100mm Dia, 100mm deep)

1.6 Remove wooden particles (north of Taxiway C1 no 2


intersection) and infill with RBB

1.7 Apply PME to arrestor gear strip north of Taxiway C m2 45

1.8 Apply 50mm wide RBB to perimeter of arrestor m 90


gear strip.

1.9 Apply 50mm wide RBB to transverse, longitudinal m 500


construction joints and reflective cracking at
Runway 03 Threshold

1.10 Apply 75mm wide RBB to AGL cable slots m 250

1.11 Rout out, clean and repair existing cable slot and m 3
reinstate joint sealant RBB

1.12 Treat edge drop off. Supply and place seeded m2 100
topsoil and spray with bitumen emulsion adjacent
access pavement on western side.

1.13 Raise existing grated drainage pits and surrounding no 5


edges ensuring falls are to grated pits. Treat any
disturding grassed areas with seeded topsoil and
spray with bitumen emulsion

1.14 Apply 50mm wide RBB to scuffed areas m 25

Subtotal Runway 03-21 **

3540138 62
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

2 Runway 08-26

2.1 Apply 50mm wide RBB to longitudinal and m 500


Transverse construction joints and reflective
cracking on Runway 08 Threshold

2.2 Apply 50mm wide RBB application to perimeter of m 2


existing AC patch repairs located near 4,000ft
Marker board

2.3 Asphalt patch repair to north east corner of Runway m2 12


26 Threshold. Mill out existing AC pavement to a
depth of 50mm, apply tack coat and supply and
compact AC Mix 14. Apply 50mm RBB to patch
perimeter. (2m x 6m)

2.4 Apply 50mm RBB to minor spalling along the m 50


asphalt and concrete interfaces at the arrestor
assemblies.

2.5 Clean existing runway end markings and repaint m2 1000


(both runway ends)

Subtotal Runway 08-26 **

3540138 63
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

3 Taxiway A

3.1 Asphalt patch repair to areas of extensive m2 24


blistering. Mill out existing AC pavement to a depth
of 50mm, apply tack coat and supply and compact
AC Mix 14. (2No 2m x 6m)

3.2 Apply 50mm RBB to patch perimeter. Item 3.1 m 32

3.3 Apply 50mm wide RBB to open centreline m 50


longitudinal construction joint

3.4 Apply 50mm wide RBB to longitudinal construction m 30


joint at the interface with Taxiway B3

3.5 Apply 75mm wide RBB to spalling lengths of m 50


secondary AGL cable slots.

Subtotal Taxiway Alpha **

3540138 64
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

4 Taxiway B

4.1 Fill voids in the concrete surface SRE(S). no 10

4.2 Large corner crack (approx 1.5m long) near the m 1.5
southern fillet at the Taxiway B2/D intersection to
be routed and filled with sealant.

4.3 Longitudinal cracks on low strength concrete slabs m 40


adjacent to the edge of Taxiway B to be routed and
sealed with Thioflex 600

4.4 Apply PME to coarse asphalt surfacing in the m2 150


northern asphalt shoulder pavement towards
Runway 03-21

4.5 Asphalt patch repair to shoulder at the interface m2 10


with Runway 03-21. Mill out existing AC pavement
to a depth of 50mm, apply tack coat and supply
and compact AC Mix 14. Apply 50mm RBB to patch
perimeter.

4.6 Apply 50mm Wide RBB to cracks in the asphalt m 30


shoulder pavement adjacent to the Main Apron

4.7 Apply PME to surrounding areas of Item 4.6 m2 25

4.8 Apply 50mm wide RBB to cracks along the sealed m 1000
shoulder on the western flank including the asphalt
to concrete interface.

4.9 Apply 50mm wide RBB to open and cracked m 250


construction joints on Taxiways B3 to B5

4.10 Asphalt patch repair to western shoulder north west m2 75


of Hangar F. Mill out existing AC pavement to a
depth of 50mm, apply tack coat and supply and
compact AC Mix 14. Apply 50mm RBB to patch
perimeter. (30m length x shoulder width)

4.11 AGL cable slot to be repaired and re-sealed where m 4


AGL cable has become exposed in western
shoulder of Taxiway B2.

4.12 Secondary AGL cable slot to be repaired and re- m 2


sealed where AGL cable slot has become exposed
on Taxiway B3.

Subtotal Taxiway Bravo **

3540138 65
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

5 Taxiway C

5.1 Apply 50mm wide RBB to open joints and cracks m 500
along Taxiways C1 and C2.

Subtotal Taxiway Charlie **

3540138 66
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

6 Taxiway D

6.1 Large parallel crack to be treated with SRE(S) spall m2 0.7


repair, approximate dimensions 200mm wide by
3.5m long.

Subtotal Taxiway Delta **

3540138 67
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

7 Taxiway E

7.1 Larger voids in the concrete surfacing on Taxiway no 10


E1 to be filled with epoxy grout or SRE(S).

7.2 Apply 50mm wide RBB to the interface of the m 30


asphalt and concrete pavements towards the edge
of Runway 03-21

7.3 Rout out and clean old concrete joints and seal with m 600
Thioflex 600 or similar approved.

7.4 Large corner break / spall on irregular shaped m 1


concrete slab towards the NW corner at the
intersection with Runway 03-21 to be routed and
sealed with Thioflex 600.

7.5 Repair spalls along Taxiways E1 and E2 using m2 2.5


SRE(S), minimum 25m x 75mm wide of SRE(S)
repairs.

7.6 Reinstated cores to AGL shallow base fittings to be no 15


re-cored and filled with pavement quality concrete,
cores approx 300mm in diameter.

7.7 Cut back over-banded AGL cable slot and apply m 0.5
75mm wide RBB on the southern shoulder of
Taxiway E1

Subtotal Taxiway Echo **

3540138 68
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

8 Taxiway F

8.1 Apply 50mm wide RBB to the longitudinal m 120


construction joints along the western fillet from the
Runway 26 Threshold

8.2 Apply 50mm wide RBB to the concrete / asphalt m 30


interfaces along Taxiways A1 and F

8.3 Fill localised pock mark on the concrete surface no 1


with SRE(S)

8.4 Rout out and clean cracked and peeling joint m 45


sealant and re-seal using Thioflex 600.

Subtotal Taxiway Foxtrot **

3540138 69
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

9 Taxiway H

9.1 Apply 50mm wide RBB to open construction joints m 250


and asphalt patch repairs following poisoning and
removal of grass and other vegetation.

9.2 Asphalt patch repair towards OLA. Mill out existing m2 12


AC pavement to a depth of 75mm, apply tack coat
and supply and compact AC Mix 14. Apply 50mm
RBB to patch perimeter.

9.3 Clean and repaint line marking along the length of m2 250
Taxiway H including the centreline and edge
markings.

Subtotal Taxiway Hotel **

3540138 70
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

10 Flight Line Apron

10.1 Spall repairs to concrete joints using SRE(S) m2 12.5


(located in particular in the newer areas of concrete
pavement - various locations)

10.2 Rout out, clean and seal longitudinal cracks with m 125
Thioflex 600. (In particular in the newer areas of
concrete pavement and on the Hangar access
pavements to the north east of the Flight Line
Apron)

10.3 Remove existing line markings and repaint on new m2 700


sections of concrete in the Flight Line Apron

Subtotal Flight Line Apron **

3540138 71
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

11 Main Apron – Concrete Apron North West of


Hangar B

11.1 Rout out and clean cracks in concrete slabs and m 50


seal with Thioflex 600. (In particular around grated
drainage pits)

11.2 Repair spalling joints and slab corners with SRE(S) m2 1.5
(repairs typically 50mm wide by 300mm long)

11.3 Repair spalling joints and slab corners with SRE(S) m2 0.5
(repairs up to 450mm long by 350 wide)

11.4 Rout out and clean old joint sealant and replaced m 1000
with Thioflex 600.

11.5 Apply 50mm wide RBB to cracking along m 100


longitudinal joints (towards interface with Taxiway
B2)

Subtotal Main Apron - Concrete **

3540138 72
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

12 Main Apron – Asphalt Pavement between


Hangars B and C

12.1 Apply 50mm Wide RBB to interface between m 50


asphalt and concrete pavements

12.2 Apply 50mm wide RBB to open asphalt m 150


construction joints

12.3 Repair structural failure on pit lid sum 1

12.4 Apply 50mm wide RBB along longitudinal joints m 50


towards interface with Taxiway B

12.5 Apply 50mm wide RBB to cracks developed from m 100


swelling and shoving

Subtotal Main Apron - Asphalt **

3540138 73
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

13 Main Apron – Segmental Concrete Block


between Hangars C and D

No works proposed

Subtotal Main Apron - Segmental Concrete **

3540138 74
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

14 Main Apron – Flexible Pavement between


Hangars C, D, E and F

14.1 Asphalt patch repair to block cracking and pot m2 150


holes. Mill out existing AC pavement to a depth of
75mm, apply tack coat and supply and compact AC
Mix 14. Apply 50mm RBB to patch perimeter.

14.2 Apply sand and bitumen emulsion to coarse and m2 500


ravelled areas of surfacing

Subtotal Main Apron - Flexible Pavement **

3540138 75
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

15 Fire Station

No works proposed

Subtotal Fire Station **

3540138 76
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

16 OLA off Taxiway H

16.1 Treat edge drop off to surrounding grass strip. m 100


Supply and place seeded topsoil and spray with
bitumen emulsion on the edges of Taxiways H1
and H3

16.2 Clean and repaint existing line markings on OLA m2 300


and Taxiway H.

Subtotal OLA **

3540138 77
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

17 Civil Apron

17.1 Apply 50mm wide RBB to open longitudinal m 200


construction joints and random cracks

17.2 Clean and repaint line marking in the Civilian m 250


Aircraft Apron area (allow 150mm wide yellow).

Subtotal Civil Apron **

3540138 78
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

18 VMA Apron (Visiting Military Aircraft)

18.1 Apply 50mm wide RBB to open construction joints m 200


and concrete pavement interface on asphalt
taxiway area

18.2 Treat edge drop off surrounding VMMA. Supply and m2 100
place seeded topsoil and spray with bitumen
emulsion

18.3 Spall repairs to around grated catch pit, 300mm m2 0.15


long x 50mm wide with SRE(S).

18.4 Removal and reinstatement of pavement line m2 147


markings (150mm wide, plus 100mm black
borders) - allow 420m.

Subtotal VMMA Apron **

3540138 79
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

19 Aircraft Wash Apron

19.1 Apply 50mm wide RBB to asphalt/concrete m 50

19.2 Rectify edge drop off . Supply and place seeded m2 5


topsoil and spray with bitumen emulsion

Subtotal Aircraft Wash Apron **

3540138 80
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: HMAS Albatross Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

20 Provisional Items

20.1 Daily Rate for WSO (10 hour shift) Day Rate Only

Subtotal Provisional Items **

3540138 81
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: Jervis Bay Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

RAAF BASE JERVIS BAY PAVEMENT WORKS

a Preliminary and General

1 Runway 08-26
2 Runway 15-33
3 Taxiways
4 Apron
5 Provisional Items

Base Subtotal

Individual pricing items shown on drawings

3540138 82
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: Jervis Bay Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST


General

The following abbreviations for units and works have been Note
used in this schedule:
mm = millimetre
m = linear metre
m2 = square metre
m3 = cubic metre
No. = number
kg = kilogram
t = tonne
hr = hour
LS = lump sum
PS = Provisional Sum
AC = Asphaltic Concrete
RBB = Rubberised Bituminous Bandage
PME = Polymer Modified Bitumen Emulsion
AGL = Aeronautical Ground Lighting

Tenderers are advised that this Schedule is to be read in Note


conjunction with the Drawings and Specification to which
they are hereby referred for full description of the items
measured herein.

Tenderers are referred to the General and Special Note


Conditions of Contract and the Preliminaries Section of the
Specification and are deemed to have allowed herein for
all items that may affect the works, such as night works.

The prices and rates entered in this Schedule are deemed Note
to have allowed for ALL costs involved in supply, placing
and /or fixing each item in its final position or form.
Unpriced items are deemed to be included elsewhere.

The Contract Administrator (CA) must be notified of any Note


discrepancies between this Schedule, the plans and the
Specification prior to any work being undertaken on the
items in question.

3540138 83
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: Jervis Bay Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

All items measured herein are measured net and no Note


allowance has been made for waste, overbreak,
compaction, rolling margins, tolerances and the like.
All costs associated with these items are deemed to be
included in the rates.

All rates entered herein shall be exclusive of GST Note

Quantities provided in this schedule are the Contract Note


Administrator's estimate of actual works as shown on the
Tender Drawings.
Notwithstanding, there is no guarantee as to the accuracy
of this information. No allowance has been made for
wastage, construction tolerances or temporary works
including ramping.

Asphalt tonnage has been based on an assumed density Note


of 2.4 tonne/m3.

3540138 84
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: Jervis Bay Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

a Preliminary

a1.1 Mobilise to the site, maintain and subsequently remove from site Sum 1
all necessary plant, equipment, gear, hoists, tools, cartage,
transport, car parking, temporary facilities and the like. Include for
giving all trades and subcontractors the free use of same as
required.

a1.2 Ongoing overheads and other costs not included elsewhere in the Sum 1
schedule

a1.3 Quality Plan, Safety Plan, Environmental Management Plan and Sum 1
Program, Submission of Mix Design and materials test results

a1.4 Provision of "As-Constructed" drawings. Sum 1

a1.5 Provide any directional/ warning signs and barriers as required Sum 1
including markers and lights in accordance with CASA MoS139,
remove from site upon completion.

a1.6 Allow for full time site based suitable qualified and experienced Sum 1
Works Safety Officer (WSO) for the duration of the works,
including mobilisation, vehicles, accommodation, meals and other
allowances.

3540138 85
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: Jervis Bay Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

1 Runway 08-26

1.1 Localised asphalt patch repairs to areas of block 2 25 0


m
cracking. Mill out existing AC pavement to a depth of
50mm, apply tack coat and supply and compact AC
Mix 14. Apply 50mm RBB to patch perimeter.

1.2 Apply 50mm wide RBB to longitudinal joints and m 1500 0


random open cracks on runway.

1.3 Roll (two passes of Pneumatic Tyred Roller) blisters 2 2500 0


m
on Runway 26 RESA

1.4 Apply 75mm wide RBB with Sand infill to cracks in m 1000 0
blisters on Runway 26 RESA.

1.5 Remove existing paint markings (centreline, edge, 2 6500 0


m
touch down, fixed distance) by water cutting and
reinstate.

Subtotal (1) ** 0

3540138 86
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: Jervis Bay Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

2 Runway 15-33

2.1 Apply 50mm wide RBB to open cracks and block m 250 0
cracking

2.2 Remove existing paint markings (centreline, edge, 2 7000 0


m
touch down, fixed distance) by water cutting and
reinstate.

2.3 Remove Temporary Runway Crosses. Mill existing 2 250 0


m
surface to a depth of 5mm and apply PME to surface.

2.4 Sweep Runway 33 ORP 2 3500 0


m

2.5 Reinstate loss of grass cover. Supply and place 2 50 0


m
seeded topsoil and spray with bitumen emulsion.

2.6 Clean out drainage gullies on Runway 15 and remove no 3 0


waste from site.

Subtotal (2) ** 0

3540138 87
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: Jervis Bay Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

3 Taxiways

3.1 Apply 50mm wide RBB crack and joint sealing m 100 0

3.2 Localised asphalt patch repairs. Mill out existing AC 2 10 0


m
pavement to a depth of 50mm, apply tack coat and
supply and compact AC Mix 14. Apply 50mm RBB to
patch perimeter.

Subtotal (3) ** 0

3540138 88
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: Jervis Bay Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

4 Aprons

4.1 Localised asphalt patch repair. Mill out existing AC 2 2 0


m
pavement to a depth of 50mm, apply tack coat and
supply and compact AC Mix 14. Apply 50mm RBB to
patch perimeter.

4.2 Apply 50mm wide RBB crack and joint sealing m 200 0

4.3 Rectify edge drop off. Remove loose material supply 2 30 0


m
and place seeded topsoil and spray with bituminous
emulsion 1l/m2

Subtotal (4) ** 0

3540138 89
2009-10 National Airfields Maintenance Project - Package 1
PROJECT: Jervis Bay Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

5 Provisional Items

5.1 Daily Rate for WSO (10 hour shift) Day Rate Only 0

Subtotal Provisional Items ** 0

3540138 90
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

RAAF BASE EAST SALE PAVEMENT WORKS

a Preliminary and General

1 Runway 04-22
2 Runway 09-27
3 Taxiway A
4 Taxiway B
5 Taxiway C
6 Taxiway D
7 Taxiway H
8 Taxiway I
9 Taxiway L
10 Eastern Apron
11 PC-9 Apron
12 King Air Apron
13 Western Apron
14 Southern Apron
15 Engine Run Up Facility
16 Provisional Items

Base Subtotal

Individual pricing items shown on drawings

3540138 91
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST


General

The following abbreviations for units and works have been Note
used in this schedule:
mm = millimetre
m = linear metre
m2 = square metre
m3 = cubic metre
No. = number
kg = kilogram
t = tonne
hr = hour
LS = lump sum
PS = Provisional Sum
AC = Asphaltic Concrete
RBB = Rubberised Bituminous Bandage
PME = Polymer Modified Bitumen Emulsion
AGL = Aeronautical Ground Lighting

Tenderers are advised that this Schedule is to be read in Note


conjunction with the Drawings and Specification to which
they are hereby referred for full description of the items
measured herein.

