You are on page 1of 29

TECHNICAL PROPOSAL

DESIGN OF SHAMSA CHILDREN VILLAGE PROJECT



TENDER OPENING COMMITTEE,
SHAMSA CHILDREN VILLAGE



Company Name: Complex Engineering Services
Add: Darulaman Road, Opposite to Habibya High School
Kabul Afghanistan
E-mail: info@complexeng.net
Phone: +93(0)786028028, +93(0)787335316

Submitted to: Shamsa Children Village, Procurement Department


Date: 20/Jan/2014

Table of Content: Pages

Executive Summary ..... 2
Shamsa Children Village.. 1
Design Personnel Capabilities....3
Technical Approach.. 3
Topography Survey....1
Geotechnical Survey..........................................................................................1
Design Criteria...1
Design Software1
Design Development Process.1
Design Calculation.1
Design Submittal....3
Experience.....8
Key Design Personnel...7
Design Schedule....1







Shamsa Children Village

Complex Engineering Services is pleased to submit this proposal for the design
documentation of Shamsa Children Village heating system, at Kabul Afghanistan.
COMPLEX ENGINEERING SERVICES understands the mission-critical nature of the
design and construction of the projects. Our ongoing projects throughout the region
translate into a unique ability to staff and supervise this project. We know how to move
people, equipment, and materials into the region based on over 6 years of experience
working alongside the different donors who are implementing projects in Afghanistan,
we have worked with USAID,UNOPS, PRTs, RCCs and US-ARMY CORPS OF
ENGINEERING.
We feel the best approach to successfully execute this project is to self-perform the work.
As such, through our performance on previous projects of similar size and complexity,
we have clearly demonstrated the ability to meet project budget, schedule, and quality
constraints.
COMPLEX ENGINEERING SERVICES has been designing educational, health, and
military facilities since 2006 and we have completed 12 design projects throughout
Afghanistan which had different structural system like concrete frame, steel structure,
CMU buildings, K-span buildings, 3D panel system buildings and road network and
bridges. In most of these projects that we have worked were the military compounds
throughout Afghanistan which consist of asphalt road, concrete road, footpath, helipad,
cargo handling area and airports, so COMPLEX ENGINEERING SERVICES has the
ability to easily come along with the best design of this project and is intimately familiar
with the standards of ministry of public work of Afghanistan, USAID PRTs etc.
requirements to successfully complete every component of these projects having already
delivered over $800,000.00 worth of educational, health and military Facilities
throughout the country. The key factor of (C.E.S) is that we have our own design team
in our main office in Kabul and self-perform the projects, we have 15 afghan design
professional engineer who have degree of licensed, masters in engineering and now
they are currently working in our projects in north-east of Afghanistan in our projects
which are 90% completed, so we are very keen to start working with Al-Jisr Charity as
this is very easy for us to come along with this kind of project because we have already
designed projects of the same complexity and size, so this is going to be very easy for us
as we have already close to the area.
Our design staff are equipped with most recent design software and update design code
of the time like AutoCAD 2012, AutoCAD Civil 3D, SAP2000, ETABS, SAFE, HAP,
RAM, STAD-PRO.
Executive Summary

Shamsa Children Village
Because of our established capacity, local workforce, and dedication, we believe we are
one of the best Afghan Design companies that can successfully complete this project. We
provide the best value to Clients that no other local/international contractor can match.
Our selection for this project will present stakeholders with a complete project solution.
The following experience sheets showcase five COMPLEX ENGINEERING SERVICES
projects that best demonstrate our experience performing on projects similar in size and
scope to this project. Our execution strategy builds on our successful performance to
date for our client on numerous facilities.
COMPLEX ENGINEERING SERVICES have a long term capacity building policy, and
currently four to five trainees are being trained in our company by our design team, so
that they can be the future design engineer of Afghanistan.


























