Email:info@uttarontechnologies.comWeb:www.uttaron.webs.com

TermsandConditions:DetailEngineeringAssessmentforStructuralSafety

1. Deliverable:ReportandAsbuiltDrawinginlinewiththecodesandregulations.

2. ScopeofWork:Limitedtoevaluationonlynotcoversanyretrofittingworks.

A. Concrete&ReinforcementConfigurationTests:

I. Insitu 4/3 core cutting & testing from BUET lab by Universal testing machine (UTM) for determine
compressivestrengthofconcrete.Coregivestheactualcompressivestrengthofparticularconcrete,but
it is advisable to collect minimum number of core from existing building. At least 4 Nos of core (per
building) may be sufficient. UPV and Rebound Hammer will be used on the same spot of coring and
determinecompressivestrengthseparately.ThecalibratedresultsofcoretestandUPV&Hammershall
be used to determine a reliable value of concrete strength. Thus the compressive strength of concrete
forallkeyloadcaringstructuralmembersofthestructurewillbedeterminedbyUPV&Hammer.
II. Testofrebarfortensilestrength.
III. UsingtheabovementionedcorrelationfromcoretestandUPVwithHammertestregardingcompressive
strength, UPV and hammer will be used at least 15 spot (/building) to determine the compressive
strengthofkeystructuralElements.
IV. InSituScanningtestUsingFerroScan(ExistingRebardetection)atleast15nos.perbuilding.

B. SoilTest:
Soiltestatminimumfourlocations.

C. FoundationExplorations:
At least Three (If required more) Foundation (/Building) will be explored to verify its size with existing
designdrawings.

D. StructuralDesignforcheckexistingstructure:
I. Analysisofsubsoilinvestigationsreport.
II. Develop computer simulated Finite element model (With Etabs/ Sap) by using concrete compressive
strengthandrebartensiletestdata.
III. AnalysiswillbeperformedasperGuidelineofBNBC2006.
IV. Checkingofstructuralstabilityandsafety.
V. CheckingoflateralloadresistancecapacityoftheBuilding
VI. Designcheckforsoftstory&DynamicLoad(Forearthquake&Windload)
VII. CheckingofSpecialjointdetailforearthquakeorotherlateralload.

UTTARON
TECHNOLOGI ES
General Supply and Engineering Solutions

Page3of4

Apartment402,ConfigureShadhona,3ESouthKallyanpur
Dhaka1207,Bangladesh.Hotline01678631636,88028091611
Email:info@uttarontechnologies.comWeb:www.uttaron.webs.com

E. Report&AsbuiltDrawing:
I. AsBuiltarchitecturaldrawing.
II. Asbuiltstructuraldrawing.
III. DetailEngineeringAssessmentreports.

3. ClientsResponsibility:
I. Anypreviousrecordonmajorincidents
II. Providingtheconcerneddepartmentalpersonneltoeasetheinspection
III. Procuringallsortsofpermissionandformalitiesfromtheauthorities/bodies
IV. Ensuringtheworkenvironmenttoconducttheinspections
V. Themachine/occupancylayoutplaninCADformatifavailable
VI. Detailedloadofeachfloor/equipmentwithsignature
VII. Existingstructuraldrawings,soiltestreportandtestreportandotherrelevantdocumentsifavailable
VIII. Providinglaborduringtestandfoundationexploration

4. Contingency:
Deliverablemaydelayedduetofollowingissues

I. Absentofproperinformationanddesireddocuments
II. Naturaldisasters
III. RoadBlockage
IV. Instabilityatfactorylevelduetoworkersvexation
V. Anyunwantedsituationbeyondcontrol
5. ConsultancyFees:
Project:EvaluationofExistingBuilding(s)

SlNo. NameoftheWork Fees(BDT)


1 Asbuiltarchitecturaldrawing.

2 Asbuiltstructuraldrawing.
3
InSitupercorecutting&testing(withscanning),Testing
atBUETlab.
4 Rebartest
5
InSituUltraSonicPulseVelocityTestandHammertest
withreport
6 RebarScanningtestwithreport
7
SoilTest(60100Boring)
SoilExplorationforconfirmationofFoundationsizeand
Depth.AtleastThreeforeachbuilding.Ownerwill
engagemanpowerforsoilexploration.
8
Modelbasedanalysis(UsingFiniteElementsoftware
ETABS/SAP)ForExistingStructure withreport.

UTTARON
TECHNOLOGI ES
General Supply and Engineering Solutions

Page4of4

Apartment402,ConfigureShadhona,3ESouthKallyanpur
Dhaka1207,Bangladesh.Hotline01678631636,88028091611
Email:info@uttarontechnologies.comWeb:www.uttaron.webs.com

6. PaymentSchedule:Feewillbepayablebytheclientininstallmentsasfollows:

Item ServicePhase Fee


1 Materialtestfeewithworkorder 50%ofTotalfee
2
AfterSubmissionofNonDestructivetestresultwithanalysis
reportanddraftreport.AndAsbuiltdrawings.
20%ofTotalfee
3 SubmissionofAnalysisandFinalReportresult. 20%ofTotalfee
4
AfterMeetingwithAccordappointedstructuralEngineerand
fullfillallrequirements.
10%ofTotalfee

Note:Quotedamountwillnotincludeanytypeofgovernmenttaxorvat.Quotedamountexcludingthedesignofretrofitwork.
Alsothequotedamountmaychangewiththeadditionalworks.
7. TimeSchedule:
3to5workingweeks(fromthedateofpayments,mayvarydependingontheavailabilityofequipment).