Tenderers are referred to the General and Special Note


Conditions of Contract and the Preliminaries Section of the
Specification and are deemed to have allowed herein for
all items that may affect the works, such as night works.

The prices and rates entered in this Schedule are deemed Note
to have allowed for ALL costs involved in supply, placing
and /or fixing each item in its final position or form.
Unpriced items are deemed to be included elsewhere.

The Contract Administrator (CA) must be notified of any Note


discrepancies between this Schedule, the plans and the
Specification prior to any work being undertaken on the
items in question.

3540138 92
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

All items measured herein are measured net and no Note


allowance has been made for waste, overbreak,
compaction, rolling margins, tolerances and the like.
All costs associated with these items are deemed to be
included in the rates.

All rates entered herein shall be exclusive of GST Note

Quantities provided in this schedule are the Contract Note


Administrator's estimate of actual works as shown on the
Tender Drawings.
Notwithstanding, there is no guarantee as to the accuracy
of this information. No allowance has been made for
wastage, construction tolerances or temporary works
including ramping.

Asphalt tonnage has been based on an assumed density Note


of 2.4 tonne/m3.

3540138 93
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

a Preliminary

a1.1 Mobilise to the site, maintain and subsequently remove from site all Sum 1
necessary plant, equipment, gear, hoists, tools, cartage, transport,
car parking, temporary facilities and the like. Include for giving all
trades and subcontractors the free use of same as required.

a1.2 Ongoing overheads and other costs not included elsewhere in the Sum 1
schedule

a1.3 Quality Plan, Safety Plan, Environmental Management Plan and Sum 1
Program, Submission of Mix Design and materials test results

a1.4 Provision of "As-Constructed" drawings. Sum 1

a1.5 Provide any directional/ warning signs and barriers as required Sum 1
including markers and lights in accordance with CASA MoS139,
remove from site upon completion.

a1.6 Allow for full time site based suitable qualified and experienced Sum 1
Works Safety Officer (WSO) for the duration of the works, including
mobilisation, vehicles, accommodation, meals and other
allowances.

3540138 94
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

1 Runway 04-22

1.1 Apply 50mm wide RBB to open joints and cracks m 1000
(various locations)

1.2 Apply PME to localised coarse areas including joints 2 250


m
(various locations)

1.3 Apply 50mm wide RBB to open joints and cracks on m 100
the shoulders - Runway 04 Threshold

1.4 Apply 50mm RBB to open joints and cracks on the m 200
shoulders - Runway 22 Threshold

1.5 Fill exposed upstand at pit on Taxiway I sum 1

1.6 Reinstate loss of grass cover. Supply and place 2 200


m
seeded topsoil and spray with bituminous emulsion.

1.7 Sweep Runway 04 blast area 2 200


m

Subtotal (1) **

3540138 95
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

2 Runway 09-27

2.1 Apply 50mm wide RBB to open joints and cracks at m 500
Runway 09 Threshold

2.2 Apply 50mm wide RBB to open joints and cracks at m 200
Runway 27 Threshold

2.3 Apply PME to localised coarse areas on Runway 09- 2 50


m
27 (east of Taxiway E)

2.4 Apply 50mm wide RBB to open joints and cracks on m 100
the shoulders

2.5 Clean existing flaking marking and repaint on concrete m2 800


surface on Runway 09 Threshold

2.6 Remove loose stone and reinstate grass cover. sum 1


Supply and place seeded topsoil and spray with
bituminous emulsion either side of the concrete base
at Runway 09 Arrestor Gear

2.7 Remove loose stone and reinstate grass cover. sum 1


Supply and place seeded topsoil and spray with
bituminous emulsion either side of the concrete base
at Runway 27 Arrestor Gear

2.8 Reinstate grass opposite Taxiway E. Supply and place 2 200


m
seeded topsoil and spray with bituminous emulsion

Subtotal (2) **

3540138 96
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

3 Taxiway A

3.1 Apply PME to localised coarse areas on Taxiway A 2 50


m
(east of Taxiway D)

3.2 Undertake joint spalls with SRE(S) on Taxiway A5 - 2 1


m
75mm wide.

3.3 Resealing concrete joints on Taxiway A5 with Thioflex m 600


600 or an equivalent approved product in 2010
(though this could be deferred until the planned
overlay works in 2011)

3.4 Apply 75mm wide RBB to the interface between m 200


concrete and asphalt on Taxiway A5

3.5 Apply 50mm wide RBB to open joints and cracks on m 200
the shoulders with 50mm wide RBB

Subtotal (3) **

3540138 97
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

4 Taxiway B

4.1 Apply PME to localised coarse areas on Taxiway B7 2 25


m
(east of Taxiway I)

4.2 Apply PME to localised coarse areas on Taxiway B3 2 250


m

4.3 Apply 75mm wide RBB to open and spalling m 200


longitudinal joints along Taxiway B6 and B7.

4.4 Apply 50mm wide RBB to open joints and cracks on m 250
shoulders

4.5 Remove loose stone and edge breaks. Supply and 2 250
m
place seeded topsoil and spray with bituminous
emulsion. Areas include Taxiway B3, south of B4, B7
and Taxiway A.

Subtotal (4) **

3540138 98
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

5 Taxiway C

5.1 Supply and place seeded topsoil and spray with 2 10


m
bituminous emulsion to edge drop off on Taxiway C1

5.2 Repair spalled concrete to Edge Light 308 on Taxiway sum 1


C2.

Subtotal (5) **

3540138 99
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

6 Taxiway D

6.1 Localised PME treatment to asphalt surface on 2 25


m
Taxiway D4 east of the hold line

6.2 Remove loose stone and edge breaks. Supply and 2 100
m
place seeded topsoil and spray with bituminous
emulsion on the north side of Taxiway D4

6.3 Apply PME to localised coarse areas on Taxiway D3 2 400


m
(East at a number of locations)

6.4 Apply 50mm wide RBB to open joints and cracks on m 125
and adjacent to the Southern Apron entrances

6.5 Apply PME to localised coarse areas on Taxiway D3 2 250


m
(West at a number of locations)

6.6 Apply 50mm wide RBB to open joints and cracks on m 125
Taxiway D4 either side of Taxiway B3

6.7 Apply RBB to pock marks on Taxiway D3 - 25mm No 50


diameter (number of locations)

Subtotal (6) **

3540138 100
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

7 Taxiway H

7.1 Apply 75mm wide RBB to open joint on Taxiway H3 m 20

7.2 Remove loose material. Supply and place seeded 2 300


m
topsoil and spray with bituminous emulsion on the
edges of Taxiways H1 and H3

Subtotal (7) **

3540138 101
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

8 Taxiway I

8.1 Apply PME to localised coarse areas east of the hold 2 10


m
line

8.2 Apply 50mm wide RBB to open joints and cracks on m 200
the shoulders

Subtotal (8) **

3540138 102
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

9 Taxiway L

9.1 Treat vegetation with an approved pesticide and apply m 200


50mm wide RBB to open joints and cracks on the
shoulders with 50mm wide RBB

9.2 Supply and place seeded topsoil and spray with sum 1
bitumen emulsion to upstand adjacent to the pit on the
west side of the Taxiway L

Subtotal (9) **

3540138 103
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

10 Eastern Apron

10.1 Apply 50mm wide RBB to cracks m 60

10.2 Asphalt patch or realignment of airside marking line sum 1

10.3 Undertake local SRE(S) repairs to the grated slot sum 1


drain.

10.4 Clean existing red clearance line markings and repaint m 200
(150mm wide)

Subtotal (10) **

3540138 104
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

11 PC-9 Apron

11.1 Rout out and clean concrete joints and seal with m 750
Thioflex 600 or similar approved product. (Exact
location of sealing to be confirmed on site after a
detailed site survey with Superintendent)

11.2 Undertake SRE(S) spall repairs typically 75mm wide. 2 0.15


m
(Exact location of repairs to be confirmed on site after
a detailed site survey of apron with Superintendent)

11.3 Supply and place seeded topsoil and spray with 2 750
m
bitumen emulsion to north of Apron

Subtotal (11) **

3540138 105
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

12 King Air Apron

12.1 Localised asphalt patch repairs to area in front of the 2 60


m
eastern King Air Hangar. Mill out existing AC
pavement to a depth of 50mm, apply tack coat and
supply and compact AC Mix 14. Apply 50mm RBB to
patch perimeter.

12.2 Apply 50mm wide RBB to open joints and cracks m 250

12.3 Undertake spall repairs to slot drain on Stand No 4 - 2 0.3


m
with SRE(S) at 75mm wide

12.4 Undertake concrete spall repairs to the concrete door 2 0.25


m
rail on the western King Air Hangar - 250mm wide and
75mm deep with SRE(S)

12.5 Clean existing red clearance line markings and repaint 2 60


m
(100mm wide)

12.6 Clean and repaint yellow apron pavement markings 2 75


m
(lead in lines and numerals)

Subtotal (12) **

3540138 106
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

13 Western Apron

No works proposed

Subtotal (13) **

3540138 107
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

14 Southern Apron

14.1 Apply PME to localised coarse areas 2 25


m

14.2 Apply 50mm RBB to open joints m 60

14.3 Treat edge drop off. Remove loose material. Supply 2 200
m
and place seeded topsoil and spray with bituminous
emulsion

Subtotal **

3540138 108
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

15 Engine Run Up Facility

15.1 Undertake concrete spall repairs with SRE(S) - 75mm 2 0.075


m
wide.

15.2 Rout out and clean concrete cracks 20mm wide. Seal m 25
with Thioflex 600 or similar approved product.

15.3 Remove loose material. Supply and place seeded 2 50


m
topsoil and spray with bituminous emulsion on the
entrance to the Engine Run Up Bay

Subtotal (15) **

3540138 109
2009-10 National Airfield Maintenance Project - Package 1
PROJECT: RAAF Base East Sale Airfield Maintenance Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

16 Provisional Items

16.1 Daily Rate for WSO (10 hour shift) Day Rate Only

16.2 Remove and reinstate Runway 09-27 paintmarkings 2 5800


m
(Provisional):
Centreline (450mm wide) - allow 1350m
Edge lines to both sides (450mm wide) - allow 4460m
Numerals (9 x 3) - allow 4 No.
End Marks to both ends (1200mm wide) - allow 90m
TDZ [4 x (3 x 30) + 2 x (9 x 45)] - both ends
Threshold Markings at Runway End 27 (30m by 1.7m
wide) - 12 No.

16.3 Taxiway A: Reinstate centreline (150mm wide) 2 360


m
marking - allow 2280m, and Hold markings (4 x
150mm wide) - allow 23m width (Provisional)

16.4 Taxiway I: Remove loose edge breaks and loose m 400


aggregate if not removed by Base personnel in 2009
(Provisional)

16.6 Remarking Runway 04-22 Edge lines (2 x 150mm m 300


wide) - allow 300m (Provisional)

Subtotal Provisional Items **

3540138 110
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

RAAF BASE AMBERLEY PAVEMENT WORKS

a Preliminary and General

1 Runway 15-33
2 Runway 04-22
3 Taxiway Alpha
4 Taxiway Bravo
5 Taxiway Charlie
6 Taxiway Delta
7 Taxiway Golf
8 Taxiway Hotel
9 Taxiway Juliet
10 Taxiway Tango
11 Taxiway Zulu
12 Central Apron Taxiway
13 Air Movements Apron
14 F1-11 Aprons
15 Northern Aprons
16 Central Apron
17 MRTT Apron
18 C17 Apron
19 3AD (Boeing Apron)
20 Bomber Replenishment Apron (BRA)
21 Engine Run Up Facility and Tow Road
22 EO Apron
23 Provisional Items

Base Subtotal

Individual pricing items shown on drawings

3540138 111
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST


General

The following abbreviations for units and works have been Note
used in this schedule:
mm = millimetre
m = linear metre
m2 = square metre
m3 = cubic metre
No. = number
kg = kilogram
t = tonne
hr = hour
LS = lump sum
PS = Provisional Sum
AC = Asphaltic Concrete
RBB = Rubberised Bituminous Bandage
PME = Polymer Modified Bitumen Emulsion
AGL = Aeronautical Ground Lighting

Tenderers are advised that this Schedule is to be read in Note


conjunction with the Drawings and Specification to which
they are hereby referred for full description of the items
measured herein.

Tenderers are referred to the General and Special Note


Conditions of Contract and the Preliminaries Section of the
Specification and are deemed to have allowed herein for
all items that may affect the works, such as night works.

The prices and rates entered in this Schedule are deemed Note
to have allowed for ALL costs involved in supply, placing
and /or fixing each item in its final position or form.
Unpriced items are deemed to be included elsewhere.

The Contract Administrator (CA) must be notified of any Note


discrepancies between this Schedule, the plans and the
Specification prior to any work being undertaken on the
items in question.

3540138 112
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

All items measured herein are measured net and no Note


allowance has been made for waste, overbreak,
compaction, rolling margins, tolerances and the like.
All costs associated with these items are deemed to be
included in the rates.

All rates entered herein shall be exclusive of GST Note

Quantities provided in this schedule are the Contract Note


Administrator's estimate of actual works as shown on the
Tender Drawings.
Notwithstanding, there is no guarantee as to the accuracy
of this information. No allowance has been made for
wastage, construction tolerances or temporary works
including ramping.

Asphalt tonnage has been based on an assumed density Note


of 2.4 tonne/m3.

3540138 113
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

a Preliminary

a1.1 Mobilise to the site, maintain and subsequently remove from site all Sum 1
necessary plant, equipment, gear, hoists, tools, cartage, transport, car
parking, temporary facilities and the like. Include for giving all trades
and subcontractors the free use of same as required.

a1.2 Ongoing overheads and other costs not included elsewhere in the Sum 1
schedule

a1.3 Quality Plan, Safety Plan, Environmental Management Plan and Sum 1
Program, Submission of Mix Design and materials test results

a1.4 Provision of "As-Constructed" drawings. Sum 1

a1.5 Provide any directional/ warning signs and barriers as required Sum 1
including markers and lights in accordance with CASA MoS139,
remove from site upon completion.

a1.6 Allow for full time site based suitable qualified and experienced Works Sum 1
Safety Officer (WSO) for the duration of the works, including
mobilisation, vehicles, accommodation, meals and other allowances.

3540138 114
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

1 Runway 15-33

1.1 RBB (50mm wide) application is required on the m 500


Runway 15 eastern shoulder and on the Runway 15
sealed runway end

1.2 RBB (50mm wide) application of cracked asphalt m 200


repairs on the Runway 15 Threshold concrete area is
required

1.3 RBB (50mm wide) application is required to the m 110


western shoulder

1.4 SRE(S) treatment to a spall on the eastern side of the 2 1


m
runway south of the central ORP and three spalls on the
western side

1.5 Rout out and seal spalling joints on the western side of m 90
the runway in the threshold area

1.6 Treatment of localised aggregate loss / pavement No 25


cavities is required at approximately 25 locations along
the runway length - core and AC fill

1.7 An asphalt patch repair 75mm thick AC14 mix is 2 0.5


m
required within the runway intersection, 0.5m by 0.5m.
Another patch repair 0.5m x 0.5m is required on the
centreline south of the southern arrestor gear assembly.

1.8 75mm wide RBB to AGL cable slots at the runway m 70


intersection and Runway 33 displaced threshold

1.9 PME treatment to two localised areas of coarse surface 2 20


m
material south of the runway intersection

1.10 50mm wide RBB application to cracked paver joints is m 5000


required along the majority of flexible portion of the
runway and north of the intersection

1.11 50mm wide RBB application is required on the asphalt m 100


area at the northern extent of the Runway 33 ORP

3540138 115
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

1.12 PME treatment required on the asphalt area at the 2 10


m
northern extent of the Runway 33 ORP

1.13 Reseal joints adjacent the AGL fittings within the m 60


Runway 33 Threshold concrete area

1.14 Five spall locations require 50mm wide RBB application m 5


in the Runway 33 Threshold / ORP concrete area

1.15 Concrete cracks to be routed and sealed with approved m 8


sealant (e.g. Thioflex 600)

1.16 50mm wide RBB application required south of Runway m 50


End 15

1.17 SRE(s) treatment required for failed crack repair 2 3


m

1.18 75mm wide RBB application to AGL cable slots required m 100
at intersection of Taxiway C

1.19 PME treatment to 2 No. Localised areas at End 33 2 40


m

1.20 Concrete cracks south of Taxiway T to be routed out m 500


and sealed with approved sealant (e.g. Thioflex 600)

1.21 Old/damaged joint sealant south of Taxiway T to be m 5000


routed out and resealed

1.22 Reinstate centreline (0.45m wide, 30m long with 20m 2 270
m
spacings, painted white), 2 coats - allow 1000m of
Runway

Subtotal Runway 15-33 **

3540138 116
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

2 Runway 04-22

2.1 SRE(s) treatment to spalls in the north-east corner of m 0.05


the Runway 04 Threshold concrete area

2.2 Reseal Runway 04 Threshold / ORP concrete area m 200

2.3 RBB application on longitudinal and localised fatigue m 520


cracking along the length of Runway 04-22, either side
of Runway 15-33

2.4 75mm AC14 Mix mill and fill east of Taxiway B 2 1


m
intersection

2.5 2 No. 75mm AC14 Mix mill and fill patch midway 2 1
m
between Taxiway B and 15-33, southern edge

2.6 75mm AC14 Mix mill and fill shoulder reconstruction 2 10


m
required at the intersection with Taxiway J

2.7 PME application is required to treat the eroded shoulder 2 5


m
edge at the intersection with Taxiway C3

2.8 Reinstate Numeral (04-22) paint markings 2 116


m

2.9 Reinstate edge line (450mm wide both sides) paint 2 1370
m
markings,1523m

2.10 Reinstate Runway Threshold (1.7m wide by 30m long, 2 1224


m
12No. Each end) paint markings, 24No.

