You are on page 1of 2

1) NFPA ..for Car parking structure system (ans.

88A)
2) Inspection of heat detector according to NFPA (ans.
Quarterly)
3) Visual inspection of zone control valve as per NFPA
standard (ans. Semi yearly)
4) Testing of Fire alarm sound according to NFPA standard
(ans. Monthly)
5) Condensate water generated from which part of split unit
(ans. Evaporator)
6) Project definition (sorry the choices are not listed)
7) What is the system used to extract the air from the
basement (ans. Ventilation system)
8) What is the name of the upward force which is equal the
downward force and keep the object floating (ans.
Buoyancy force)
9) At which part of project the following take place: design
change, scheduling and planning (ans. Execution part)
10) Bolt size: M33x 3 means (ans. 33 related to bolt
diameter and 3 related to pitch to pitch distance)
11) Fire damper function is (sorry choices are not listed)
12) Function of cooling tower is (sorry choices are not
listed)
13) Convert from CM to INCH (ans. Divide by 2.54)
14) Civil defense the main part to approve and review the
fire fighting systems
15) Water start boiling at (ans. Saturated liquid)

You might also like