OPERATIONAL TASKS

TO IMPROVE
PROFITABILITY FOR
THE YEAR 2008-09

This document gives the overall operational


situation of Bhimavaram depot and
operational decisions to be taken in the
ensuing year to improve profitability
B.Tagoor varma DM/BVRM
3/5/2008
INTRODUCTION:
Bhimavaram is a town the West Godavari District in the state of Andhra Pradesh, India.
Bhimavaram is located at 16°31′60″N 81°31′60″E16.5333, 81.5333.[ It has an average elevation
of 5 meters (19 feet).

Bhimavarm is also called as "Second Bardoli of India". This name is given by Mahathma Gandhi
at the time of his visit to this place on the occasion of freedom movement in India. The northern
part of Bhimavaram is known as One Town and the southern Part Two Town.

Bhimavaram is connected to by road and rail to all major cities. It has two railway stations
(junction and town stations) and a bus station with a bus depot with 106 buses. It has train
facility connected to metropolitan cities, such as Chennai, Hyderabad, Bangalore, Kolkota and
connected with a train to temple city "Tirupathi".

The place is well connected by bus (Old bus stand located in Two town and New Bus stand
located in One Town) and train routes (Town Station in Two town and Junction Railway Station
located in One Town).

Bhimavaram has a population of 2 lakhs, and is divided into 39 wards geographically. It has
been upgraded as a special grade municipality.

Bhimavaram is an assembly constituency in Andhra Pradesh. There are 1,77,470 registered


voters in Bhimavaram constituency in 1999 elections.

Some famous temples located here are:

Gunupudi Sri Uma Someshwara Janardhana Swamy temple

One of the five Pancharamas. Built during the 3rd century A.D., the Shivalinga in the temple is
believed to assume a black-cum-brown colour on no-moon day and becomes whitish on full-
moon day. The prathista of the Shivalinga is by Moon God.

Sri Mavullamma temple

Mavullamma Festival Starts on 14 th January of every year and runs for 30 days) She is the
Goddess of Bhimavaram

Sri Bhimeshwara Swamy temple

The name of the town is derived from it.

Jain Temple

Located at PeddaAmiram. Oone of its kind in the whole of Andhra Pradesh

Bhimavaram is also a town renowned for the several educational institutes that are here. DNR
Educational Institutions (DNR College) This is the oldest Colege in the WestGodavariDist and
one of the oldest collegs in a.p.

SRKR Engineering College This is one of The Good Private Engineering colleges in
Andhrapradesh..

Bhimavaram is a centre of aqua and paddy business. It is one of the important commercial
towns in West Godavari District.

2
Bhimavaram is well known for its aqua culture and paddy fields in its surrounded villages, it is
the centre of trade, Shopping, entertainment for more than 300 villages.

Bhimavaram is one of the biggest centres for aquaculture (fish and prawn farming) in India.
Traditionally this area has been a large producer of paddy (rice), but more recently many
farmers are shifting to fish culture.

(Information source: http://en.wikipedia.org/wiki/Bhimavaram )

LOCATIONAL MAP:

BHIMAVARAM DEPOT:
Bhimavaram depot was established in the year 1960. The new bus station was established in
the year 1990. It has 17 plat forms and nearly 630 trips are touching the bus station regularly.
Bhimavaram depot has connected 110 villages and serving 7 mandals. At present it has 102
schedules with 106 buses operating on 40 routes. The type wise details as on march 1st 2008 is
given here under.

Table.1: details of type wise buses of Bhimavaram depot as on march 1st 2008-03-04
s.no Type own schedules buses Sch kms % to total

1 Super luxury RTC 6 6 2492 6.4

2 Deluxe RTC 4 4 2400 6.3

3 Express RTC 13 14 6186 16.0

4 Express HIRE 8 8 3808 9.8

5 Palle velugu RTC 57 60 19230 49.6

6 Palle velugu HIRE 9 9 3054 9.0

7 Palle velugu MINI HIRE 5 5 1610 4.2

8 Total 102 106 38780 100

3
ROUTE WISE ALLOCATION OF RESOURCES AND IT’S PROFITABILITY:

Table no:2 shows the details of routes and their profitability upto January 2008.

E.P.K(incl
SN route own buses Cond Drv type sch.kms vu C.P.K bp amt) m.p.k optdkms gross margin
1 BHEL-AKVD RTC 2 0 4 SPLX 836 418 14.95 16.22 1.27 256416 325648.32
2 BHEL-KLD RTC 2 0 4 SPLX 828 414 14.77 15.49 0.72 253346 182409.12
3 ECIL RTC 2 0 4 SPLX 828 414 14.95 14.32 -0.63 140760 -88678.8
4 VISAKAPATNAM RTC 4 0 12 DLX 2400 600 15.09 14.57 -0.52 732000 -380640
5 AMALAPURAM HIRE 2 4 0 EXP 900 450 15.78 14.63 -1.15 59250 -68137.5
6 AMALAPURAM RTC 1 2 2 EXP 450 450 16.00 12.09 -3.91 319070 -1247563.7
7 BHADRACHALAM HIRE 1 2 0 EXP 504 504 16.21 13.01 -3.20 83664 -267724.8
8 BHADRACHALAM RTC 2 4 4 EXP 1020 510 16.17 16.12 -0.05 308068 -15403.4
9 TIRUPATHI HIRE 2 3 0 EXP 1036 518 16.50 10.94 -5.56 242494 -1348266.64
10 TIRUPATHI RTC 2 0 6 EXP 1036 518 15.15 16.13 0.98 317496 311146.08
11 VIJAYAWADA(AKV) RTC 2 4 4 EXP 944 472 15.88 12.91 -2.97 283341 -841522.77
12 VIJAYAWADA(KLD) HIRE 3 6 0 EXP 1368 456 15.78 14.74 -1.04 153947 -160104.88
13 VIJAYAWADA(KLD) RTC 6 12 12 EXP 2736 456 16.52 15.79 -0.73 1044880 -762762.4
14 AMALAPURAM HIRE 2 4 0 PV 750 375 16.97 15.08 -1.89 53982 -102025.98
15 AMALAPURAM RTC 5 10 10 PV 1858 372 17.12 13.56 -3.56 707073 -2517179.88
16 ANTHARVEDI RTC 1 2 2 PV 348 348 16.84 12.45 -4.39 103963 -456397.57
17 ASWARAOPET RTC 1 1 1 PV 256 256 16.29 14.39 -1.90 76714 -145756.6
18 BOSECOLONY RTC 1 2 2 PV 300 300 19.20 10.60 -8.60 87234 -750212.4
19 CHINAMILLIPADU RTC 1 2 2 PV 290 290 19.45 11.84 -7.61 86532 -658508.52
20 DONGAPINDI RTC 1 2 2 PV 252 252 19.50 11.69 -7.81 73889 -577073.09
21 DODDIPATLA RTC 1 2 2 PV 330 330 18.24 11.13 -7.11 95363 -678030.93
22 ELURU HIRE 3 4 0 PV 952 317 18.00 14.60 -3.40 130918 -445121.2
23 ELURU RTC 7 9 9 PV 2264 323 16.20 13.84 -2.36 759780 -1793080.8
24 ELURU-GANAPAVARAM RTC 1 2 2 PV 366 366 16.34 12.24 -4.10 108801 -446084.1
25 GANAPAVARAM HIRE 5 10 0 PV 1610 322 14.32 12.47 -1.85 342838 -634250.3
26 GANAPAVARAM RTC 1 2 2 PV 320 320 18.14 10.97 -7.17 219244 -1571979.48
27 GUDIVADA HIRE 2 4 0 PV 708 354 18.06 15.08 -2.98 48872 -145638.56
28 GUDIVADA RTC 1 2 2 PV 396 396 15.80 12.41 -3.39 239491 -811874.49
29 KAMATHAVANIGUDEM RTC 1 2 2 PV 300 300 17.64 10.74 -6.90 89288 -616087.2
30 LOSARI RTC 3 6 6 PV 952 317 17.25 12.18 -5.07 255638 -1296084.66
31 MACHILIPATNAM RTC 3 6 6 PV 1128 376 16.36 12.72 -3.64 286987 -1044632.68
32 MAMUDUR RTC 1 2 2 PV 324 324 18.17 10.77 -7.40 94576 -699862.4
33 MODI RTC 1 2 2 PV 310 310 19.03 11.55 -7.48 92072 -688698.56
34 NARSAPURAM-MP RTC 4 8 8 PV 1200 300 19.10 13.88 -5.22 328671 -1715662.62
35 PALAKOLLU HIRE 2 4 0 PV 644 322 18.56 17.68 -0.88 41768 -36755.84
36 PALAKOLLU RTC 7 14 14 PV 2254 322 18.18 14.35 -3.83 739423 -2831990.09