2.11 Reinstate Runway centreline (0.45m wide, 30m long, 2 405


m
20m spacings) paint markings, 30No.

2.12 Reinstate Touchdown Zone (3m wide by 30m long - 2 2340


m
4No. And 9m wide by 45m long - 2No.) paint markings
at each end

2.13 PME treatment to repair fuel seal at OLA3 2 400


m

2.14 Apply FRM to damaged fuel seal at OLA3 2 400


m

2.15 50mm wide RBB application to area adjacent to OLA3 m 100

3540138 117
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

2.16 Reinstate Taxiway C3 & D Turn Lines (150mm wide), 2 30


m
200m

2.17 Reinstate Hold Lines (4No. 150mm wide with 3 spaces, 2 40.5
m
refer 8.4.3 of CASA MoS139) at each approach to
Runway 15/33, 2 coats - allow 45m width of Runway

Subtotal Runway 04-22 **

3540138 118
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

3 Taxiway Alpha

3.1 50mm wide RBB application to reflective cracking from m 2000


underlying concrete pavement along the full length

3.2 50mm wide RBB application to the edge break between m 30


the taxiway and eastern shoulder pavements midway
between Runway 04 and Taxiway H

3.3 Bitumen spray chip seal application to the eroded edge 2 675
m
on the eastern shoulder south of Taxiway H

3.4 Asphalt overlay (75mm AC14 Mix mill and fill) to 2 900
m
shoulders near Taxiway B

3.5 50mm wide RBB application to reflective cracking near m 500


western end

3.6 Provide new Gatic Class F (900kN) Grate, Frame and LS 5000
reinforced concrete support slab

3.7 Reinstate paint markings (150mm wide centreline, 2 675


m
double 150mm edge lines, painted yellow), 2 coats -
allow 900m

Subtotal Taxiway Alpha **

3540138 119
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

4 Taxiway Bravo

4.1 50mm wide RBB application to the northern shoulder of m 100


the northern ORP

4.2 Rout out and seal spalls at both extents of Taxiway B1 m 7


and in front of the C17 Apron

4.3 Reinstate paint marking (150mm centrelines, double 2 300


m
150mm edge lines) at the northern end of Taxiway B, 2
coats - 400m

4.4 Rout out and seal spalling joint at the southern entrance m 15
to the MRTT Apron

4.5 SRE(s) treatment to spalls from Taxiway T to Taxiway 2 5


m
G

4.6 Rout out and seal spalling joints and cracked slabs m 2500
between Taxiway T to Taxiway G area

4.7 50mm wide RBB application to repair cracked asphalt m 300


patches on the concrete slabs

4.8 50mm wide RBB application to treat block cracking m 100


observed on the western shoulder between the MRTT
and F111 Aprons

4.9 Grind and reseal spalled joints between Taxiway B1 to m 1000


Taxiway T

4.10 SRE(S) treatment to spalled joints between Taxiway B1 2 2


m
to Taxiway T

4.11 75mm AC14 Mix mill and fill patch repair on Access 2 4
m
track north of Taxiway T

4.12 50mm wide RBB treatment required on joints north and m 60


south of Taxiway T

Subtotal Taxiway Bravo **

3540138 120
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

5 Taxiway Charlie

5.1 50mm wide RBB application at the intersection of m 100


Taxiway C1 with the Air Movements Apron where
reflective cracking has occurred

5.2 50mm wide RBB application on Taxiway C3 within the m 200


hold line of Runway 15-33

5.3 50mm wide RBB application to treat longitudinal m 200


cracking on Taxiway C3

5.4 50mm wide RBB application at the interface between m 50


the western Taxiway C3 shoulder and the concrete
pavement at the intersection with Runway 22

5.5 Reinstate yellow paint markings (150mm centreline, 2 750


m
double 150mm edge lines) on Taxiway C3, 2 coats -
allow 1000m

5.6 75mm AC14 Mix mill and fill shoulder overlay to 2 350
m
Taxiway C1

5.7 50mm wide RBB application required on Taxiway C2 m 200

5.8 50mm wide RBB application required to full length of m 2000


Taxiway C3

Subtotal Taxiway Charlie **

3540138 121
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

6 Taxiway Delta

6.1 50mm wide RBB application to full length of shoulders m 5000

6.2 50mm wide RBB application to treat longitudinal m 150


cracking within the Runway 33 hold line

6.3 50mm wide RBB application required to cracked m 100


pavement

Subtotal Taxiway Delta **

3540138 122
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

7 Taxiway Golf

7.1 Reconstruct 2No. cracked slabs 7.5m x 7.5m x 450mm 2 120


m
thick, including 200mm thick Crushed Rock
basecourse and all joints as detailed.

7.2 Rout out and reseal joints m 500

7.3 75mm AC14 Mix mill and fill patch repairs required at 2 50
m
western shoulder extent

7.4 SRE(S) treatment to various spalls at intersection of 2 2


m
Taxiway G and B

Subtotal Taxiway Golf **

3540138 123
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

8 Taxiway Hotel

8.1 Reconstruction of four central 7.2m by 7.6m concrete 2 225


m
slabs 450mm thick, including 200mm thick Crushed
Rock basecourse and all joints as detailed.

8.2 Reseal all concrete joints m 1000

Subtotal Taxiway Hotel **

3540138 124
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

9 Taxiway Juliet

9.1 PME application to treat coarse material at the southern 2 20


m
extent of the Taxiway B intersection

9.2 50mm wide RBB application along the full length of m 3000
taxiway to treat the open paver joints, longitudinal and
localised fatigue cracking

9.3 Install new yellow paint markings (150mm centreline, 2 525


m
double 150mm edge lines), 2 coats - 700m

9.4 75mm AC14 Mix mill and fill patch repairs required to 2 10
m
shoulder near intersection with Taxiway Z

9.5 Rout out and seal 2 No. cracked concrete slabs m 8

9.6 Rout and reseal concrete slab joints near 04 threshold m 900

Subtotal Taxiway Juliet **

3540138 125
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

10 Taxiway Tango

No works proposed

Subtotal Taxiway Tango **

3540138 126
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

11 Taxiway Zulu

11.1 50mm wide RBB application along the full length of m 100
Taxiway Z to treat the open cracking

11.2 75mm AC14 Mix mill and fill patch repair 2 4


m

Subtotal Taxiway Zulu **

3540138 127
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

12 Central Apron Taxiway

12.1 50mm wide RBB application to the longitudinal and m 100


block cracked areas

12.2 75mm AC14 Mix mill and fill asphalt patch repairs to the 2 50
m
southern taxiway adjacent the existing patches

12.3 75mm AC14 Mix mill and fill asphalt patch repair on 2 20
m
northern Taxiway

Subtotal Central Apron Taxiway **

3540138 128
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

13 Air Movements Apron

13.1 50mm wide RBB application is required to treat paver m 2000


joints on the Air Movements Apron

13.2 Rout out and seal joints at eastern taxilane concrete m 650

Subtotal Air Movements Apron **

3540138 129
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

14 F111 Apron

14.1 Rout and seal cracked concrete along centreline at m 80


northern edge

14.2 SRE(s) treatment to 20 No. concrete spall on the 2 5


m
northern extent of the apron

14.3 SRE treatment to 8 No. spalls along the west / east 2 8


m
grate drain on the F111 Apron

14.4 50mm wide RBB application to treat fine, full width, m 200
central slab cracks located in the central area of the
F111 Apron

14.5 50mm wide RBB application required on cracked m 100


northern shoulder

14.6 50mm wide RBB application required along grate drain m 100

14.7 Reconstruct 2 No. Cracked slabs at invert 450mm thick, 2 120


m
including 200mm thick Crushed Rock basecourse and
all joints as detailed.

Subtotal F111 Aprons **

3540138 130
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

15 Northern Apron

15.1 SRE(s) treatment to 5 No. concrete spalls on the 2 4


m
Northern Apron

15.2 50mm wide RBB application to treat block cracking on m 200


the western flexible pavement area of the Northern
Apron

15.3 Rout out and seal 11 No. cracked slabs m 100

Subtotal Northern Aprons **

3540138 131
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

16 Central Apron

16.1 50mm wide RBB application to treat longitudinal and m 500


block cracking on the flexible pavement area at the
north-western extent of the apron

16.2 SRE(s) treatment to 2 No. spalls towards the southern 2 0.5


m
and eastern corners of the apron

Subtotal Central Apron **

3540138 132
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

17 MRTT Apron

No works proposed

Subtotal MRTT Apron **

3540138 133
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

18 C17 Apron

No works proposed

Subtotal C17 Apron **

3540138 134
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

19 3AD (Boeing Apron)

19.1 Rout and seal of a concrete crack is required on one m 6


slab on the southern side of the 3AD Apron

19.2 50mm wide RBB application to treat intensive cracking m 50


on the shoulder area where the 3AD Apron meets the
eastern side of Taxiway Z

Subtotal 3AD (Boeing Apron) **

3540138 135
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

20 Bomber Replenishment Apron (BRA)

20.1 SRE(s) treatment to 2 No. localised spalls and a 2 4


m
spalling joint on the western side of the BRA

20.2 50mm wide RBB application at the shoulder interface m 50


between Taxiway D and the eastern access point to the
BRA

20.3 75mm AC14 Mix mill and fill asphalt patch repairs near 2 30
m
access stubs

Subtotal Bomber Replenishment Apron (BRA) **

3540138 136
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

21 Engine Run Up Facility and Tow Road

21.1 Rout and Reseal joints m 200

Subtotal Engine Run Up Facility and Tow Road **

3540138 137
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

22 EO Apron

No works proposed

Subtotal EO Apron **

3540138 138
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Amberley Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

23 Provisional Items

23.1 Daily Rate for WSO (10hr shift) Day Rate Only

23.2 Rubber Removal on Runway 04-22 2 20000


m

Subtotal Provisional Items **

3540138 139
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base AAC Oakey Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

AAC OAKEY PAVEMENT WORKS

a Preliminary and General

1 Runway 14-32
2 Runway 05-23
3 Runway 09-27
4 Taxiway Alpha
5 Taxiway Bravo
6 Taxiway Charlie
7 Hot Refuel Point Access Taxiways
8 Old Civil/Compass Swing Taxiway
9 Military Apron
10 RSAF Apron
11 Civil Apron
12 Hot Refuel Point
13 Lane 3 and Lane 7
14 Provisional Items

Base Subtotal

Individual pricing items shown on drawings

3540138 140
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base AAC Oakey Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST


General

The following abbreviations for units and works have been Note
used in this schedule:
mm = millimetre
m = linear metre
m2 = square metre
m3 = cubic metre
No. = number
kg = kilogram
t = tonne
hr = hour
LS = lump sum
PS = Provisional Sum
AC = Asphaltic Concrete
RBB = Rubberised Bituminous Bandage
PME = Polymer Modified Bitumen Emulsion
AGL = Aeronautical Ground Lighting

Tenderers are advised that this Schedule is to be read in Note


conjunction with the Drawings and Specification to which
they are hereby referred for full description of the items
measured herein.

Tenderers are referred to the General and Special Note


Conditions of Contract and the Preliminaries Section of the
Specification and are deemed to have allowed herein for
all items that may affect the works, such as night works.

The prices and rates entered in this Schedule are deemed Note
to have allowed for ALL costs involved in supply, placing
and /or fixing each item in its final position or form.
Unpriced items are deemed to be included elsewhere.

The Contract Administrator (CA) must be notified of any Note


discrepancies between this Schedule, the plans and the
Specification prior to any work being undertaken on the
items in question.

3540138 141
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base AAC Oakey Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

All items measured herein are measured net and no Note


allowance has been made for waste, overbreak,
compaction, rolling margins, tolerances and the like.
All costs associated with these items are deemed to be
included in the rates.

All rates entered herein shall be exclusive of GST Note

Quantities provided in this schedule are the Contract Note


Administrator's estimate of actual works as shown on the
Tender Drawings.
Notwithstanding, there is no guarantee as to the accuracy
of this information. No allowance has been made for
wastage, construction tolerances or temporary works
including ramping.

Asphalt tonnage has been based on an assumed density Note


of 2.4 tonne/m3.

3540138 142
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base AAC Oakey Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

a Preliminary

a1.1 Mobilise to the site, maintain and subsequently remove from site all Sum 1
necessary plant, equipment, gear, hoists, tools, cartage, transport, car
parking, temporary facilities and the like. Include for giving all trades
and subcontractors the free use of same as required.

a1.2 Ongoing overheads and other costs not included elsewhere in the Sum 1
schedule

a1.3 Quality Plan, Safety Plan, Environmental Management Plan and Sum 1
Program, Submission of Mix Design and materials test results

a1.4 Provision of "As-Constructed" drawings. Sum 1

a1.5 Provide any directional/ warning signs and barriers as required Sum 1
including markers and lights in accordance with CASA MoS139,
remove from site upon completion.

a1.6 Allow for full time site based suitable qualified and experienced Works Sum 1
Safety Officer (WSO) for the duration of the works, including
mobilisation, vehicles, accommodation, meals and other allowances.

3540138 143
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base AAC Oakey Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

1 Runway 14-32

1.1 RBB (50mm wide) application to the longitudinal and m 6000


localised block cracking along Runway 14-32

1.2 Asphalt patch repair (75mm AC14 mill and fill) at the 2 4
m
intersection with the compass swing access taxiway to
treat a localised rutted and block cracked area, 50m
RBB treatment to perimeter.

1.3 Reseal AGL cable slot at the intersection with Taxiway m 60


C

1.4 RBB (50mm wide) treatment to Runway 32 end m 50

Subtotal Runway 14-32 **

3540138 144
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base AAC Oakey Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

2 Runway 05-23

2.1 RBB (50mm wide) application to the localised m 10


longitudinal cracking on the southern side of the
Runway 05 threshold area.

2.2 RBB (50mm wide) application to the longitudinal m 20


cracking in the Runway 23 sealed runway end

Subtotal Runway 05-23 **

3540138 145
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base AAC Oakey Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

3 Runway 09-27

3.1 Reseal AGL cable slot at the intersection with Taxiway m 10


B

3.2 RBB (50mm wide) application to treat cracking on the m 50


southern shoulder at the intersection with Taxiway B

3.3 RBB (50mm wide) application to treat open paver joints m 60


at the intersection of Taxiway A

3.4 Water blast to remove the old paint markings west of 2 100
m
Taxiway A

3.5 Apply PME treatment following Item 3.4 2 100


m

3.6 RBB (50mm wide) application to the open longitudinal m 20


cracks adjacent the old paint markings west of Taxiway
A

3.7 RBB (50mm wide) application to the edge of the m 10


existing patch repairs and edge break at the Runway 27
end

3.8 RBB (50mm wide) treatment m 20

3.9 PME treatment to various areas on eastern half of 2 25


m
Runway 09-27

3.10 PME treatment to central 12m at Runway 27 End 2 1500


m

Subtotal Runway 09-27 **

3540138 146
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base AAC Oakey Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

4 Taxiway Alpha

4.1 PME surface application to the intersection of Taxiway 2 100


m
A with Taxiway B to treat the coarse surface material

4.2 PME treatment of localised coarse areas from Runway 2 2000


m
09-27 to Runway 14-32

4.3 PME treatment of localised coarse areas from Taxiway 2 1000


m
B to Runway 09-27

4.4 75mm wide RBB to AGL cable slots located on Runway m 300
09-27 and Runway 14-32 intersections

4.5 RBB (50mm wide) application to the open paver joints m 1600
and longitudinal cracking between the Military Apron
and Runway 14-32

4.6 RBB (75mm wide) treatment to AGL cable slots m 100

4.7 Paint Marking Double Edge lines (150mm wide) and 2 600
m
Centreline (150mm wide), 2 coats - 800m

4.8 PME surface treatment to full width and length of 2 9725


m

Subtotal Taxiway Alpha **

3540138 147
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base AAC Oakey Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

5 Taxiway Bravo

5.1 Sand filling and 50mm wide RBB to open cracks on m 100
shoulders

5.2 RBB (50mm wide) application is required to longitudinal m 240


cracking

5.3 75mm wide RBB to AGL cable slots at the Taxiway A m 100
intersection

5.4 PME surface application to boney area between 2 100


m
Taxiway B3 and B2

5.5 PME surface treatment on Taxiway B4 2 10


m

Subtotal Taxiway Bravo **

3540138 148
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base AAC Oakey Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

6 Taxiway Charlie

6.1 RBB (50mm wide) application required to cracking m 70

Subtotal Taxiway Charlie **

3540138 149
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base AAC Oakey Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

7 Hot Refuel Point Access Taxiways

7.1 RBB (50mm wide) to treat cracking m 40

7.2 RBB (75mm wide) to AGL cable slots m 100

Subtotal Hot Refuel Point Access Taxiways **

3540138 150
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base AAC Oakey Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

8 Old Civil/Compass Swing Taxiway

8.1 RBB (50mm wide) to paver joint cracks m 400

8.2 Repaint Compass Swing circle marking (150mm wide), 2 15


m
2 coats - allow 100m

8.3 Asphalt patch repair 2 4


m

Subtotal Old Civil Taxiway **

3540138 151
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base AAC Oakey Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