Shamsa Children Village
1. Shamsa Children Village:
More than three decades of civil war in Afghanistan has left behind thousands
of children homeless that most of them are living in very bad situation on the streets.
There are many children who experience physical and mental abuse daily and most of
them under the age of 14. More than 30 per cent of children of primary school age are
working on the streets in Afghanistan and are often their family's sole breadwinners.
That means that millions of children are not going to school.
Child labor is also rampant, with many impoverished families selling their kids into
forced labor sexual exploitation, and early marriage. Some of the children, who can be
as young as 3 years old are overworked and are suffer from malnutrition and disease.
The lack Shelter is another big problem for the children in Afghanistan as the number
of the children are increasing day by day, so there is a sever need to provide them with
appropriate shelter for them to live in. Complex Engineering Services in close
coordination with Al-Jisr Charity will provide the design of heating system for the
existing buildings as well as the design of new building according to the international
codes and standards.





















Shamsa Children Village
2. Design Personnel capabilities

Our large CES Kabul design office is led by Mr. Norrullah. He manages our staff in
the creation and adaptation of the project designs. His staff of engineers analyzes
local site conditions and the material and equipment we intend to procure. With
their previous and current expertise, having successfully designed numerous
facilities, the successful design of any
project is certain.
His design team is well versed in the
requirements and specifications
required by the International
Standards. Design submittals are
reviewed by our QC design section
against TO requirements. After
submission, we then incorporate any
changes from the client by answering
the clients comments. Our design capability is unmatched and has experience with
all major systems required to include airfields, pre-engineered buildings, CMU
buildings, temporary facilities, and 3-D shot-crete buildings. We have also
designed and installed all utilities production and distribution systems to include
wastewater treatment, water production, and high/low voltage power plants.
We have successfully completed over $300,000.00 design-build projects for USACE
in the last 5 years. We have the right in-house staff, subs to perform almost any
potential challenge this project would present us in the city.
In our review of our Design-Build capabilities for each type of project, we will show
how this team successfully completely similar type of your Campus project.
We have the right engineering staff to perform most of the tasks expected under this
project.
2.1 Architectural
We have successfully completed for all clients almost every type of building. We
designed and built barracks, DFACs, headquarter buildings, fire stations,
classrooms, toilets, aircraft hangars, maintenance shops, clinics, and many other
types of buildings. Our architects designed over 3 million square foot of buildings
for USACE and other client like USAID, GOA etc.



Shamsa Children Village
2.2 Structural
We have designed every type of structural system. We designed k-Spans,
Pre-engineered buildings (PEB), CMU, Truss system, 3-D Building system, concrete
structures, and even local clay brick structures.
2.3 Electrical and Mechanical Work
All buildings electromechanical design-build is being done in house. When we first
worked in Afghanistan 7 years ago, we could not find good electromechanical
design-build teams to come to Afghanistan. We had to establish our own to ensure
we meet tough client
requirements. We became
the expert in the field, in
such way that critical and
pioneering World Bank,
ISAF and USACE
electromechanical work was
done by our CES team.



Central heating system

2.4 Water and Sewage Systems
Our design of two ANA garrisons projects, illustrated our flexibility and capability
in water and sewage systems. In Farah and Nimroz we designed new water sources
(wells) with water networks to serve 2000 and 4000 personnel, respectively. Design
in Nimroz was challenging due to the variant terrain, however we were able to
maintain water pressure and flow throughout the system.
For sewage systems, the two garrisons differ; Farah has simple aeration lagoons for
treatment of waste water to serve the 2000 personnel. This simple construction
helped us complete the sewage system for project timeliness and is ideal for the
customer due to the hot climate of Farah province. Nimroz has been designed
differently; using an advanced packaged waste water system, which although is a
long lead item, will be beneficial due to the sites restricted area availability. The
difference in the two garrisons, demonstrates our capability and knowledge to apply
the right solution for the right project.

Shamsa Children Village
We use modern design software like EPAnet to analyze water network as we did on
ISAF KIA network and KMTC water network. EPAnet enabled us to model the
water system, test various scenarios, especially with the KIA fire water network and
overcome pitfalls before they occur when the water is critically needed. We were
able to size the various pumps, for pressure, flow, and size, valves, and even pipe
diameters. Our continued use of the right tools, water software and water
specifications, for design and construction proves us technically capable to address
any obstacles to deliver water and sewage networks.
2.5 Civil Work
Civil project to highlight our capability is the Shinari Erosion control retaining wall.
This project was constructed in order to divert an active drainage wadi around a
border post constructed in a drainage basin. We designed this project utilizing local
techniques with modern design philosophies. We incorporated local rock wall
construction with specialized gabion construction. The attached photo highlights
this critical project in an extremely remote area.