4
E.P.K(incl
SN route own buses Cond Drv type sch.kms vu C.P.K bp amt) m.p.k optdkms gross margin
37 PEDALANKA RTC 3 6 6 PV 996 332 17.35 12.25 -5.10 257132 -1311373.2
38 PEDAMALLAM RTC 1 2 2 PV 370 370 17.34 11.47 -5.87 109770 -644349.9
39 RAJAMUNDRY RTC 11 22 22 PV 4092 372 17.26 13.27 -3.99 1129489 -4506661.11
40 THANUKU-A RTC 1 2 2 PV 324 324 18.84 11.82 -7.02 82805 -581291.1
EXTRA operation 171 160 16.54 16.87 0.33 216388 71408.04
DEPOT margin with out -
A subsidy,marketng,mrg spls 102 38780 380 11053433 31996856.59
amount on buspass sales 3730680
a cat cards 369580
b jht/cgc 192350
c mst 868280
d spl hires 60000 1253822
e subsidy from govt 11600000
f other revenue 5525000
B sub total (a to f) 19809032
-
depot margin(A+B) 11113433 12187824.59

The following routes has shown positive margin with out including subsidy and other revenue.

1. BHEL-AKIVIDU
2. BHEL-KALIDINDI
3. THIRUPATHI (RTC)

The following routes has shown positive margin after adding subsidy, other revenue, and
special operations.

1. BHEL-AKIVIDU
2. BHEL-KALIDINDI
3. THIRUPATHI (RTC)
4. ECIL
5. VISAKAPATNAM
6. AMALAPURAM (HIRE) –EXP
7. BHADRACHALAM (RTC)
8. VIJAYAWADA -via KALIDINDI( HIRE AND RTC)
9. PALAKOLLU (HIRE)

5
PROFITABILITY OF THE DEPOT:
Last four years data is available regarding the profit and loss for the Bhimavaram depot.
All the 4 years it has shown losses. The details are given in the table no:3.
Table.3: financial performance of Bhimavaram depot for the last 4 years
YEAR LOSS IN Rs lakhs LOSS in paise per km

2003-04 -222.34 -189

2004-05 -197.23 -164

2005-06 -157.48 -131

2006-07 -236.02 -188

2007-08 upto jan 08 -121.88 -109

TREND IN THE LAST 4 MONTHS:


The under signed has taken the charge of depot manager on 21st October 2007. Since
then number of activities were taken up to strengthen the administration of the depot
and to ensure smooth and quality operations. Following are a list of tasks carried out in
the last 4 months to improve the overall performance of the depot.

1. Preparation of employee database to record all positive,negative,neutral activities of a


worker. It also gives details what we done to each union, punishment cases handling, ease
while counseling on kmpl, absenteesm(nov1/2007)
2. Preparation of vehicle database - gives problems bus wise, vehicle wise kmpl , census on
vehicle condition periodically, breakdowns vehicle wise, (1/11/07)
3. Maintaining a planner for dms time, execution of planner daily.(1/11/07)
4. Daily posting of muster was started immediately(1/11/07)
5. Made both garage and office airtel phones in working condition(oct2007)
6. Clarified that any absence will not be converted as leave in future: (oct 2007)
7. Given new work list to all the present clerks for effective monitoring of work (oct07)
8. One traffic loader was placed at the gate of main bus station ,bvrm for effective monitoring of
2 home guards. (oct07)
9. One traffic loader was placed at old bus station(jan 2008)
10. Observed 2 generators (garage,b/s)are not in working condition. Some other tools like elgi
washing plant,disc cleaning machine, one drilling machine are also not in working condition.
Repaires were carried out and made ready (oct07)
11. Old sweeping and washing contractor was not good in work. so I removed him. New
contractor on daily wage basis was taken for activity.(nov07)
12. Sweeping and washing record was not maintained properly. Washing staff attendence and
washing details register at mf room and streamlined.(11nov07)
13. One cleaner was taken out from dgt (11nov07)
14. Special vehicle mainteinace team was formed for 7 buses with 1 mech and 2 cleaners to look
after delux,sl buses. 2 teams was formed for 14 buses(nov07)
15. Fixation of buses was done for all schedules and a list was given for effective
monitoring.(nov2007)
16. There is a practice in special hires- party will not pay permit fee - he approaches union
gumastha and he collects 400/- and gets a permit - this practice is changed - corp collects 100/
as permit fee - challana will be raised to govt.(nov 16 2007)
17. Hitherto c-offs were given in the garage, if mechanic went for relief. Now the system is
changed -agree to give OT bus BDR must be maintained in a proper manner.(15/11/07)