9 Military Apron

9.1 Three new earthing points are required on the Tiger No 3


Apron

9.2 RBB (50mm wide) application is required to seal m 50


longitudinal cracking to the south of the Tiger Apron

9.3 Reseal AGL slots leading to Taxiway B2 with 75mm m 100


wide RBB

9.4 RBB (50mm wide) application to the paver joints and m 260
longitudinal cracking on the western side of the apron

9.5 PME applications to the northern extent of the Kaiwa 2 70


m
Apron where standing water has damaged the
pavement (approximately 50m2), and at the southern
pavement interface where the pavement is coarse,
2
(approximately 20m )

9.6 RBB (50mm wide) application to the paver joints, m 1000


longitudinal and localised block cracking on the main
Military Apron

9.7 Rout and seal of cracks on the Kaiwa helicopter pads m 60

9.8 RBB (50mm wide) to fine cracking on concrete pads m 60

9.9 RBB (50mm wide) to perimeter of concrete pads m 950

9.10 Rout and seal cracks on the Blackhawk concrete pads m 120

9.11 Paint marking (150mm wide) yellow centrelines, 2 coats 2 425


m
- 2750m

Subtotal Military Apron **

3540138 152
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base AAC Oakey Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

10 RSAF Apron

10.1 75mm wide RBB to AGL cable slots at the southern m 300
extent of the pavement area

10.2 RBB (50mm wide) application to paver joints and m 100


longitudinal cracking is required between the two rows
of concrete pads and at the western extent of the apron
(outside of the FRM treated area)

10.3 Repaint centreline markings (150mm wide) yellow, 2 2 300


m
coats - 1800m

Subtotal RSAF Apron **

3540138 153
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base AAC Oakey Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

11 Civil Apron

11.1 Sweep Civil Apron to remove loose aggregate LS 1

Subtotal Civil Apron **

3540138 154
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base AAC Oakey Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

12 Hot Refuel Point

12.1 Rout and seal of concrete cracking is required on both m 60


refuelling aprons

Subtotal Hot Refuel Point **

3540138 155
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base AAC Oakey Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

13 Lane 3 and Lane 7

13.1 Sand filling and 50mm wide RBB to open cracks on m 25


Lane 3

13.2 50mm wide RBB to cracks on Lane 3 m 300

13.3 Sand filling and 50 wide RBB to open cracks on Lane 7 m 120

13.4 50mm wide RBB to cracks on Lane 7 m 40

Subtotal Lane 3 and Lane 7 **

3540138 156
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base AAC Oakey Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

14 Provisional Items

14.1 Daily Rate for WSO (10hr shift) Day Rate Only

Subtotal Provisional Items **

3540138 157
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Wyoming Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

WYOMING AIRFIELD PAVEMENT WORKS

a Preliminary and General

1 Runway 06-24
2 Taxiway
3 Apron
4 Provisional Items

Base Subtotal

Individual pricing items shown on drawings

3540138 158
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Wyoming Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST


General

The following abbreviations for units and works have been Note
used in this schedule:
mm = millimetre
m = linear metre
m2 = square metre
m3 = cubic metre
No. = number
kg = kilogram
t = tonne
hr = hour
LS = lump sum
PS = Provisional Sum
AC = Asphaltic Concrete
RBB = Rubberised Bituminous Bandage
PME = Polymer Modified Bitumen Emulsion
AGL = Aeronautical Ground Lighting

Tenderers are advised that this Schedule is to be read in Note


conjunction with the Drawings and Specification to which
they are hereby referred for full description of the items
measured herein.

Tenderers are referred to the General and Special Note


Conditions of Contract and the Preliminaries Section of the
Specification and are deemed to have allowed herein for
all items that may affect the works, such as night works.

The prices and rates entered in this Schedule are deemed Note
to have allowed for ALL costs involved in supply, placing
and /or fixing each item in its final position or form.
Unpriced items are deemed to be included elsewhere.

The Contract Administrator (CA) must be notified of any Note


discrepancies between this Schedule, the plans and the
Specification prior to any work being undertaken on the
items in question.

3540138 159
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Wyoming Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

All items measured herein are measured net and no Note


allowance has been made for waste, overbreak,
compaction, rolling margins, tolerances and the like.
All costs associated with these items are deemed to be
included in the rates.

All rates entered herein shall be exclusive of GST Note

Quantities provided in this schedule are the Contract Note


Administrator's estimate of actual works as shown on the
Tender Drawings.
Notwithstanding, there is no guarantee as to the accuracy
of this information. No allowance has been made for
wastage, construction tolerances or temporary works
including ramping.

Asphalt tonnage has been based on an assumed density Note


of 2.4 tonne/m3.

3540138 160
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Wyoming Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

a Preliminary

a1.1 Mobilise to the site, maintain and subsequently remove from site all Sum 1
necessary plant, equipment, gear, hoists, tools, cartage, transport, car
parking, temporary facilities and the like. Include for giving all trades
and subcontractors the free use of same as required.

a1.2 Ongoing overheads and other costs not included elsewhere in the Sum 1
schedule

a1.3 Quality Plan, Safety Plan, Environmental Management Plan and Sum 1
Program, Submission of Mix Design and materials test results

a1.4 Provision of "As-Constructed" drawings. Sum 1

a1.5 Provide any directional/ warning signs and barriers as required Sum 1
including markers and lights in accordance with CASA MoS139,
remove from site upon completion.

a1.6 Allow for full time site based suitable qualified and experienced Works Sum 1
Safety Officer (WSO) for the duration of the works, including
mobilisation, vehicles, accommodation, meals and other allowances.

3540138 161
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Wyoming Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

1 Runway 06-24

1.1 RBB application is required to treat the longitudinal m 350


cracks along the full length of the runway, heavier at the
Runway 24 end

1.2 Treatment of the open edge break on the southern m 100


shoulder at the western end of the runway, sand fill and
50mm wide RBB

1.3 Treatment of the open edge break on the northern m 50


shoulder at the western end of the runway, sand fill and
50mm wide RBB

Subtotal Runway 06-24 **

3540138 162
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Wyoming Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

2 Taxiway

2.1 50mm wide RBB application is required in the central m 20


area to seal the observed longitudinal cracking

2.2 Treatment of the open edge break centrally on the m 20


western shoulder and at the apron interface on the
eastern shoulder with sand fill and 50mm wide RBB

Subtotal Taxiway **

3540138 163
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Wyoming Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

3 Apron

3.1 50mm wide RBB application to the longitudinal cracks m 100


on the Central Apron area

Subtotal Apron **

3540138 164
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Wyoming Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

4 Provisional Items

4.1 Daily Rate for WSO (10 hour shift) Day Rate Only

Subtotal Provisional Items **

3540138 165
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

RAAF TOWNSVILLE PAVEMENT WORKS

a Preliminary and General

1 Runway 01-19
2 Runway 07-25
3 Taxiway Alpha
4 Taxiway Echo
5 Taxiway Foxtrot
6 Taxiway Golf
7 Taxiway India
8 Taxiway Juliet
9 Taxiway Lima
10 Taxiway Mike
11 Taxiway Sierra
12 Taxiway Tango
13 Taxiway Uniform
14 Taxiway Whiskey
15 Taxiway Yankee
16 Taxiway Zulu
17 Aircraft Wash Bay
18 5 AVN Helicopter Apron
19 Main Apron
20 Maritime OLAs (12-14) and EOA 11

Base Subtotal

Individual pricing items shown on drawings

3540138 166
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST


General

The following abbreviations for units and works have been Note
used in this schedule:
mm = millimetre
m = linear metre
m2 = square metre
m3 = cubic metre
No. = number
kg = kilogram
t = tonne
hr = hour
LS = lump sum
PS = Provisional Sum
AC = Asphaltic Concrete
RBB = Rubberised Bituminous Bandage
PME = Polymer Modified Bitumen Emulsion
AGL = Aeronautical Ground Lighting

Tenderers are advised that this Schedule is to be read in Note


conjunction with the Drawings and Specification to which
they are hereby referred for full description of the items
measured herein.

Tenderers are referred to the General and Special Note


Conditions of Contract and the Preliminaries Section of the
Specification and are deemed to have allowed herein for
all items that may affect the works, such as night works.

The prices and rates entered in this Schedule are deemed Note
to have allowed for ALL costs involved in supply, placing
and /or fixing each item in its final position or form.
Unpriced items are deemed to be included elsewhere.

The Contract Administrator (CA) must be notified of any Note


discrepancies between this Schedule, the plans and the
Specification prior to any work being undertaken on the
items in question.

3540138 167
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

All items measured herein are measured net and no Note


allowance has been made for waste, overbreak,
compaction, rolling margins, tolerances and the like.
All costs associated with these items are deemed to be
included in the rates.

All rates entered herein shall be exclusive of GST Note

Quantities provided in this schedule are the Contract Note


Administrator's estimate of actual works as shown on the
Tender Drawings.
Notwithstanding, there is no guarantee as to the accuracy
of this information. No allowance has been made for
wastage, construction tolerances or temporary works
including ramping.

Asphalt tonnage has been based on an assumed density Note


of 2.4 tonne/m3.

3540138 168
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

a Preliminary

a1.1 Mobilise to the site, maintain and subsequently remove from site all Sum 1
necessary plant, equipment, gear, hoists, tools, cartage, transport, car
parking, temporary facilities and the like. Include for giving all trades
and subcontractors the free use of same as required.

a1.2 Ongoing overheads and other costs not included elsewhere in the Sum 1
schedule

a1.3 Quality Plan, Safety Plan, Environmental Management Plan and Sum 1
Program, Submission of Mix Design and materials test results

a1.4 Provision of "As-Constructed" drawings. Sum 1

3540138 169
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

1 Runway 01-19

1.1 RBB (50mm wide) treatment to cracks west of Runway m 120


01

1.2 SRE(s) treatment to spalls east of Runway 01 m2 2

1.3 RBB (50mm wide) treatment to cracks and spalls at m 200


Runway End 01, west of Southern ORP

1.4 RBB (50mm wide) treatment to AC/Concrete joint at m 350


Runway End 01

1.5 SRE(s) repairs to 3No. of holes located west of m2 0.1


Southern ORP

1.6 Remove and replace 4No. slabs (6m x 4m, 450mm m2 100
thick) located at 01 End, including 200mm thick
Crushed Rock basecourse and all joints as detailed.

1.7 Rubber removal Runway End 01, south of Taxiway D3 m2 10000

1.8 RBB (50mm wide) treatment to centreline cracking, m 200


south of Taxiway D

1.9 RBB (75mm wide) treatment to AGL slots at intersection m 500


of Taxiway G1 and G2

1.10 SRE(s) treament to minor spalls at Runway End 19 m2 0.75

1.11 RBB (50mm wide) treatment to joints at Runway End 19 m 5

1.12 SRE(s) treatment to major spall at Runway End 19 m2 0.5

1.13 Renew failed concrete joint sealant at Runway End 19 m 2

1.14 RBB (50mm wide) to shoulders both sides full length m 2000

1.15 Asphalt patch repair to old light fitting LS 1

Subtotal Runway 01-19 **

3540138 170
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

2 Runway 07-25

No works proposed

Subtotal Runway 07-25 **

3540138 171
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

3 Taxiway Alpha

3.1 1 No. Concrete slab (4m x 4m, 350mm thick) to be m2 16


broken out and replaced with 450mm thick slab
opposite Southern ORP, including 200mm thick
Crushed Rock basecourse and all joints as detailed.

3.2 SRE(S) repair to spalls at Taxiway A1 m2 2

3.3 50mm wide RBB to cracks and spalls m 200

3.4 Fill localised edge drop with topsoil and grass south of m2 40
Taxiway I

3.5 RBB (50mm wide) treatment to east of Taxiway A5 m 3

3.6 RBB (50mm wide) treatment to cracked paver joint m 25

3.7 RBB (50mm wide) treatment to pock marks west m 5


shoulder of Taxiway A6

3.8 RBB (50mm wide) treatment to transverse and m 40


longitudinal cracking south of Taxiway G1

3.9 PME treatment to west shoulder of Taxiway A7 m2 12

3.10 RBB (50mm wide) treatment to west shoulder of m 15


Taxiway A7

3.11 RBB (50mm wide) treatment to Taxiway A7 m 50

3.12 RBB (50mm wide) treatment to concrete/asphalt m 15


interface

3.13 SRE(s) treatment to spalling joint east of Northern ORP m2 1.5

3.14 SRE(s) treatment to 6No. Holes at Taxiway A7 m2 1

3.15 RBB (50mm wide) treatment to TWY A7 shoulder joint m 10

3.16 SRE(s) treatment to spalls adjacent to Northern ORP m2 3.75

3.17 Concrete cracks to be routed out and sealed with an m 5


approved joint sealant (eg Thioflex)

3.18 RBB (50mm wide) treatment to Taxiway A7 bend m 300

Subtotal Taxiway Alpha **

3540138 172
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

4 Taxiway Echo

4.1 PME treatment to Taxiway E1 m2 3700

4.2 SEST treatment to shoulders of Taxiway E1 m2 1500

4.3 PME treatment to isolated boney patch m2 400

4.4 Reinstate paintmarkings to full length of Taxiway E1 m2 142.5


(150mm wide centreline, 150mm double edge lines), 2
coats - allow 190m

4.5 RBB (50mm wide) treatment to open longitudinal joint m 40

4.6 RBB (50mm wide) treatment to edge cracks, north m 100


shoulder of Taxiway E2

4.7 PME treatment to Taxiway E2 m2 7000

4.8 SEST treatment to both shoulders of Taxiway E2 m2 3300

4.9 Reinstate paintmarkings to full length of Taxiway E2 m2 356.25


(150mm wide centreline, 150mm double edge lines), 2
coats - allow 475m

Subtotal Taxiway Echo **

3540138 173
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

5 Taxiway Foxtrot

5.1 RBB (50mm wide) treatment to cracks m 150

Subtotal Taxiway Foxtrot **

3540138 174
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

6 Taxiway Golf

6.1 Remove old Taxiway G1 centreline (approx 150mm m2 40


wide) by watercutting 1m wide and PME treatment 1m
wide

6.2 RBB (75mm wide) treatment to AGL slots on Taxiway m 100


G1

6.3 RBB (50mm wide) treatment to open cracks on Taxiway m 200


G2

6.4 RBB (75mm wide) treatment to AGL cable slots at m 100


intersection of Taxiway G2 and U

6.5 Reinstate paintmarkings to full length of Taxiway G2 m2 375


(150mm wide centreline, 150mm double edge lines), 2
coats - allow 500m

6.6 PME treatment to full width of Taxiway G2 up to Taxiway m2 8950


U

Subtotal Taxiway Golf **

3540138 175
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

7 Taxiway India

7.1 RBB (50mm wide) treatment to edges m 150

Subtotal Taxiway India **

3540138 176
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

8 Taxiway Juliet

8.1 SRE(s) treatment to cracked corner north of Aircraft m2 1


Wash Bay

Subtotal Taxiway Kilo **

3540138 177
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

9 Taxiway Lima

9.1 RBB (50mm wide) treatment east of Taxiway L m 1

9.2 PME treatment east of Taxiway L m2 10

Subtotal Taxiway Lima **

3540138 178
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

10 Taxiway Mike

10.1 RBB (50mm wide) treatment leading to OLA 14 m 15

10.2 RBB (50mm wide) treatment to boney patch repairs m 15

10.3 RBB (75mm wide) treatment to all AGL slots m 500

10.4 Asphalt patch repair at EOA 11 m2 10

10.5 PME to boney patch near EOA11 m2 10

10.6 PME treatment to full length of Taxiway M incl asphalt m2 40600


pavement located in OLAs 12-14 and EOA11

10.7 SEST treatment to both shoulders of Taxiway M up to m2 14350


Taxiway G2 and including OLA 12-14 and EOA11
asphalt pavements

10.8 Reinstate paintmarkings to full length of Taxiway M m2 1800


(150mm wide centreline, 150mm double edge lines), 2
coats - allow 2400m

Subtotal Taxiway Mike **

3540138 179
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

11 Taxiway Sierra

11.1 Removal of edge drop offs (by filling with selected m2 40


material, topsoil and seal with bitumen emulsion)

11.2 PME treatment to full width of Taxiway S m2 1280

11.3 SEST treatment to both shoulders of Taxiway S m2 540

11.4 Reinstate paintmarkings to Taxiway S (150mm m2 120


centreline, double 150mm edge lines, yellow), 2 coats -
allow 160m

Subtotal Taxiway Sierra **

3540138 180
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

12 Taxiway Tango

12.1 Asphalt patch repair (50mm AC14 mix mill and fill) m2 21
adjacent to OLA 8

12.2 RBB (50mm wide) treatment to asphalt/concrete m 18


interface at OLA 8

12.3 Asphalt patch repair (50mm AC mix mill and fill) m2 21


adjacent to OLA 6, allow 21m2

12.4 RBB (50mm wide) treatment to spalls at OLA 6 m 2

12.5 PME treatment to full width of Taxiway T incl. OLA m2 15300


pavements

12.6 SEST treatment to shoulders of Taxiway T incl. OLA m2 4620


shoulders

12.7 Reinstatement of paintmarkings (150mm centrelines, m2 975


double 150mm edge lines), 2 coats - allow 1300m

Subtotal Taxiway Tango **

3540138 181
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

13 Taxiway Uniform

13.1 RBB (50mm wide) treatment to all AGL cable slots m 1200
around OLA 6-10

13.2 PME treatment to full width of Taxiway U1 & U2 m2 3690

13.3 SEST treatment to shoulders of Taxiway U1 & U2 m2 1035

13.4 Reinstatement of paintmarkings (150mm centrelines, m2 187.5


double 150mm edge lines), 2 coats - allow 250m

Subtotal Taxiway Uniform **

3540138 182
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

14 Taxiway Whiskey

14.1 Provide asphaltic seal to access road (50mm thick m2 300


AC14 mix on tack coat)