3. Technical Approach:

As per our company past performance and our staff experience in the design
field we have handled from small to large scale projects as you can see in our project
list, so this proves that we have created a system and management how to carry out
jobs and take responsibility to prevent any inconsistency during the design
management of the project. In order to work through a project complex engineering
services has got one design department one design QC department and one
submittal department. Each of these departments is being managed by our
professional and experienced managers working with us a long time. In design
department we have five sub departments like architecture department, structure
department, civil department, mechanical department and electrical department.
For team organization of each of these departments please refer to the team
structure as well as for QC department we have assign one experienced engineer for
every design department to check the design submittal before submitting it to the
client. And also for submittal department we have two individuals for printing and
preparing the submittal package and handing over to the client. Beside these
complex engineering services has a long term relationship with the survey team who
are working under the name free land Surveying & Engineering Co, and they have
provided us the different kinds of survey data for most of our project even they can

Shamsa Children Village
provide the survey data in most remote and dangerous areas of Afghanistan as well
as for geotechnical report we have considered GSMTL/Geo Scientific Material
Testing Laboratories, this company is also one of our customer and they are working
with us for a long time which is also one of the approved geotechnical company by
the US-ARMY CORPS OF ENGINEERS.
If we are awarded this project after the clearing of contract document with the client
we will take on hand the following tasks;

3.1 Topography Survey:
The first task in this project is to conduct a topographic survey of the project
site. These data consist of points inside the project which shows the easting,
northing, elevation and description of the points.
Using professional surveyor staff and utilizing professional survey equipment,
including GPS, Total Station and automatic/digital levels, we will conduct a full
topographical survey, develop primary survey controls and establish a control
points network along the project site based on National Datum benchmark to be
used. We will develop and set out the Preliminary alignment and verify whether it
suits actual field conditions. The alignment will be modified where necessary to give
the best possible grade to suit the existing terrain conditions, and minimize the
amount of cut and fill.
A traverse survey shall be carried out to determine X, Y coordinates. The elevations
(Z value) of the control points shall also be determined with reference to the existing
National Datum.
The permanent control points shall be concreted and center shall be a stainless steel
pin with 12 mm diameter. Each control points will be marked with its reference
number, date of construction, elevation and coordinates. These points will be
established at ground level in suitable ground conditions in location where they
shall not be disturbed by construction works and shall be maintained throughout
the contract period.

3.2 Geotechnical Survey:

Gathering site specific geotechnical information necessary to design and
construct the foundation and drainage structures on this project.
As previously mentioned GSMTL/Geo Scientific Material Testing Laboratories is a
company which is cooperating with us in different projects, so after the topography

Shamsa Children Village
survey we will send our team of geotechnical engineers to conduct the required tests
and samples. The following task will be carried out by the geotechnical engineers:

Existing geotechnical (e.g., surface and subsurface) conditions,
Subsurface exploration logs, location of exploration points, foundations
selected, soil bearing capacity, pavement design criteria (e.g., CBR values, K
Values), ground water levels, and road embankment and pavement
construction recommendations.
Materials (e.g., concrete cement, asphalt and aggregates).
Slope and rock stability evaluation, protection measures.
After carrying out the geotechnical investigation a geotechnical report will be
prepared and will be submitted to the client for approval.

3.3 Design Criteria:
The design criteria, standard and parameter for this project will be based on
international building code (IBC), American concrete institution (ACI), American
society of civil engineer (ASCE), international mechanical code (IMC), international
plumbing code (IPC) and Ministry of Public Works (MPW) Standards.


3.4 Design Software:
Using the recent version of (ASHRE, CARRIER HAP, ETABS, SAFE, SAP2000), for
design calculation and AutoCAD 2012 for drafting of drawings will be utilized in this
project.