6
18. Identified 0-0-0 LSA crew in the depot upto october. Given appreciation letters(22/11/07)
19. Presently, bvrm bus staion has 2 control charts. One for this depot, other for out depots and
service wise timings are provided. Now that has been changed, destination wise, platform no
wise flow chart was developed and implemented(22/11/07)
20. General shift off in the garage was changed from Saturday to Monday. This will facilitate more
specail operation on mondays(3dec2007)
21. Fixation of drivers was called for all ordinary and express services in the depot except
TIMS.(2dec2007)
22. On TIMs duties an understanding was achieved on willingness and seniority basis and based
on that, TIMs chart will be called with in 6 months(3dec2007)
23. There was a practice to send conductors for special hire services. But this was changed. As a
first measure, for all special hires for which double drivers are booked, conducotrs will be
avoided to reduce cost.implemented w.e.f 6dec.(6dec2007)
24. Operated "badradri dharsani" 7 buses on mukkoti ekadasi day from bhimavaram to
bhadrachalam -21dec 2007
25. Opened a special package tour naming "bhadradri dharsan'" on every Saturday from
bhimavaram (23-dec-2007) - but the response is poor(feb 2008)
26. Amalapuram-bvrm-palakol- route flow was stream lined by ed v&v office was implmented
w.e.f 31-dec-2007
27. HSD ground tank no.1 shifting was taken up 25 dec 2007
28. Office order was given to all mechanical supervisors to check tyre pressures once in a week -
31dec2007
29. A note was processed to change the office premises to bus station complex(10 jan 2008)
30. 3 trips were arranged to peda pulleru (13 jan 2008)
31. SPECIAL operations were carried out on sankranthi season -20 jan 2008 (details of sankranthi
list)
32. Achieved a profit of 5 lakhs for the month of jan 2008. loss for the month of jan 2007 is 11
lakhs.(feb 10 2008)
33. System of adding additional trips in the marriage special was introduced to increase crew
prodty in which conductors are being sent.(feb10,2008)
34. A note was processed to remove actis system and booking clerks which saves 50000 per
month.an out side agency has to be called.(feb 15 2008)
35. Opearated antarvedhi special opeartion with 20 buses for 2 days and earned 40 % increase in
the gross earnings over previous year(feb 17 2008)
36. Mamudur night out trip restored (feb 20,2008)
37. A note was processed to introduce 3 buses on the route bhimavaram - mtm via losari(feb 20
2008)
38. A note was processed to introduce a super luxury service on route bhimavaram - bhel via
losari ,bantumilli(feb 20 2008)
39. Timings of doddipatla night out changed(feb 15 2008)
40. A note was processed to introduce bvrm-palakol non stop services with 35 min running time
and 25 min frequency(25 feb 2008)
41. A note was processed to augument 3 buses on route bvrm- vja via kalidindi(22 feb 2008)
PARAMETERS – PERFORMANCE

Bhimavaram depot has shown positive improvement in Important parameters like


earnings,kilometers, EPK, OR , VU, EPB, Cancellations due to mechanical reasons,
accident rate, punctuality, topup lub kmpl, break down rate, spring consumption, RC
tyre life, new tyre scrap rate, R.T.factor, percentage of mech dfects in tyres, and man
power related parameters(BSR,CP,EP).

7
Where as, it has shown negative performance in the parameters like, crew
cancellations,total cancellations, HSDkmpl, total lub kmpl, fleet utilization, new tyre life,
total tyre life, total scrap rete, CPK on personnel, work shop, tyre, stores and total CPK.
GRAPH.NO:1 A.V.U and EPK in the year 2007-08
2007
365 16.00

360 360
358
15.44 15.50
355 356
354
15.00
350
348 348 14.75
14.65
345 14.50
344
340
13.96 14.00
335 336 336
333 13.75 13.76 13.78
13.57 13.58 my tenure 13.50
330 13.49 13.43
329
325
13.00
320
12.50
315

310 12.00
apr may jun jul aug sep oct nov dec jan feb mar

GRAPH.NO:2 earnings(in lakhs) and kilometers (in lakhs) in the year 2007-08
2007

180.00 12.00
11.85
174.42 11.80
170.00 170.10
11.58 11.60
11.51
161.05 11.40
160.00 159.40
156.25 11.20
153.36
11.05 11.08
152.15
11.01
150.00 10.99 149.38 11.00
147.06
10.90
145.53
10.84 10.80
my tenure
140.00 10.70
138.40 10.60

10.40
130.00
10.20 10.20

120.00 10.00
apr may jun jul aug sep oct nov dec jan feb mar

8
GRAPH.NO:3 HSD KMPL and MECHANIAL cancellations for the year 2007-08
2007

5.45 0.80

5.40 5.40 0.70


0.68
5.38
5.35 0.60
0.55 5.33
5.32
5.30 5.30 5.30 0.50

5.26
5.25 0.40 0.40
5.24
0.35 5.23
0.33
5.20 0.31 my0.30
tenure 0.30
0.28
5.18
5.15 0.20
0.16 0.15
5.10 0.10
0.07

5.05 0.00
apr may jun jul aug sep oct nov dec jan feb mar

GRAPH.NO:4-PROFIT/LOSS
PROFIT/LOSS MONTH WISE in the year 2007-08
2007
60
41.65
40

20
7.44 4.99
1.37
0
-0.02
apr may jun jul aug sep oct nov dec jan feb mar
-6.25 4.66
-4.66
-20 -14.98
-27.88my tenure
-40

-60

-80
-80.24
-100

9
OPERATIONAL TASKS TO BE CARRIED OUT IN THE YEAR 2008-09

It is proposed to implement following operational tasks in the year 2008-09 in the


Bhimavaram depot so that it’s financial performance will be improved.
OPR.TASK.1 INTRODUCTION OF A SUPER LUXURY SERVICE IN THE
ROUTE BHIMAVARAM TO BHEL via LOSARI, BANTUMILLI.

It is proposed to operate a new super luxury service via Losari, Bantumilli. It is a potential route
having important villagers like gollavani tippa, Losari, pallipalem, Krithi vennu, Bantumilli,
thummidi, and mudinepalli. A note file has been processed vide no: o1/535(4)/08 –bvrm dtd
31.01.08.

The depot requires 2 new super luxury buses. Expected E.P.K is 16.00 and C.P.K 15.00. The
service will be operated with TIMS and it requires 6 drivers and 2 TIMS. Expected profitability
is given in table.no.4

TABLE NO:4 PROPOSED BHEL –VIA LOSARI, BANTUMILLI.

E.P.K(incl
route own buses C D type sch.kms vu C.P.K bp amt) m.p.k Optdkms gross margin
BHEL -VIA LOSARI RTC 2 0 4 SPLX 868 434 15.00 16.00 1.00 316820 316820

OPR.TASK.2 INTRODUCTION OF A SUPERLUXURY SERVICE IN THE ROUTE


BHIMVARAM TO JEEDIMETLA via VEERAVASARAM,ATTILI,
GANAPAVARAM,CHEBROL

There is another potential route to operate to Hyderabad is via Ganapavaram. It is observed


that 4 private hi-tech services are operating from this point. It does not have any railway point
also. So there is good untapped potentiality in this route.

The depot requires 2 super luxury buses to operate 6 drivers and 2 TIMS. Expected EPK is
16.00 and CPK is 15.00 and economics is given in table.no.5. A note will be processed shortly.

E.P.K(incl
route own buses C D type sch.kms Vu C.P.K bp amt) m.p.k Optdkms gross margin
JEEDIMETLA -
GANAPAVARM RTC 2 0 4 SPLX 928 464 15.00 16.00 1.00 338720 338720

OPR.TASK.3 UPGRADATION OF VISAKAPATNAM SERVICE FROM DELUXE


TO SUPER LUXURY.

