You are on page 1of 9

Auditorium : Day/Date :

Movie Title : Movie Title : Movie Title : Movie Title : Movie Title :
Show ke-1 : Show ke-2 : Show ke-3 : Show ke-4 : Show ke-5 :
Status : Landing /Breakdown* Status : Landing /Breakdown* Status : Landing /Breakdown* Status : Landing /Breakdown* Status : Landing /Breakdown*
Time/Reel * Proj. SoundFilm Oth Sign Time/Reel * Proj. SoundFilm Oth Sign Time/Reel * Proj. SoundFilm Oth Sign Time/Reel * Proj. SoundFilm Oth Sign Time/Reel * Proj. SoundFilm Oth Sign
00.15" 00.15" 00.15" 00.15" 00.15"
00.30" 00.30" 00.30" 00.30" 00.30"
00.45" 00.45" 00.45" 00.45" 00.45"
01.00" 01.00" 01.00" 01.00" 01.00"
01.15" 01.15" 01.15" 01.15" 01.15"
01.30" 01.30" 01.30" 01.30" 01.30"
01.45" 01.45" 01.45" 01.45" 01.45"
02.00" 02.00" 02.00" 02.00" 02.00"
02.15" 02.15" 02.15" 02.15" 02.15"
02.30" 02.30" 02.30" 02.30" 02.30"
02.45" 02.45" 02.45" 02.45" 02.45"
Movie Title : Movie Title : DLP
Show ke-6 : Show ke-7 : L1
Status : Landing /Breakdown* Status : Landing /Breakdown* VOL L2
Time/Reel * Proj. SoundFilm Oth Sign Time/Reel * Proj. SoundFilm Oth Sign L3
00.15" 00.15" L4
00.30" 00.30"
00.45" 00.45" BARCO :
01.00" 01.00"
01.15" 01.15"
01.30" 01.30"
01.45" 01.45"
02.00" 02.00"
02.15" 02.15"
02.30" 02.30"
02.45" 02.45"
Note: * coret yang tidak perlu
* Other : - Portholes tertutup rapat
- Masking bekerja dengan baik
- Lampu ruangan Mati
Pagi Malam
Paraf Shift Leader
PIC (Night) :
r
e
v
i s
i
0
5
1
3
projectionistcp@blitzmegaplex.com
MOVIE TRAILER
~ CHECKLIST MONITORING ~
PIC (Day) : PIC (Midle) :
BOOKING SCHEDULE
Reel Take IN Take Out 123456789 Show : Show : Show : Show : Show : Show : Show : Reel Take IN Take Out 123456789 Reel Take IN Take Out 123456789 Reel Take IN Take Out 123456789 Reel Take IN Take Out 123456789 Reel Take IN Take Out 123456789 Reel Take IN Take Out 123456789
MAINTENANCE ITEMS & SUGGESTED SCHEDULE
F
r
e
q
.
General Projector & Soundhead (1)
Clean Projector & Soundhead Interiors daily
Remove Film Gate to thoroughly clean Film Pads, Runners, Rails, Guides and aperture plates.
Inspect Trap, Gate, sprockets and lenses for excessive dirt build-up.
daily
Clean Sprockets & Pad Rollers daily
Clean and inspect Optical Sound components Exciter Lamp, Slit Lens & Solar Cell OR Red LED &
Optical Lens.
daily weekly
Check Oil Levels and general lubrication according to manufacturer's instructions. daily
Check and Adjust Optical Sound Preamp Levels at Processor as required. monthly
Check and Adjust Basic Optical Sound A-Chain as required. 3 monthly
Check & Clean Projector Oil Filter if required. 6 monthly
Blow dust from Projector Motor. Check and Tighten Drive Motor Mounts. Inspect and Adjust
Drive Belts as required. Lubricate external pulleys and/or gears as required.
6 monthly
Change Projector Oil according to manufacturer's instructions. 3 monthly
Thorough Cleaning of Key Components
Wipe clean Platter System Disks. daily
Inspect and Clean Projection Lens with lens tissue & cleaner. weekly
Blow excess dust and dirt from Projector, Shutter Housing and Soundhead using canned or
compressed air.
monthly
Inspect and Clean Optical Sound Components (Exciter, Slit Lens and Solar Cell) with Q-Tips, lens
tissue & cleaner.
monthly
0
Xenon System Maintenance
Check Xenon Cooling Fan operation for proper air flow monthly
Check general Xenon Bulb appearance and electrical connections. monthly
Check Xenon Exhaust System for proper air flow and check CFM monthly
Check Xenon Bulb Focus and adjust as required. monthly
Xenon Bulb Rotation as recommended by Bulb manufacturer. monthly
Check ALL DC Power Connections in Lamphouse. 3 monthly
Visual inspection and check of Xenon Power Supply for proper cooling system operation and tight
electrical connections.