14.2 RBB (75mm wide) treatment to AGL cable slots m 5

14.3 PME treatment to entire Taxiway W m2 4790

14.4 SEST treatment to Taxiway W shoulders m2 1735

14.5 Reinstatement of paintmarkings (150mm centrelines, m2 240


double 150mm edge lines), 2 coats - allow 320m

Subtotal Taxiway Whiskey **

3540138 183
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

15 Taxiway Yankee

15.1 RBB (50mm wide) treatment to OLA 3 m 60

15.2 RBB (50mm wide) treatment to OLA 2 m 20

15.3 Joint sealant required leading up to OLA 4/Taxiway Z m 30

15.4 PME treatment to entire Taxiway Y including asphalt m2 17160


pavements to OLA 1-5

15.5 SEST treatment to shoulders of Taxiway Y incl OLA m2 4600


shoulders

15.6 Reinstatement of paintmarkings (150mm centrelines, m2 975


double 150mm edge lines), 2 coats - allow 1300m

Subtotal Taxiway Yankee **

3540138 184
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

16 Taxiway Zulu

16.1 RBB (50mm wide) treatment to spalls m 20

16.2 PME treatment to full width of Taxiway Z excluding m2 1100


Taxiway shoulders

16.3 SEST treatment to shoulders of Taxiway Z m2 420

16.4 Reinstatement of paintmarkings (150mm centrelines, m2 187.5


double 150mm edge lines), 2 coats - allow 250m

Subtotal Taxiway Zulu **

3540138 185
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

17 Aircraft Wash Bay

17.1 SRE(s) treatment to repair spalls m2 2

Subtotal Aircraft Wash Bay **

3540138 186
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

18 5 AVN Helicopter Apron

18.1 Fuel resistant membrane to be reinstated m2 900

18.2 RBB (50mm wide) treatment to open joints on the west m 100
side

18.3 RBB (50mm wide) treatment to central apron m 100

18.4 PME treatment to isolated patch of asphalt, southeast of m2 4


the eastern apron

18.5 PME treatment to boney asphalt, eastern side of east m2 500


apron

18.6 RBB (50mm wide) treatment to paver joints, central to m 1000


the east apron

18.7 Asphalt patch repair 50mm thick on the east apron m2 1

18.8 Fuel resistant membrane to be reinstated to Stands 4A, m2 250


4B and 5A

18.9 RBB (50mm wide) treatment to open crack north of the m 5


central apron

18.10 RBB (50mm wide) treatment to open longitudinal joints m 350

Subtotal 5 AVN Helicopter Apron **

3540138 187
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

19 Main Apron

19.1 SRE(s) treatments to spalls m2 2

19.2 RBB (50mm wide) treatment to centreline cracks m 150

19.3 SRE(s) treatments to cracked slab and failed joints m2 2

19.4 RBB (50mm wide) treatments to south end of apron m 20

19.5 Remove parking line paint marking (150mm wide) m2 25

19.6 RBB (50mm wide) treatment to open cracks m 100

19.7 Asphalt patch repair (50mm AC14 mix mill and fill) m2 4
adjacent to cesspit

19.8 Concrete cracks to be routed out and sealed with m 10


approved joint sealant (eg Thioflex 600)

19.9 Seal joints m 2500

19.10 Grind spalls at northern end of Main Apron and reseal m 20


joints

Subtotal Main Apron **

3540138 188
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Townsville Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

20 Maritime OLAs (12-14) and EOA11

20.1 RBB (50mm wide) treatment to localised spalls at OLA m 150


13

20.2 RBB (50mm wide) treatment to all AGL cable slots at m 1200
OLA 11 to 14 and EOA 11

20.3 SRE(S) Spall Repairs at OLA 13 and 14 m2 0.1

20.4 Rout and seal joints at OLA 12-14 m 50

20.5 Topsoil and grass m2 20

20.6 RBB (50mm wide) treatment to EOA 11 m 15

20.7 Rout and seal joints at EOA 11 m 10

20.8 Grind and reseal spalled joints at EOA 11 m 50

20.9 PME treatments to OLA 12-14 and EOA11 included in Note


Taxiway M

Subtotal Maritime OLAs **

3540138 189
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

RAAF BASE SCHERGER PAVEMENT WORKS

a Preliminary and General

1 Runway 12-30
2 Taxiway A (Emergency Runway 12-30)
3 Taxiway B
4 Taxiway C
5 Taxiway D
6 Taxiway E
7 Taxiway F
8 Taxiway G
9 Taxiway H
10 Taxiway J
11 Taxiway K
12 Taxiway L
13 Taxiway M
14 Taxiway N
15 General Purpose Apron
16 Fighter Stike OLA's
17 Maritime EOA's
18 QRAF
19 Helipads
20 Provisional Items

Base Subtotal

Individual pricing items shown on drawings

3540138 190
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST


General

The following abbreviations for units and works have been Note
used in this schedule:
mm = millimetre
m = linear metre
m2 = square metre
m3 = cubic metre
No. = number
kg = kilogram
t = tonne
hr = hour
LS = lump sum
PS = Provisional Sum
AC = Asphaltic Concrete
RBB = Rubberised Bituminous Bandage
PME = Polymer Modified Bitumen Emulsion
AGL = Aeronautical Ground Lighting

Tenderers are advised that this Schedule is to be read in Note


conjunction with the Drawings and Specification to which
they are hereby referred for full description of the items
measured herein.

Tenderers are referred to the General and Special Note


Conditions of Contract and the Preliminaries Section of the
Specification and are deemed to have allowed herein for
all items that may affect the works, such as night works.

The prices and rates entered in this Schedule are deemed Note
to have allowed for ALL costs involved in supply, placing
and /or fixing each item in its final position or form.
Unpriced items are deemed to be included elsewhere.

The Contract Administrator (CA) must be notified of any Note


discrepancies between this Schedule, the plans and the
Specification prior to any work being undertaken on the
items in question.

3540138 191
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

All items measured herein are measured net and no Note


allowance has been made for waste, overbreak,
compaction, rolling margins, tolerances and the like.
All costs associated with these items are deemed to be
included in the rates.

All rates entered herein shall be exclusive of GST Note

Quantities provided in this schedule are the Contract Note


Administrator's estimate of actual works as shown on the
Tender Drawings.
Notwithstanding, there is no guarantee as to the accuracy
of this information. No allowance has been made for
wastage, construction tolerances or temporary works
including ramping.

Asphalt tonnage has been based on an assumed density Note


of 2.4 tonne/m3.

3540138 192
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

a Preliminary

a1.1 Mobilise to the site, maintain and subsequently remove from site all Sum 1
necessary plant, equipment, gear, hoists, tools, cartage, transport, car
parking, temporary facilities and the like. Include for giving all trades
and subcontractors the free use of same as required.

a1.2 Ongoing overheads and other costs not included elsewhere in the Sum 1
schedule

a1.3 Quality Plan, Safety Plan, Environmental Management Plan and Sum 1
Program, Submission of Mix Design and materials test results

a1.4 Provision of "As-Constructed" drawings. Sum 1

a1.5 Provide any directional/ warning signs and barriers as required Sum 1
including markers and lights in accordance with CASA MoS139,
remove from site upon completion.

a1.6 Allow for full time site based suitable qualified and experienced Works Sum 1
Safety Officer (WSO) for the duration of the works, including
mobilisation, vehicles, accommodation, meals and other allowances.

a1.7 Allowance for contractor/subcontractor mobilisation Sum 1

Subtotal Preliminary **

3540138 193
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

1 Runway 12-30

1.1 50mm wide RBB to open joint m 250

1.2 PME m2 3

1.3 SEST m2 1200

1.4 50mm wide RBB northwest of Taxiway C1 m 350

1.5 50mm wide RBB to cracked joints m 50

1.6 50mm wide RBB to shoulder area m 50

1.7 PME m2 80

1.8 PME m2 10

1.9 50mm wide RBB to transverse joint m 45

1.10 50mm wide RBB to centre line m 20

1.11 SEST m2 50

1.12 SEST m2 16

1.13 SEST - 2 X 10m2 patches m2 20

1.14 50mm wide RBB to open construction joint m 50

1.15 75mm wide RBB to inset light fittings m 5

1.16 SEST 2 X 40m2 patches m2 80

1.17 50mm wide RBB to intersection of Taxiway E m 50

Subtotal **

3540138 194
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

2 Taxiway A (Emergency Runway 12-30)

2.1 Apply threshold white transverse stripe marking m2 30


(1200mm wide), 2 coats

2.2 SEST to southwestern shoulder midway of Taxiway A2 m2 500

2.3 75mm wide RBB to AGL cable slots on Taxiway C1 m 15

2.4 PME to east of Taxiway C1 m 20

2.5 SEST to Taxiway A2 pavement edge m2 400

2.6 SEST to Taxiway A2 pavement edge m2 500

2.7 50mm wide RBB to AC "bubble" on Taxiway A2 m 1

2.8 PME on Taxiway A2 m 4

2.9 50mm wide RBB to intersection of Helipad Taxiway m 10

2.10 PME to west of Taxiway D1 m2 100

2.11 75mm wide RBB to AGL cable slots at intersection with m 200
Taxiway D1

2.12 Apply threshold transverse stripe marking on Taxiway m2 30


A3 (1200mm wide), 2 coats

2.13 PME to areas of micro cracking on Taxiway A3 m2 2000

Subtotal **

3540138 195
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

3 Taxiway B

3.1 50mm wide RBB by QRAF m 200

Subtotal **

3540138 196
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

4 Taxiway C

4.1 50mm wide RBB to Taxiway F/G intersection m 20

4.2 50mm wide RBB to old ravelled joints on Taxiway C2 m 40

4.3 75mm wide RBB AGL cables slots m 50

4.4 50mm wide RBB east of Taxiway H m 60

4.5 New paint markings - 150mm wide yellow, 2 coats m2 900

4.6 50mm wide RBB to west of Taxiway J m 60

4.7 50mm wide RBB to open cracks to east of Taxiway J m 25

4.8 PME to east of Taxiway J m2 10

4.9 PME on Taxiway C1 m2 20

4.10 SEST on Taxiway C1 m2 320

Subtotal **

3540138 197
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

5 Taxiway D

5.1 PME treatment to areas of micro cracking m2 300

5.2 RBB to two old pot hole repairs m 5

Subtotal **

3540138 198
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

6 Taxiway E

6.1 PME patches m2 120

Subtotal **

3540138 199
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

7 Taxiway F

7.1 Sand fill and 50mm wide RBB to edge break m 20

7.2 PME to isolated boney/ravelling areas m2 50

7.3 50mm wide RBB to open joint m 40

7.4 PME m2 100

Subtotal **

3540138 200
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

8 Taxiway G

No works proposed

Subtotal **

3540138 201
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

9 Taxiway H

No works proposed

Subtotal **

3540138 202
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

10 Taxiway J

10.1 75mm wide RBB to AGL cable slots m 100

Subtotal **

3540138 203
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

11 Taxiway K

11.1 PME to boney/ravelling asphalt m2 80

Subtotal **

3540138 204
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

12 Taxiway L

12.1 PME to boney/ravelling asphalt m2 40

12.2 50mm wide RBB to open joints/cracks m 15

Subtotal **

3540138 205
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

13 Taxiway M

13.1 50mm wide RBB m 15

13.2 PME m2 75

Subtotal **

3540138 206
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

14 Taxiway N

14.1 SEST m2 500

Subtotal **

3540138 207
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

15 General Purpose Apron

15.1 50mm wide RBB to interface m 50

15.2 50mm wide RBB to concrete spall m 10

15.3 Clear out existing drains m 50

15.4 SEST to shoulder pavement m2 40

15.5 50mm wide RBB to minor cracks in concrete m 50

Subtotal **

3540138 208
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

16 Fighter Strike OLA's

16.1 PME to localised areas m2 75

16.2 75mm wide RBB to AGL cable slots m 100

16.3 Rout out and seal cracked slabs m 20

16.4 PME m2 35

16.5 PME to boney/ravelling asphalt m2 40

16.6 50mm wide RBB to OLA 3 m 10

16.7 Rout out and seal cracked slabs with Thioflex 600 m 2

16.8 Rout out and seal cracked slabs with Thioflex 600 m 30

16.9 Rout out and seal cracked slabs with Thioflex 600 m 5

Subtotal **

3540138 209
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

17 Maritime EOA's

17.1 PME m2 100

17.2 50mm wide RBB to Eastern EOA m 100

Subtotal **

3540138 210
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

18 QRAF

No works proposed

Subtotal **

3540138 211
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

19 Helipads

19.1 Repaint yellow airfield markings edge (double 150mm m2 160


wide) and centre line (150mm wide) 5No lines, 2 coats -
210m

19.2 50mm wide RBB to longitudinal joint m 50

19.3 50mm wide RBB to open cracks m 50

Subtotal **

3540138 212
2009-10 National Airfields Maintenance Project - Package 2
PROJECT: RAAF Base Scherger Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

20 Provisional Items

20.1 Daily Rate for WSO (10hr shift) Day Rate Only

Subtotal **

3540138 213
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

EDINBURGH AIRFIELD PAVEMENT WORKS

a Preliminary and General

1 Runway 18-36
2 Runway 04-22
3 Taxiway A
4 Taxiway B
5 Taxiway C
6 Taxiway D
7 Taxiway E
8 Taxiway F
9 Taxiway K
10 Taxiway L
11 Transport Apron - Asphalt
12 Transport Apron - Concrete
13 Main Apron
14 Ordinance Loading Aprons (OLAs)
15 Engine Run Up Apron
16 Aircraft Wash Apron
17 Turntable
18 Compass Swing Area
19 Provisional Items

Base Subtotal

Individual pricing items shown on drawings

3540138 214
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST


General

The following abbreviations for units and works have been Note
used in this schedule:
mm = millimetre
m = linear metre
m2 = square metre
m3 = cubic metre
No. = number
kg = kilogram
t = tonne
hr = hour
LS = lump sum
PS = Provisional Sum
AC = Asphaltic Concrete
RBB = Rubberised Bituminous Bandage
PME = Polymer Modified Bitumen Emulsion
AGL = Aeronautical Ground Lighting

Tenderers are advised that this Schedule is to be read in Note


conjunction with the Drawings and Specification to which
they are hereby referred for full description of the items
measured herein.

Tenderers are referred to the General and Special Note


Conditions of Contract and the Preliminaries Section of the
Specification and are deemed to have allowed herein for
all items that may affect the works, such as night works.

The prices and rates entered in this Schedule are deemed Note
to have allowed for ALL costs involved in supply, placing
and /or fixing each item in its final position or form.
Unpriced items are deemed to be included elsewhere.

The Contract Administrator (CA) must be notified of any Note


discrepancies between this Schedule, the plans and the
Specification prior to any work being undertaken on the
items in question.

3540138 215
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

All items measured herein are measured net and no Note


allowance has been made for waste, overbreak,
compaction, rolling margins, tolerances and the like.
All costs associated with these items are deemed to be
included in the rates.

All rates entered herein shall be exclusive of GST Note

Quantities provided in this schedule are the Contract Note


Administrator's estimate of actual works as shown on the
Tender Drawings.
Notwithstanding, there is no guarantee as to the accuracy
of this information. No allowance has been made for
wastage, construction tolerances or temporary works
including ramping.

Asphalt tonnage has been based on as assumed density Note


of 2.4 tonne/m3.

3540138 216
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

a Preliminary

a1.1 Mobilise to the site, maintain and subsequently remove from site all Sum 1
necessary plant, equipment, gear, hoists, tools, cartage, transport,
car parking, temporary facilities and the like. Include for giving all
trades and subcontractors the free use of same as required.

a1.2 Ongoing overheads and other costs not included elsewhere in the Sum 1
schedule

a1.3 Quality Plan, Safety Plan, Environmental Management Plan and Sum 1
Program, Submission of Mix Design and materials test results

a1.4 Provision of "As-Constructed" drawings. Sum 1

a1.5 Provide any directional/ warning signs and barriers as required Sum 1
including markers and lights in accordance with CASA MoS139,
remove from site upon completion.

a1.6 Allow for full time site based suitable qualified and experienced Sum 1
Works Safety Officer (WSO) for the duration of the works, including
mobilisation, vehicles, accommodation, meals and other allowances.