The present performance is here under. A case is under process vide:o1/535(9)/08-bvrm dt


23/2/08

E.P.K(i
sch.k ncl bp optdkm gross
Route Own buses C D type ms Vu C.P.K amt) m.p.k s margin

RTC(07-
VISAKAPATNAM 08) 4 0 12 DLX 2400 600 15.09 14.57 -0.52 732000 -380640
VISAKAPATNAM RTC(08-09) 4 0 12 SPLX 2400 600 15.59 17.10 1.51 876000 1322760

10
The route is getting 14.57 EPK.. The OR is 76 and the number of passengers would be 30. If the
same passengers board a super luxury instead of deluxe the EPK would be 17.10. this definitely
improves OR and margin. The expected improvement in margin is shown in table.

OPR.TASK.4 INCREASE IN AUTHORISED TICKET BOOKING AGENTS FROM


11 TO 25 .

With the increase in the super luxury buses and spread in the serving area, there is every need
to increase authorized ticket booking agents. At present we have 11 agents. The proposed areas
are, padmalaya center,Bhimavaram, Losari, gollavani tippa, kruthivennu, Bantumilli, thummidi,
singaraya palem, veeravasaram,navudur, brhamina cheruvu, athili, pippara, ganapavaram,
narayanapuram.

OPR.TASK.5 AUGUMENTATION OF BHIMAVARAM – VIJAYAWADA via


KALIDINDI route WITH 3 HIRE BUSES.

It is proposed to operate this route with 12 buses duly adding all 3 hire buses in this route as
augmentation and one bus as replacement to RTC schedule, so that the route will have 12 buses
and with 24 trips making a frequency of 40 minutes. Proposed schedules for the 12 buses are
furnished here under. A case was processed for sanction vide: o1/535(10)/08-bvrm dt 23/2/8

FROM TO DEP ARR FROM TO DEP ARR


BUS-1 BVRM VJA(KLD) 04:00 07:15 BUS-5 BVRM VJA(KLD) 06:40 09:55
BUS-1 VJA(KLD) BVRM 07:45 11:00 BUS-5 VJA(KLD) BVRM 10:25 13:40
BUS-1 BVRM VJA(KLD) 12:00 15:15 BUS-5 BVRM VJA(KLD) 14:40 17:55
BUS-1 VJA(KLD) BVRM 15:45 19:00 BUS-5 VJA(KLD) BVRM 18:25 21:40

BUS-10 BVRM VJA(KLD) 10:00 13:15 BUS-6 BVRM VJA(KLD) 07:20 10:35
BUS-10 VJA(KLD) BVRM 13:45 17:00 BUS-6 VJA(KLD) BVRM 11:05 14:20
BUS-10 BVRM VJA(KLD) 18:00 21:15 BUS-6 BVRM VJA(KLD) 15:20 18:35
BUS-10 VJA(KLD) BVRM 21:45 01:00 BUS-6 VJA(KLD) BVRM 19:05 22:20

BUS-11 BVRM VJA(KLD) 10:40 13:55 BUS-7 BVRM VJA(KLD) 08:00 11:15
BUS-11 VJA(KLD) BVRM 14:25 17:40 BUS-7 VJA(KLD) BVRM 11:45 15:00
BUS-11 BVRM VJA(KLD) 18:40 21:55 BUS-7 BVRM VJA(KLD) 16:00 19:15
BUS-11 VJA(KLD) BVRM 05:00 08:15 BUS-7 VJA(KLD) BVRM 19:45 23:00

BUS-12 BVRM VJA(KLD) 11:20 14:35 BUS-8 BVRM VJA(KLD) 08:40 11:55
BUS-12 VJA(KLD) BVRM 15:05 18:20 BUS-8 VJA(KLD) BVRM 12:25 15:40
BUS-12 BVRM VJA(KLD) 19:20 22:35 BUS-8 BVRM VJA(KLD) 16:40 19:55
BUS-12 VJA(KLD) BVRM 06:00 09:15 BUS-8 VJA(KLD) BVRM 20:25 23:40

BUS-2 BVRM VJA(KLD) 04:40 07:55 BUS-9 BVRM VJA(KLD) 09:20 12:35
BUS-2 VJA(KLD) BVRM 08:25 11:40 BUS-9 VJA(KLD) BVRM 13:05 16:20
BUS-2 BVRM VJA(KLD) 12:40 15:55 BUS-9 BVRM VJA(KLD) 17:20 20:35
BUS-2 VJA(KLD) BVRM 16:25 19:40 BUS-9 VJA(KLD) BVRM 21:05 00:20

BUS-3 BVRM VJA(KLD) 05:20 08:35 BUS-4 BVRM VJA(KLD) 06:00 09:15

11
BUS-3 VJA(KLD) BVRM 09:05 12:20 BUS-4 VJA(KLD) BVRM 09:45 13:00
BUS-3 BVRM VJA(KLD) 13:20 16:35 BUS-4 BVRM VJA(KLD) 14:00 17:15
BUS-3 VJA(KLD) BVRM 17:05 20:20 BUS-4 VJA(KLD) BVRM 17:45 21:00

OPR.TASK.6 INTRODUCTION OF A NEW EXPRESS ROUTE “ BHIMAVARAM


– RAJAMUNDRY” WITH 6 BUSES.

Recently it is proposed by regional office to shift 2 bhadrachalam schedules to narsapuram


depot. This saves 2 buses at Bhimavaram. Due to replacement of hire buses on route vja(kklr), 2
buses will be saved. 2 buses can be saved by cancelling 2 RTC schedules operating on thirupathi
route. As the performance of hire service of thirupathi is not at all encouraging, it is proposed to
cancel the service duly diverting hire buses to existing RTC timings. This saves 2 RTC buses. So
a net saving of 6 buses. With the 6 saved 6 express buses, it is proposed to operate 15 round
trips of bvrm-rajamundry via Palakollu.

It is proposed to give 2hrs 25 min running time with 5 minutes halt at ravulapalem.

Case has to be sent in this regard. Expected EPK is 16.00 and CPK is 15.75. proposed economics
for 2008-09 is here under.

expected
Ow buse typ sch.km E.P.K(incl m.p. gross
route n s C D e s vu C.P.K bp amt) k optdkms margin
47 15.7
RAJAMUNDRY RTC 6 12 12 EXP 2850 5 5 16.00 0.25 1040250 260062.5
Proposed schedules are given here under

BUS1/2 BVRM RJY 05:00 07:30 BUS3/4 BVRM RJY 06:00 08:30 BUS 5/6 BVRM RJY 07:00 09:30
BUS1/2 RJY BVRM 08:00 10:30 BUS3/4 RJY BVRM 09:00 11:30 BUS 5/6 RJY BVRM 10:00 12:30
BUS1/2 BVRM RJY 11:00 13:30 BUS3/4 BVRM RJY 12:00 14:30 BUS 5/6 BVRM RJY 13:00 15:30
BUS1/2 RJY BVRM 14:00 16:30 BUS3/4 RJY BVRM 15:00 17:30 BUS 5/6 RJY BVRM 16:00 18:30
BUS1/2 BVRM RJY 17:00 19:30 BUS3/4 BVRM RJY 18:00 20:30 BUS 5/6 BVRM RJY 19:00 21:30
BUS1/2 RJY BVRM 05:00 07:30 BUS3/4 RJY BVRM 06:00 08:30 BUS 5/6 RJY BVRM 07:00 09:30
BUS1/2 BVRM RJY 08:00 10:30 BUS3/4 BVRM RJY 09:00 11:30 BUS 5/6 BVRM RJY 10:00 12:30
BUS1/2 RJY BVRM 11:00 13:30 BUS3/4 RJY BVRM 12:00 14:30 BUS 5/6 RJY BVRM 13:00 15:30
BUS1/2 BVRM RJY 14:00 16:30 BUS3/4 BVRM RJY 15:00 17:30 BUS 5/6 BVRM RJY 16:00 18:30
BUS1/2 RJY BVRM 17:00 19:30 BUS3/4 RJY BVRM 18:00 20:30 BUS 5/6 RJY BVRM 19:00 21:30

OPR.TASK.7 INTRODUCTION OF A NEW EXPRESS ROUTE “BHIMAVARAM –


JANAGAREDDY GUDEM” via ELURU.