3 monthly
0
Misc. Booth Items
Check platter system and control plate. daily
Check pink noise daily
Inspect Film Splicer, Perforators and Blades. Clean and Service as required. weekly
Inspect Platter and Film Guidance Rollers and Keepers for smooth operation, flat spots, cracks or
nicks that might damage film. Adjust & Align as required.
weekly
Lubricate and adjust Platter Make-Up Table as recommended by manufacturer. Check and adjust
Drive Mechanism if required.
monthly
MM / BMPS Server
Check output signal daily
Check HDD storage weekly
Upadate Windows and anti virus 2 weekly
Cleaning inside MM server monthly
Check and repair connector monthly
Take the view log monthly
DLP Projector
Inspect and check the fans can work properly daily
Inspect and clean the lens with lens tissue weekly
Check, Clean and Change (if necessarry) air filter weekly
Check DLP lamp condition and change if the time to be replaced monthly
Take the view log from each DLP monthly
BARCO Projector
Check and clean air filter monthly
Check pressure of the liquid cooling circuit. Pressure between 0,5 and 1 bar monthly
Take the view log monthly
Inspect and clean the lens as recommended by manufacture monthly
Inspect and clean z screen as recommended by manufacture monthly
Check Exhaust System for proper air flow and check CFM (min 235 CFM) monthly
Check Xenon hour and lamp condition. Adjust and or Change if the time to be replaced monthly
DSR Server
Take the view log from each DSR monthly
Check HDD storage weekly
Auditorium Inspections
Walk-Through during Show Time to assess presentation quality. daily
Confirm required screen light, image resolution and focus, etc. daily
Projection Screen Inspection. daily
Overall presentation quality analysis. Check sound system performance with test films, including
pre-amp levels, channel balance and auditorium level check.
monthly
Check Curtain and control for proper operation. monthly
Check Movable Masking and control for proper operation. monthly
Check Masking Motor, ropes, pulleys and track for proper operation. Lubricate as recommended
by manufacturer.
3 monthly
Check and Adjust Projector A-Chain and Auditorium B-Chain as required. 6 monthly
0
Miscellaneous
Humidity check in the projector room monthly
(1) Frequency of recommended service may vary depending on ambient conditions, film
condition and hours of operation. Some operations should be performed prior to
each presentation before threading up the system.
(2) Frequency of recommended service may vary depending on manufacturer and equipment type.
GENERAL NOTES:
All work within the console and projection system should be done with all incoming AC
Power turned OFF.
ALWAYS:
Listen for abnormal noises from the system, particularly the projector mechanism.
Note overall quality of presentations.
Wipe Film Trap and Gate clean after each presentation.
Visually assess picture quality, taking into account light levels, image and focus, etc.
Learn to spot changes in presentation quality and equipment operation.
DAILY CHECKLIST
Date
Audi A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10
General Projector & Soundhead
Clean Projector & Soundhead Interiors
v v v v v v v
Inspect Trap, Gate, sprockets and lenses for
excessive dirt build-up. v v v v v v v
Clean Sprockets & Pad Rollers
v v v v v v v
Clean and inspect Optical Sound components
v v v v v v v
Check Oil Levels and general lubrication
v v v v v v v
Thorough Cleaning of Key Components
Wipe clean Platter System Disks.
Misc. Booth Items
Check platter system and control plate.
Check pink noise
E Cinema
Check output signal
Inspect and check the DLP fans can work
properly
AuditoriumInspections
Confirm required screen light, image
resolution and focus, etc.
Projection Screen Inspection.
Date
Audi A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10
General Projector & Soundhead
Clean Projector & Soundhead Interiors
Inspect Trap, Gate, sprockets and lenses for
excessive dirt build-up.
Clean Sprockets & Pad Rollers
Clean and inspect Optical Sound components
Check Oil Levels and general lubrication
Thorough Cleaning of Key Components
Wipe clean Platter System Disks.
Misc. Booth Items
Check platter system and control plate.
Check pink noise
E Cinema
Check output signal
Inspect and check the DLP fans can work
properly
AuditoriumInspections
Confirm required screen light, image
resolution and focus, etc.