4. Design development process:

Upon approval of topography survey and geotechnical report our design
engineer will start working the design of project. The design analysis will contain all
explanatory material giving the design rational for any design decisions which
would not be obvious to an engineer review the final drawings and specifications.
The design analysis contains the criteria for and the history of the project design,
including criteria furnished by the engineer, letters, codes and references.
Design phase review comments and actions assigned to the designer will be included
with each submission package. Specific requirement for the design analysis, listed
by submittal phase are contain hereinafter.

Shamsa Children Village

4.1 Design calculation:
The design calculation report shall be provided with each submission of the
package. The report will contain structural calculation of road pavement, hydraulic
calculation of culvert, bridge and road site ditches, structural calculation of bridge.
The report will be organized and presented in a clean and legible format
incorporating a title page index for each volume. A table of contents, which shall be
an index of the indices, shall be furnished when there is more than one volume. The
source of loading condition, supplementary sketches, graphs, formulae, and
references shall be identified.

4.2 Design Submittals:

35% design submittal requirement:
After the completion of the geotechnical report topography survey, we will develop a
preliminary site plan, so our 10% design submittal will be consisting of the following
items:
1- geotechnical report
2- preliminary site plan
3- topography plan
4- Coordinate plan
5- Architectural plans

65% design submittal requirements including incorporating of 10% submittal comments
1- Revised geotechnical report as per client comments at, scope of work, code and
standards.
2- Revised site plan as per client comments, scope of work, code and standards
3- Revised topography plan as per client comments, scope of work, code and
standards.
4- Revised Coordinate plan as per client comments, scope of work, code and
standards.
6- Architecture drawings (plans, sections, elevations and detail of door window
schedule)
7- Structural drawing (foundation plan, floor plans, foundation detail, frame detail
slab rebar detail) and calculation
8- Mechanical drawings like HVAC plans, sections, details and calculation

Shamsa Children Village
10- Electrical drawing like lighting plan, power plan, fire alarms, CCTV and
calculation.
11- Complete Specification considering the requirement of the entire project
12- Design narrative.

90% design submittal requirements including incorporating of 10% &65% submittal
comments
1- Geotechnical report.
2- Master site plan.
3- Topography plan.
4- Coordinate plan.
5- Revised Architecture drawings (plans, sections, elevations, complete detail and
door window schedule) as per client comments, scope of work, code and
standards.
6- Revised Structural drawing (foundation plan, floor plans, foundation detail,
frame detail slab rebar detail, roof detail, wall detail) and calculation as per
client comments, scope of work, code and standards.
7- Revised Mechanical drawings like HVAC plans, sections, details and calculation
as per client comments, scope of work, code and standards.
8- Revised Electrical drawing like lighting plan, power plan, fire alarms, CCTV
and calculation as per client comments, scope of work, code and standards.
9- Revised Complete Specification considering the requirement of the entire project
as per client comments, scope of work, code and standards.
12- Revised Design narrative as per client comments, scope of work, code and
standards.
100% design submittal requirements including incorporating of 10%, 65% &90%
submittal comments;
1- Geotechnical report.
2- Master site plan.
3- Topography plan.
4- Coordinate plan.
5- Revised Architecture drawings (plans, sections, elevations, complete detail and
door window schedule) as per client comments, scope of work, code and
standards.
6- Revised Structural drawing (foundation plan, floor plans, foundation detail,
frame detail slab rebar detail, roof detail, CMU wall detail) and calculation as

Shamsa Children Village
per client comments, scope of work, code and standards. 8-
7- Revised Mechanical drawings like HVAC plans, sections, details and calculation
as per client comments, scope of work, code and standards. 9-
8- Revised Electrical drawing like lighting plan, power plan, fire alarms, CCTV
and calculation as per client comments, scope of work, code and standards..
9- Revised Complete Specification considering the requirement of the entire project
as per client comments, scope of work, code and standards.
10- Revised Design narrative as per client comments, scope of work, code and
standards.

At the final stage of the submittal, two hard copies and one soft copy of the project
which shall include the (AutoCAD, PDF, DOC) files will be delivered to the client.

