The distance between Bhimavaram and Eluru is 65kms. The distance between Eluru to
jangareddy gudem is 55kms. A combination of 2 ordinary routes will make good potential
express route with a route length of 120kms. Operation of 12 trips with 6 buses will give 1 hour
frequency.

It is proposed to give 3hrs running time and in Eluru town, bus touches old bus station first and
then to new bus station and goes to jangareddy gudem via ashok nagar to patronage new route
course.

It is proposed to operate 3 buses each by Bhimavaram and jangareddygudem depots.

12
3 ordinary buses will be cancelled on routes, viz, pedamallam, eluru, and
o.g.tippa(Losari)and these buses will be operated on this route. A notefile to this effect will
be processed.

Expected E.P.K is 16.00 and CPK is 15.60 and economics for 2008-09 is given here under.

expected
Ow buse typ sch.km E.P.K(incl m.p. optdkm gross
route n s C D e s vu C.P.K bp amt) k s margin
48 15.6
JANGAREDDY GUDEM RTC 3 6 6 EXP 1440 0 0 16.00 0.40 525600 210240
Proposed schedules for both Bhimavaram and jangareddy gudem depots are given here under.

BVRM-1 BVRM JRG 06:00 09:00 JRG-1 JRG BVRM 06:00 09:00
BVRM-1 JRG BVRM 09:30 12:30 JRG-1 BVRM JRG 09:30 12:30
BVRM-1 BVRM JRG 13:00 16:00 JRG-1 JRG BVRM 13:00 16:00
BVRM-1 JRG BVRM 16:30 19:30 JRG-1 BVRM JRG 16:30 19:30
BVRM-2 BVRM JRG 07:10 10:10 JRG-2 JRG BVRM 07:10 10:10
BVRM-2 JRG BVRM 10:40 13:40 JRG-2 BVRM JRG 10:40 13:40
BVRM-2 BVRM JRG 14:10 17:10 JRG-2 JRG BVRM 14:10 17:10
BVRM-2 JRG BVRM 17:40 20:40 JRG-2 BVRM JRG 17:40 20:40
BVRM-3 BVRM JRG 08:20 11:20 JRG-3 JRG BVRM 08:20 11:20
BVRM-3 JRG BVRM 11:50 14:50 JRG-3 BVRM JRG 11:50 14:50
BVRM-3 BVRM JRG 15:20 18:20 JRG-3 JRG BVRM 15:20 18:20
BVRM-3 JRG BVRM 18:50 21:50 JRG-3 BVRM JRG 18:50 21:50
OPR.TASK.8 INTRODUCTION OF BHIMAVARAM –KHAMMAM EXPRESS
SERVICE ON RECIPROCAL BASIS.

We are going to save one express bus on route Bhimavaram-vijayawada(kld) after replacing 4
buses with hire buses. Now it is proposed to operate this bus to a new route “Bhimavaram –
khammam” via Tadepalligudem, janagreddy gudem, aswaraopeta, and sathupally. The vehicle
utilization would be 476 kms.

It is proposed to operate this schedule on reciprocal basis with khammam depot as it would be
convenient to commuters in having a fast return journey. A note file to this effect will be
processed.

Proposed economics is here under.

expected
ow E.P.K(incl optdkm gross
route n Buses C D type sch.kms vu C.P.K bp amt) m.p.k s margin
KHAMMAM RTC 1 2 2 EXP 476 476 15.60 16.00 0.40 173740 69496
OPR.TASK.9 EXTENSION OF VJA – EXPRESS BUSES TO PALAKOL.

It is proposed to operate all RTC schedules of Bhimavaram –vijayawada to extend to Palakollu.


In this regard proposals of head office were already served to unions. An increase of 46 kms will
be effected in all RTC schedules.
Net effect is detailed here under.
expected
ow E.P.K(incl gross
route n Buses C D type sch.kms vu C.P.K bp amt) m.p.k optdkms margin
VIJAYAWADA(KLD) RTC 5 10 10 EXP 2510 502 15.25 15.80 0.55 916150 503882.5

13
OPR.TASK.10 INCREASE ONE ROUND TRIP IN ALL RTC PALAKOL
SCHEDULES.

At present Bhimavaram – palkol shuttle services has 7 round trips as schedule in a day. Crew
will be given 2 duties for 7 round trips. Proposals were given to unions in implementing 8 trips
a day, having 2 day outs with 4 rounds each. It will be implemented in the month of april 2008.
The projected economics is given here under.
C. expected
Buse typ sch.k P. E.P.K(incl m.p. optdkm gross
Route own s C D e ms vu K bp amt) k s margin

PALAKOLLU HIRE 2 4 0 PV 644 322 18.56 17.68 -0.88 235060 -206852.8


PALAKOLLU RTC 4 8 8 PV 1472 368 17.12 14.35 -2.77 537280 -1488265.6
PALAKOLLU -NON
STOP(MINI) HIRE 4 0 0 PV 1656 414 11.50 12.50 1.00 604440 604440

OPR.TASK.11 INTRODUCTION OF NON STOP SERVICES ON BHIMAVARAM –


PALAKOL ROUTE.

Scrutiny of star documents was conducted taking 3 peak days and 3 slack days in the month of
January 2008 for all palakol shuttle services. The details of trip wise number of passengers at
each stage and direct tickets between Bhimavaram and palakol are counted. It is observed that
nearly 15 passengers are direct passengers in all trips. It comes to nearly 945 direct passengers
in one direction. The number of direct passengers will be more than this number as other
services like Eluru-palakol, Eluru-narsapuram, Bhimavaram-amalapuram will take some direct
passengers. So it is assumed that nearly 1200 direct passengers are available in one direction.
So it is a fit case for introduction of a non stop service.

1. It is proposed to introduce a non-stop route with 4 mini hire buses.


2. Each mini hire bus will operate 9 round trips with a vu of 414 kms.
3. On both sides current booking will be opened with 4 duties per day.
4. It is proposed to collect express fare of rs.11.00 instead of 10.00 ordinary fare.
5. The running time would be 35 minutes as against existing 55min running time for
ordinary services.
6. Intially a flow of 25mintues is proposed with a starting time at 6.00 and ending trip at
20.35 at Bhimavaram.