Projection Screen Inspection.
9 10 11 12 13 14 15
5 6 7 8
16
1 2 3 4
Date
Audi A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10
General Projector & Soundhead
Clean Projector & Soundhead Interiors
Inspect Trap, Gate, sprockets and lenses for
excessive dirt build-up.
Clean Sprockets & Pad Rollers
Clean and inspect Optical Sound components
Check Oil Levels and general lubrication
Thorough Cleaning of Key Components
Wipe clean Platter System Disks.
Misc. Booth Items
Check platter system and control plate.
Check pink noise
E Cinema
Check output signal
Inspect and check the DLP fans can work
properly
AuditoriumInspections
Confirm required screen light, image
resolution and focus, etc.
Projection Screen Inspection.
Date
Audi A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10
General Projector & Soundhead
Clean Projector & Soundhead Interiors
Inspect Trap, Gate, sprockets and lenses for
excessive dirt build-up.
Clean Sprockets & Pad Rollers
Clean and inspect Optical Sound components
Check Oil Levels and general lubrication
Thorough Cleaning of Key Components
Wipe clean Platter System Disks.
Misc. Booth Items
Check platter system and control plate.
Check pink noise
E Cinema
Check output signal
Inspect and check the DLP fans can work
properly
AuditoriumInspections
Confirm required screen light, image
resolution and focus, etc.
Projection Screen Inspection.
17 19 20
31
21 22 23
25 26 27 28
18 24
29 30
WEEKLY CHECKLIST
Week
Audi A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11
Thorough Cleaning of Key Components
Inspect and Clean Projection Lens with lens tissue &
cleaner.
Misc. Booth Items
Inspect Film Splicer, Perforators and Blades. Clean
and Service as required.
Inspect Platter and Film Guidance Rollers and Keepers
for smooth operation, flat spots, cracks or nicks that
might damage film. Adjust & Align as required.
BMPS Server
Check & monitoring capacity HDD storage
Upadate Windows and anti virus (2 weekly)
DLP Projector
Inspect and clean the lens with lens tissue
Check, Clean and Change (if necessarry) air filter
DSR Server
Check HDD storage
5 1 2 3 4
MONTHLY CHECKLIST
Audi A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11
General Projector & Soundhead
Check and Adjust Optical Sound Preamp Levels at Processor as required.
(3 monthly)
Change Projector Oil according to manufacturer's instructions. (3
monthly)
Check & Clean Projector Oil Filter if required. (6 monthly)
Blow dust from Projector Motor. Check and Tighten Drive Motor Mounts.
Inspect and Adjust Drive Belts as required. Lubricate external pulleys
and/or gears as required. (6 monthly)
Thorough Cleaning of Key Components
Blow excess dust and dirt from Projector, Shutter Housing and Soundhead
using canned or compressed air.
Inspect and Clean Optical Sound Components and red led with Q-Tips, lens
tissue & cleaner.
Xenon System Maintenance
Check Xenon Cooling Fan operation for proper air flow
Check general Xenon Bulb appearance and electrical connections.
Check Xenon Exhaust System for proper air flow and check CFM
Check Xenon Bulb Focus and adjust as required.
Xenon Bulb Rotation as recommended by Bulb manufacturer.
Check ALL DC Power Connections in Lamphouse. (3 monthly)
Visual inspection and check of Xenon Power Supply for proper cooling
system operation and tight electrical connections. (3 monthly)
BMPS Server
Cleaning inside MM server
Check connector for good condition and work properly
Take the view log
Defragment HDD storage
Audi A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11
DLP Projector
Check DLP lamp condition for over hourtime limit and change if the time to
be replaced
Take the view log from each DLP
BARCO Projector
Check and clean air filter
Check pressure of the liquid cooling circuit. Pressure between 0,5 and 1 bar
Take the view log
Inspect and clean the lens as recommended by manufacture
Inspect and clean XL Real D as recommended by manufacture
Check Exhaust System for proper air flow and check CFM
Check Xenon hour and lamp condition. Adjust and or Change if the time to
be replaced
DSR Server
Take the view log from each DSR
Auditorium Inspections
Check Curtain and control panel system for proper operation.
Check Movable Masking and control for proper operation.
Check Masking Motor, ropes, pulleys and track for proper operation.
Lubricate as recommended by manufacturer. (3 monthly)
Miscellaneous
check temperature level in the projector room

You might also like