Shamsa Children Village
5. Experience ( Similar Assignments) sheet # 1







Shamsa Children Village
Sheet # 2








Shamsa Children Village
Sheet # 3







Shamsa Children Village
Sheet # 4










Shamsa Children Village
Sheet # 5






Shamsa Children Village
Sheet # 6


Shamsa Children Village
Sheet # 7







Shamsa Children Village
Sheet # 8










Shamsa Children Village
6. Key Design Personnel:





Design Manager
Name Eng. Abdullah
Education B.sc in civil Engineering, from Kabul University Engineering Faculty.
Graduated from Amani High school.
Active Registration(s) N/A
Experience
With this firm: 2 yrs
With other firms: 7 yrs
Eng. Abdullah has extensive USACE, USAID, GOA design experience from surveying
(using Total Station) to structural design using SAP to drafting and complete
construction supervision. He has become one of the best Afghan engineers that
COMPLEX ENGINEERING SERVICES has mentored. He has the experience and flexibility
to work in any challenging assignment and long hours. His communication skill has
resulted to follow up the modifications and change orders through a fair
communication with the client.
Mr. Abdullah began working in the construction technical disciplines 6 years ago.
Eng. Abdullah joined COMPLEX ENGINEERING SERVICES on April 2012 as a design
manager and managed the team on the design of following projects.
ANP Laghman Province Afghanistan.
Design and construction of medical hospital in Kabul Afghanistan.
Design and construction of ANP in Urozgan province.
Design and construction of Class-1 Warehouse Kabul Afghanistan.
Design and construction of ANP Sheberghan.
Design and construction of Generator Room
Experience with other firms :
Position: Design engineer.
Duration: June 2003 Up to September 2006.
ORGANIZATION: UIProject Construction company.
Position: Design Manager
Duration: Oct 2006 Up to April 2009.
ORGANIZATION: KhairZai Architectural and Engineering Consultants
Position: Design Manager
Duration: Oct 2010 Up to now.
ORGANIZATION: Complex Engineering Services
Specialized Experience &
Technical Competency
Etabs, Sap2000, Safe, Civil 3D, MS Word, MS Dos, MS Excel, MS Access and Power
Point, CAD 2005-2010, Photoshop, Studio max,
Languages Pashtu, English, Dari &Urdu
Other Eng.Abdullah had professional training in structural softwares, codes and programs.




Shamsa Children Village
Senior Civil Engineer
Name Obaidurahman Hanif
Education Faculty of Engineering Civil Dept Kabul unevirsity
Nadria High School Kabul Afghanistan
BSC Pakistan

Active Registration(s) N/A
Experience
With this firm: 3 yrs
With other firms: 4 yrs
Obaidurahman Hanif is an experienced Engineer having performed work on all
types, sizes, and complexities of projects. Over the past 8 years with C.E.S.
Obaidurahman Hanif has gained an extensive knowledge of USACE, GOA, USAID
projects, leading our team of engineers and surveyors on many projects.
As a senior civil engineer Obaidurahman Hanif has been responsible for the
following projects:
Senior civil engineer for design of Logar High School.
Senior civil engineer for design of medical hospital in Laghman province
Afghanistan.
Senior civil engineer for design of Kabul warehouse US-ARMY project.
Senior civil engineer for design of BP Company in JARF Badakhshan
province Afghanistan.
Senior civil engineer of design quality control of Ghamberi phase 4.
Senior civil engineer for design NAVAC JALALABAD project.
Experience with other Firms :
Position: civil design engineer
Duration: April 2005 Aug 2007
Organization: Road and Roof Construction.
Position: civil design engineer
Duration: May 2007 Jan 2009
Organization: Asia Atlas Construction Company.
Position: civil design engineer
Duration: Aug 2009 up to now.
Organization: Complex Engineering Services.
Specialized Experience &
Technical Competency
MS.Office
AutoCad 2012
AutoCad Civil 3D
Languages Pashtu, Dari, English.
Other Training :
SAFETY CLASES KU
PLANNING CLASES KU
TEACHING SKILS POLY TECHNIQUES







Shamsa Children Village


Senior Architecture
Name Eng. Ahmadwali
Education Faculty of Engineering Archeticture Dept Kabul university
Naderia High School Kabul Afghanistan
IT training Courses in Kabul engineering Faculty.