To this effect a note file has been processed vide, o1/535(12)/2008-bvrmdtd-26/2/08. The
possible economics was worked out and the details are mentioned as whole in operational task
no.10.

OPR.TASK.12 FORMATION OF A NEW P.V. ROUTE “BHIMAVARAM-


MACHILIPATNAM” via LOSARI.

Several representation from public and public representatives are there requesting to operate
machilipatnam via Losari , Bantumilli, after construction of bridge on upputeru near pallipalem.
At present Bhimavaram is operating schedules upto pallipalem and machilipatnam depot
operates up to pallipalem even after a bridge. Now the scenario changed and route survey was
conducted, established that there is a great need for direct bus to machilipatnam. It reduces
Rs.7/- fare to direct commuter from Bhimavaram to machilipatnam.

14
It is decided to save 1 bus in machilipatnam, 1 bus in gudiwada, and one bus in rajamundry
route to operate 3 buses in this newly formed route. With a reciprocal operation from
machilipatnam depot, it will ensure 12 round trips with 1 hour frequency.

It is proposed to operate 3 buses as single crew duties as 4 singles will give 304 kms. Route
length is 76kms.
Possible economics is given here under.
expected
Buse typ sch.km C.P. E.P.K(incl m.p. optdkm gross
route own s C D e s vu K bp amt) k s margin

MACHILIPATNAM-
LOSARI RTC 3 3 3 PV 912 304 16.00 13.00 -3.00 332880 -998640

OPR.TASK.13 INCREASE PRODUCTIVITY IN ELURU SCHEDULES.

Following is the existing operation economics of Eluru route.


expected
ow Buse typ sch.km C.P. E.P.K(incl m.p. Optdkm gross
route n s C D e s vu K bp amt) k s margin

ELURU RTC 7 9 9 PV 2264 323 16.20 13.84 -2.36 826360 -1950209.6


Out of 7 buses in this route, 5 are single crew schedules with 2 trips to Eluru and one trip to
palakol. This gives only 306 vehicle utilization. now it is proposed to operate all 5 single crew
schedules as either rest off duties or change over duties. This gives more trips in Eluru route
and one bus can be saved.

Possible economics is given here under.


expected
E.P.K(incl gross
route own buses C D type sch.kms vu C.P.K bp amt) m.p.k Optdkms margin

-
ELURU RTC 6 12 12 PV 2294 382 16.80 14.60 -2.20 837310 1842082
(it is expected that CPK increase by 60 paise as crew involvement increases, and an EPK
increase is expected on par with hire buses on this route.)

OPR.TASK.14 MAKE ONE PEDALANKA SCHEDULE AS SINGLE CREW DUTY.

In pedalanka route 3 buses are under opearation. One bus is going to be replaced with a hire bus
in the peak season of 2008-09. Out of the 2 RTC buses, one bus is proposed for cancellation. The
lone bus is proposed for conversion to single crew duty duly eliminating kalidindi trip which
makes 3 round trips to pedalanka. A convenient single crew schedule with kms of 276 can be
formed with eligible O.T.
The expected profitability is given in the table.
expected
ow buse typ sch.km C.P. E.P.K(incl m.p. optdkm gross
route n s C D e s vu K bp amt) k s margin

PEDALANKA RTC 1 1 1 PV 302 302 16.50 13.50 -3.00 110230 -330690


(there will be a decrease of 2.00rupees loss per km is expected due to increase in crew
productivity and removing kalidindi trip)

15
OPR.TASK.15 PROCESS NOTE FOR CHANGING HIRE BUS SCHEDULE IN
GUDIWADA TO MAKE 3 ROUND TRIPS IN THAT ROUTE.

2 Hire buses are under operation on the route gudivada with a VU of 354. Whereas RTC bus is
operating 6 singles to gudivada(66kms route length), makes 396 kms. In order to give a
schedule for 354 kms, 2 trips to palkollu and 2 trips to gudiwada was made resulting in
clash/bunching in both the routes.

Now it is proposed to process a note file to competent authority to change hire bus kms from
354 to 396 kms duly lowering the slab rate of hire bus payment.

This ensures, 6 trips with 2 buses, instead of existing 7 trips with 3 buses makes a saving of one
bus.

Change of economics after increase in productivity can be seen in the following table.
expected
ow Buse typ sch.km C.P. E.P.K(incl m.p. Optdkm gross
Route n s C D e s vu K bp amt) k s margin

GUDIVADA HIRE 2 4 0 PV 792 396 16.00 15.08 -0.92 289080 -265953.6

OPR.TASK.16 MAKE ASWARAOPETA 2 DAY-OUTS DULY CURTAILING UPTO


JANAGAREDDY GUDEM.

At present we are operating one bus to aswaraopeta as a single crew duty. Its VU is 256kms. SR
scrutiny was done and load pattern, at various stages were studied. It is found that there are
less number of commuters are travelling between jangareddy gudem and aswaraopeta. The
direct passengers are also very less.
70

60 rachur, 60
chebrolu, 60
aredu, 56
nidamrru,
pamulprru, 57
trmlplm, 53 pngdm, 53mhptnXrds,
ganaprm,
undi, 53
50 pngdm, 52
bmdl jn, 49 dtml, 49 48
trmlplm,
rachur, 45 bmdlrlygate, 44
nidamrru, 43 vegavrm, 43 bmdlpulla,
jn, 4241
40 bmdlrlygate, 39 tdvi, 40 kaiakram, 41
gnpvrm, 38pulla, 37
chebrolu, 35 tadichrla, 35 laxmiprm, 36
kaiakram, 33dtml, 32
30 borramlxrd,
guravaigdm,
kkota, 31 3232 vanga vri gdm,kkota, 32 32 31
tadichrla,
jrg, 30
vegavrm, 29jlgmilli, 27 borramlxrd, 29
aredu, 27 26
pamulprru, jrg, 27
guravaigdm, 27
undi, 25
tdvi, 23 aspt,23
laxmiprm,
24
20 bvrm, 19 vanga vri gdm, 20
mhptnXrds, 18 jlgmilli, 18

10

0
undi

undi
nidamrru

nidamrru
bvrm

trmlplm

trmlplm

bhimavram
jrg

jrg
tdvi

tdvi
aspt
aredu

pulla

tadichrla

tadichrla

pulla

aredu
chebrolu

borramlxrd

borramlxrd
bmdl jn

bmdl jn

chebrolu
vanga vri gdm

vanga vri gdm

16
So, now it is proposed to have 2 round trips to jangareddygudem with the same route course
and operated as day-outs. VU would become 400kms. Increase in kms and crew and its effect on
profitability is given in the following table.
expected
E.P.K(incl gross
route own buses C D type sch.kms vu C.P.K bp amt) m.p.k optdkms margin

ASWARAOPET RTC 1 2 2 PV 400 400 16.29 14.69 -1.60 146000 -233600

(it is expected that an no increase in personnel CPK due to kms increase and an increase of
30paise EPK due to low revenue bit curtailment)

OPR.TASK.17 MAKE BOSE COLONY – SINGLE CREW.

Bose colony is a single bus route and its EPK only 10.60(includes bus pass amount). The
schedule makes 6 round trips to the village. It unnecessary to operate 6 trips. It is proposed to
cancel one trip and make the schedule, single crew. The VU would become 250.