3540138 217
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

1 Runway 18-36

1.1 SRE(S) spall repairs to be undertaken in northern (18) m2 0.10


threshold towards edge of Taxiway E, allow 2 no.
repairs 300mm long x 50mm wide

1.2 RBB 50mm wide to be undertaken along perimeter of m 100


concrete/asphalt in Runway 18 threshold adjacent
edge of Taxiway E

1.3 50mm wide RBB to open longitudinal and transverse m 1,500


joints on the runway

1.4 50mm wide RBB to interface with northern arrestor m 90


gear assembly

1.5 Reinstate grass cover in both pavement edges at the m2 400


Runway 18 threshold

1.6 Cut back asphalt and reinstate topsoil and grass m2 50


cover at Runway 18 RESA

1.7 Fill edge drop to Taxiway F on both fillets with topsoil m2 50


and grass

1.8 Fill hole with compacted fill and topsoil at the edge of m2 1
the runway, approximately 1m x 1m, 0.5m deep

1.9 50mm wide RBB to cracking south of southern m 200.0


arrestor gear

1.10 Lichen removal from concrete slabs at south end by m2 2,000


water cutting

1.11 Bandage perimeter of the southern concrete Runway m 200


36 threshold with 50mm wide RBB

1.13 Rout and seal longitudinal concrete cracks at Runway m 4.5


36 end

1.14 Replace cracked threshold light slab LS 1

Subtotal Runway 18-36 **

3540138 218
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

2 Runway 04-22

2.1 Repair 10 No. pock marks by coring and asphalt No. 10


backfill

2.2 SEST application at 22 end m2 3000

2.3 50mm wide RBB at 22 end m 200

2.4 Repaint threshold markings at 22 end (12 stripes at m2 612


30m long x 1.7m wide)

Subtotal Runway 04-22 **

3540138 219
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

3 Taxiway A

3.1 PME treatment to Taxiway A m2 4,000

3.2 SEST treatment to shoulders m2 750

3.3 Crack sealing of open longitudinal and transverse m 150


construction joints with 50mm wide RBB

3.4 Reinstate taxiway markings (yellow 150mm wide m2 113


centreline, double 150mm wide edge lines) - 150m

Subtotal Taxiway Alpha **

3540138 220
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

4 Taxiway B

4.1 PME application to whole Taxiway (except the new m2 28000


surface area between C17 apron and Taxiway C)

4.2 SEST treatment to shoulders m2 11,000

4.3 Shrink/swell cracks on southern edge of intersection m 30


with Taxiways A/D to be filled with sand and sealed
with 75mm wide RBB

4.4 50mm wide RBB to cracks in the vicinity of the tower m 500

4.5 75mm wide RBB to AGL cable slots near fire station m 50

4.6 50mm wide RBB to interfaces with new asphalt and m 120
cable trench towards the Transport Apron

4.7 50mm wide RBB to open paver joints at south end m 150

4.8 Replace edge light slab near tower LS 1

4.9 Repainting of Taxiway markings (yellow, 150mm wide m2 1,313


centrelines, double 150mm wide edge lines) - 1750m

4.10 50mm thick AC14 patch to block cracking next to m2 2


trench reinstatement

Subtotal Taxiway Bravo **

3540138 221
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

5 Taxiway C

5.1 RBB to open paver joints m 250

5.2 Shrink/swell cracks on eastern pavement edge (near m 100


hold point for Runway 18-36) to be filled with sand
and sealed with 75mm wide RBB

5.3 50mm wide RBB to perimeter of trench reinstatement m 45

5.4 Fill old transformer pit excavation with compacted fill, m2 1.0
topsoil and reinstate grass cover, allow 1m2, 0.3m
deep

5.5 RBB (50mm wide) treatment west of Turntable m 50.0


Platform

5.6 Reinstate paint markings (150mm wide centrelines, m2 38


double 150mm wide edge lines, yellow) - allow 50m

Subtotal Taxiway Charlie **

3540138 222
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

6 Taxiway D

6.1 PME treatment to whole taxiway m2 16,400

6.2 SEST treatment to shoulders m2 3,800

6.3 50mm deep AC14 Mix mill and fill patch repairs to m2 40
significant ruts in aircraft wheel paths (150m from
intersection with Taxiways E and F)

6.4 50mm wide RBB to open paver joints and wheel track m 2,000
cracks along Taxiway D

6.5 Sand fill and 50mm wide RBB edge cracks m 500

6.6 75mm wide RBB to AGL cable slots near Taxiway B m 100

6.7 Reinstate Taxiway paint markings (yellow, 150mm m2 750


wide centreline, double 150mm wide edge lines) -
1000m

Subtotal Taxiway Delta **

3540138 223
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

7 Taxiway E

7.1 PME surface treatment to Taxiway E m2 14,000

7.2 Water cutting in some PME areas m2 500

7.3 SEST application to Taxiway E shoulders m2 4,300

7.4 50mm deep AC14 Mix mill and fill patch repairs to m2 100
significant ruts in aircraft wheel paths (50m north of
intersection with Taxiways D / F)

7.5 Perimeter of previous asphalt patch repairs to be m 250


sealed with 50mm wide RBB

7.6 50mm wide RBB to open diagonal cracks and m 1,500


longitudinal and transverse construction joints

7.7 Resurface access road with 50mm thick AC14 Mix m2 70


(mill and fill)

7.8 Reinstate Taxiway paint markings (yellow, 150mm m2 750


wide centreline, double 150mm wide edge lines) -
1000m

7.9 Set cable marker slabs flush with ground LS 1,000

Subtotal Taxiway Echo **

3540138 224
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

8 Taxiway F

8.1 PME surface treatment to Taxiway F m2 2,800

8.2 RBB (50mm wide) to open cracks in shoulder m 300


pavement areas

8.3 SEST treatment to shoulder pavement areas m2 750

8.4 Set cable marker slabs flush with ground LS 1,000

Subtotal Taxiway Foxtrot **

3540138 225
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

9 Taxiway K

9.1 50mm wide RBB to open construction joints along m 400


Taxiway K

9.2 75mm deep AC14 Mix mill and fill patch repair m2 4

Subtotal Taxiway Kilo **

3540138 226
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

10 Taxiway L

10.1 50mm wide RBB to perimeter of previous asphalt m 50


patch repairs

10.2 75mm wide RBB to open cracks along Taxiway L m 250

Subtotal Taxiway Lima **

3540138 227
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

11 Transport Apron - Asphalt

11.1 3 No. 50mm deep AC14 Mix mill and fill patch repairs m2 90
to be undertaken to areas of significant block cracking
on the pavement surfacing

11.2 Open cracks to be sealed with 50mm wide RBB m 500

Subtotal Transport Apron - Asphalt **

3540138 228
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

12 Transport Apron - Concrete

12.1 Joint sealant in northern access taxiway to be routed m 500


out and replaced with Thioflex 600

Subtotal Transport Apron - Concrete **

3540138 229
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

13 Main Apron

13.1 PME treatment to whole apron except concrete and m2 150,000


FRM areas

13.2 50mm deep A14 Mix mill and fill patch repairs to be m2 28
undertaken Stands A1, C3 and C5 at 3m x 2m and
stand B3 at 5m x 2m.

13.3 50mm deep AC14 Mix mill and fill patch repair to be m2 1
undertaken at northern end of slot drain in front of
parking row A position 1

13.4 Core to remove metal object, backfill with asphalt No. 1


(Taxilane B, 10m from northern edge, between
Parking Rows C and D)

13.5 Apply Fuel Resistant Membrane (Superseal or m2 120


approved equivalent) 1m wide to paver joint cracks

13.6 50mm wide RBB application to open longitudinal and m 2,000


transverse construction joints on the Main Apron area
and Taxilanes A and B

13.7 50mm wide RBB sealing to be undertaken on open m 250


reflective cracks in south western section of the Main
Apron

13.8 75mm wide RBB application to asphalt / concrete m 100


interface at the F-18 covered parking positions

13.9 50mm wide RBB to perimeter of trench at Stand E8 m 100

13.10 75mm deep AC14 Mix mill and fill asphalt resurfacing m2 500
at south west corner

13.11 Rout and seal cracks on concrete slabs m 100

13.12 Rout and seal spalling joints - Row E concrete strips m 20


and the concrete area in the south eastern corner

13.13 Rout and seal joints in concrete area west of Stand A2 m 100

13.14 Repaint apron markings (yellow, 150mm centrelines - m2 870


12,500m, double 150mm edge lines), 2 coats - allow
5800m

13.15 50mm wide RBB sealing to perimeter of AC patch m 150


repair

Subtotal Main Apron **

3540138 230
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

14 OLAs

14.1 Rout and seal longitudinal cracks with Thioflex 600 on m 9


the concrete slabs

14.2 Asphalt patch to concrete edges, 0.5m wide m2 40

14.3 50mm wide RBB cracks and joints at lead up to OLA m2 200
1

Subtotal OLAs **

3540138 231
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

15 Engine Run Up Apron

15.1 50mm wide RBB to open concrete / asphalt interface m 170


at entrance to and perimeter around the Engine Run-
Up Apron

15.2 50mm wide RBB to cracks on reinforced concrete m 50


slab surrounding inset railing for blast walls

15.3 3 No. SRE(S) spall repairs to be undertaken to m2 0.10


cracked concrete slab edges and corners in Engine
Run-Up Apron

15.4 Rout out and reseal concrete joints m 250

Subtotal Engine Run Up Apron **

3540138 232
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

16 Aircraft Wash Apron

16.1 The concrete U-channel is to be reconstructed – 80m m 80


long using ACO class D (400kn) grated channel
section

16.2 Asphalt shoulders to be reconstructed (75mm deep m2 300


AC14 Mix mill and fill)

16.3 Failed joints to be routed out and resealed with m 200


Thioflex 600

Subtotal Aircraft Wash Apron **

3540138 233
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

17 Turntable

17.1 SRES(S) spall repairs to be undertaken on the m2 0.4


Turntable apron area

17.2 50mm wide RBB to asphalt / concrete interfaces in m 50


the Turntable apron area

17.3 Cut back flaking line marking with water cutting and m2 5
reinstate

Subtotal Turntable **

3540138 234
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

18 Compass Swing Area

18.1 50mm wide RBB application to asphalt / concrete m 250


interface around the perimeter of the Compass Swing
Area

18.2 SRE(S) repair to spalls m 0.5

Subtotal Compass Swing Area **

3540138 235
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Edinburgh Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

19 Provisional Items

19.1 Daily Rate for WSO (10 hour shift) Day Rate Only -

19.2 Rubber removal on Ranway 18-36 required in m2 5,000


Touchdown Zones subject to review of friction testing

3540138 236
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

PEARCE AIRFIELD PAVEMENT WORKS

a Preliminary and General

1 Runway 18L-36R
2 Runway 18R-36L
3 Runway 05-23
4 Taxiway Alpha
5 Taxiway Bravo
6 Taxiway Charlie
7 Taxiway Delta
8 Taxiway Echo
9 SASR Taxiway
10 Taxiway Zulu
11 Main Apron
12 Engine Run Up Apron
13 Air Movements Apron
14 OLA and Aircraft Wash Aprons
15 RSAF Apron
16 SASR (Mock Up) Apron
17 Provisional Items

Base Subtotal

Individual pricing items shown on drawings

3540138 237
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST


General

The following abbreviations for units and works have been Note
used in this schedule:
mm = millimetre
m = linear metre
m2 = square metre
m3 = cubic metre
No. = number
kg = kilogram
t = tonne
hr = hour
LS = lump sum
PS = Provisional Sum
AC = Asphaltic Concrete
RBB = Rubberised Bituminous Bandage
PME = Polymer Modified Bitumen Emulsion
AGL = Aeronautical Ground Lighting

Tenderers are advised that this Schedule is to be read in Note


conjunction with the Drawings and Specification to which
they are hereby referred for full description of the items
measured herein.

Tenderers are referred to the General and Special Note


Conditions of Contract and the Preliminaries Section of the
Specification and are deemed to have allowed herein for
all items that may affect the works, such as night works.

The prices and rates entered in this Schedule are deemed Note
to have allowed for ALL costs involved in supply, placing
and /or fixing each item in its final position or form.
Unpriced items are deemed to be included elsewhere.

The Contract Administrator (CA) must be notified of any Note


discrepancies between this Schedule, the plans and the
Specification prior to any work being undertaken on the
items in question.

3540138 238
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

All items measured herein are measured net and no Note


allowance has been made for waste, overbreak,
compaction, rolling margins, tolerances and the like.
All costs associated with these items are deemed to be
included in the rates.

All rates entered herein shall be exclusive of GST Note

Quantities provided in this schedule are the Contract Note


Administrator's estimate of actual works as shown on the
Tender Drawings.
Notwithstanding, there is no guarantee as to the accuracy
of this information. No allowance has been made for
wastage, construction tolerances or temporary works
including ramping.

Asphalt tonnage has been based on as assumed density Note


of 2.4 tonne/m3.

3540138 239
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

a Preliminary

a1.1 Mobilise to the site, maintain and subsequently remove from site all Sum 1
necessary plant, equipment, gear, hoists, tools, cartage, transport, car
parking, temporary facilities and the like. Include for giving all trades
and subcontractors the free use of same as required.

a1.2 Ongoing overheads and other costs not included elsewhere in the Sum 1
schedule

a1.3 Quality Plan, Safety Plan, Environmental Management Plan and Sum 1
Program, Submission of Mix Design and materials test results

a1.4 Provision of "As-Constructed" drawings. Sum 1

a1.5 Provide any directional/ warning signs and barriers as required Sum 1
including markers and lights in accordance with CASA MoS139,
remove from site upon completion.

a1.6 Allow for full time site based suitable qualified and experienced Works Sum 1
Safety Officer (WSO) for the duration of the works, including
mobilisation, vehicles, accommodation, meals and other allowances.

3540138 240
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

1 Runway 18L-36R

1.1 Localised PME treatment to open coarse areas on m2 850.00


Runway 18L-36R

1.2 RBB (50mm wide) treatment to open joints and cracks m 325.00
in Runway 36R Threshold

1.3 Renewal of centreline markings (900mm white) on m2 162.00


Runway 18L Threshold and TDZ (after rubber removal)
(2 coats)

1.4 Rout out and sealing of cracks in concrete on Taxiway m 50.00


A3

1.5 Localised concrete spall repairs with SRE(S) on m2 1.00


Taxiway A3 and Runway 18L

1.6 Resealing of joints on North East ORP m 1000.00

1.7 RBB (50mm wide) allowance for treatment to cracks on m 200.00


North West ORP

1.10 RBB (50mm) to central 10m of 36R Threshold m 100.00

1.11 RBB (50mm wide) to open tranverse joints m 50.00

1.12 Remove rubber from paint markings at 18L Threshold. m2 162.00

Subtotal Runway 18L-36R **

3540138 241
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

2 Runway 18R-36L

2.1 Localised PME treatment to open coarse areas on m2 1050.00


Runway 18R-36L

2.2 RBB (50mm wide) treatment to open joints on Runway m 125.00


18R

2.3 Renewal of centreline markings (900mm white) in m2 324.00


Runway 18R and 36R Thresholds and TDZs (after
rubber removal) - 360m length.

2.4 Rubber removal from paint markings m2 324.00

Subtotal Runway 18R-36L **

3540138 242
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

3 Runway 05-23

3.1 Localised PME treatment to open coarse areas on m2 100.00


Runway 05-23

3.2 RBB (50mm wide) treatment to reflective cracks on m 600.00


Runway 23

3.3 RBB (50mm wide) treatment to reflective cracks on m 500.00


Runway 05

3.4 RBB (50mm wide) treatment to random cracks and m 900.00


joints along Runway 05-23 (priority to be given to central
12m width)

3.5 RBB (75mm wide) to AGL cable slots at Taxiway A2 m 100.00

3.6 RBB (75mm wide) to AGL cable slots at Taxiway D4 m 10.00

3.7 RBB (50mm wide) treatment to open transverse joint in m 25.00


Runway 23 Blast Area

3.8 Rectify edge drop off and loss of grass cover on m2 100.00
Runway 23 Blast Area with topsoil and grass

Subtotal Runway 05-23 **

3540138 243
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

4 Taxiway Alpha

4.1 Asphalt patch repair (75mm deep with AC14 Mix - mill m2 25.00
and fill) on Taxiway A1 (West Invert to Hawk Apron)

4.2 RBB (50mm wide) treatment to cracks and joints on m 1000.00


Taxiway A1 (cracks in excess of 5mm to be filled with
clean dry sand prior to RBB)

4.3 RBB (50mm wide) treatment to cracks and joints on m 100.00


Taxiway A2

4.4 RBB (50mm wide) treatment to cracks and joints on m 350.00


Taxiway A3

4.5 RBB (75mm wide) treatment to cracks and joints on m 2750.00


Taxiways A1 to A3 shoulders (cracks to be filled with
clean dry sand prior to RBB)

4.6 RBB (75mm wide) treatment to AGL cable slots on m 40.00


Taxiway A1

Subtotal Taxiway Alpha **

3540138 244
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

5 Taxiway Bravo

5.1 Asphalt patch repairs (75mm deep mill and fill with m2 150.00
AC14 Mix) on east side of Taxiway B1 between RSAF
Apron and AMA

5.2 RBB (50mm wide) treatment to cracks and joints on m 1700.00


Taxiway B1

5.3 RBB (50mm wide) treatment to cracks and joints on m 450.00


Taxiway B2

5.4 RBB (75mm wide) treatment to cracks on painted edge m 600.00


Taxiway B1 (cracks to be filled with clean dry sand prior
to RBB)