Active Registration(s) N/A

Experience
With this firm: 4 yrs
With other firms: 7 yrs
Eng. Ahmadwali is an experienced Engineer having performed work on all types, sizes,
and complexities of USACE, USAID, GOA projects. Over the past 4 years with C.E.S.
Eng. Eng. Ahmadwali has gained an extensive knowledge of USACE, USAID and
government projects, leading our team of Architecture design engineers and training
many others in this field in different projects.
He has worked with CES as a senior Architect engineer for the following projects
Design of computer science faculty Kabul University.
Design of Mosa tower, khoshal khan Kabul Afghanistan
Design of media center in Kabul University Kabul Afghanistan.
Design of ANP in Urozgan province.
Design of Class-1 Warehouse Kabul Afghanistan.
Design of ANP Sheberghan.
Experience with other firms :
Position: Architecture
Duration: June 2005 Up to September 2008.
ORGANIZATION: Faizi Masroor Construction Company.
Position: Architecture
Duration: September 2008 Up to April 2010.
ORGANIZATION: UIProject construction company.
Position: Senior Architecture .
Duration: Aug 2010 Up to now.
ORGANIZATION: Complex Engineering Services.


Specialized Experience
& Technical
Competency
MS Word, MS Dos, MS Excel, MS Access and Power Point,
Scheduling on Primavera P6, Ms.Project.

Languages Bangle, English, Dari, and Urdu




Shamsa Children Village









































Senior Mechanical/Plumbing Engineer

Name Eng.Homayoun Dost
Education B.sc in Mechanical Engineering, from Kabul University
Mechanical Engineering Faculty.
Habibia High Scholl Kabul Afghanistan
Active Registration(s) N/A
Experience
With this firm: 2 yrs
With other firms: 5 yrs
As a Mechanical Engineer Homayoun Dost has worked with many reputable
companies during his career and has got enough experience in design of
mechanical/Plumbing engineering. Engineer Homayoun Dost has
experience of different kinds of GOA, USAID and US-ARMY projects like site
adopt renovation and design build.
As a mechanical engineer, Homayoun Dost has been responsible for the
following US-ARMY project.
Design of computer science faculty Kabul University.
Design of Mosa tower, khoshal khan Kabul Afghanistan.
Design of media center in Kabul University Kabul Afghanistan.
Heating and cooling system of new ministry of defense of
Afghanistan.
Design of plumbing system of AZIZI plaza Kabul Afghanistan.
Design of Class-1 Warehouse Kabul Afghanistan.
Design of ANP Sheberghan.
.
Experience with Other Firm :
Position: Mechanical Design Engineer
Duration: June 2005 Up to September 2008.
ORGANIZATION: UIProject Construction Company.
Position: Senior Mechanical Engineer.
Duration: September 2008 Up to April 2011.
ORGANIZATION: State Corps Engineering Services.
Position: Senior Mechanical/Pluming Design Engineer.
Duration: May 2011 Up to now.
ORGANIZATION: Complex Engineering Services
Position: Senior Mechanical/Plumbing Design Engineer
Duration: June 2011 Up to Date.
COMPLEX ENGINEERING SERVICES.
Specialized Experience &
Technical Competency
MS Word, MS Dos, MS Excel
Languages Pashtu, English, Dari and Urdu




Shamsa Children Village














































Senior Structure Engineer
Name Eng.Ahmadshah
Education B.sc in Civil Engineering, from Kabul University Civil Engineering
Faculty.
Naserkhserow High School
Active Registration(s) N/A
Experience
With this firm: 2 yrs
With other firms: 5 yrs
As a Civil/Structure Eng.Ahmadshah has worked with many reputable
companies during his career and has got enough experience in design of
structural engineering and has designed many structural project having
different structural systems like concrete frames, shear walls, steel frames,
3D panel system etc. Engineer Wahid has experience of different kinds of
US-ARMY; USAID projects like site adopt renovation and design build.
As a civil/structure engineer Wahid has been responsible for the following
US-ARMY project.
As a senior structure Engineer of Mosa Tower.
As a senior structure Engineer of media center Kabul University.
As a Senior Structure Engineer for design of Kabul warehouse
project
As a Senior Structure Engineer for design quality control of
Ghamberi phase 4.
As a Senior Structure engineer for design of US-AIR FORCE projects
Sheendand Herat Afghanistan.
Experience with Other Firm :
Position: structure design engineer
Duration: June 2003 Up to September 2006.
ORGANIZATION: ASIA ATLAS Construction Company.
Position: senior structure design engineer.
Duration: September 2006 Up to April 2010.
ORGANIZATION: UIProject Construction Company.
Position: Senior structure engineer.
Duration: May 2010 Up to now.
ORGANIZATION: Complex Engineering Services

