You are on page 1of 3

Questionnaires

Date: . / Mar / 2012


1, Name of Vendor:
. . .
2, Contact Point
Office
1) Name

: ..

2) Hand phone

: ..

3) Email

: ..

Manufacturing Shop
1) Name

: ..

2) Hand phone

: ..

3) Fax

: ..

4) E-mail

: ..

5) Website of company: .
3, Company General
1) Business field, product
- Main business : ..

- Main production: ..

2) Established: dd/mm/yy
3) Employee
- Permanent

: . person

- Temporary

: . person

- Total

: . person

4) Shop area
- Total shop area

: m2

- Shop area in building : m2


5) Patents/Licenses
.

Page 1 of 3

6) Manufacturing capacity of main production


.
4, Prefabricated Package Substation
1) Have you ever supplied the prefabricated package substation? Please provide
reference lists (supply list) for the package substation (Year/Client/Overall
Dimension)?
.
.
2) Does your company design and manufacture the package substation enclosure? Or
does your company use subcontractor for design and manufacturing of the package
substation enclosure?
.

3) Where does your company manufacture the package substation enclosure?
.

4) Where does your company install electrical equipment and cabling in the package
substation?
.

5) Have you ever supplied package substation including the following accessories?
- Fire alarm

Yes / No

- Air conditioning/Ventilation

Yes / No

- Lighting

Yes / No

- Fire protection system using CO2, FM200

Yes / No

.

6) How is the package substation transported to the site?
.

7) About your largest (or typical) package substation, please inform us the following:
- Applicable codes and standards

: .

- Highest voltage

: .

Page 2 of 3

kV

- Highest capacity

: .

kVA

- Largest Dimensions

: .

W(m) x D(m) x H(m)

- MV panels manufacturer

: .

- LV panels manufacturer

: .

8) Design engineering capability


.
9) Standard delivery time (after PO)
- Package Substation

: .. . week(s)

10) Port of FOB


.
11) ISO 9001 Certificate
.
12) Others
- Availability of type test certificate.
.
- Availability of testing facilities (Routine/Type/Special tests).
.
- Availability of field services.
.
5, Reference documents
Please provide the following documents.
- Company profile.
- Reference list (supply list) for package substation.
- Package substation catalogues.
- Sub-vendors list for main parts.

Page 3 of 3

You might also like