5.5 RBB (75mm wide) treatment to AGL cable slots on m 70.00


Taxiway B1

5.6 RBB (75mm wide) treatment to AGL cable slots on m 45.00


Taxiway B2

5.7 Concrete spall repairs with SRE(S) on Taxiway B2 m2 1.00

5.8 Repaint centre line yellow (150mm wide) after RBB m2 20.00

Subtotal Taxiway Bravo **

3540138 245
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

6 Taxiway Charlie

6.1 Localised PME treatment to open coarse areas on m2 20.00


Taxiway C1

6.2 Allowance for RBB (50mm wide) treatment to cracks m 100.00


and joints on Taxiway C1

6.3 RBB (75mm wide) treatment to open joints on Taxiway m 250.00


C1 shoulders

6.4 RBB (75mm wide) treatment to AGL cable slots on m 20.00


Taxiway C1

6.5 AC14 patch repair in the wheel paths (75mm deep mill m2 35.00
and fill)

Subtotal Taxiway Charlie **

3540138 246
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

7 Taxiway Delta

7.1 Localised PME treatment to Taxiway D2 (West) m2 20.00

7.2 RBB (50mm wide) treatment to open cracks and joints m 50.00
on Taxiway D1

7.3 RBB (50mm wide) treatment to open cracks and joints m 100.00
on Taxiway D2

7.4 RBB (50mm wide) treatment to open longitudinal joints m 100.00


on Taxiway D3

7.5 RBB (50mm wide) treatment to open cracks and joints m 150.00
on Taxiway D4

7.6 RBB (75mm wide) treatment to open joints on Taxiway m 175.00


D1 taxiway/shoulder edge

7.7 RBB (75mm wide) treatment to open joints on Taxiway m 350.00


D2 taxiway/shoulder edge

7.8 RBB (75mm wide) treatment to AGL cable slots on m 10.00


Taxiway D1

7.9 RBB (75mm wide) treatment to AGL cable slots on m 25.00


Taxiway D2

7.10 SEST application to D4 m2 250.00

Subtotal Taxiway Delta **

3540138 247
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

8 Taxiway Echo

8.1 RBB (50mm wide) treatment to cracks and joints on m 300.00


Taxiway E1 (West)

8.2 Provide edge markings (150mm continuous double m2 150.00


yellow) on Taxiway E2 - 250m length

Subtotal Taxiway Echo **

3540138 248
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

9 SASR Taxiway

9.1 Apply PME to localised scuffed pavement areas m2 2.00

9.2 Treat the shoulder edges with bitumen emulsion spray m2 250.00

Subtotal SASR Taxiway **

3540138 249
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

10 Taxiway Zulu

10.1 Rectify step at concrete asphalt interface by Taxiway D1 m2 10.00


with AC14 Mix asphalt patch (75mm deep mill and fill)

Subtotal Taxiway Zulu **

3540138 250
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

11 Main Apron

11.1 Concrete spall repairs and pock marks with SRE(S) on m2 3.50
Aircraft Shelters 1 to 6

11.2 Concrete spall repairs with SRE(S) on the Main Apron m2 2.00

11.3 Miscellaneous concrete spall repairs with SRE(S) m2 2.00

11.4 Concrete joint resealing to east of Hawk Apron (after m 1500.00


weed removal)

11.5 Concrete joint resealing on Aircraft Shelters 1 to 6 m 20.00

11.6 Miscellaneous concrete joint resealing m 150.00

11.7 Rout and seal concrete cracks on Aircraft Shelters 1 to m 25.00


6

11.8 RBB (50mm wide) treatment to cracks and joints to m 750.00


asphalt pavements

11.9 RBB (75mm wide) treatment to cracks, joints and AGL m 150.00
cable slots

11.10 Treat joints and cracks in Ascrete pavements with m 500.00


75mm wide RBB on PC9 Apron

11.11 Treat joints and cracks in Ascrete pavements with m 300.00


75mm wide RBB on Hawk Apron

11.12 PME treatment to localised areas of asphalt m2 200.00

11.13 Renew pavement markings on concrete surfaces m2 875.00


including Aircraft Shelters 1 to 7 (yellow centreline plus
black borders) – 2,500m length

11.4 RBB (75mm wide) treatment to AGL cable slot on west m 20.00
side of Apron.

Subtotal Main Apron **

3540138 251
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

12 Engine Run Up Apron

12.1 Renew apron edge markings (double 150mm yellow m2 48.00


marking) – 80m length

12.2 Asphalt patch repair on taxi link/airside road– 75mm m2 4.00


thick AC14 Mix (mill and fill)

Subtotal Engine Run Up Apron **

3540138 252
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

13 Air Movements Apron

13.1 Concrete spall repairs with SRE(S) m2 1.00

13.2 Concrete joint resealing to south east corner m 400.00

13.3 Asphalt patch repair to northern taxiway link with 75mm m2 2.00
AC14 Mix mill and fill

13.4 Renew/upgrade apron markings (150mm wide m2 297.50


continuous yellow with 100mm black borders) – 850m
length.

Subtotal Air Movements Apron **

3540138 253
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

14 OLA and Aircraft Wash Aprons

14.1 Concrete spall repairs with SRE(S) m2 1.50

14.2 RBB (50mm wide) treatment to cracks and joints m 200.00

14.3 RBB (75mm wide) treatment to open joints on shoulder m 100.00


edge

14.4 Rectify step at concrete asphalt interface on Aircraft m2 20.00


Wash Apron with 75mm AC14 Mix (mill and fill)

14.5 Asphalt patch repair to Aircraft Wash Apron with 75mm m2 10.00
thick AC Mix14 mill and fill

14.6 RBB (75mm wide) treatment to AGL cable slots m 70.00

14.7 Reseal joints (20mm wide) on OLA2 m 50.00

14.8 Reinstate lost grass cover on east edge of OLA2 m2 20.00

14.9 Remove black sealant and reseal on OLA1 m 100.00

Subtotal OLA and Aircraft Wash Aprons **

3540138 254
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

15 RSAF Apron

15.1 Re sand joints and seal localised areas of ICBP m2 1500.00

15.2 Treat weeds and moss on ICBP LS 1.00

15.3 Asphalt patch repair (75mm thick AC14 Mix mill and fill) m2 2.00
on north taxiway

15.4 RBB (50mm wide) treatment to cracks and joints on m 100.00


asphalt area to west of Administrative Building

15.5 Treat heavy weed growth on asphalt shoulders LS 1.00

Subtotal RSAF Apron **

3540138 255
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

16 SASR (Mock Up) Apron

No work proposed

Subtotal SASR (Mock Up) Apron ** -

3540138 256
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Pearce Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

17 Provisional Items

17.1 Daily Rate for WSO (10 hour shift) Day Rate Only -

3540138 257
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Gin Gin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

GIN GIN AIRFIELD PAVEMENT WORKS

a Preliminary and General

1 Runway 08-26
2 Taxiway Alpha
3 Taxiway Bravo
4 Taxiway Charlie
5 Taxiway Delta
6 Taxiway Echo
7 Taxiway Foxtrot
8 Taxiway Golf
9 Main Apron
10 Provisional Items

Base Subtotal

Individual pricing items shown on drawings

3540138 258
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Gin Gin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST


General

The following abbreviations for units and works have been Note
used in this schedule:
mm = millimetre
m = linear metre
m2 = square metre
m3 = cubic metre
No. = number
kg = kilogram
t = tonne
hr = hour
LS = lump sum
PS = Provisional Sum
AC = Asphaltic Concrete
RBB = Rubberised Bituminous Bandage
PME = Polymer Modified Bitumen Emulsion
AGL = Aeronautical Ground Lighting

Tenderers are advised that this Schedule is to be read in Note


conjunction with the Drawings and Specification to which
they are hereby referred for full description of the items
measured herein.

Tenderers are referred to the General and Special Note


Conditions of Contract and the Preliminaries Section of the
Specification and are deemed to have allowed herein for
all items that may affect the works, such as night works.

The prices and rates entered in this Schedule are deemed Note
to have allowed for ALL costs involved in supply, placing
and /or fixing each item in its final position or form.
Unpriced items are deemed to be included elsewhere.

The Contract Administrator (CA) must be notified of any Note


discrepancies between this Schedule, the plans and the
Specification prior to any work being undertaken on the
items in question.

3540138 259
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Gin Gin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

All items measured herein are measured net and no Note


allowance has been made for waste, overbreak,
compaction, rolling margins, tolerances and the like.
All costs associated with these items are deemed to be
included in the rates.

All rates entered herein shall be exclusive of GST Note

Quantities provided in this schedule are the Contract Note


Administrator's estimate of actual works as shown on the
Tender Drawings.
Notwithstanding, there is no guarantee as to the accuracy
of this information. No allowance has been made for
wastage, construction tolerances or temporary works
including ramping.

Asphalt tonnage has been based on as assumed density Note


of 2.4 tonne/m3.

3540138 260
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Gin Gin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

a Preliminary

a1.1 Mobilise to the site, maintain and subsequently remove from site all Sum 1
necessary plant, equipment, gear, hoists, tools, cartage, transport,
car parking, temporary facilities and the like. Include for giving all
trades and subcontractors the free use of same as required.

a1.2 Ongoing overheads and other costs not included elsewhere in the Sum 1
schedule

a1.3 Quality Plan, Safety Plan, Environmental Management Plan and Sum 1
Program, Submission of Mix Design and materials test results

a1.4 Provision of "As-Constructed" drawings. Sum 1

a1.5 Provide any directional/ warning signs and barriers as required Sum 1
including markers and lights in accordance with CASA MoS139,
remove from site upon completion.

a1.6 Allow for full time site based suitable qualified and experienced Sum 1
Works Safety Officer (WSO) for the duration of the works, including
mobilisation, vehicles, accommodation, meals and other allowances.

a1.7 Daily Rate for WSO (10 hour shift) Day Rate Only -

3540138 261
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Gin Gin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

1 Runway 08-26

1.1 Treat localised open coarse areas on Runway 08-26 m2 800.00


with PME. Priority over central 8m width.

1.2 Treat localised lengths of open joints and cracks on m 250.00


Runway 26 with 50mm wide RBB

1.3 Undertake concrete spall repairs on Runway 26 m2 0.25


Threshold with 150mm wide SRE(s) treatment

1.4 Replace joint sealant on Runway 08 m 10.00

1.5 Undertake concrete spall repairs on Runway 08 m2 0.25


Threshold with 150mm wide SRE(s) treatment

1.6 Replace joint sealant on Runway 26 m 10.00

1.7 Renew "08" marking on Runway 08-26 m2 54.00

Subtotal Runway 08-26 **

3540138 262
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Gin Gin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

2 Taxiway Alpha

2.1 Treat localised lengths of open joints and cracks from m 125.00
Taxiway G to Taxiway C with 50mm wide RBB

2.2 Treat localised loss of sand chip seal shoulder m2 20.00


pavement with PME

2.3 Renew centreline marking – 1,850m (continuous m2 277.50


150mm wide, yellow)

Subtotal Taxiway Alpha **

3540138 263
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Gin Gin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

3 Taxiway Bravo

3.1 Renew Taxiway B centreline (continuous 150mm wide m2 30.00


yellow) marking – 200m length

3.2 Renew Western Holding Bay centreline markings m2 70.00


(150mm wide yellow and provide 100mm wide black
borders) – 200m

Subtotal Taxiway Bravo **

3540138 264
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Gin Gin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

4 Taxiway Charlie

4.1 Repair asphalt “bulge” on the east side of the taxiway m2 50.00
with 50mm AC14 Mix mill and fill

4.2 Renew Taxiway C centreline (continuous150mm wide m2 30.00


yellow) marking – 200m length

4.3 Extend Eastern Holding Bay runway hold markings m2 21.00


(150mm wide yellow and 100mm wide black borders
on concrete pavements) – 60m length

4.4 Reinstate grass cover m2 20.00

Subtotal Taxiway Charlie **

3540138 265
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Gin Gin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

5 Taxiway Delta

5.1 Renew Taxiway D centreline (continuous 150mm m2 12.00


wide yellow) marking – 75m length

Subtotal Taxiway Delta **

3540138 266
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Gin Gin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

6 Taxiway Echo

6.1 Renew Taxiway E centreline (continuous 150mm wide m2 12.00


yellow) marking – 75m length

Subtotal Taxiway Echo **

3540138 267
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Gin Gin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

7 Taxiway Foxtrot

7.1 Treat localised lengths of open joints and cracks with m 55.00
50mm wide RBB

Subtotal Taxiway Foxtrot **

3540138 268
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Gin Gin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

8 Taxiway Golf

8.1 RBB (50mm wide) to open longitudinal cracks m 5.00

8.2 RBB (75mm wide) to AGL cable slots m 10.00

8.3 PME treatment at junction with Runway 08-20 m2 25.00

Subtotal Taxiway Golf **

3540138 269
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Gin Gin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

9 Main Apron

9.1 Undertake concrete joint spall repairs with 150mm m2 1.50


wide SRE(S) – priority to pavement areas under
Shelters 1 and 2

9.2 Replace localised lengths of concrete joint sealant m 150.00

9.3 Renew all pavement markings (yellow, continuous m2 420.00


150mm wide and provide new 100mm wide black
borders) – 1,200m length

9.4 SRE(S) infill to pock marks in concrete (25mm No 10.00


diameter)

9.5 Local asphalt repair (50mm mill and fill with AC14 m2 10.00
Mix) to rectify edge step and ponding on east side of
apron

9.6 Replace loss of grass cover to south of apron m2 10.00

Subtotal Main Apron **

3540138 270
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Gin Gin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

10 Provisional Items

10.1 Daily Rate for WSO (10 hour shift) Day Rate Only -

3540138 271
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

DARWIN AIRFIELD PAVEMENT WORKS

a Preliminary and General

1 Runway 11-29
2 Runway 18-36
3 Taxiway Alpha
4 Taxiway Bravo 1
5 Taxiway Charlie
6 Taxiway Delta
7 Taxiway Echo
8 Taxiway Golf
9 Taxiway Hotel
10 Taxiway Juliet
11 Taxiway Kilo
12 Taxiway Lima
13 Taxiway November
14 Military Hard Stand
15 Bomber Replenishment Apron (BRA)
16 Fighter Replenishment Apron (FRA)
17 173 Squadron Maintenance Hangar
18 Engine Run Up Apron
19 Ordinance Loading Complex
20 Quick Reaction Alert Facilities

Base Subtotal

Individual pricing items shown on drawings

3540138 272
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST


General

The following abbreviations for units and works have been Note
used in this schedule:
mm = millimetre
m = linear metre
m2 = square metre
m3 = cubic metre
No. = number
kg = kilogram
t = tonne
hr = hour
LS = lump sum
PS = Provisional Sum
AC = Asphaltic Concrete
RBB = Rubberised Bituminous Bandage
PME = Polymer Modified Bitumen Emulsion
AGL = Aeronautical Ground Lighting

Tenderers are advised that this Schedule is to be read in Note


conjunction with the Drawings and Specification to which
they are hereby referred for full description of the items
measured herein.

Tenderers are referred to the General and Special Note


Conditions of Contract and the Preliminaries Section of the
Specification and are deemed to have allowed herein for
all items that may affect the works, such as night works.

The prices and rates entered in this Schedule are deemed Note
to have allowed for ALL costs involved in supply, placing
and /or fixing each item in its final position or form.
Unpriced items are deemed to be included elsewhere.

The Contract Administrator (CA) must be notified of any Note


discrepancies between this Schedule, the plans and the
Specification prior to any work being undertaken on the
items in question.

3540138 273
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

All items measured herein are measured net and no Note


allowance has been made for waste, overbreak,
compaction, rolling margins, tolerances and the like.
All costs associated with these items are deemed to be
included in the rates.

All rates entered herein shall be exclusive of GST Note

Quantities provided in this schedule are the Contract Note


Administrator's estimate of actual works as shown on the
Tender Drawings.
Notwithstanding, there is no guarantee as to the accuracy
of this information. No allowance has been made for
wastage, construction tolerances or temporary works
including ramping.

Asphalt tonnage has been based on as assumed density Note


of 2.4 tonne/m3.

3540138 274
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

a Preliminary

a1.1 Mobilise to the site, maintain and subsequently remove from site all Sum 1
necessary plant, equipment, gear, hoists, tools, cartage, transport, car
parking, temporary facilities and the like. Include for giving all trades
and subcontractors the free use of same as required.

a1.2 Ongoing overheads and other costs not included elsewhere in the Sum 1
schedule

a1.3 Quality Plan, Safety Plan, Environmental Management Plan and Sum 1
Program, Submission of Mix Design and materials test results

a1.4 Provision of "As-Constructed" drawings. Sum 1

a1.5 Provide any directional/ warning signs and barriers as required Sum 1
including markers and lights in accordance with CASA MoS139,
remove from site upon completion.

3540138 275
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

1 Runway 11-29

1.1 Reseal concrete joints at Runway 29 Threshold m 900.00

1.2 Rout and seal cracks in concrete at Runway 29 m 25.00


Threshold.

1.3 Rout and seal cracks in concrete at Western ORP m 50.00

1.4 Asphalt patch repair (75mm mill and fill with AC14 Mix) m2 50.00
to rectify step and groove closure at asphalt concrete
interface at Runway 29 Threshold

1.5 RBB (50mm wide) to treatment to concrete cracks in m 300.00


Eastern ORP

1.6 Sweep shoulder and apply SEST on west side of m2 200.00


Eastern ORP

1.7 RBB (50mm wide treatment to asphalt cracks on m 20.00


Taxiway B2.

1.8 RBB (50mm wide) treatment to asphalt cracks on m 20.00


Taxiway E2.

1.9 Repair concrete pit at Taxiway V2 LS 1.00

1.10 Provide black border (100mm wide) to runway hold LS 1.00


markings on Runway 26/Taxiway A6

Subtotal Runway 11-29 **

3540138 276
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

2 Runway 18-36

2.1 Asphalt patch repair (75mm mill and fill with AC14 Mix) m2 60.00
to south of Runway 11-29. 50mm wide RBB to be
applied to the perimeter of the patch. PME surface
treatment to be applied to patch.

2.2 RBB (50mm wide) treatment to asphalt cracking on m 20.00


Western side of Runway 18-36 (100m north of Taxiway
N).

2.3 Bitumen emulsion spray on millings at Runway 36 m2 20.00


RESA edge (east side).