OPR.TASK.18 MAKE DONAGA PINDI – SINGLE CREW.

Dongapindi is a single bus route which has, 12 singles with a VU of 252kms. It is proposed to
give only 10singles and make the schedule as single crew duty.

OPR.TASK.19 MAKE CHINAMILLI PADU – SINGLE CREW.

10 single trips are operating to chinamillipadu. It’s EPK at the end of jan 2008 is 11.84 and
yielded a loss of 7.61 rs per km. the route does not need 5 round trips of operation. So it is
proposed to make it a single crew and operate only 4 trips to the village.

It is expected a reduction in loss of Rs2.60 lakhs due to change in crew duties and curtailing
lowest yielding trip.

OPR.TASK.20 MAKE MODI –SINGLE CREW.

Modi is another single bus route , in which 5 round trips are under operation. Its EPK is 11.55
and the total loss up to jan 2008 is Rs.6.88laks. It is proposed to operate this schedule as single
crew duly reducing one round trip making 248kms. Eligible OT will be given.

OPR.TASK.21 ADD ONE ROUND TRIP TO NARSAPURAM –MATSYA PURI


SCHEDULES TO MAKE 3/3 DAY OUTS.

At present Narsapuram via Matsyapuri route is being operated by both Bhimavaram and
Narsapuram depot with 4 buses each. Each bus is operating 5 round trips. The route length is
30kms and running time is 80min. it is opined that excess running time is given and needs to be
revised.

It is proposed to operate the day out schedules as change-over with 3 trips per duty. This will
save one bus for each depot. Reduction of loss can be viewed in the table no:.

OPR.TASK.22 PLACEMENT OF TRAFFIC LOADERS ON ALL TRAFFIC


GENERATING POINTS.

To achieve the desired EPK levels in the important routes, placement of traffic loaders is very
much essential. At present we have 2 loaders in new bus station and one in old bus station. 15

17
important traffic generating points were identified for placement of traffic loaders. As and
when, the suitable retired employee, approaches, will be engaged as traffic loader.

OPR.TASK.23 CANCELLATION OF THANUKU-ALAMUR DULY CLUBBING IN


MAMUDUR N/O

It is noticed that thanuku- alamur schedule has only 2 usefl trips i.e to thanuku. These trips can
be conveniently be clubbed with the nelamur trips in mamudur n/o schedule and one bus can
be saved.

Proposed schedule is given here under

FROM TO DEP ARR


BVRM MMDR 12:00 13:00
MMDR BVRM 13:15 14:15
BVRM TNK(NLMR,ALMR) 14:30 16:30
TNK(NLMR,ALMR) BVRM 16:45 18:45
BVRM PKL 19:00 19:55
PKL BVRM 20:00 20:55
BVRM MMDR 21:20 22:20
MMDR BVRM 05:00 06:00
BVRM TNK(NLMR,ALMR) 06:30 08:30
TNK(NLMR,ALMR) BVRM 08:45 10:45

ADJUSTEMENT OF BUSES AND TYPE WISE ALLOCATION

Following changes will occur in the number of buses and service mix will be changed when
compared to the existing operation.

CHANGE OF SCHEDULES AND PRODUCT ALLOCATION IN DIFFERENT ROUTES


sno Additions assistance from
no type Route generation of buses
head office in
1 2 sup lux hyderabad to be supplied from head office sanctioning buses
head office in
2 2 sup lux hyderabad to be supplied from head office sanctioning buses
3 6 express rajamundry from saved express buses regional office
as 2 hire buses are going to commision shortly, on replacement
4 2 express vijayawada(akvd) 2 express buses will be saved. regional office
5 1 express khammam from saved express buses headoffice to operate
6 regional office
7 3 express jangareddy gudem from saved p.v buses regional office
as hire buses are called, they can pumped into the route as
8 3 express vijayawada(kalidindi) agumentation instead of replacment. regional office
9 3 palle velugu machilipatnam(losari) new route introduction from saved buses
Palle
10 4 velugu(MINI) PALAKOL new MINI hire buses has to be called head offce permission
26

18
Deletions assistance from
no type Route generation of buses
as these schedules are given to hire buses at narsapuram, 2 exp
1 2 express Bhadrachalam buses are saved at bhimavaram depot regional office
it is proposed to give existing rtc bus timings to hire buses and
2 2 express Thirupathi cancel one service to thirupathi saves 2 express buses regional office
as 2 hire buses are going to commision shortly, on replacement
3 2 express vijayawada(akvd) 2 express buses will be saved. regional office
4 hire buses are going to be added shortly, in which 3 for
4 1 express vijayawada(kalidindi) augumentation and 1 on replacement. So one bus will be saved. regional office
5 1 palle velugu Eluru 7buses to 6 buses duly increasing trips in existing buses regional office
6 1 palle velugu Gudiwada 1 rtc schedule cancelled regional office
7 1 palle velugu Machilipatnam 1 rtc schedule cancelled regional office
8 1 palle velugu o.g.tippa can be cancelled, low revenue,low VU regional office
9 1 palle velugu Pedalanka can be cancelled, low revenue,low VU regional office
10 1 palle velugu Antarvedi can be cancelled, low revenue,low VU regional office
as 4 mini hire buses are introduced as non stop and increase in regional office AND
11 2 palle velugu Palakol 1 trip in all rtc schedules, 2 buses can be with drawn unions
12 1 palle velugu narsapuram-mp 1 bus can be saved due to increase in VU UNIONS
regional office
13 2 palle velugu Rajamundry as express route is introduced, 2 pv buses can be with drawn. permission
as thanuku alamur trips can be adjusted in mamudur bus, one regional office
14 1 palle velugu Thanuku bus can be saved permission
19