Specialized Experience &
Technical Competency
MS Word, MS Dos, MS Excel, Etabs, Safe, Sap2000, Stadpro, Stad
foundation, Ram
Languages Pashtu, English, Dari and Urdu




Shamsa Children Village


Senior Electrical Engineer
Name Eng. Mujtaba
Education Faculty of Engineering electrical Dept Kabul university
Sayedulnasery High School
IT training Courses in Kabul engineering Faculty.

Active Registration(s) N/A
Experience
With this firm: 3 yrs
With other firms: 7 yrs
Eng. Mujtaba is an experienced Engineer having performed work on all types, sizes,
and complexities of US-ARMY projects. Over the past 4 years with C.E.S. Eng. Mujtaba
has gained an extensive knowledge of USACE, USAID and government projects, leading
our team of electrical design engineers and training many others in this field in
different projects.
He has worked with CES as a senior electrical engineer for the following projects
Senior electrical engineer for the design Kabul university science faculty new
building.
Senior electrical engineer for design 7-story building in Kabul Afghanistan.
Senior electrical for the design of media center in Kabul university.
Senior electrical for the design of ANCOP GHAZNI expansion project.
Senior electrical for the design ANCOP KONDUZ expansion project.
Senior electrical for the design quality control of Ghambri phase 4.
Experience with other firms :
Position: electrical design engineer
Duration: June 2008 Up to September 2010.
ORGANIZATION: UIProject Construction company.
Position: Senior electrical design engineer
Duration: September 2010 Up to April 2012.
ORGANIZATION: StateCorps Engineering Services.
Position: Senior electrical design engineer .
Duration: Aug 2010 Up to now.
ORGANIZATION: Complex Engineering Services.

Specialized Experience
& Technical
Competency
MS Word, MS Dos, MS Excel, MS Access and Power Point,
Scheduling on Primavera P6, Ms.Project.

Languages Bangle, English, Dari, and Urdu




Shamsa Children Village


Project Scheduler
Name Eng. Ramin Abasy
Education B.SC from Kabul university engineering faculty civil Dep.
Graduated from Amany High School
Certificate of IT from Afghan IT center.
Undertake primavera P3 and Ms.project courses from Afghan IT center

Active Registration(s) N/A
Experience
With this firm: 3 yrs
With other firms: 4 yrs
As Planning Mr.Ramin Abasy is responsible for Scheduling planner for AED and
PRT, projects Dyn Crops in p3 Project progress monitor. Entering all Pay
Activities in p3 Invoice Payment certifier Prepares work plans using MS Project,
Sure Track & Primavera. Project cost analyses Manager.

October 2009 -Present: COMPLEX ENGINEERING SERVICES, Senior Planning
Engineer
Design and construction of ANP in Urozgan province.
Design and construction of Class-1 Warehouse Kabul Afghanistan.
Design and construction of ANP Sheberghan.
Design and construction of Generator Room
Experience with Other Firm :
2003-2005 UIProject construction company
2005-2007 StateCorpe construction LTD
2007-2009 FAIZI MASROOR construction company
2009-up to date COMPLEX ENGINEERING SERVICES.
Specialized Experience &
Technical Competency
MS Word, MS Dos, MS Excel, MS Access and Power Point. Primavera.
Microsoft Project
Languages Pashtu, English, Dari, Urdu
Other Training
Safety
QA/QC Course
Project Scheduling Course
Primavera- Panjab University
Project planning/ Testing and Commissioning



Shamsa Children Village


7. Design schedule:
The overall design of the project will be provided within 42 calendar days.