2.4 Localised replacement of grass cover on Runway 36 m2 20.00


(east side) – allow 20m²

Subtotal Runway 18-36 **

3540138 277
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

3 Taxiway Alpha

3.1 Apply SEST to eastern shoulder of Taxiway A1 m2 3000.00

3.2 Localised PME application to open coarse areas on m2 25.00


Taxiway A1

3.3 RBB (50mm wide) treatment to open cracks on Taxiway m 40.00


A1

3.4 Asphalt patch repairs (mill and fill 40mm AC10 Mix) on m2 20.00
western edge of Taxiway A1 shoulder

3.5 RBB (75mm wide) treatment to AGL cable slots on m 10.00


Taxiway A2

3.6 RBB (50mm wide) treatment to open cracks on Taxiway m 30.00


A3

3.7 RBB (50mm wide) treatment to open cracks on Taxiway m 150.00


A3 shoulder

3.8 RBB (75mm wide) treatment to AGL cable slots on m 125.00


Taxiway A3

3.9 Localised PME application to open coarse areas on m2 125.00


Taxiway A4

3.10 RBB (50mm wide) treatment to open cracks on Taxiway m 75.00


A4

3.11 RBB (50mm wide) treatment to open cracks on Taxiway m 50.00


A4 shoulder

3.12 RBB (75mm wide) treatment to AGL cable slots on m 50.00


Taxiway A4

3.13 Renew AGL cable slot sealant on Taxiway A4/S m 250.00


junction

3.14 Renew edge markings (double yellow – each 150mm m2 30.00


wide) on Taxiway A4 east of Taxiway S – 100m length

3.15 RBB (50mm wide) treatment to open longitudinal joint m 5.00


on Taxiway A5

3.16 RBB (50mm wide) treatment to open joint and cracks on m 135.00
Taxiway A6

3.17 RBB (50mm wide) treatment to open cracks on Taxiway m 300.00


A6 shoulder by FRA

3540138 278
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

3.18 RBB (50mm wide) treatment to concrete spalls at m 50.00


asphalt concrete interface on Taxiway A6

3.19 Concrete repairs with SRE(S) on Taxiway A6 on m2 5.00


western FRA invert

3.20 Rout out and seal cracks in concrete at northern extent m 75.00
of Taxiway A1.

3.21 RBB (50mm wide) treatment to edge of concrete trench m 40.00


across Taxiway A3.

3.22 SRE(S) corner repairs on Taxiway A1 - minimum 75mm m2 0.15


deep

3.23 Asphalt patch repair (75mm mill and fill with AC14 Mix) m2 10.00
on Taxiway A6 east of FRA

Subtotal Taxiway Alpha **

3540138 279
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

4 Taxiway Bravo 1

4.1 RBB (50mm wide) treatment to open cracks m 75.00

Subtotal Taxiway Bravo 1 **

3540138 280
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

5 Taxiway Charlie

5.1 Apply bitumen seal to eastern shoulder of Taxiway C1 m2 500.00

5.2 RBB (50mm wide) treatment to open cracks, trench m 500.00


joints on Taxiways C1and C2

5.3 Renew faded taxiway edge markings (yellow 2No m2 30.00


150mm wide) on outer curve of Taxiway C1 – 100m
length

5.4 RBB (50mm wide) treatment to open cracks on Taxiway m 20.00


C3.

5.5 RBB (50mm wide) treatment to open cracks on Taxiway m 10.00


C3 eastern shoulder.

5.6 RBB (50mm wide) treatment to open cracks on Taxiway m 50.00


C4.

5.7 RBB (50mm wide) treatment to open cracks on Taxiway m 100.00


C4 shoulder

Subtotal Taxiway Charlie **

3540138 281
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

6 Taxiway Delta

6.1 Localised PME application to open coarse areas to m2 50.00


immediate south of Runway 11-29

6.2 RBB (50mm wide) treatment to open cracks. m 45.00

6.3 RBB (75mm wide) treatment to AGL cable slots. m 15.00

Subtotal Taxiway Delta **

3540138 282
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

7 Taxiway Echo

7.1 Localised PME application to open coarse areas on m2 10.00


Taxiway E1.

7.2 RBB (50mm wide) treatment to open cracks on Taxiway m 50.00


E1.

Subtotal Taxiway Echo **

3540138 283
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

8 Taxiway Golf

8.1 RBB (50mm wide) treatment to open cracks m 100.00

8.2 RBB (50mm wide) treatment to cracking on eastern m 20.00


Taxiway A1 shoulder interface.

8.3 Provide 150mm wide continuous centreline- 250m m2 37.50


length (Base to confirm requirement).

Subtotal Taxiway Golf **

3540138 284
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

9 Taxiway Hotel

9.1 m 30.00
RBB (50mm wide) treatment to open cracks and joints

Subtotal Taxiway Hotel **

3540138 285
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

10 Taxiway Juliet

10.1 RBB (50mm wide) treatment to open cracks. m 20.00

Subtotal Taxiway Juliet **

3540138 286
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

11 Taxiway Kilo

11.1 RBB (50mm wide) treatment to open cracks. m 30.00

Subtotal Taxiway Kilo **

3540138 287
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

12 Taxiway Lima

12.1 Localised PME application to open coarse areas m2 10.00

12.2 RBB (75mm wide) treatment to AGL cable slots m 80.00

Subtotal Taxiway Lima **

3540138 288
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

13 Taxiway November

13.1 RBB (75mm wide) treatment to AGL cable slots m 30.00

Subtotal Taxiway Novemeber **

3540138 289
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

14 Military Hard Stand (MHS)

14.1 Concrete joint spall repairs on the Central MHS m2 7.50

14.2 Rout and seal concrete cracks on Central MHS m 300.00

14.3 RBB (50mm wide) treatment to open cracks and joints m 1250.00
in asphalt surfaces on the North Western MHS

14.4 RBB (50mm wide) treatment to open cracks and joints m 2500.00
in asphalt surfaces on North Eastern MHS

14.5 RBB (50mm wide) treatment to open cracks and joints m 400.00
on Southern MHS.

14.6 Remove loose concrete and treat weed growth from old LS 1.00
pavement areas to immediate east of North MHS -
approximately 15,000m2

14.7 Sweep surface and treat weed growth from chip seal LS 1.00
areas to immediate west of Taxiway C2.

Subtotal Military Hard Stand **

3540138 290
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

15 Bomber Replenishment Apron (BRA)

15.1 Reseal concrete joint on western invert m 10.00

15.2 Rout and seal concrete crack to south of central invert m 10.00

15.3 Rout out and seal cracks to south of BRA. m 25.00

15.4 RBB (50mm wide) treatment to cracks/joints on eastern m 25.00


invert

15.5 RBB (50mm wide) treatment to cracks/joints on western m 10.00


invert.

15.6 RBB (50mm wide) treatment to cracks/joints on BRA. m 60.00

Subtotal Bomber Replenishment Aprons (BRA) **

3540138 291
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

16 Fighter Replenishment Apron (FRA)

16.1 RBB (50mm wide) treatment to open joint along m 250.00


northern edge

16.2 RBB (50mm wide) treatment to open cracking on m 50.00


eastern shoulders.

16.3 RBB (50mm wide) treatment to cracking on southern m 60.00


edge of FRA.

16.4 SRE(S) repair to concrete at Western Invert m2 5.00

16.5 SRE(S) spall repair at southwest of FRA m2 0.25

Subtotal Fighter Replenishment Apron **

3540138 292
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

17 173 Squadron Maintenance Hangar

17.1 RBB (50mm wide) treatment to open cracks on southern m 125.00


shoulder

17.2 Concrete joint sealing to apron south of Hangar m 600.00

Subtotal 173 Squadron Maintenance Apron **

3540138 293
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

18 Engine Run Up Apron

18.1 RBB (50mm wide) treatment to open cracks on north m 20.00


eastern shoulder.

Subtotal Engine Run Up Apron **

3540138 294
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

19 Ordinance Loading Complex

19.1 RBB (50mm wide) treatment to open cracks on Western m 25.00


OLA8

19.2 RBB (50mm wide) treatment to open cracks on Western m 20.00


OLA 6

19.3 RBB (50mm wide) treatment to open cracks on Western m 20.00


OLA 9

19.4 RBB (75mm wide) treatment to AGL cable slots on m 140.00


Western OLA

19.5 RBB (75mm wide) treatment to AGL cable slots on m 50.00


Eastern OLA

Subtotal Ordinance Loading Complex **

3540138 295
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Darwin Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: Tender Issue November 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

20 Quick Reaction Alert Facilities (QRAF)

20.1 RBB (50mm wide) treatment to cracks on Taxiways W2 m 350.00


and X2

20.2 Concrete spall repairs with SRE(S) on OLAs11 and 12 m2 0.50

20.3 Reseal AGL cable slots on Taxiway W2 m 20.00

20.4 PME treatment to asphalt surface to north of OLA11 m2 30.00

Subtotal Quick Action Alert Facilities **

3540138 296
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Tindal Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

TINDAL AIRFIELD PAVEMENT WORKS

a Preliminary and General

1 Taxiway Romeo
2 Taxiway Sierra
3 Taxiway Victor 2
4 Air Movements Apron
5 75 Squadron OLAs
6 Deployed Fighter OLAs
7 Maritime OLAs
8 75SQN Aircraft Maintanance Apron
9 Engine Run Up Facility (incl Taxiway)
10 Provisional Items

Base Subtotal

Individual pricing items shown on drawings

3540138 297
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Tindal Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST


General

The following abbreviations for units and works have been Note
used in this schedule:
mm = millimetre
m = linear metre
m2 = square metre
m3 = cubic metre
No. = number
kg = kilogram
t = tonne
hr = hour
LS = lump sum
PS = Provisional Sum
AC = Asphaltic Concrete
RBB = Rubberised Bituminous Bandage
PME = Polymer Modified Bitumen Emulsion
AGL = Aeronautical Ground Lighting

Tenderers are advised that this Schedule is to be read in Note


conjunction with the Drawings and Specification to which
they are hereby referred for full description of the items
measured herein.

Tenderers are referred to the General and Special Note


Conditions of Contract and the Preliminaries Section of the
Specification and are deemed to have allowed herein for
all items that may affect the works, such as night works.

The prices and rates entered in this Schedule are deemed Note
to have allowed for ALL costs involved in supply, placing
and /or fixing each item in its final position or form.
Unpriced items are deemed to be included elsewhere.

The Contract Administrator (CA) must be notified of any Note


discrepancies between this Schedule, the plans and the
Specification prior to any work being undertaken on the
items in question.

3540138 298
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Tindal Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

All items measured herein are measured net and no Note


allowance has been made for waste, overbreak,
compaction, rolling margins, tolerances and the like.
All costs associated with these items are deemed to be
included in the rates.

All rates entered herein shall be exclusive of GST Note

Quantities provided in this schedule are the Contract Note


Administrator's estimate of actual works as shown on the
Tender Drawings.
Notwithstanding, there is no guarantee as to the accuracy
of this information. No allowance has been made for
wastage, construction tolerances or temporary works
including ramping.

Asphalt tonnage has been based on as assumed density Note


of 2.4 tonne/m3.

3540138 299
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Tindal Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

a Preliminary

a1.1 Mobilise to the site, maintain and subsequently remove from site all Sum 1
necessary plant, equipment, gear, hoists, tools, cartage, transport, car
parking, temporary facilities and the like. Include for giving all trades
and subcontractors the free use of same as required.

a1.2 Ongoing overheads and other costs not included elsewhere in the Sum 1
schedule

a1.3 Quality Plan, Safety Plan, Environmental Management Plan and Sum 1
Program, Submission of Mix Design and materials test results

a1.4 Provision of "As-Constructed" drawings. Sum 1

a1.5 Provide any directional/ warning signs and barriers as required Sum 1
including markers and lights in accordance with CASA MoS139,
remove from site upon completion.

a1.6 Allow for full time site based suitable qualified and experienced Works Sum 1
Safety Officer (WSO) for the duration of the works, including
mobilisation, vehicles, accommodation, meals and other allowances.

3540138 300
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Tindal Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

1 Taxiway Romeo

1.1 PME treatment to the asphalt surface (central 8m width) m2 13300.00

1.2 Reinstate centreline paint markings (150mm wide yellow m2 249.00


centreline) following PME - 1,660m length

1.3 Localised PME treatment to coarse open areas in m2 50.00


asphalt surfaces (150mm yellow centreline pavement
markings to be renewed)

1.4 RBB (50mm wide) treatment to pock marks, open m 200.00


asphalt joints and cracks in asphalt taxiway surface

1.5 RBB (50mm wide) treatment to open asphalt joints and m 250.00
cracks in asphalt shoulder surface/edge

1.6 RBB (75mm wide) treatment to AGL cable slots at the m 50.00
intersection with Taxiway W

Subtotal Taxiway Romeo **

3540138 301
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Tindal Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

2 Taxiway Sierra

2.1 PME treatment to the asphalt surfaces (central 8m m2 9600.00


width) (150mm yellow centreline pavement markings to
be renewed) between Taxiways R and V2

2.2 Localised PME treatment to coarse open areas in m2 125.00


asphalt surfaces (150mm yellow centreline pavement
markings to be renewed)

2.3 Asphalt patch repair (mill 75mm and infill with AC14 Mix) m2 50.00
to areas exhibiting rutting between OLAs 49 and 50

2.4 Asphalt patch repair (mill 75mm and infill with AC14 Mix) m2 200.00
to areas exhibiting early signs of rutting/bleeding
between OLA 39 and Taxiway V2

2.5 RBB (50mm wide) treatment to open asphalt joints and m 175.00
cracks

2.6 RBB (50mm wide) treatment to open asphalt joints and m 100.00
cracks on pavement edge

2.7 Renew centreline paint markings 150mm wide m2 240.00

Subtotal Taxiway Sierra **

3540138 302
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Tindal Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

3 Taxiway Victor 2

3.1 Localised PME treatment to coarse open areas in m2 50.00


asphalt surfaces (pavement markings to be renewed)

3.2 Asphalt patch repair (mill 75mm and infill with AC14 Mix) m2 100.00
to areas exhibiting rutting

3.3 Asphalt patch repair (mill 75mm and infill with AC14 Mix) m2 100.00
to areas early signs of rutting

3.4 RBB (50mm wide) treatment to open asphalt joints and m 300.00
cracks

Subtotal Taxiway Victor 2 **

3540138 303
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Tindal Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

4 Air Movements Apron

4.1 Re-sand joints and seal localised areas of ICBP m2 50.00

4.2 Concrete surface scaling repairs with asphalt (mill m2 150.00


50mm concrete, prime and infill with 50mm AC10 Mix
with PME surface treatment – 50mm wide RBB
treatment to perimeter of repair) - allow 50No.
Contractor and Superintendent to undertake a joint site
survey to identify areas of scaling

4.3 RBB (50mm wide) treatment to existing asphalt repairs m 250.00


to concrete pavement

4.4 Rout and seal longitudinal cracks in concrete slabs m 100.00

4.5 RBB (50mm wide) treatment to cracks in asphalt m 1000.00


shoulder and Hangar entrance

4.6 RBB (75mm wide) treatment to AGL cable slots m 200.00

Subtotal Aircraft Movements Apron **

3540138 304
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Tindal Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

5 75 Squadron OLAs

5.1 PME treatment to localised coarse open areas in m2 600.00


asphalt surfaces

5.2 RBB (50mm wide) treatment to open asphalt joints and m 350.00
cracks

5.3 RBB (50mm wide) treatment to concrete cracks and m 10.00


spalls

5.4 Renew concrete joint sealant m 50.00

5.5 Localised regrading to improve drainage and remove silt LS 1.00


build up on OLA6

Subtotal 75 Squadron OLAs **

3540138 305
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Tindal Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

6 Deployed Fighter OLAs

6.1 RBB (50mm wide) treatment to open asphalt joints and m 500.00
cracks

6.2 RBB (50mm wide) treatment to concrete spalls and m 15.00


cracks

6.3 RBB (75mm wide) treatment to AGL cable slots m 100.00

6.4 Secure drainage grating on OLA 25 LS 1.00

Subtotal Deployed Fighter OLAs **

3540138 306
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Tindal Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

7 Maritime OLAs

7.1 PME treatment to localised coarse open areas in m2 75.00


asphalt surfaces – allow 75m²

7.2 RBB (50mm wide) treatment to open asphalt joints and m 525.00
cracks

7.3 Infill edge drop offs in perimeter of ICBP with topsoil and m2 150.00

Subtotal Maritime OLAs **

3540138 307
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Tindal Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

8 75SQN Aircraft Maintenance Apron

8.1 RBB (50mm wide) treatment to open asphalt joints and m 400.00
cracks in shoulder pavement

Subtotal 75 SQN Aircraft Maintenance Apron **

3540138 308
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Tindal Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

9 Engine Run Up Facility (incl Taxiway)

9.1 PME treatment to localised coarse open areas in m2 10.00


asphalt surfaces

9.2 RBB (50mm wide) treatment to open asphalt joints and m 300.00
cracks in taxiway pavement

9.3 RBB (50mm wide) treatment to open asphalt joints and m 100.00
cracks in shoulder pavement

9.4 RBB (50mm wide) treatment to concrete cracks m 10.00

Subtotal Engine Run Up Facility (incl Taxiway) **

3540138 309
2009-10 National Airfields Maintenance Project - Package 3
PROJECT: RAAF Base Tindal Airfield Pavement Works BID CURRENCY: AUD
SUBTITLE: 90% Detailed Design October 2009

REF DESCRIPTION UNIT QUANTITY RATE COST

10 Provisional Items

10.1 Daily Rate for WSO (10 hour shift) Day Rate Only -

10.2 Grade 7 Chip seal application to open areas of apron m2 Rate Only
and taxiway pavement (7000m2)

3540138 310