PROJECTED ROUTE WISE PROFITABILITY AND DEPOT FINAL P/L FOR THE YEAR 2008-09

expected
E.P.K(incl
SN route own buses C D type sch.kms vu C.P.K bp amt) m.p.k optdkms gross margin
1 BHEL-AKVD RTC 2 0 4 SPLX 836 418 14.95 16.50 1.55 305140 472967
2 BHEL-KLD RTC 2 0 4 SPLX 828 414 14.77 16.00 1.23 302220 371730.6
3 ECIL RTC 2 0 4 SPLX 828 414 14.95 16.00 1.05 302220 317331
4 BHEL -VIA LOSARI RTC 2 0 4 SPLX 868 434 15.00 16.00 1.00 316820 316820
5 JEEDIMETLA -GANAPAVARM RTC 2 0 4 SPLX 928 464 15.00 16.00 1.00 338720 338720
6 VISAKAPATNAM RTC 4 0 12 SPLX 2400 600 15.59 17.10 1.51 876000 1322760
7 AMALAPURAM HIRE 2 4 0 EXP 900 450 15.78 14.63 -1.15 328500 -377775
8 AMALAPURAM RTC 1 2 2 EXP 450 450 16.00 14.00 -2.00 164250 -328500
9 BHADRACHALAM HIRE 1 2 0 EXP 504 504 16.21 17.01 0.80 183960 147168
10 JANGAREDDY GUDEM RTC 3 6 6 EXP 1440 480 15.60 16.00 0.40 525600 210240
11 KHAMMAM RTC 1 2 2 EXP 476 476 15.60 16.00 0.40 173740 69496
12 RAJAMUNDRY RTC 6 12 12 EXP 2850 475 15.75 16.00 0.25 1040250 260062.5
13 TIRUPATHI HIRE 2 3 0 EXP 1036 518 16.50 16.13 -0.37 378140 -139911.8
14 VIJAYAWADA(AKV) HIRE 2 4 0 EXP 944 472 15.88 14.00 -1.88 344560 -647772.8
15 VIJAYAWADA(KLD) HIRE 7 14 0 EXP 3192 456 15.78 16.00 0.22 1165080 256317.6
16 VIJAYAWADA(KLD) RTC 5 10 10 EXP 2510 502 15.25 15.80 0.55 916150 503882.5
17 AMALAPURAM HIRE 2 4 0 PV 750 375 16.97 15.08 -1.89 273750 -517387.5
18 AMALAPURAM RTC 5 10 10 PV 1858 372 17.12 14.50 -2.62 678170 -1776805.4
19 ASWARAOPET RTC 1 2 2 PV 400 400 16.29 14.69 -1.60 146000 -233600
20 BOSECOLONY RTC 1 1 1 PV 250 250 16.29 11.00 -5.29 91250 -482712.5
21 CHINAMILLIPADU RTC 1 1 1 PV 232 232 16.70 12.00 -4.70 84680 -397996
22 DONGAPINDI RTC 1 1 1 PV 210 210 16.30 12.00 -4.30 76650 -329595
23 DODDIPATLA RTC 1 2 2 PV 356 356 17.60 12.50 -5.10 129940 -662694
24 ELURU HIRE 3 4 0 PV 952 317 18.00 14.60 -3.40 347480 -1181432
25 ELURU RTC 6 12 12 PV 2294 382 16.80 14.60 -2.20 837310 -1842082
26 ELURU-GANAPAVARAM RTC 1 2 2 PV 366 366 16.34 12.24 -4.10 133590 -547719
27 GANAPAVARAM HIRE 5 10 0 PV 1610 322 14.32 12.47 -1.85 587650 -1087152.5

19
expected
E.P.K(incl
SN route own buses C D type sch.kms vu C.P.K bp amt) m.p.k optdkms gross margin
28 GANAPAVARAM RTC 1 2 2 PV 320 320 18.14 10.97 -7.17 116800 -837456
29 GUDIVADA HIRE 2 4 0 PV 792 396 16.00 15.08 -0.92 289080 -265953.6
30 KAMATHAVANIGUDEM RTC 1 2 2 PV 300 300 17.64 10.74 -6.90 109500 -755550
31 LOSARI HIRE 1 2 0 PV 310 310 18.56 14.00 -4.56 113150 -515964
32 LOSARI RTC 1 2 2 PV 292 292 17.25 12.18 -5.07 106580 -540360.6
33 MACHILIPATNAM RTC 2 4 4 PV 752 376 16.36 12.72 -3.64 274480 -999107.2
34 MACHILIPATNAM-LOSARI RTC 3 3 3 PV 912 304 16.00 13.00 -3.00 332880 -998640
35 MAMUDUR RTC 1 2 2 PV 324 324 18.17 10.77 -7.40 118260 -875124
36 MODI RTC 1 1 1 PV 248 248 16.50 11.55 -4.95 90520 -448074
37 NARSAPURAM-MP RTC 3 6 6 PV 1080 360 16.40 13.88 -2.52 394200 -993384
38 PALAKOLLU HIRE 2 4 0 PV 644 322 18.56 17.68 -0.88 235060 -206852.8
39 PALAKOLLU RTC 5 8 8 PV 1840 368 17.12 14.35 -2.77 671600 -1860332
PALAKOLLU -NON
40 STOP(MINI) HIRE 4 0 0 PV 1656 414 11.50 13.00 1.50 604440 906660
41 PEDALANKA HIRE 1 2 0 PV 378 378 17.80 13.50 -4.30 137970 -593271
42 PEDALANKA RTC 1 1 1 PV 302 302 16.50 13.50 -3.00 110230 -330690
43 RAJAMUNDRY RTC 9 18 18 PV 3348 372 17.26 14.50 -2.76 1222020 -3372775.2
EXTRA operation 169 144 16.54 16.87 0.33 259665 85689.45
DEPOT margin with out
A subsidy,marketng,mrg spls 109 43766 402 15974590 -18566825.25
amount on buspass sales 4476816
a cat cards 443496
b jht/cgc 230820
c Mst 1041912
d spl hires 71646 1504586
e subsidy from govt 13920000
f other revenue 6630000
B sub total (a to f) 23770814
depot margin(A+B) 16046236 5203988.75

FINAL PICTURE:

On implementation of all the above operational tasks, it is estimated that a profit of


Rs.52.03lakhs is expected. Its route wise split up is shown in the above table in page no:19.
Following assumptions are made in calculating the figures.

1. All the cost parameters are kept constant.(hire bus rates, hsd price, hsd kmpl, tyre cpk
etc,.)
2. Projections regarding extra operation, buspass sales, cat cards, jhts, subidy were made
based on the 10 months real performance of 2007-08. No growth is added to these
earnings.
3. Basic fares are kept constant.
4. All mechanical parameters are kept constant on par with the 2007-08 performance.
5. All tasks are expected to be implemented w.e.f from 1st april 2008. The effects of all tasks
were taken into account w.e.f 1st april 2008.
6. In some routes, EPK increase is expected, which is equivalent to hire bus performance
on that route. In some other routes, cancellation of few un remunerative trips would
improve route EPK.

20
CREW & BUSES

A net increase of 7 schedules will occur. It increases conductor duties to 175 from 171 and
reduces driver duties from 160 to 146. Following table details change in the split up of buses.

2007-08 2008-09
SUP.LUX
6 14

DELUX 4

RTC

EXPRESS 13 16

P.V 57 45
BUSES

EXPRESS 8 14

HIRE P.V 9 11

P.V MINI 5 9

FIGURE 1 CHANGE IN TYPE OF BUSES FROM 2007-08 TO 2008-09

CONCLUSIONS:

It is a document based on the true financial results of the 2007-08, which shows that profits are
possible for Bhimavaram depot, if all the above mentioned tasks completed with in one year.
Every employee in the depot is requested to go through the contents of the document and offer
your valuable, productive, profitable suggestions for the depot.

The document emphasizes only operational tasks for the betterment of depot margin. That does
not mean, improvement in mechanical parameters is not needed. Any improvement in
mechanical parameters is an in-house management that does not require much out side
support. So it is not felt that a document of this kind is necessary for mechanical performance.
Any improvement in mechanical area will increase the expected profits further.

It is requested to cooperate with the depot management in implementing the above operational
tasks and in achieving positive margins for the year 2008-09. It is requested to the trade union
leaders and delegates to understand the need of the hour and cooperate the management in
true spirit to achieve profitability for the depot.

Yours sincerely

B.TAGOOR VARMA
DEPOT MANAGER